K25/K27 Characterization for Demonstrating Criticality Incredibility K-25 / K-27 D and D Project

The K-25 and K-27 Buildings are currently undergoing decontamination and decommissioning (D and D) as part of a non-time critical removal action. When the enrichment process was shut-down, the process gas equipment and piping was purged to remove UF{sub 6}, but the process gas system was not generally chemically treated to remove solid holdup. Generally, chemical treatment was completed it was not very effective in removing the larger deposits. Because of this, uranium deposits continue to reside throughout the process gas system. There is the potential for unreacted UF{sub 6} to be present, as well. A key part of this project is to locate the remaining significant uranium deposits and manage them appropriately. Since some process gas components in the K-25 and K-27 Buildings contain enriched uranium holdup, it is important to ensure nuclear criticality safety during demolition or subsequent loading and transport of waste. Therefore, a major task in preparation for demolition is to demonstrate that 'criticality is incredible (CI)' in each building area. The U.S. Department of Energy (DOE) and Bechtel Jacobs Company LLC (BJC) are in agreement that proper and thorough characterization of fissile holdup material in the K-25 and K-27 process gas components is a key element in achieving and demonstrating that criticality is incredible, as well as in management of demolition wastes and collection of holdup material. While the classic project scheduling wisdom may indicate that performing all of the data quality objectives (DQO) and planning before the field work starts, the size of the K-25 / K-27 D and D Project combined with the evolving decommissioning plans and re-plans have indicated that a fresh look at what further characterization data are needed to meet the current project requirements. Performing a DQO in the middle of the project allowed a much greater degree of accuracy of the real project data needs than was possible even 22 months ago. The outcome of the DQO work led to development of the project characterization and criticality incredibility project plan, which will close any data gaps to support the implementation of the re-planned project during the next few years, results from the characterization will support not only the criticality incredible decision(s), but also waste management and disposal along with environmental release requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ORNL Soils Remediation and Slabs Removal - The Bridge from D and D to Redevelopment - 12342

The landscape of the Oak Ridge National Laboratory (ORNL) has dramatically changed over the past 2 years with demolition of aging facilities in the Central Campus. Removal of these infrastructure legacies was possible due to an influx of DOE-Environmental Management funding through the American Recovery and Reinvestment Act of 2009 (ARRA). Facility D and D traditionally removes everything down to the building slab, and the Soils and Sediments Program is responsible for slabs, below-grade footers and sub-grade structures, abandoned waste utilities, and soils contaminated above certain risk levels that must be removed before the site can be considered for redevelopment. DOE-EM has used a combination of base and ARRA funding to facilitate the clean-up process in ORNL's 2000 Area. Demolition of 13 buildings in the area was funded by the ARRA. Characterization of the remaining slabs, underground pipelines and soils was funded by DOE-EM base funding. Additional ARRA funding was provided for the removal of the slabs, pipelines and contaminated soils. Removal work is in progress and consists of removing and disposing of approximately 7,650 cubic meters (m{sup 3}) of concrete, 2,000 m{sup 3} of debris, and 400 m{sup 3} of contaminated soil. Immediately adjacent to the 2000 Area is the Oak Ridge Science and Technology Park and the modernized ORNL western campus. The Science and Technology Park is the only private sector business and technology park located within the footprint of a national laboratory. The completion of this work will not only greatly reduce the risk to the ORNL campus occupants but also allow this much sought after space to be available for redevelopment and site reuse efforts at ORNL. Demolition of aging facilities enabled by injection of ARRA funding has significantly altered the landscape at ORNL while reducing risk to laboratory personnel and operations and providing valuable central campus land parcels for redevelopment to expand and enhance the science mission of the Laboratory. D and D of these infrastructure legacies that were once eyesores that harbored risk in the ORNL Central Campus have been transformed to green spaces and extremely valuable candidate sites for future buildings. The 2000 Area slabs and soils removal marks the first step in creating the bridge between the modernized east and west campus and acts as the cornerstone in the redevelopment of the ORNL Central Campus area which will be a key contributor to ORNL meeting its vision of the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic D and D: Smart robots - 15093

