Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Gateway”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

STTR Phase I: Low-Cost, High-Accuracy, Whole-Building Carbon Dioxide Monitoring for Demand Control Ventilation

This STTR Phase I project assessed the feasibility of a new CO 2 sensing system optimized for low-cost, high-accuracy, whole-building monitoring for use in demand control ventilation. The focus was on the development of a wireless networking platform and associated firmware to provide signal conditioning and conversion, fault- and disruptiontolerant networking, and multi-hop routing at building scales to avoid wiring costs. Early exploration of a bridge (or “gateway”) to direct digital control services was also explored. Results of the project contributed to an improved understanding of a new electrochemical sensor for monitoring indoor CO 2 concentrations, as well as the electronics and networking infrastructure required to deploy those sensors at building scales. New knowledge was acquired concerning the sensor’s accuracy, environmental response, and failure modes, and the acquisition electronics required to achieve accuracy over a wide range of CO 2 concentrations. The project demonstrated that the new sensor offers repeatable correspondence with commercial optical sensors, with supporting electronics that offer gain accuracy within 0.5%, and acquisition accuracy within 1.5% across three orders of magnitude variation in generated current. Considering production, installation, and maintenance costs, the technology presents a foundation for achieving whole-building CO 2 sensing at a price point below $0.066 / sq-ft – meeting economic feasibility criteria established by the Department of Energy. The technology developed under this award addresses obstacles on the critical path to enabling whole-building CO 2 sensing and demand control ventilation in commercial retrofits, small commercial buildings, residential complexes, and other highpotential structures that have been slow to adopt these technologies. It presents an opportunity to significantly reduce energy use throughout the United States.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

INL/EXT-17-41117-Rev000

The mission of the U.S. Department of Energy’s Office of Nuclear Energy (DOE-NE) is to advance nuclear power as a resource that is capable of meeting the nation’s energy, environmental, and national security needs by resolving technical, cost, safety, proliferation resistance, and security barriers through research, development, and demonstration. There has never been a more compelling time to develop sources of safe, clean, renewable, carbon-free base power for the United States. Over six decades of use, nuclear power has been proven to be a safe and reliable base alternative to fossil energy sources. The primary barriers to wider commercialization of nuclear power are the life-cycle costs of current plants, the long cycle associated with development of new nuclear technologies that may be more suitable for today’s energy markets, and the regulatory risk associated with this investment in new nuclear technology. While many innovative nuclear energy concepts exist that match current energy market needs, the lengthy and expensive research, development, and demonstration process and uncertain prospects for licensing discourages investment of private capital. The DOE-NE strategy both sustains the current reactor fleet and provides technology options for development of advanced nuclear energy systems. The strategy for moving innovative ideas to the marketplace centers on the Gateway for Accelerated Innovation in Nuclear (GAIN) Initiative. As the lead national laboratory for DOE-NE, Idaho National Laboratory provides much of the nuclear research, development, and demonstration capability needed to move nuclear innovation forward to deployment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2016 Nuclear Energy Voucher Pilot Program Final Summary

In March 2016, the Department of Energy Office of Nuclear Energy (DOE-NE) Gateway for Accelerated Innovation in Nuclear (GAIN) initiative launched the NE Voucher pilot program for small businesses that develop advanced nuclear technologies. The intent of this program is to provide access to unique physical and intellectual capital that exists within the DOE National Laboratory complex for private-sector developers of innovative nuclear energy technologies. Vouchers allow recipients to have work performed on their behalf at select DOE laboratory facilities. The work is funded by DOE-NE and must be completed within approximately 12 months of the award date. Awards for the pilot had values of $50,000–300,000 each, depending on the complexity of the task requested. The program requires a 20% cost share by voucher recipients. In addition to providing the technical assistance sought by the awardees, the 2016 pilot award cycle showed that the program fosters relationships between these businesses and DOE laboratory staff, serving the GAIN mission to develop a private-public partnership framework that will enable accelerated commercialization of innovative concepts. For the inaugural voucher program, DOE-NE made a total of $2M available. In total, twenty-nine proposals were received and eight (Table 1) were chosen for award based on several criteria, including technical quality, level of innovation, commercialization potential, and relevance to the DOE-NE mission. After the review process, cooperative agreements were finalized, and work on all eight vouchers started in September 2016 and all but one were completed by the end of September, 2017. The single exception was completed in December, 2017.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

