Distributed Energy Management for Networked Microgrids Embedded Modern Distribution System Using ADMM Algorithm
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Not Available
The growth of inverter-based resources (IBRs) in modern power systems can challenge system stability since they do not natively provide inertia, prompting a need to develop new methods to address the potential instabilities. In this paper, a dynamically configurable grid-forming (GFM) and grid-following (GFL) control is proposed, which enables inverters to flexibly transition to support system needs. The operation mode transition between GFM and GFL controls is adopted as an additional degree of control flexibility to adjust the small-signal stability margin. In addition, a holistic and detailed small-signal model for a distribution feeder that captures the dynamics from both synchronous generators (SGs) and IBRs is also derived and used to evaluate the effectiveness of the proposed GFM/GFL controls to augment the system small-signal stability margin. Case studies with varying levels of IBRs were implemented in MATLAB/Simulink to demonstrate the effectiveness of the proposed approach.
This paper discusses the current systems used at the Goddard Space Flight Center for processing spacecraft data, as well as the future system prospects. While current systems rely significantly on minicomputers, future systems will emphasize workstations. Space data formats will become more structured, and the increased application of space data standards will permit greater flexibilities in ground data processing, data distribution and savings in mission and data operations.
The proliferation of electrolyzers presents an opportunity for grid operators. Fast response times and the use of hydrogen as storage can be leveraged in a symbiotic way to support increasing penetration levels of photovoltaics (PV) in the distribution grid. This work presents the grid integration of an electrolyzer fleet and its control applications to minimize the impact of increasing solar PV penetration in the distribution network. The study involves a feeder model of a real utility circuit from a utility partner with an operational model of a fleet of electrolyzers. The operational improvements are quantified with performance metrics. The metrics show that the fleet control application of the electrolyzers can aid in reducing overvoltages, voltage fluctuations, and control device operations induced by intermittent solar generation. The locational dependence of electrolyzers are also discussed in terms of performance metrics.
Not Available
Eight mm tape libraries are known primarily for their small size, large storage capacity, and low cost. However, many applications require an additional attribute which, heretofore, has been lacking -- high transfer rate. Transfer rate is particularly important in a large scale data distribution environment -- an environment in which 8 mm tape should play a very important role. Data distribution is a natural application for 8 mm for several reasons: most large laboratories have access to 8 mm tape drives, 8 mm tapes are upwardly compatible, 8 mm media are very inexpensive, 8 mm media are light weight (important for shipping purposes), and 8 mm media densely pack data (5 gigabytes now and 15 gigabytes on the horizon). If the transfer rate issue were resolved, 8 mm could offer a good solution to the data distribution problem. To that end Exabyte has analyzed four ways to increase its transfer rate: native drive transfer rate increases, data compression at the drive level, tape striping, and homogeneous drive utilization. Exabyte is actively pursuing native drive transfer rate increases and drive level data compression. However, for non-transmitted bulk data applications (which include data distribution) the other two methods (tape striping and homogeneous drive utilization) hold promise.
This paper provides an overview and update of a specialized frequency reference system for the NASA Deep Space Network (DSN) to support Ka-band radio science experiments with the Cassini spacecraft, currently orbiting Saturn. Three major components, a Hydrogen Maser, Stabilized Fiber-optic Distribution Assembly (SFODA), and 10 Kelvin Cryocooled Sapphire Oscillator (10K CSO) and frequency-lock-loop, are integrated to achieve the very high performance, ground based frequency reference at a remote antenna site located 16 km from the hydrogen maser. Typical measured Allan Deviation is 1.6 -14 1 0a't 1 second and 1.7 x 10 -15 at 1000 seconds averaging intervals. Recently two 10K CSOs have been compared in situ while operating at the remote DSN site DSS-25. The CSO references were used operationally to downconvert the Ka band downlink received from the Cassini spacecraft in a series of occultation measurements performed over a 78 day period from March to June 2005.
