Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Development assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Secondary Payload Opportunities on NASA's Space Launch System (SLS) Enable Science and Deep Space Exploration

For the first time in almost 40 years, a NASA human-rated launch vehicle has completed its Critical Design Review (CDR). With this milestone, NASA's Space Launch System (SLS) and Orion spacecraft are on the path to launch a new era of deep space exploration. This first launch of SLS and the Orion Spacecraft is planned no later than November 2018 and will fly along a trans-lunar trajectory, testing the performance of the SLS and Orion systems for future missions. NASA is making investments to expand the science and exploration capability of the SLS by developing the capability to deploy small satellites during the trans-lunar phase of the mission trajectory. Exploration Mission 1 (EM-1) will include thirteen 6U Cubesat small satellites to be deployed beyond low earth orbit. By providing an earth-escape trajectory, opportunities are created for the advancement of small satellite subsystems, including deep space communications and in-space propulsion. This SLS capability also creates low-cost options for addressing existing Agency strategic knowledge gaps and affordable science missions. A new approach to payload integration and mission assurance is needed to ensure safety of the vehicle, while also maintaining reasonable costs for the small payload developer teams. SLS EM-1 will provide the framework and serve as a test flight, not only for vehicle systems, but also payload accommodations, ground processing, and on-orbit operations. Through developing the requirements and integration processes for EM-1, NASA is outlining the framework for the evolved configuration of secondary payloads on SLS Block upgrades. The lessons learned from the EM-1 mission will be applied to processes and products developed for future block upgrades. In the heavy-lift configuration of SLS, payload accommodations will increase for secondary opportunities including small satellites larger than the traditional Cubesat class payload. The payload mission concept of operations, proposed payload capacity of SLS, and the payload requirements for launch and deployment will be described to provide potential payload users an understanding of this unique exploration capability.

Singer, Jody↗

A Blockchain Case Study for Urban Air Mobility Operational Intent

To realize the potential of Urban Air Mobility (UAM), an assurance of cybersecurity is critical for public acceptance. UAM is a concept that proposes to develop short-range, point-to-point transportation systems in metropolitan areas using vertical takeoff and landing (VTOL) aircraft to overcome increasing surface congestion. The growth in the development of UAM systems, and the associated data exchange and service interactions will be at risk due to numerous types of cybersecurity attacks. The intent of this work is to leverage a permissioned blockchain to simulate secure data exchange and storage for the UAM operational intent use case. In this case study, two vehicle operators are operating in the same airspace. Their intent is to fly vehicles that land at a shared vertiport, securely.

Urban Air Mobility↗

A Blockchain Case Study for Urban Air Mobility Operational Intent

To realize the potential of Urban Air Mobility (UAM), an assurance of cybersecurity is critical for public acceptance. UAM is a concept that proposes to develop short-range, point-to-point transportation systems in metropolitan areas using vertical takeoff and landing (VTOL) aircraft to overcome increasing surface congestion. The growth in the development of UAM systems, and the associated data exchange and service interactions will be at risk due to numerous types of cybersecurity attacks. The intent of this work is to leverage a permissioned blockchain to simulate secure data exchange and storage for the UAM operational intent use case.

UAM↗

A Blockchain Case Study for Urban Air Mobility Operational Intent

To realize the potential of Urban Air Mobility (UAM), an assurance of cybersecurity is critical for public acceptance. UAM is a concept that proposes to develop short-range, point-to-point transportation systems in metropolitan areas using vertical takeoff and landing (VTOL) aircraft to overcome increasing surface congestion. The growth in the development of UAM systems, and the associated data exchange and service interactions will be at risk due to numerous types of cybersecurity attacks. The intent of this work is to leverage a permissioned blockchain to simulate secure data exchange and storage for the UAM operational intent use case.

UAM↗

Promoting Robust Design of Diode Lasers for Space: A National Initiative

The Diode-laser Array Working Group (DAWG) is a national-level consumer/provider forum for discussion of engineering and manufacturing issues which influence the reliability and survivability of high-power broad-area laser diode devices in space, with an emphasis on laser diode arrays (LDAs) for optical pumping of solid-state laser media. The goals of the group are to formulate and validate standardized test and qualification protocols, operational control recommendations, and consensus manufacturing and certification standards. The group is using reliability and lifetime data collected by laser diode manufacturers and the user community to develop a set of standardized guidelines for specifying and qualifying laser diodes for long-duration operation in space, the ultimate goal being to promote an informed U.S. Government investment and procurement strategy for assuring the availability and durability of space-qualified LDAs. The group is also working to establish effective implementation of statistical design techniques at the supplier design, development, and manufacturing levels to help reduce product performance variability and improve product reliability for diodes employed in space applications

