Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Approach and status for a unified national plan for satellite remote sensing research and development

Public Law 98-365, the Land Remote-Sensing Commercialization Act of 1984, requires that the Secretary of the Department of Commerce and the Administrator of the National Aeronautics and Space Administration 'shall, within one year after the date of the Law's enactment and biennially thereafter, jointly develop and transmit to the Congress a report that includes (1) a unified national plan for remote-sensing research and development applied to the earth and its atmosphere; (2) a compilation of progress in the relevant on-going research and development activities of Federal agencies; and (3) an assessment of the state of our knowledge of the Earth and its atmosphere, the needs for additional research (including research related to operational Federal remote-sensing space programs), and opportunities available for further progress'. NASA and NOAA have organized a series of public forums to encourage interest and discussion of the national plan.

Butera, Kristine↗

NASA historical report. First six years of NASA: A concise chronology

This chronology was compiled to satisfy numerous requests for highlights of historical information on the activities during the first six years that the National Aeronautics and Space Administration has existed as the Federal agency conducting the U.S. program for the scientific exploration of space and the exploitation of space science and technology for peaceful uses. The chronology shows the following: highlights of NASA's administrative, organizational, and policy; NASA milestones in space science and technology; items reflecting contributions of NASA offices, centers, and individuals; major policy statements by the President and NASA administrators; and a summary item reflecting evolution, growth, and accomplishments of NASA.

Holme, Molly↗

Low Earth orbit communications satellite

A current thrust in satellite communication systems considers a low-Earth orbiting constellations of satellites for continuous global coverage. Conceptual design studies have been done at the time of this design project by LORAL Aerospace Corporation under the program name GLOBALSTAR and by Motorola under their IRIDIUM program. This design project concentrates on the spacecraft design of the GLOBALSTAR low-Earth orbiting communication system. Overview information on the program was gained through the Federal Communications Commission licensing request. The GLOBALSTAR system consists of 48 operational satellites positioned in a Walker Delta pattern providing global coverage and redundancy. The operational orbit is 1389 km (750 nmi) altitude with eight planes of six satellites each. The orbital planes are spaced 45 deg., and the spacecraft are separated by 60 deg. within the plane. A Delta 2 launch vehicle is used to carry six spacecraft for orbit establishment. Once in orbit, the spacecraft will utilize code-division multiple access (spread spectrum modulation) for digital relay, voice, and radio determination satellite services (RDSS) yielding position determination with accuracy up to 200 meters.

Moroney, D.↗

Overview of the Landsat-7 Mission

Landsat-7 is scheduled for launch on April 15 from the Western Test Range at Vandenberg Air Force Base, Calif., on a Delta-H expendable launch vehicle. The Landsat 7 satellite consists of a spacecraft bus being provided by Lockheed Martin Missiles and Space (Valley Forge, Pa.) and the Enhanced Thematic Mapper Plus instrument built by Raytheon (formerly Hughes) Santa Barbara Remote Sensing (Santa Barbara, Calif.). The instrument on board Landsat 7 is the Enhanced Thematic Mapper Plus (ETM+). ETM+ improves upon the previous Thematic Mapper (TM) instruments on Landsat's 4 and 5 (Fig. la and lb). It includes the previous 7 spectral bands measuring reflected solar radiation and emitted thermal emissions but, in addition, includes a new 15 in panchromatic (visible-near infrared) band. The spatial resolution of the thermal infrared band has also been improved to 60 m. Both the radiometric precision and accuracy of the sensor are also improved from the previous TM sensors. After being launched into a sun-synchronous polar orbit, the satellite will use on-board propulsion to adjust its orbit to a circular altitude of 438 miles (705 kilometers) crossing the equator at approximately 10 a.m. on its southward track. This orbit will place Landsat 7 along the same ground track as previous Landsat satellites. The orbit will be maintained with periodic adjustments for the life of the mission. A three-axis attitude control subsystem will stabilize the satellite and keep the instrument pointed toward the Earth to within 0.05 degrees. Later this year, plans call for the NASA Earth Observation System (EOS) Terra (AM-1) observatory and the experimental EO-1 mission to closely follow Landsat-7's orbit to support synergistic research and applications from this new suite of terrestrial sensor systems. Landsat is the United States' oldest land-surface observation satellite system, with satellites continuously operating since 1972. Although the program has scored numerous successes in scientific and resource-management applications, Landsat has had a tumultuous history of management and funding changes over its nearly 27-year history. Landsat-7 marks a new direction in the program to reduce the cost of data and increase systematic global coverage for use in global change research as well as commercial and regional applications. With the passage of the Land Remote Sensing Policy Act in 1992, oversight of the Landsat program began to shift from the commercial sector to the federal government. NASA integrated Landsat-7 into its EOS science program in 1994. Landsat-7 is managed and operated jointly by NASA and U.S. Geological Survey (USGS). As a result, the costs of acquiring observations from

Williams, Darrel↗

Technology Assessment of High Capacity Data Storage Systems: Can We Avoid a Data Survivability Crisis?