Residential and commercial buildings have huge potential to contribute value to improve grid resilience by participating grid services. To reveal the significant value, it is critical to estimate the grid service capability from these buildings. Unlike the large-scale distributed energy resources such as wind and solar farms, those buildings need to participate grid services in aggregation, not by individual. Therefore, it is important to appropriately group buildings for aggregation. The load profiles in the same group will have similar characteristics at the same time step, so grid operators can send the grid service signal to the customer group with a higher chance to respond at that time step. In this paper, we develop a load profile clustering method to classify the building-level load profiles for grid service capability estimation. In our two-step clustering approach, we first calculate the total load consumption for each building, clustering the load profiles based on energy consumption level. Then, we further cluster the load profiles in each energy cluster based on the load shape. The parameter selection for each clustering step is discussed. The proposed method is applied on actual building-level load profiles, and the results have proved the effectiveness of this method.
The United States power grid will continue to experience stress from aging infrastructure, extreme weather, and increasing loads. In order to strengthen resiliency, researchers need to run tests and simulations that model real-life infrastructure. Idaho National Laboratory (INL) is creating a digital twin of its Critical Infrastructure Test Range Complex (CITRC). CITRC is an at-scale grid testbed which can be configured in utility-realistic distribution scenarios for a variety of tests, such as advanced grid protection and control. A digital twin of this infrastructure would support in-depth tests/simulations without risking physical consequences, before trialing devices under test at-scale. This project focuses on the data acquisition part of constructing a digital twin. It investigates the Supervisory Data Acquisition and Control (SCADA) system of CITRC and explores ways to utilize this system for the twin. Future “ideal” at-scale implementations such as upgraded equipment, modern communication protocols, and automation applications are also explored.
We describe an event-based, publish-and-subscribe mechanism based on using 'smart subscriptions' to recognize weakly-structured events. We present a hierarchy of subscription languages (propositional, predicate, temporal and agent) and algorithms for efficiently recognizing event matches. This mechanism has been applied to the management of distributed applications.
The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter summarizes the growth in distribution-connected energy resources and provides a detailed review of impacts to the distribution grid of growth in customer electricity demand, solar, and storage, as well as required distribution grid upgrades and associated costs.
The U.S. transportation and electricity sectors have historically operated independently, but the growth of electric vehicles (EVs) is driving their convergence. After decades of stagnant demand, utilities must prepare for rising load growth, driven in part by transportation electrification. Utilities must anticipate when and where these new loads will materialize to effectively manage EV growth and maintain grid reliability. This presentation outlines NREL's approach to developing high-resolution EV load datasets for distribution planning, with insights from the Multi-State Transportation Electrification Impact Study on EV and load forecasting, infrastructure requirements, and managed charging strategies.
The NASA EOS Data and Information System (EOSDIS) Core System (ECS) will contain one of the largest data management systems ever built - the ECS Science and Data Processing System (SDPS). SDPS is designed to support long term Global Change Research by acquiring, producing, and storing earth science data, and by providing efficient means for accessing and manipulating that data. The first two releases of SDPS, Release A and Release B, will be operational in 1997 and 1998, respectively. Release B will be deployed at eight Distributed Active Archiving Centers (DAAC's). Individual DAAC's will archive different collections of earth science data, and will vary in archive capacity. The storage and management of these data collections is the responsibility of the SDPS Data Server subsystem. It is anticipated that by the year 2001, the Data Server subsystem at the Goddard DAAC must support a near-line data storage capacity of one petabyte. The development of SDPS is a system integration effort in which COTS products will be used in favor of custom components in very possible way. Some software and hardware capabilities required to meet ECS data volume and storage management requirements beyond 1999 are not yet supported by available COTS products. The ECS project will not undertake major custom development efforts to provide these capabilities. Instead, SDPS and its Data Server subsystem are designed to support initial implementations with current products, and provide an evolutionary framework that facilitates the introduction of advanced COTS products as they become available. This paper provides a high-level description of the Data Server subsystem design from a COTS integration standpoint, and discussed some of the major issues driving the design. The paper focuses on features of the design that will make the system scalable and adaptable to changing technologies.
The Kennedy Space Center voltage profile program computes voltages at all busses greater than 1 Kv in the network under various conditions of load. The computation is based upon power flow principles and utilizes a Newton-Raphson iterative load flow algorithm. Power flow conditions throughout the network are also provided. The computer program is designed for both steady state and transient operation. In the steady state mode, automatic tap changing of primary distribution transformers is incorporated. Under transient conditions, such as motor starts etc., it is assumed that tap changing is not accomplished so that transformer secondary voltage is allowed to sag.
Not Available