5th Annual Earth System Grid Federation Face-to-Face Conference report, Monterey, California, December 7-11, 2015

The purpose of the Fifth Annual Earth System Grid Federation (ESGF) Face-to-Face (F2F) Conference was to present the most recent information on the state of ESGF’s software stack and to identify and address the data needs and gaps for the climate and weather communities that ESGF supports. This was the first meeting at which members of the international community, under international ESGF Executive Committee leadership, came together to host the conference. The organizers believed that the ESGF F2F Conference was an ideal gateway for agencies and science project leads to express their current and future data infrastructure needs to tool developers. The organizers also envisioned that attendees would brainstorm and share enhancement plans for data distribution, analysis, visualization, hardware and international network infrastructure, standards, and utilization of assorted community resources.

54 ENVIRONMENTAL SCIENCES↗

GAIN Fuel Safety Research Workshop

The Gateway for Accelerated Innovation in Nuclear (GAIN) Fuel Safety Research Workshop was held in Idaho Falls, Idaho, at the Idaho National Laboratory (INL) meeting center in the Energy Innovation Laboratory (EIL). The purpose of the workshop was to gather fuel safety research needs from the broad range of industrial nuclear technology users and developers. The needs will be analyzed relative to the national laboratory capabilities to help inform program planning and funding. The workshop provided a forum to learn about transient testing from a research and regulatory perspective and tour participation of the Transient Reactor Test Facility (TREAT), Advanced Test Reactor (ATR), and Materials and Fuels Complex (MFC).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Licensing Modernization Project for Advanced Reactor Technologies: FY 2018 Project Status Report

The promise of new nuclear technology and the future of commercial power in the United States (U.S.) are linked to the existence of an efficient and safety-focused regulatory review and licensing process. With an appropriate regulatory framework, reactor suppliers and regulators can design, license, build, and export advanced reactor units more effectively and efficiently and thereby help meet the growing need for clean and reliable energy. To help address the challenge of maintaining compatibility between the regulatory environment and new commercial nuclear plant designs, the U.S. Department of Energy (DOE) is supporting an industry-led effort called the Licensing Modernization Project (LMP). This cost-shared initiative, started in 2016 and scheduled to continue through mid-2019, targets amendment to key elements of the U.S. nuclear power reactor regulatory framework to specifically address licensing barriers in advanced-reactor concepts. The project is focused on updating guidance for certain technical licensing requirements that are largely incompatible with non-light-water reactors (non-LWR) and establish a new pathway for design-safety evaluations and license-application development. Upon completion, the project will have created a new pathway, founded on modern probabilistic assessment techniques, that offers developers, suppliers, regulators, and owner/operatorowner-operators greater clarity and assurance in design and licensing decisions. The LMP employs a team of advanced reactor technology and licensing subject matter experts working closely with U.S. regulators, affected industries, and interested members of the public. The project is managed by Southern Company and supported through a cost share arrangement with DOE. Technical contributions are also provided to the project from the Idaho National Laboratory (INL) Regulatory Development area, the Nuclear Energy Institute (NEI), and the U.S. Nuclear Regulatory Commission (NRC). The LMP identified a suite of high priority issues that provided significant uncertainty within the regulated non-LWR community. It was determined that much of this uncertainty could be retired by issuing updated licensing guidance founded on safety performance demonstrations and modern probabilistic methodologies. The success criteria for the project were established as: • Generate sets of technology inclusive (TI), risk-informed, and performance-based (TI-RIPB) technical requirements, recommendations, and proposals that could be reviewed, amended, and adopted for use by both NRC staff and industry. The proposals would create an optional-use regulatory framework without imposing additional (i.e., mandatory) requirements. • Support LMP the recommended updates of LMP such that they can be finalized, endorsed by NRC, and used by applicants within 5 years. This also supports the DOE advanced- reactor development and deployment goal of completing licensing reviews for technically mature non-LWR concepts sufficient to allow construction to proceed by the early 2030’s. • Further overall programmatic objectives established by DOE’s Gateway for Accelerated Innovation in Nuclear (GAIN) initiative by resolving technology-inclusive policy issues that adversely impact regulatory reviews, siting, permitting, and/or licensing of non-LWRs. This would provide significantly more regulatory certainty for advanced reactor developers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enabling Advanced Reactors for the Market Meeting Summary Report

