Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Launch and Commissioning of the Deep Space Climate Observatory

The Deep Space Climate Observatory (DSCOVR), formerly known as Triana, successfully launched on February 11th, 2015. To date, each of the five space-craft attitude control system (ACS) modes have been operating as expected and meeting all guidance, navigation, and control (GN&C) requirements, although since launch, several anomalies were encountered. While unplanned, these anomalies have proven to be invaluable in developing a deeper understanding of the ACS, and drove the design of three alterations to the ACS task of the flight software (FSW). An overview of the GN&C subsystem hardware, including re-furbishment, and ACS architecture are introduced, followed by a chronological discussion of key events, flight performance, as well as anomalies encountered by the GN&C team.

DSCOVR↗

RHIC spin flipper commissioning results

The five AC dipole RHIC spin flipper design in the RHIC Blue ring was first tested during the RHIC 2012 polarized proton operation. The advantage of this design is to eliminate the vertical coherent betatron oscillations outside the spin flipper. The closure of each ac dipole vertical bump was measured with orbital response as well as spin. The effect of the rotating field on the spin motion by the spin flipper was also confirmed by measuring the suppressed resonance at Q{sub s} = 1 - Q{sub osc}.

43 PARTICLE ACCELERATORS↗

Commissioning of a beta* knob for dynamic IR correction at RHIC

In addition to the recent optics correction technique demonstrated at CERN and applied at RHIC, it is important to have a separate tool to control the value of the beta functions at the collision point ({beta}*). This becomes even more relevant when trying to reach high level of integrated luminosity while dealing with emittance blow-up over the length of a store, or taking advantage of compensation processes like stochastic cooling. Algorithms have been developed to allow modifying independently the beta function in each plane for each beam without significant increase in beam losses. The following reviews the principle of such algorithms and their experimental implementation as a dynamic {beta}-squeeze procedure.

43 PARTICLE ACCELERATORS↗

Cybersecurity of DER Systems: Cybersecurity Training for State Commissions

NARUC regularly hosts multi-day cybersecurity training events for commissioners and their staff to gain knowledge of IT/OT technologies, understand the spectrum of state and federal approaches to cybersecurity, and explore cybersecurity cost recovery challenges and innovative solutions to address them. About 300 commissioners and staffers typically register for these virtual events.

cybersecurity cost recovery↗

The Building and Commissioning of the Batch Pyrolysis Plant in Studsvik, Sweden - 12447

After a sequence of lab scale and bench scale trials the building of a pyrolysis plant could begin at the Studsvik site in Sweden. The facility is primarily aimed at treatment of uranium contaminated organic waste originating at fuel manufacturing plants and other facilities where the main contamination is uranium. The plant is an extension/addition to the already operating incinerator. In order to further widen the waste acceptance criteria the design of the off-gas treatment system does not have the same design as that of the incinerator. The building of the facility began in April 2011, and the first heating of the facility took place in late December, 2011. The site acceptance tests are planned for January, as are the first inactive trials aimed at optimisation of process control. The facility is planned to be operating with radioactive materials from February 2012. The pyrolysis unit is primarily aimed at treatment of uranium contaminated waste, under conditions that facilitate leaching and recovery of the uranium from the ashes. However, a number of other uses are conceivable. The batch fed pyrolysis unit, with its chosen design of the off-gas treatment system, enables treatment of some waste fractions that are difficult to treat in the incinerator. For instance small campaigns, i.e. smaller quantities of waste (typically <5 tonnes), or waste containing high levels of chlorine and sulphur are possible to treat in the pyrolysis unit. The pyrolysis unit is also expected to perform well in the treatment of other 'difficult' waste fractions, for instance waste containing pyrophoric materials, or other types of waste that benefit from the high level of process control, i.e. control of temperature and atmosphere throughout the process, that can be obtained in the pyrolysis unit compared to the incinerator. Furthermore, treatment in the pyrolysis unit minimises the risk of cross contamination between different waste treatment campaigns. This feature is obtained thanks to the low gas flow rates in the vessel, which means that a higher retention of nuclides in the ashes is obtained, but also through a design that facilitates cleaning of the pyrolysis vessel and the system beyond this, or even exchanging the most critical components, such as the pyrolysis vessel itself, if need be. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results from the commissioning of a multi-modal endoscope for ultrasound and time of flight PET