In a recent address at the California Science Center in Los Angeles, Vice President Al Gore articulated a Digital Earth Vision. That vision spoke to developing a multi-resolution, three-dimensional visual representation of the planet into which we can roam and zoom into vast quantities of embedded geo-referenced data. The vision was not limited to moving through space, but also allowing travel over a time-line, which can be set for days, years, centuries, or even geological epochs. A working group of Federal Agencies, developing a coordinated program to implement the Vice President's vision, developed the definition of the Digital Earth as a visual representation of our planet that enables a person to explore and interact with the vast amounts of natural and cultural geo-referenced information gathered about the Earth. One of the challenges identified by the agencies was whether the technology existed that would be available to permanently store and deliver all the digital data that enterprises might want to save for decades and centuries. Satellite digital data is growing by Moore's Law as is the growth of computer generated data. Similarly, the density of digital storage media in our information-intensive society is also increasing by a factor of four every three years. The technological bottleneck is that the bandwidth for transferring data is only growing at a factor of four every nine years. This implies that the migration of data to viable long-term storage is growing more slowly. The implication is that older data stored on increasingly obsolete media are at considerable risk if they cannot be continuously migrated to media with longer life times. Another problem occurs when the software and hardware systems for which the media were designed are no longer serviced by their manufacturers. Many instances exist where support for these systems are phased out after mergers or even in going out of business. In addition, survivability of older media can suffer from physical breakdown of components (e.g. tapes simply lose their magnetic properties after a long time in storage). As a result, a potential data survivability crisis is emerging. The scale of the crisis is comparable to that facing the Social Security System. Sometime in one or two decades, the exponential growth of data will become so great that many enterprises will not be able to migrate through their data to more permanent media during the lifetime of the media on which it resides. This will result in significant losses of data and their resultant impacts. To avoid this crisis, we need to plan and devote greater financial and intellectual resources are needed for the development and refinement of new storage media and migration technologies in order to preserve all data any organization determines worth saving permanently. This talk will explore technological solutions and suggested recommendations to address this technological data crisis.

Halem, Milton↗

Flying Qualities Evaluation of a Commuter Aircraft With an Ice Contaminated Tailplane

During the NASA/FAA (Federal Aviation Administration) Tailplane Icing Program, pilot evaluations of aircraft flying qualities were conducted with various ice shapes attached to the horizontal tailplane of the NASA Twin Otter Icing Research Aircraft. Initially, only NASA pilots conducted these evaluations, assessing the differences in longitudinal flight characteristics between the baseline or clean aircraft, and the aircraft configured with an Ice Contaminated Tailplane (ICT). Longitudinal tests included Constant Airspeed Flap Transitions, Constant Airspeed Thrust Transitions, zero-G Pushovers, Repeat Elevator Doublets, and Simulated Approach and Go-Around tasks. Later in the program, guest pilots from government and industry were invited to fly the NASA Twin Otter configured with a single full-span artificial ice shape attached to the leading edge of the horizontal tailplane. This shape represented ice formed due to a 'Failed Boot' condition, and was generated from tests in the Glenn Icing Research Tunnel on a full-scale tailplane model. Guest pilots performed longitudinal handling tests, similar to those conducted by the NASA pilots, to evaluate the ICT condition. In general, all pilots agreed that longitudinal flying qualities were degraded as flaps were lowered, and further degraded at high thrust settings. Repeat elevator doublets demonstrated reduced pitch damping effects due to ICT, which is a characteristic that results in degraded flying qualities. Pilots identified elevator control force reversals (CFR) in zero-G pushovers at a 20 deg flap setting, a characteristic that fails the FAR 25 no CFR certification requirement. However, when the same pilots used the Cooper-Harper rating scale to perform a simulated approach and go-around task at the 20 deg flap setting, they rated the airplane as having Level I and Level II flying qualities respectively. By comparison, the same task conducted at the 30 deg flap setting, resulted in Level II flying qualities for the approach portion, and Level III for the go-around portion.The results of this program indicate that safe and acceptable flying qualities with an ICT condition, can be effectively assessed by task-oriented pilot maneuvers. In addition, other maneuvers such as repeat elevator doublets provide good qualitative and quantitative assessments of pitch damping and elevator effectiveness, which are characteristics that correlate well with pilot task ratings. The results of this testing indicate that the FAR 25 zero-G pushover maneuver, which requires no CFR during its execution, may be an overly conservative pass/fail criteria for aircraft certification.