Tratt, David M.↗

Enhancing the Payload Development Process for Lunar Gateway and Lunar Surface Science & Exploration: Space Biology Beyond Low-Earth-Orbit Instrumentation and Science Series (BLISS) Science Working Group 2023-2024 Annual Report

Space biology BLEO research is inherently driven by the differences between the LEO and BLEO environments, which can be broadly characterized by the five-hazard “RIDGE” paradigm (Radiation, Isolation, Distance, Gravity, Environment, e.g., similar to Figure 2 in (1)). Thus, the envisioned goals over the next decade will include using the cislunar and lunar surface environments to (A) characterize deep-space environments including biological effects of radiation and other stressors, (B) gain experience from isolation of very small groups in very small enclosures, (C) learn to compensate for distance from Earth via in situ resource utilization (ISRU) and bioregenerative life support, (D) gain assurance that all aspects of deep-space exploration can proceed in altered or artificial gravity environments, (E) develop essential adaptation scenarios for the built (e.g., low pressure) and external (e.g., temperature extremes, dust) environments.

Biology↗

Radiation Hardness Assurance: Evolving for NewSpace

During the past decade, numerous small satellites have been launched into space, with dramatically expanded dependence on advanced commercial-off-the-shelf (COTS) technologies and systems required for mission success. While the radiation effects vulnerabilities of small satellites are the same as those of their larger, traditional relatives, revised approaches are needed for risk management because of differences in technical requirements and programmatic resources. While moving to COTS components and systems may reduce direct costs and procurement lead times, it undermines many cost-reduction strategies used for conventional radiation hardness assurance (RHA). Limited resources are accompanied by a lack of radiation testing and analysis, which can pose significant risks - or worse, be neglected altogether. Small satellites have benefited from short mission durations in low Earth orbits with respect to their radiation response, but as mission objectives grow and become reliant on advanced technologies operating for longer and in harsher environments, requirements need to reflect the changing scope without hindering developers that provide new capabilities.

Radiation Hardness Assurance (RHA)↗

Radiation Hardness Assurance: Evolving for NewSpace

During the past decade, numerous small satellites have been launched into space, with dramatically expanded dependence on advanced commercial-off-the-shelf (COTS) technologies and systems required for mission success. While the radiation effects vulnerabilities of small satellites are the same as those of their larger, traditional relatives, revised approaches are needed for risk management because of differences in technical requirements and programmatic resources. While moving to COTS components and systems may reduce direct costs and procurement lead times, it undermines many cost-reduction strategies used for conventional radiation hardness assurance (RHA). Limited resources are accompanied by a lack of radiation testing and analysis, which can pose significant risks—or worse, be neglected altogether. Small satellites have benefited from short mission durations in low Earth orbits with respect to their radiation response, but as mission objectives grow and become reliant on advanced technologies operating for longer and in harsher environments, requirements need to reflect the changing scope without hindering developers that provide new capabilities.

Radiation Hardness Assurance (RHA)↗

NASA Lewis Launch Collision Probability Model Developed and Analyzed

There are nearly 10,000 tracked objects orbiting the earth. These objects encompass manned objects, active and decommissioned satellites, spent rocket bodies, and debris. They range from a few centimeters across to the size of the MIR space station. Anytime a new satellite is launched, the launch vehicle with its payload attached passes through an area of space in which these objects orbit. Although the population density of these objects is low, there always is a small but finite probability of collision between the launch vehicle and one or more of these space objects. Even though the probability of collision is very low, for some payloads even this small risk is unacceptable. To mitigate the small risk of collision associated with launching at an arbitrary time within the daily launch window, NASA performs a prelaunch mission assurance Collision Avoidance Analysis (or COLA). For the COLA of the Cassini spacecraft, the NASA Lewis Research Center conducted an in-house development and analysis of a model for launch collision probability. The model allows a minimum clearance criteria to be used with the COLA analysis to ensure an acceptably low probability of collision. If, for any given liftoff time, the nominal launch vehicle trajectory would pass a space object with less than the minimum required clearance, launch would not be attempted at that time. The model assumes that the nominal positions of the orbiting objects and of the launch vehicle can be predicted as a function of time, and therefore, that any tracked object that comes within close proximity of the launch vehicle can be identified. For any such pair, these nominal positions can be used to calculate a nominal miss distance. The actual miss distances may differ substantially from the nominal miss distance, due, in part, to the statistical uncertainty of the knowledge of the objects positions. The model further assumes that these position uncertainties can be described with position covariance matrices. With these, and some additional simplifying assumptions, a closed-form solution for the probability of collision is obtained. This solution provides clear insights into how each of the independent parameters affects the probability of collision. It shows that for a given maximum probability of collision and prior knowledge of the objects position uncertainties and sizes, only knowledge of the nominal closest approach distance is required to make the launch/no launch decision. The model was completed and used for the mission assurance COLA analysis for the Cassini spacecraft, which was launched on a Titan IV/Centaur rocket on October 15, 1997. Although the model was specifically developed for the Cassini mission, it is clearly applicable for other launches as well. The effect of COLA closures on the launch window is shown. The bar represents the entire 140-min launch window on October 15, 1997; the blackened areas represent the loss of launch opportunities due to the potential for a collision with an orbiting object.