To address the topic of the future energy market and the role nuclear energy plays in providing a reliable energy source in that future market, the U.S. Department of Energy’s (DOE’s) Gateway for Accelerated Innovation in Nuclear (GAIN) Initiative, the Nuclear Energy Institute (NEI), and the Electric Power Research Institute (EPRI) hosted the “Enabling Advanced Reactors for the Market Symposium,” on March 8-9, 2018, at George Washington University. This symposium brought together approximately 120 technology developers, energy users, government representatives, industry, national laboratories, universities and others to engage in a dialogue about the future energy market and the role of advanced nuclear technologies.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Plug Load Management System Field Study

In 2018, NREL performed a demonstration of the IBIS InteliNetwork(TM) plug load management system, which includes: intelligent socket devices, which plug into existing electrical outlets and collect energy usage information; a gateway, which manages communication between the intelligent sockets and the PLM cloud service; and a PLM network, which is a cloud-based measurement and control network for the entire system. Two retail stores served as the field study sites. The PLM system was found to be effective at reducing plug load energy use, with a projected annual plug load reduction of 11% and 18% at the test locations. Retail staff reported that the hardware was easy to use, but no one used the online data management system, intended to analyze and control the hardware. This PLM solution shows promise as an effective means to monitor, control, and reduce plug load energy use, but the economics of the system need to be improved.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Failures and Implications of Heat Pipe Systems

Under Department of Energy (DOE), Office of Nuclear Energy (NE), Gateway for Accelerated Innovation in Nuclear (GAIN), Sandia National Laboratories (SNL) was awarded DOE-NE GAIN voucher GA-19SN020107, "Risk-informed mechanistic source term calculations for a sodium fast reactor." Under this GAIN voucher, SNL supported the industry partners development in preparation for licensing and commercialization by providing subject matter expertise on heat pipe technologies, providing computer code training and support, and perform first-of-a-kind experiments demonstrating the safety/risk impacts of heat pipe breach failures. The experiments that were performed had two primary goals: measure the peak heat fluxes that lead to heat pipe dry out and subsequent wall breach; and observe the consequences that result from catastrophic failure of a heat pipe wall. Intentional breaching of the heat pipe walls took advantage of heat pipe physics and operating limits. Large and nearly instantaneous heat fluxes were applied to the heat pipe to first cause localized dry out at the evaporator section which then leads to melting of the heat pipe wall. The hour glass heat pipe (Test 1) experienced dry out at 112 W/cm 2 and after 45 seconds, wall temperatures measure about 1,280°C and intentional failure of the heat pipe wall was achieved. The cylindrical heat pipe (Test 2) experienced dry out at 125 W/cm 2 and after 65 seconds, wall temperatures exceeded 1,400°C and intentional failure of the heat pipe wall was achieved. Both experiments characterize the parameters needed to lead to heat pipe wall failure. Furthermore, the failure of the heat pipes characterizes the safety/risk impacts from sodium-oxygen reactions that occur following the intentional failure. There were two major conclusions of these intentional failure tests: the heat pipes were able to continue operating beyond expected performance limits, and the failure behavior validated decades of operational experience.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Alliance Project: Secure Control Systems for the Energy Sector

The Alliance Project addresses Area of Interest 4: Secure Remote Access for the Energy Sector, by combining physical and cyber access under one cybersecurity access system. The Alliance Project built on the successful completion of the Lemnos and Padlock Project (DOE-Funded Project started in 2007 and 2010) and researched and developed a solution for an Ethernet Security Gateway with the functionality required to integrate the physical access control cyber system and interface with legacy and new proximity card readers used for physical access requests. This project focused on securing and enhancing the cyber system the physical access control system operates on. The team tested and demonstrated the system solution on the SEL campus. Currently the physical access cyber system is completely separate from the cyber access control cyber system. With a single system industry benefits include: (1) Single system to learn and teach employees; (2) Single system that collects and alerts on logs and events simplifying incident response plans and NERC CIP compliance; (3) Unifies trust management to a single system reducing the potential errors in privilege escalation or revocation; (4) Provides a stronger cybersecurity platform the physical access control system operates on. Today they are mostly plain text protocols and little cyber awareness; (5) Integration of physical access awareness allows the cyber system to react and adjust. In some cases, the cyber access can be enhanced with authorized physical access and other cases the cyber access can be more restricted with unauthorized physical access; and (6) Enables the utility to establish as large or as small a physical access control system as they require. One example would be when a utility shares a substation with a neighbor utility and can’t rely on the substation door for the physical access control. The Alliance technology enables them to lock equipment racks simply with no scalability issues because it stands on the cyber security infrastructure which is already highly scalable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