Ranaudo, Richard J.↗

AeroMACS C-Band Interference Modeling and Simulation Results

A new C-band (5091-5150 MHz) airport communications system designated as Aeronautical Mobile Airport Communications System (AeroMACS) is being planned under the Federal Aviation Administration s NextGen program. It is necessary to establish practical limits on AeroMACS transmission power from airports so that the threshold of interference into the Mobile Satellite Service (Globalstar) feeder uplinks is not exceeded. To help provide guidelines for these limits, interference models have been created with the commercial software Visualyse Professional. In this presentation, simulation results were shown for the aggregate interference power at low earth orbit from AeroMACS transmitters at each of up to 757 airports in the United States, Canada, Mexico, and the surrounding area. Both omni-directional and sectoral antenna configurations were modeled. Effects of antenna height, beamwidth, and tilt were presented.

Wilson, Jeffrey↗

Modeling C-Band Co-Channel Interference From AeroMACS Omni-Directional Antennas to Mobile Satellite Service Feeder Uplinks

A new C-band (5091 to 5150 MHz) airport communications system designated as Aeronautical Mobile Airport Communications System (AeroMACS) is being planned under the Federal Aviation Administration s NextGen program. An interference analysis software program, Visualyse Professional (Transfinite Systems Ltd), is being utilized to provide guidelines on limitations for AeroMACS transmitters to avoid interference with other systems. A scenario consisting of a single omni-directional transmitting antenna at each of the major contiguous United States airports is modeled and the steps required to build the model are reported. The results are shown to agree very well with a previous study.

Wilson, Jeffrey D.↗

A Distributed Simulation Framework Applied to Artemis Analysis, Studies, Integration, and Test

The National Aeronautics and Space Administration (NASA) established the Artemis Program, a series of missions to return humans to the Moon and explore further than before. To execute the Artemis missions, NASA is collaborating with commercial and international partners to create the necessary infrastructure and logistics plan that will establish a long term presence on the Moon ahead of exploring Mars. NASA and its partners are developing a collection of space and surface systems to support crewed missions to the lunar surface that will provide the mobility, habitation, logistics, and exploration support necessary for Artemis mission successes which includes robust scientific investigations. This paper details the design, capabilities, and uses of the Artemis Distributed Simulation (ADS) being developed by the NASA Exploration Systems Simulations (NExSyS) Team to support Artemis architecture studies. ADS utilizes international interoperability standards to connect a collection of independent vehicle and service simulations; these include but are not limited to elements such as rovers, landers, and habitation elements along with services like communications, environment, visualization, and data logging. ADS’s distributed nature allows for the complex aggregation of constituent Artemis elements; this includes efficient scenario modification with the addition or removal of individual simulations representing Artemis elements or services. This capability provides support for the rapid performance of various Artemis mission trade studies exploring alternate configurations. Currently, ADS uses NASA developed simulations for development and testing; however, through the use of international simulation interoperability standards, ADS provides an integration framework to incorporate dissimilar authoritative vendor simulations as Artemis systems mature and vendor simulations become available. Vendor simulations will be able to join ADS and interact with other Artemis elements and vehicles while limiting the exposure of proprietary data. This paper describes the expansion of an existing distributed simulation infrastructure to accommodate a collaborative and dynamic framework for the Artemis Program. This work includes updated federation designs, integration into existing NASA facilities, advancements in visualizations, and advancements in human driven inputs. This paper will also outline recently completed and ongoing support and collaboration with NASA studies and testing, namely results from energetics and Human-In-The-Loop (HITL) studies. The paper concludes with a plan for future developments and facility integration to enable enhanced studies in preparation for a return of humans to the lunar surface.