Bollenbacher, Gary↗

Development of Design Standards and Guidelines for Electromagnetic Compatibility and Lightning Protection for Spacecraft Utilizing Composite Materials

Preliminary design guidelines necessary to assure electromagnetic compatibility (EMC) of spacecraft using composite materials, are presented. A database of electrical properties of composite materials which may have an effect on EMC is established. The guidelines concentrate on the composites that are conductive but may require enhancement to be adequate for EMC purposes. These composites are represented by graphite reinforced polymers. Methods for determining adequate conductivity levels for various EMC purposes are defined, along with the methods of design which increase conductivity of composite materials and joints to adequate levels.

Source record↗

Safety and Mission Assurance Knowledge Management Retention: Managing Knowledge for Successful Mission Operations

Knowledge Management is a proactive pursuit for the future success of any large organization faced with the imminent possibility that their senior managers/engineers with gained experiences and lessons learned plan to retire in the near term. Safety and Mission Assurance (S&MA) is proactively pursuing unique mechanism to ensure knowledge learned is retained and lessons learned captured and documented. Knowledge Capture Event/Activities/Management helps to provide a gateway between future retirees and our next generation of managers/engineers. S&MA hosted two Knowledge Capture Events during 2005 featuring three of its retiring fellows (Axel Larsen, Dave Whittle and Gary Johnson). The first Knowledge Capture Event February 24, 2005 focused on two Safety and Mission Assurance Safety Panels (Space Shuttle System Safety Review Panel (SSRP); Payload Safety Review Panel (PSRP) and the latter event December 15, 2005 featured lessons learned during Apollo, Skylab, and Space Shuttle which could be applicable in the newly created Crew Exploration Vehicle (CEV)/Constellation development program. Gemini, Apollo, Skylab and the Space Shuttle promised and delivered exciting human advances in space and benefits of space in people s everyday lives on earth. Johnson Space Center's Safety & Mission Assurance team work over the last 20 years has been mostly focused on operations we are now beginning the Exploration development program. S&MA will promote an atmosphere of knowledge sharing in its formal and informal cultures and work processes, and reward the open dissemination and sharing of information; we are asking "Why embrace relearning the "lessons learned" in the past?" On the Exploration program the focus will be on Design, Development, Test, & Evaluation (DDT&E); therefore, it is critical to understand the lessons from these past programs during the DDT&E phase.

Johnson, Teresa A.↗

Biomedical systems analysis program

Biomedical monitoring programs which were developed to provide a system analysis context for a unified hypothesis for adaptation to space flight are presented and discussed. A real-time system of data analysis and decision making to assure the greatest possible crew safety and mission success is described. Information about man's abilities, limitations, and characteristic reactions to weightless space flight was analyzed and simulation models were developed. The predictive capabilities of simulation models for fluid-electrolyte regulation, erythropoiesis regulation, and calcium regulation are discussed.