Project' managers continually seek an ever-greater optimization of time between remote handling operations and those carried out manually; therefore, new technological solutions must be deployed. Robotics offers a great opportunity in this new field of technology to carry out, for example, samplings or remediation in hostile, cluttered surroundings. Teams in charge of dismantling at the CEA have therefore first defined robotizable functions. These functions have been assembled from existing technological blocks to arrive at robots which are operating today [RICAIII, patent: FR 2925702]. Lessons learned, particularly from experience with the RICA robot, have enabled the operating technical specifications to be fine-tuned. A new study phase has been launched applying the same principle of adapting existing, proven means. The growing role of robotics today is unquestioned. Led by research and the academic world; robots such as those equipped with wheels, tracks, feet or even helicopter rotors, are today accessible to the general public, particularly via broadening of the 'open source' concept. Added to these we need tools able to manage large component deconstruction systems, like MAESTRO. Industrialization of such high-potential technological solutions has been aided by: - Easy use, - Increasing reliability, - Flexibility of 'open source' solutions, - Widening skill networks, and therefore greater technical support - Lower costs. Decontamination and dismantling (D and D) projects must be able to meet a number of special demands, increasing the number of unit designs, their costs and delivery times. The complexity of dismantling works sites mean that each is a special case to be dealt with almost independently. Such a way of approaching these projects is not on the same wavelength as industry, with tool and method standardization. The answer to the challenge of operations in difficult environments is an eco-system of functions, performed by a set of inter-connected robots. The first step towards the construction of such robot teams is devoted to functions where strength is not necessary: investigating and clean-up in hostile environments. With this in mind, the CEA Marcoule teams have been given the objective of merging the strengthening commercial robotic world with the needs of D and D, and thus to improve the transversal use of the systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of HL deposits for the D and D of UP1 reprocessing plant - retrieval and treatment scenarios - 15295

Built in 1958 on the Marcoule CEA site, the UP1 facility, was the 1. French industrial (500 t U / year) reprocessing plant based on the PUREX process. The plant, which has stopped operation in 1997, constitutes with its auxiliary workshop (vitrification workshop, glass canister storage), one of the largest and most challenging decommissioning project in France. In about 40 years of operation, various type of fuels elements such as metallic uranium, U-Al fuel rods, Phenix breeder elements or PWR fuel have been reprocessed, thereby requiring several plant and process adaptations. Resulting from these complex process chemistry and operation history, significant fouling of the chemical plant circuits and components has occurred. The fission product (FP) concentration process is particularly concerned. Preliminary investigation performed in 2010 in the evaporator's feeding tanks revealed the presence of significant amounts of sludge and dose rates as high as 250 Gy/h. Therefore a thorough investigation campaign, including visual inspection, volume quantification, deposits sampling, and radiological characterization of the components of this workshop has been initiated in 2013. Chemical analysis performed so far show that the solids are mainly composed of zirconium phosphates, 'MoZr' compounds and nitrate salt precipitates. But the presence of insoluble fines arising from the dissolution workshop and organic residues resulting from the TBP decomposition has also been evidenced in some of the tanks. The numerous constraints associated with the management of such highly active sludge, with Cs-137 specific activity ranging from 1 to 10 GBq/g, and a complex physico-chemical composition, lead CEA to investigate the implementation of an in situ conditioning treatment able to produce a waste package complying with existing evacuation routes and/or on-site storage facilities. The full paper presents an overview of the UP1 D and D project and then focuses on the possible dismantling scenarios for the FP concentration workshop, including the evaluation of different strategies for the highly active deposits management. The investigations and deposits characterization program will be developed so as the sampling methodologies that has been specifically tuned. In the light of the best actual knowledge of the deposits properties, the recovery and conditioning treatment scenarios will be exposed, considering, as a case study, the development of a specific vitrification tool to be implemented In Situ and specifically designed to match the requirements and constraints of the D and D project: adequately dimensioned, compact, flexible with respect to the feed composition, for a limited duration of use and designed to be dismantled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Portsmouth D and D Technology Progress: Are We There Yet? - 18131