International Arctic Systems for Observing the Atmosphere (IASOA) Metadata Harvest for Oliktok Point Observations Field Campaign Report

The International Arctic Systems for Observing the Atmosphere (IASOA) was initiated as an International Polar Year (IPY) project (Uttal et al. 2015, on-line release) to address key atmospheric science questions through coordinating the considerable atmospheric observing assets at 10 pan-arctic observatories (http://iasoa.org). The mission of IASOA is to advance cross-site research objectives from independent arctic atmospheric observatories through: (1) strategically developing comprehensive observational capacity; (2) facilitating data access and usability through a single gateway; and (3) mobilizing contributions to synergistic science and socially relevant services derived from IASOA assets and expertise. In April 2015 the IASOA science steering committee invited the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility’s Oliktok Point observatory to contribute to consortium activities. The IASOA steering committee identified enhanced, cross-site data sharing through an IASOA-specific data access portal as a focus for ongoing consortium activities. The design intent of the portal has been to display the data inventories of all IASOA observatories in a succinct summary (Data-at-a-Glance) and provide the most proximal access links available to those data sets. The IASOA data access portal is not intended to replace the functions of existing archives. This succinct summary of data availability supports cross-site and interdisciplinary synthesis science activities. Efforts to enhance the legacy IASOA data access portal functionality have focused on two areas: developing a comprehensive and coherent data vocabulary for IASOA data and implementing an interoperable metadata standard for all IASOA data. The technical goal of this proposal is to work with ARM data managers to operationalize the export of metadata for observational data sets for Oliktok Point from the ARM metadata database. IASOA harvests data in the commonly used International Organization for Standardization (ISO) format. ARM has successfully generated metatdata matching this format in the past to provide metadata from its North Slope of Alaska (NSA) Barrow observatory.

54 ENVIRONMENTAL SCIENCES↗

Risk-Informed Mechanistic Source Term Calculation (Final CRADA Report)

As part of an FY18 U.S. Department of Energy (DOE) Gateway for Accelerated Innovation in Nuclear (GAIN) award, a CRADA agreement was established between Argonne National Laboratory (Argonne) and Oklo. The CRADA focused on the following three tasks to assist Oklo with the regulatory licensing of their innovative nuclear reactor design: • Task 1 – Coupling and Demonstration Analysis using The Nek5000, Diablo, and OpenMC Codes: Establishing a coupling between the neutronic, structural, and thermohydraulic analysis codes and utilizing the code package for a high-fidelity demonstration analysis of radial core expansion due to temperature changes and its impact on core reactivity. • Task 2 – Mechanistic Source Term Analysis: Performing a realistic evaluation of the potential release of radionuclides to the environment during postulated transient event sequences. • Task 3 – Data in Support of Metal Fuel Qualification: An assessment of past postirradiation examination data of metal fuel utilized in the Argonne EBR-II reactor to assist in the potential qualification of the fuel typer for regulatory licensing. The details regarding each analysis and the associated conclusions were provided to Oklo in three separate project reports. Due to the utilization of proprietary and export controlled information, the current summary report was created, which provides an uncontrolled overview of each of the three tasks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluating Tunable Lighting in Classrooms: Trial LED lighting systems in three classrooms in the Folsom Cordova Unified School District (Supplemental Report)