The EndoTOFPET-US collaboration has developed a multi-modal imaging system combining Ultrasound with Time-of-Flight Positron Emission Tomography into an endoscopic imaging device. The objective of the project is to obtain a coincidence time resolution of about 200 ps FWHM and to achieve about 1 mm spatial resolution of the PET system, while integrating all the components in a very compact detector suitable for endoscopic use. This scanner aims to be exploited for diagnostic and surgical oncology, as well as being instrumental in the clinical test of new biomarkers especially targeted for prostate and pancreatic cancer. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The completion of the construction and commissioning of the liquid radwaste treatment plant at ChNPP - 15685

Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m{sup 3} of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010, FSUE RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWS tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Testing of a First-of-a-Kind Process to Support Commissioning a New Hazard Category 2 Nuclear Facility - 16573

The Department of Energy's Department of Environmental Management faces the complex task of cleaning up waste from nuclear weapons production. Often, the clean-up requires novel and untested technologies and approaches. In these cases, it is always necessary to provide some measure of assurance that the design engineers will be able to produce a design that will function in the means intended. Too many times we have seen first of a kind nuclear processing technologies put forth as commercially ready, only to be found insufficiently mature once attempted to be readied for operation. As now required by the DOE's Technology Readiness Assessment Process, it is necessary to demonstrate technologies in a similar environment to the current application and tested with a range of bounding simulants, or actual waste materials, if possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance of the Superconducting Corrector Magnet Circuits during the Commissioning of the LHC

The LHC is a complex machine requiring more than 7400 superconducting corrector magnets distributed along a circumference of 26.7 km. These magnets are powered in 1446 different electrical circuits at currents ranging from 60 A up to 600 A. Among the corrector circuits the 600 A corrector magnets form the most diverse and differentiated group. All together, about 60000 high current connections had to be made. A fault in a circuit or one of the superconducting connections would have severe consequences for the accelerator operation. All magnets are wound from various types of Nb-Ti superconducting strands, and many contain parallel protection resistors to by-pass the current still flowing in the other magnets of the same circuit when they quench. In this paper the performance of these magnet circuits is presented, focusing on the quench behavior of the magnets. Quench detection and the performance of the electrical interconnects will be dealt with. The results as measured on the entire circuits are compared to the test results obtained at the reception of the individual magnets.

43 PARTICLE ACCELERATORS↗

Commissioning of the new AGS MMPS transformers

The Brookhaven AGS Main Magnet Power Supply (MMPS) is a thyristor control supply rated at 5500 Amps. +/-9000 Volts. The peak magnet power is 50 MWatts. The power supply is fed from a motor/generator manufactured by Siemens. During rectify and invert operation the P Bank power supplies are used. During the flattops the F Bank power supplies are used. The P Bank power supplies are fed from two 23 MVA transformers and the F Bank power supplies are fed from two 5.3 MYA transformers. The fundamental frequency of the F Bank power supplies is 1440 Hz, however the fundamental frequency of the P banks was 720 Hz. It was very important to reduce the ripple during rectify to improve polarized proton operations. For this reason and also because the original transformers were 45 years old we replaced these transformers with new ones and we made the fundamental frequency of both P and F banks 1440 Hz. This paper will highlight the major hurdles that were involved during the installation of the new transformers. It will present waveforms while running at different power levels up to 6MW full load. It will show the transition from the F-Bank power supplies to the P-Banks and also show the improvements in ripple made on the P-Bank power supplies.

43 PARTICLE ACCELERATORS↗

LCLS Undulator Commissioning, Alignment, and Performance

The LCLS x-ray FEL has recently achieved its 1.5-Angstrom lasing and saturation goals upon first trial. This was achieved as a result of a thorough pre-beam checkout, both traditional and beam-based component alignment techniques, and high electron beam brightness. The x-ray FEL process demands very tight tolerances on the straightness of the electron beam trajectory (<5 {micro}m) through the LCLS undulator system. Tight, but less stringent tolerances of {approx}100 {micro}m rms were met for the transverse placement of the individual undulator segments with respect to the beam axis. The tolerances for electron beam straightness can only be met through a beam-based alignment (BBA) method, which is implemented using large electron energy variations and sub-micron resolution cavity beam position monitors (BPM), with precise conventional alignment used to set the starting conditions. Precision-fiducialization of components mounted on remotely adjustable girders, and special beam-finder wires (BFW) at each girder have been used to meet these challenging alignment tolerances. Longer-term girder movement due to ground motion and temperature changes are being monitored, continuously, by a unique stretched wire and hydrostatic level Alignment Diagnostics System (ADS).

43 PARTICLE ACCELERATORS↗