D and D projects in general and the Portsmouth (PORTS) Gaseous Diffusion Plant (GDP) D and D Project in particular have historically relied on labor-intensive manual methods to accomplish their objectives. In partnering with the Department of Energy's Environmental Management (DOE-EM) Technology Development Office supporting the DOE Science of Safety initiative, PORTS has made significant strides identifying and implementing innovative, mission-relevant robotic and related enabling technologies into the site's day-to-day operations. A WM2017 presentation described the various steps being taken towards technology deployment at PORTS. This WM2018 presentation updates the status of implementation and presents additional technologies that are being developed for deployment at the site. Specific technologies introduced at PORTS over the past year have included Virtual Reality work planning; an emergency response platform; and tele-operated systems for equipment dismantlement, material handling and size reduction. Each of these technologies has moved forward and is progressing toward implementation and operation. In addition, newly developed technology applications for detecting uranium deposits in pipes have successfully completed a series of demonstration testing (cold, warm and hot). Development of production prototypes is currently underway for deployment by late spring 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental and Radiological Readiness of Fixatives, Foams, and Intumescent Coatings for D and D Applications - 18553

During D and D operations of legacy nuclear facilities, the ability to effectively stabilize contamination in large cavities is a significant challenge. For items that must be removed, such as gloveboxes and entry hoods, a method of simply filling the volume to stabilize any residual contamination after contamination efforts have concluded would be of great benefit, and further the As Low As Reasonably Achievable (ALARA) culture of the DOE complex. The development, testing, and characterization of commercial fixatives and foams for applicability towards fixating contamination provides a potential structural reinforcement and fire resiliency in legacy nuclear facility equipment. Much of the equipment, such as gloveboxes, shielded cells, and radiological hoods left over from nuclear processing leave large cavities. Filling these voids after decontamination efforts provides a means of shielding workers from excess radiation exposure while immobilizing residual contamination. As such, we look to continue the development of fixatives/intumescent coatings from the previous year and test commercially available polymer-based foam products for use in filling these cavities, providing a secondary level of protection and shielding during the D and D process This research is funded as part of the In-Situ Decommissioning and Technology Development and sponsored by DOE- Office of Environmental Management Technology Development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Telerobotic Control of Dexterous Dual-Arm Robots for D and D Operations - 18622

Robotic systems hold the potential to significantly reduce exposure of workers to hazardous environments such as in the deactivation and decommissioning (D and D) of nuclear facilities. Our goal is to enable an operator with minimal training to easily control a remote dual-arm robot to perform demolition tasks with hand tools. We propose a system that combines semi-autonomous coordination of the robot's arms with an intuitive operator interface based on virtual reality (VR) technology. A limb coordination system enables independent control of the robot arms, as well as coupled motion required to hold and manipulate rigid bodies such as reciprocating saws, angle grinders and crow bars. Using a VR head mounted display and stereo video from the robot for situational awareness and tracked VR hand controllers to command robot arm movement, an operator will be able to walk up to the control console, pick up the controllers, engage the manipulators, fly the grippers, grasp a tool with one or both robot arms and easily move them in unison to perform tasks. We present preliminary results using simulation and a physical dual-arm platform based on the Johns Hopkins University Applied Physics Laboratory's Modular Prosthetic Limb, an anthropomorphic device that provides hyper-dexterous human-like manipulation capabilities. Anticipated benefits of the robotic system for D and D operations include improved situational awareness, increased mission complexity, and reduced operator training time, workload, and task execution times. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Augmented Teleautonomy on a Hydraulic Manipulator for Nuclear Facility D and D - 19602

Robotic and remote system have been used in nuclear applications to keep the human workers from high radiation environment and enhance task performance. However, applications in the more unstructured nuclear environments present more formidable challenges to robotics and remote systems. In particular, remote operation tasks for nuclear facility D and D (or dismantling) requires dexterous manipulation of heavy objects with simple and rugged robotic equipment. To address such challenge, this paper presents a new teleoperation method of augmented teleautonomy for remote operation of tools for D and D tasks. Rather than imposing complex functionalities on the slave robot, focused innovation is directed to providing effective operator aids in such a way as to draw more performance out of human operators. In this regard, the development entails the implementation of an enhanced telerobotic operation method by incorporating multi-modal augmented reality operator aids and autonomous motion primitives. This paper presents the relevant technology development utilizing a mixed-reality telerobotic test bed, and system integration and demonstration with a rugged, hydraulic slave robot system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Certifying the Performance of Fixative Technologies under Open Air Demolition Activities for D and D - 20096