This report summarizes the results from a trial installation of light-emitting diode (LED) lighting systems installed in three classrooms at Gold Ridge Elementary (GRE) School in the Folsom Cordova Unified School District (FCUSD) in Folsom, CA. FCUSD asked the Sacramento Utility District (SMUD) to help them explore potential benefits of tunable-white lighting systems for children with Autism Spectrum Disorder (ASD). SMUD responded by implementing a research project and invited Pacific Northwest National Laboratory (PNNL) to document the performance of the LED lighting systems as part of a GATEWAY evaluation. SMUD and FCUSD staff coordinated and completed the design and installation of the LED systems, and coordinated the collection of data from teachers, students, and parents, while PNNL evaluated the energy and photometric performance of the systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Initial Radiation of Nuclear Power Plant Components (CRADA NFE-17-06892 Final Report)

As advanced reactor concepts are developed, instrumentation and control (I&C) cables and sensors will play a significant role in assuring their operation is well understood, and safety-related process information can be collected reliably over the course of their design life. As a first step to develop acceptance criteria and define the limits of currently available nuclear I&C cable and sensor technology, a collaboration between Oak Ridge National Laboratory and Analysis and Measurement Services (AMS) Corporation was initiated under the Gateway for Accelerated Innovation in Nuclear (GAIN) Program. This collaborative effort focused on providing technical information related to the combined thermal and radiation aging of nuclear power plant (NPP) cables, companion NPP cable insulation samples, and two prototype temperature and two pressure sensors. This work was carried out using the instrumented gamma irradiation system that is part of the High Flux Isotope Reactor Gamma Irradiation Facility (HFIR GIF). This system provided the opportunity for the condition of the prototype sensors to be tracked during the irradiation in order to determine their functional limits with greater granularity when compared to a simple irradiation insertion at the HFIRGIF. Experimental assemblies for sensor irradiation were successfully completed, and sensor irradiation to accumulated dose of 3000 kGy at a rate of approximately 6 kGy/hr was carried out. Two prototype temperature assemblies were continuously monitored during exposure to 3000 kGy and found to have no observable degradation from the irradiation. Two pressure sensors were first irradiated to 1000 kGy. At which point, one of the sensors was found to operate normally; however, a second sensor failed the operability test. The operable pressure sensor output was then continuously monitored from 1000 kGy to 3000 kGy. The sensor output exhibited steady trendable drift versus the accumulated radiation dose. At the conclusion of the irradiation, the four test sensors were released for laboratory calibration checks. The calibration check of the temperature sensors found no significant change after irradiation compared to baseline measurements before irradiation; however, both pressure sensors failed the post-test calibration checks and both sensors were not functioning properly. These results will help inform sensor manufacturers and I&C design engineers of potential limitations of these types of sensors for use in high radiation environments associated with the compact configuration of new Small Modular Reactors (SMRs) such as NuScale’s reactor power module. Irradiations on NPP cables and companion samples were not completed due to programmatic delays, however a path forward that was based on lessons learned from this project was defined to accommodate future, comparable instrumented gamma irradiations at the HFIR GIF.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Visualization Capabilities in OpenMC: Report of Activities under a DOE GAIN Voucher

This work was performed under a Cooperative Research and Development Agreement (CRADA) through the U.S. Department of Energy’s Gateway for Accelerated Innovations in Nuclear (GAIN) program in partnership with Oklo Inc., the industry participant. The broad goal of this project was to improve the visualization capabilities of OpenMC related to model development and simulation results. OpenMC is a Monte Carlo particle transport code that is developed and maintained by a broad community of contributors, of which Argonne National Laboratory plays a leading role.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Integrating System to Edge-of-Network Architecture and Management for SHINES (SEAMS) Technologies of High Penetration Grids

Consistent with the U.S. DOE’s EERE SHINES FOA objectives, the goal of this project was to enable integration from EMS to variable DER in a way that delivered visibility and opportunities for managing and controlling distributed resources using SEAMS technologies. This project implemented several SHINES technologies, which included: (1) three Stem battery systems; (2) six ConnectDER PV collars; (3) two E-Gear PV/Battery storage interfaces; and (4) eight Kitu smart inverter emulators. A Siemens Energy IP DEMS was deployed in a development environment and integrated with the SHINES technologies via OpenADR and IEEE 2030.5 protocols with documented architecture. In the case of IEEE 2030.5, a suite of technologies including a gateway, an API, software and a server from Kitu Systems (the Citadel, Convoy, Kitu Crosslink API, and Kitu Spark) were used to demonstrate that the utility could achieve visibility of distributed energy resources (DER) and control of single and multiple DER systems with a single command. The project also included a LCOE analysis of SHINES technologies compared to traditional system and circuit mitigation measures.