Source record↗

Space Transformation -- Localizing the Remote and Connecting the Isolated

In motivating the Space Transformation theme for this year’s 4S symposium, the organizers provided the following context, “Transformation of economies are driven by a change in values and accelerated by new technologies.” These words rang particularly true when I read them at the beginning of the holiday season. Like so many others, I was in the early phases of my Christmas shopping procrastination campaign, and I’d just been reflecting on how Amazon Prime was the transformational tool I’d been waiting for. Basic limiting principles of time and space, supply and demand, were all but erased by the Amazon Prime phenomenon. Coupled with emerging 3D printing and other adaptive manufacturing technologies, a transformation from deliberate planning to “think it … have it” had occurred, empowering me to procrastinate longer than I’d ever dreamed possible. The organizers went on to ponder, “Will space transformation also affect society?”, just as our team at the Air Force Research Lab’s (AFRL) Center for Rapid Innovation (CRI) were working alongside partners within our larger Integrated Capabilities Directorate, NASA’s Flight Opportunities and Small Spacecraft Technology programs, and DARPA’s Luna-10 program to develop technologies and execute demonstration missions that leverage the space domain to genuinely connect even the most remote and austere domains on the timeline of need. Picking apart the miracle that is Amazon prime, where does the model fail, and why? More relevantly to the theme of this year’s symposium, how can the space domain be used to overcome its limitations and minimize its weaknesses? Perhaps it is best assessed in the context of Use Cases. What are the Amazon delivery cost, schedule, and cargo limiters to the Amundsen-Scott South Pole Research Station, or the Lunar South Pole Research Station? This paper will explore enabling infrastructure that allows Amazon prime to thrive and assess the transformational enabling technologies that would be necessary to extend that miracle to the truly remote or the truly austere. Localizing the Remote • First, it will evaluate the ability of the on-going AFRL Rocket Cargo and Space Initiatives Ringside Seats systems, coupled with Astrobotic’s Xodiak and Xogdor capabilities, developed to support the NASA Flight Opportunities Program (FOP), to supply orbital/suborbital delivery to both improved and austere sites on the Earth and Moon. • Then, it will add the surface terminal distribution leg, with an examination of Lunar Outpost’s Mobile Autonomous Prospecting Platform (MAPP), equipped with Mobile Autonomous Robotic Swarm (MARS) software, and Intuitive Machine’s Hopper, developed with support of AFRL and NASA’s Commercial Lunar Payload Services (CLPS) program. Connecting the Isolated From there, it will focus on the destination, asking what implied destination services are required to support highly assured autonomous delivery. • Specifically, it will highlight Astrobotic’s Skymage mesh-networked publish and subscribe communication and navigation service, as well as AFRL’s on-going developments of radioisotope and reactor nuclear-sourced thermoelectric power generation and distribution systems under development under the Joint Emergent Technology Supplying On-orbit Nuclear Power (JETSON) program by Lockheed Martin, Westinghouse, Intuitive Machines, and Zeno Power, to provide the power service to locations well off the grid. • Finally, the paper will connect to the “human machine”. What connects the remote or in-situ human consumer to the remote domain? What connects the diverse international government and commercial services to each other? The former will focus on AFRL’s OraCloud feeding their Space Defense Control and Characterization System (SDCCS) and Lunar Station’s MoonHacker systems, while the latter will focus on the BlueHalo/Tensor LunX Technology Platform for the Cislunar Commodity Marketplace. In 1984, Krafft Ehricke famously remarked that, “If God wanted man to become a spacefaring species, He would have given man a Moon.” This paper is not about the Moon, but is about humans as a spacefaring species, shedding the pesky land/air limitations of the Amazon Prime model … so that we can all live a procrastinator’s “think it … have it” existence.

Charles Finley↗

Verification and Validation of Safety-Critical Aircraft Systems Operating under Off-Nominal, Contingency, and Emergency Conditions

Verification and validation (V&V) of safety-critical technologies developed for loss of control (LOC) prevention and recovery and other aviation safety concerns pose significant challenges. Aircraft LOC can result from a wide spectrum of hazards, often occurring in combination, which cannot be fully replicated during evaluation. Technologies developed for LOC prevention and recovery must therefore be effective under a wide variety of hazardous and uncertain conditions, and the verification and validation of these technologies must provide some measure of assurance that the new vehicle safety technologies do no harm (i.e., that they themselves do not introduce new safety risks). V&V technologies must also enable the identification of system limitations and constraints, as well as enable the identification of safe and unsafe operating conditions (and their boundaries). Additionally, the V&V of complex, increasingly autonomous systems is a fundamental concern. Scalable, reproducible and cost-effective techniques for the assurance of safety critical systems during their design and operation is a key barrier to fielding new systems or updating current systems. Moreover, these techniques need to provide artifacts that enable a comprehensive evidence-based approach to certification. This briefing summarizes research performed under NASA’s Aviation Safety Program and follow-on research for the V&V of safety-critical aircraft system technologies developed for LOC prevention and recovery and increasingly autonomous systems, and for a broad assurance capability in both current and emerging aviation applications. Note that, in this briefing, the term “validation” refers to a confirmation that the system implementation (e.g., algorithms etc.) is performing the intended function(s), as well as an affirmation of effectiveness in these functions. “Verification” refers to a confirmation that the system implementation in the software and hardware meets its (hopefully validated) specifications (e.g., correctly executes algorithms as designed).