Department of Energy (DOE) facilities undergoing deactivation and decommissioning (D and D) activities struggle with safety concerns of residual radioactive contamination leftover after gross decontamination efforts have concluded. The positive effects of implementing fixative technologies for decommissioning and maintenance is known across the DOE complex. However, there is no standardized metric in place that quantifies the performance of these technologies such as incombustible fixative platforms that immobilize the contamination in a solid polymer material under normal operating conditions or when exposed to stressors. The primary focus of this research is to provide the empirical data necessary to properly characterize the effects of implementing fixative technologies on mitigating the release of contamination. In addition, this effort has been used to identify and establish uniform testing protocols to quantify operational parameters of fixating platforms and properly credit such systems under a variety of operational conditions and stressors that can arise during open air demolition efforts (e.g. impact, water, thermal, etc.). The established protocols will be provided to the ASTM International E10.03 Subcommittee on Radiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components for the potential of formal standardization. Attributes to be addressed during testing are material compromise from impact stress, thermal stress for incombustible fixative materials, and immobilization factors (how well an immobilizing platform is capable of retaining fixated material during thermal and impact stressors). In developing these test methods, a greater understanding of the material's behavior under anticipated and unanticipated events, such as decommissioning activities and contingency events as outlined in the Basis of Interim Operations (BIO), can be successfully characterized. There are several key components of the experimental methodology that is essential in empirically certifying fixative technologies. A surrogate contaminant with a unique signature has been utilized with the implementation of a uniform contamination process of test coupons that is quantifiable and replicable for direct fixative comparisons. A modular test chamber has also been used to apply the various stressors of interest. Collection of released contamination that includes airborne and resettled contaminant particles and analyzed using mass spectrometry. This research directly supports DOE complex-wide concerns in terms of final disposition of nuclear facilities and the considerations made during their time between ceasing facility operation and final disposition. The results of this effort aims to provide a standardized road map and logical decision flow to better facilitate fixative technologies into D and D activities required to achieve the desired facility end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 132: Risk-Informed Approach for Decision Making in WM, D and D and SNF Management: Reasonable Assurance for Safety

Mr. Larry Camper organized a panel of experts to discuss approaches to better make risk-informed decisions in waste management, decommissioning, and the management of Spent Nuclear Fuel (SNF). The audience heard the perspectives from four panelists that addressed issues ranging from the technical basis used to make risk-informed decisions to for developing cleanup criteria and promulgating regulations and safety standards both domestically and abroad. A summary of each of the presentations given by the panelists is provided herein. This WMS BOD featured panel focused on the Risk-Informed Approach for Decision Making in WM, D and D and SNF Management and the Reasonable Assurance for Safety. The panelists addressed and discussed with the audience different approaches used for decision-making, summarizing ongoing probabilistic vs. deterministic approaches, including IAEA graded approach, and discussed policies/approaches to achieve reasonable assurance for safety rather than using absolute assurance. Panelists with presentations: Risk-Informed Decision Making - More than a Motto? (Paul Black); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid); Risk-Informed Decision-Making and Illustrative National Academies Studies (Charles Ferguson); IAEA's Revised Safety Guidance on Remediation (Michelle Roberts); NDA Radioactive Waste Strategy - A Risk Informed Approach (James McKinney)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The effects of an open and closed divertor on particle exhaust during edge-localized mode suppression by resonant magnetic perturbations in DIII-D

This paper compares the effects of divertor geometry on particle exhaust characteristics during the suppression of ELM using resonant magnetic perturbations (RMPs) on DIII-D. The subject is timely, particularly for ITER, because the combination of techniques to control or mitigate ELMs and control particle exhaust can provide confidence in the ability of an external pumping system to fully remove the particle exhaust. The differences between an open and closed divertor magnetic topology show a strong coupling of the perturbed strikepoint to the pumping manifold in closed divertor configurations, which can increase the particle exhaust by a factor of four. There is also an observed dependence on q95 in this configuration, which is a common feature of RMP ELM suppression. Neutral density in both the active and non-active divertors is seen to increase during the RMP in the ISS configuration, and edge plasma conditions (i.e. ne,sep and midplane profile of Dα) are seen to increase in the closed divertor configuration. Finally, the pumping exhaust is also shown to have a strong dependence on local measurements of the recycling flux. These observations, when taken as a whole, point to a substantial change in the plasma edge conditions, i.e. near the LCFS, throughout the poloidal cross-section of the vacuum vessel. This is coincident with the application of the RMP affecting the pumping capability of the system.