14 SOLAR ENERGY↗

GAIN FY 2021 Walk-in Work (Summary Report)

Walk-in work (WIW) is defined as work that can benefit the nuclear industry and associated stakeholders. Throughout a fiscal year (FY), WIW projects are identified and evaluated by the Gateway for Accelerated Innovation in Nuclear (GAIN) team. Based on funding availability and industry need, the GAIN team determines whether to fund a WIW project and informs the Department of Energy Office of Nuclear Energy (DOE-NE) of these decisions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Data Catalog Software for Hanford Site Environmental Datasets

Environmental information and data underpin achievement of the U.S. Department of Energy (DOE) Office of Environmental Management (EM) mission at the Hanford Site. The Hanford Environmental Data Management (HEDM) Program is the DOE Richland Operations Office (RL) approach to develop and implement a formal program for managing environmental data and the associated records, materials, and systems at the Hanford Site. The current project, contract, organization, and contractor-specific efforts at managing environmental data sets are insufficient to provide orderly, long-term, site-wide access. A vital element to be created within the HEDM program plan is a catalog of data sources, called the Hanford Environmental Information and Data Index (HEIDI), that will enable long-term access and retrievability for the multiple independent sources of data that might otherwise be difficult to discover. This report compares leading open source and commercial data catalog platforms using criteria to assess the functionality needed to develop the HEIDI catalog of Hanford data sources that connects and exchanges data with established Hanford Local Area Network (HLAN) enterprise information technology systems. Proprietary platforms evaluated included ArcGIS Enterprise Sites, Junar, OpenDataSoft, and Socrata, and non-proprietary platforms included Energy Data eXchange (EDX), Comprehensive Knowledge Archive Network (CKAN), and DKAN (a Drupal-based open data portal based on CKAN). Capabilities supporting data discoverability, retrieval, and archival, as well as metadata standard requirements and integration into the HLAN were rated as either failing to meet requirements (F), meeting requirements (M), or exceeding requirements by delivering additional desired features (E). The lowest rating for any capability area was assigned as the overall rating for the platform. These findings enable DOE-RL and the contractors implementing the HEDM plan to focus on candidate tools likely to meet the requirements for implementing HEIDI. All of the platforms receiving an overall rating of ‘F’ were unable to be deployed on Hanford infrastructure or within dedicated cloud resources. A propriety software-as-a-service (SaaS) model of delivering a data catalog (e.g., found in software such as Junar and OpenDataSoft) favors consistency across customers at the expense of customization and configurable roles that are needed for Hanford work. Hosting data on a shared commercial platform places limits on dataset size (maximum of 240 Mb for OpenDataSoft), a significant limitation for HEIDI implementation. EDX, a government data catalog based on CKAN, received the ‘F’ rating due to an inability to incorporate authentication from HLAN into the system. Among platforms rated ‘M’ or ‘E’, only the Socrata platform had a SaaS delivery model. In contrast to other SaaS platforms, Socrata provided custom roles and gateways that allow local datasets to be incorporated into an online catalog. Socrata also complies with the Federal Risk and Authorization Management Program, a significant benefit for cloud-based management of Hanford data. The other platforms rated ‘M’ or ‘E’, ArcGIS Enterprise Sites, CKAN, and DKAN, provide fully self-hosted options, allowing for greater control and flexibility with the HEIDI catalog. These widely used tools have supportive communities of practice, extensive customization options, and demonstrated deployments that provide evidence that they can meet requirements, often deliver additional desired features, and work well with federal government systems. Completely customized alternatives built on a collection of applications were not evaluated because achieving similar performance to CKAN or DKAN requires substantial resources, especially in the absence of the active communities that have grown to support these tools. ArcGIS Enterprise Sites, Socrata, CKAN, and DKAN were evaluated as strong candidates for successful implementation with HEIDI.

54 ENVIRONMENTAL SCIENCES↗