Artemis↗

Making Commercial Whole Building Program Delivery Easier and Less Risky Greg Thomas, Performance Systems Development

Whole building commercial programs can be challenging to deliver due to their complexity and scope. A broad suite of Federal tools and reference standards can be leveraged to reduce program cost and risk, and improve scalability. The OpenEfficiency Initiative (OEI) is a DoE funded effort to expand the deployment of Federal tools and reference standards into whole building commercial efficiency programs. OEI is developing an open source data exchange platform which is being informed and motivated by pilots.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Technology Performance Exchange [Fact Sheet]

This fact sheet, 'The Technology Performance Exchange' will be presented at the ET Summit, held at the Pasadena Convention Center on October 15-17, 2012. The Technology Performance Exchange will be a centralized, Web-based portal for finding and sharing energy performance data for commercial building technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2012 Market Report on U.S. Wind Technologies in Distributed Applications

At the end of 2012, U.S. wind turbines in distributed applications reached a 10-year cumulative installed capacity of more than 812 MW from more than 69,000 units across all 50 states. In 2012 alone, nearly 3,800 wind turbines totaling 175 MW of distributed wind capacity were documented in 40 states and in the U.S. Virgin Islands, with 138 MW using utility-scale turbines (i.e., greater than 1 MW in size), 19 MW using mid-size turbines (i.e., 101 kW to 1 MW in size), and 18.4 MW using small turbines (i.e., up to 100 kW in size). Distributed wind is defined in terms of technology application based on a wind project’s location relative to end-use and power-distribution infrastructure, rather than on technology size or project size. Distributed wind systems are either connected on the customer side of the meter (to meet the onsite load) or directly to distribution or micro grids (to support grid operations or offset large loads nearby). Estimated capacity-weighted average costs for 2012 U.S. distributed wind installations was $\$$2,540/kW for utility-scale wind turbines, $\$$2,810/kW for mid-sized wind turbines, and $\$$6,960/kW for newly manufactured (domestic and imported) small wind turbines. An emerging trend observed in 2012 was an increased use of refurbished turbines. The estimated capacity-weighted average cost of refurbished small wind turbines installed in 2012 was $\$$4,080/kW. As a result of multiple projects using utility-scale turbines, Iowa deployed the most new overall distributed wind capacity, 37 MW, in 2012. Nevada deployed the most small wind capacity in 2012, with nearly 8 MW of small wind turbines installed in distributed applications. In the case of mid-size turbines, Ohio led all states in 2012 with 4.9 MW installed in distributed applications. State and federal policies and incentives continued to play a substantial role in the development of distributed wind projects. In 2012, U.S. Treasury Section 1603 payments and grants and loans from the U.S. Department of Agriculture’s Rural Energy for America Program were the main sources of federal funding for distributed wind projects. State and local funding varied across the country, from rebates to loans, tax credits, and other incentives. Reducing utility bills and hedging against potentially rising electricity rates remain drivers of distributed wind installations. In 2012, other drivers included taking advantage of the expiring U.S. Treasury Section 1603 program and a prosperous year for farmers. While 2012 saw a large addition of distributed wind capacity, considerable barriers and challenges remain, such as a weak domestic economy, inconsistent state incentives, and very competitive solar photovoltaic and natural gas prices. The industry remains committed to improving the distributed wind marketplace by advancing the third-party certification process and introducing alternative financing models, such as third-party power purchase agreements and lease-to-own agreements more typical in the solar photovoltaic market. Continued growth is expected in 2013.

distributed wind↗

Smart Labs Accelerator: I2SL China

Presentation offers an overview of energy-efficient Smart Labs, including the benefits, the program, and what it takes to develop one.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Research Campus Energy: I2SL China

Presentation offers an overview of energy-efficient research campuses, including the benefits, the program, and what it takes to develop one.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Aviation Applications for Satellite-Based Observations of Cloud Properties, Convection Initiation, In-flight Icing, Turbulence and Volcanic Ash

Advanced Satellite Aviation Weather Products (ASAP) was jointly initiated by the NASA Applied Sciences Program and the NASA Aviation Safety and Security Program in 2002. The initiative provides a valuable bridge for transitioning new and existing satellite information and products into Federal Aviation Administration (FAA) Aviation Weather Research Program (AWRP) efforts to increase the safety and efficiency of the airspace system. The ASAP project addresses hazards such as convective weather, turbulence (clear-air and cloud-induced), icing and volcanic ash and is particularly applicable in extending the monitoring of weather over data-sparse areas such as the oceans and other observationally remote locations. ASAP research is conducted by scientists from NASA, the FAA AWRP's Product Development Teams (PDT), NOAA and the academic research community. In this paper we provide a summary of activities since the inception of ASAP that emphasize the use of current-generation satellite technologies toward observing and mitigating specified aviation hazards. A brief overview of future ASAP goals is also provided in light of the next generation of satellite sensors (e.g., hyperspectral; high spatial resolution) to become operational in the 2006-2013 timeframe.