Validation↗

Enabling Science and Deep Space Exploration through Space Launch System (LSL) Secondary Payload Opportunities

For the first time in almost 40 years, a NASA human-rated launch vehicle has completed its Critical Design Review (CDR). By reaching this milestone, NASA's Space Launch System (SLS) and Orion spacecraft are on the path to launch a new era of deep space exploration. NASA is making investments to expand science and exploration capability of the SLS by developing the capability to deploy small satellites during the trans-lunar phase of the mission trajectory. Exploration Mission 1 (EM-1), currently planned for launch no earlier than July 2018, will be the first mission to carry such payloads on the SLS. The EM-1 launch will include thirteen 6U Cubesat small satellites that will be deployed beyond low earth orbit. By providing an earth-escape trajectory, opportunities are created for advancement of small satellite subsystems, including deep space communications and in-space propulsion. This SLS capability also creates low-cost options for addressing existing Agency strategic knowledge gaps and affordable science missions. A new approach to payload integration and mission assurance is needed to ensure safety of the vehicle, while also maintaining reasonable costs for the small payload developer teams. SLS EM-1 will provide the framework and serve as a test flight, not only for vehicle systems, but also payload accommodations, ground processing, and on-orbit operations. Through developing the requirements and integration processes for EM-1, NASA is outlining the framework for the evolved configuration of secondary payloads on SLS Block upgrades. The lessons learned from the EM-1 mission will be applied to processes and products developed for future block upgrades. In the heavy-lift configuration of SLS, payload accommodations will increase for secondary opportunities including small satellites larger than the traditional Cubesat class payload. The payload mission concept of operations, proposed payload capacity of SLS, and the payload requirements for launch and deployment will be described to provide potential payload users an understanding of this unique exploration capability.

Singer, Jody↗

Budget estimates: Fiscal year 1994. Volume 1: Agency summary

The NASA FY 1994 budget request of $15,265 million concentrates on (1) investing in the development of new technologies including a particularly aggressive program in aeronautical technology to improve the competitive position of the United States, through shared involvement with industry and other government agencies; (2) continuing the nation's premier program of space exploration, to expand our knowledge of the solar system and the universe as well as the earth; and (3) providing safe and assured access to space using both the space shuttle and expendable launch vehicles. Budget estimates are presented for (1) research and development, including space station, space transportation capability development, space science and applications programs, space science, life and microgravity sciences and applications, mission to planet earth, space research and technology, commercial programs, aeronautics technology programs, safety and mission quality, academic programs, and tracking and data advanced systems; and (2) space operations, including space transportation programs, launch services, and space communications.

Source record↗

JPL process for tailoring mission assurance to specific projects

This document identifies a processs for tailoring Mission Assurance (MA) activities to JPL flight projects. These MA activities are to be accomplished during appropriate phases of projects involved in design, development, test, fabrication, launch and mission operations. MA is the responsibility of all participants on a project; it enhances their contribution to the success of the mission.

mission assurance↗

Structural Requirements for the Space Propulsion Engine Systems

In January 2004, the National Aeronautics and Space Administration (NASA) was given a vision for Space Exploration by President Bush, setting our sight on a bold new path to go back to the Moon, then to Mars and beyond. As NASA gets ready to meet the vision set by President Bush, failures are not an option. Reliability of the propulsion engine systems will play an important role in establishing an overall safe and reliable operation of these new space systems. A new standard, NASA-STD-5012, Strength and Life Assessment for Space Propulsion System Engines, has been developed to provide structural requirements for assessment of the propulsion systems engine. This standard is a complement to the current NASA-wide standard NASA-STD-5001, Structural Design and Test Factors of Safety for Spaceflight Hardware, which excluded the requirement for the engine systems (rotatory structures) along with pressure vessels. As developed, this document builds on the heritage of the multiple industrial standards related to strength and life assessment of the structures. For assuring a safe and reliable operation of a product and/or mission, establishing a set of structural assessment requirements is a key ingredient. Hence, a concentrated effort was made to improve the requirements where there are known lessons learned during the design, test, and operation phases of the Space Shuttle Main Engine (SSME) and other engine development programs. Requirements delineated in this standard are also applicable for the reusable and/or human missions. It shall be noted that "reliability of a system cannot be tested and inspected but can only be achieved if it is first designed into a system." Hence, these strength and life assessment requirements for the space propulsion system engines shall be used along with other good engineering practices, requirements, and policies.

Aggarwal, Pravin K.↗