Unterberg, Ezekial↗

JET (3He)-D scenarios relying on RF heating: survey of selected recent experiments

Recent JET experiments have been devoted to the study of (3He) D plasmas involving radio frequency (RF) heating. This paper starts by discussing the RF heating efficiency theoretically expected in such plasmas, covering both relevant aspects of wave and of particle dynamics. Then it gives a concise summary of the main conclusions drawn from recent experiments that were either focusing on studying RF heating physics aspects or that were adopting RF heating as a tool to study plasma behavior. Depending on the minority concentration chosen, different physical phenomena are observed. At very low concentration (X[3He] < 1%), energetic tails are formed which trigger MHD activity and result in loss of fast particles. Alfv n cascades were observed and gamma ray tomography indirectly shows the impact of sawtooth crashes on the fast particle orbits. Low concentration (X[3He] < 10%) favors minority heating while for X[3He] 10% electron mode conversion damping becomes dominant. Evidence for the Fuchs et al standing wave effect (Fuchs et al 1995 Phys. Plasmas 2 1637 47) on the absorption is presented. RF induced deuterium tails were observed in mode conversion experiments with large X[3He] (18%). As tentative modeling shows, the formation of these tails can be explained as a consequence of wave power absorption by neutral beam particles that efficiently interact with the waves well away from the cold D cyclotron resonance position as a result of their substantial Doppler shift. As both ion and electron RF power deposition profiles in (3He) D plasmas are fairly narrow giving rise to localized heat sources the RF heating method is an ideal tool for performing transport studies. Various of the experiments discussed here were done in plasmas with internal transport barriers (ITBs). ITBs are identified as regions with locally reduced diffusivity, where poloidal spinning up of the plasma is observed. The present know-how on the role of RF heating for impurity transport is also briefly summarized.

16 TIDAL AND WAVE POWER↗

Frustrated tunneling ionization during laser-induced D{sub 2} fragmentation: Detection of excited metastable D{sup *} atoms

In a recent Letter, Manschwetus et al.[Phys. Rev. Lett. 102, 113002 (2009)] reported evidence of electron recapture during strong-field fragmentation of H{sub 2}--explained using a frustrated tunneling ionization model. Unusually, the signature of this process was detection of excited H{sup *} atoms. We report here an extensive study of this process in D{sub 2}. Our measurements encompass a study of the pulse duration, intensity, ellipticity, and angular distribution dependence of D{sup *} formation. While we find that the mechanism suggested by Manschwetus et al. is consistent with our experimental data, our theoretical work shows that electron recollision excitation cannot be completely ruled out as an alternative mechanism for D{sup *} production.

74 ATOMIC AND MOLECULAR PHYSICS↗

Amplitude analysis of the B + → D + D - K + decay

Results are reported from an amplitude analysis of the B + → D + D - K + decay. The analysis is carried out using LHCb proton-proton collision data taken at $\sqrt{s}$ = 7, 8, and 13 TeV, corresponding to a total integrated luminosity of 9 fb -1 . In order to obtain a good description of the data, it is found to be necessary to include new spin-0 and spin-1 resonances in the D - K + channel with masses around 2.9 GeV/c 2 , and a new spin-0 charmonium resonance in proximity to the spin-2 χ c2 (3930) state.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Charm mixing in a model-independent analysis of correlated D{sup 0}D{sup 0} decays

We investigate the impact of charm mixing on a model-independent {gamma} measurement using the Dalitz plot analysis of the three-body D decay from the B{sup +}{yields}DK{sup +} process, and show that ignoring the mixing at all stages of the analysis is safe up to a sub-degree level of precision. We also find that in the coherent production of the D{sup 0}D{sup *0} system in e{sup +}e{sup -} collisions, the effect of charm mixing is enhanced, and propose a model-independent method to measure charm mixing parameters in time-integrated Dalitz plot analysis at charm factories.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