Mecikalski, John R.↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WBS 4.2.1.31 Integrated Life Cycle Sustainability Analysis

The main objective of this project (following the 2017 BETO Program Peer-Review) is to provide BETO with a coherent methodology and modeling framework based on life cycle (LCA) and economic input-output analysis, tested and vetted with stakeholders, to better understand the effects of an expanding U.S. bioeconomy at specific levels including economic dimensions such as jobs, gross domestic product (value added), and environmental criteria such as air pollutant emissions, water and land use, ecotoxicity, and others. This supports a 2019 milestone in the BETO MYP and simultaneously addresses a gap previously identified in the BETO program and highlighted, e.g., by BETO Program Peer Reviewers in 2015 and 2017. To fill in this gap, NREL started collaborating with developers of the national level U.S. Environmentally-Extended Input-Output (USEEIO) model in FY18. This peer-reviewed, open source model is based on publicly available data, and developed and maintained by U.S. EPA where it has been the basis for EPA's Sustainable Material Management analyses and program. Also, USEEIO was initially designed for use with EPA's Tool for the Reduction and Assessment of Chemicals and Other Environmental Impacts (TRACI). It aligns well with similar efforts including the Federal LCA Commons and the Sustainable Acquisition Program at the Department of Defense (DoD). In FY18, NREL convened stakeholders from federal agencies, universities, and private sector entities to identify and form a common understanding of (1) models describing the U.S. economy and how to build off of them, (2) a bioeconomy definition for the next modeling steps, (3) the (sub)sectors that can/should be used in the framework, and (4) opportunities for collaboration and data sharing. NREL then created a first order model by disaggregating, i.e., separating the economic activities associated with and attributed to a selected product of the bioeconomy: corn ethanol. Corn ethanol is well studied and has a significant amount of public, validated economic industry information. This is important as disaggregation is a critical step in creating a representative and accurate framework. Corn ethanol served as a validation test case for the method and framework. By the end of FY18, the team was able to generate several scenarios for corn ethanol on national and selected regional levels providing results on the absolute and relative (Megajoule) effects in several environmental and economic impact categories. A second objective of the project is to inform BETO's strategic decision making, specifically its sustainability research portfolio, by engaging in, evaluating, and synthesizing selected global multi-year activities from the perspectives of a variety of complex multilateral and multi-stakeholder processes that pertain to bioenergy. This helps to (1) identify gaps, barriers, and critical areas for future BETO bioenergy and sustainability assessments; (2) identify opportunities and challenges to a sustainable U.S. bioeconomy; and (3) contribute to and disseminate BETO information to and from major global bioenergy and sustainability efforts. This project's work with multilateral organizations ensures that U.S. science-based viewpoints are considered and helps to balance the influence of the large number of countries with the same centralized philosophy. This engagement builds a more solid foundation for sustainable biomass and bioenergy systems in the U.S. and in the world. Working with multi-lateral, international platforms including IEA Bioenergy, Global Bio-Energy Partnership (GBEP), and their partner organizations also allows engagement with important stakeholders including policy makers, industry, NGOs, and academia.

09 BIOMASS FUELS↗

Modeling Weather Impact on Ground Delay Programs

Scheduled arriving aircraft demand may exceed airport arrival capacity when there is abnormal weather at an airport. In such situations, Federal Aviation Administration (FAA) institutes ground-delay programs (GDP) to delay flights before they depart from their originating airports. Efficient GDP planning depends on the accuracy of prediction of airport capacity and demand in the presence of uncertainties in weather forecast. This paper presents a study of the impact of dynamic airport surface weather on GDPs. Using the National Traffic Management Log, effect of weather conditions on the characteristics of GDP events at selected busy airports is investigated. Two machine learning methods are used to generate models that map the airport operational conditions and weather information to issued GDP parameters and results of validation tests are described.

Wang, Yao↗