Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CERTIFICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 631 records · Page 35

Control Systems & LEED

This article discusses the LEED guidelines (2009 v3), and corresponding points, that can only be attained using control systems for lighting, HVAC, and/or the entire building. Integrating and centralizing control systems allows for better building management, energy savings and can potentially award 29 points towards certification across the following categories: Sustainable Sites, Energy & Atmosphere, and Indoor Air Quality. In closing, potential energy savings are highlighted and the overall market potential for control systems are summarized.

Control Systems↗

ESPC ESA Case Study: Energy Affordability at the National Institute of Standards and Technology

The U.S. Department of Commerce (DOC) National Institute of Standards and Technology (NIST) in Gaithersburg, Maryland, installed a 5 MW-DC photovoltaic (PV) system under an energy savings performance contract energy sales agreement (ESPC ESA). The project was implemented using the U.S. Department of Energy (DOE) ESPC ENABLE contract vehicle. This project provides an example of the benefits of using an ESPC ESA to reduce project costs and provide the best value to the government, allowing the system owner to monetize tax incentives such as the federal investment tax credit (ITC) and Modified Accelerated Cost Recovery System (MACRS), and use or sell the solar renewable energy certificates (SRECs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status and Trends in the Voluntary Market (2018 Data)

Green power refers to renewable electricity voluntarily purchased by retail electricity customers. Renewable energy sources for green power include solar, wind, biomass, geothermal, and small-scale hydropower. This report summarizes data on the various ways in which voluntary purchasers - including residential, commercial, and institutional customers - purchase green power. We summarize key historic trends in U.S. voluntary green power markets and the current status of green power sales through seven products: utility green pricing programs, utility renewable contracts, competitive suppliers, unbundled renewable energy certificates, community choice aggregations, power purchase agreements, and community solar.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Status and Trends in the Voluntary Market (2019 Data)

Green power refers to renewable electricity voluntarily purchased by retail electricity customers. Renewable energy sources for green power include solar, wind, biomass, geothermal, and small-scale hydropower. This report summarizes data on the various ways in which voluntary purchasers - including residential, commercial, and institutional customers - purchase green power. We summarize key historic trends in U.S. voluntary green power markets and the current status of green power sales through seven products: utility green pricing programs, utility renewable contracts, competitive suppliers, unbundled renewable energy certificates, community choice aggregations, power purchase agreements, and community solar.

42 ENGINEERING↗

Rural K-12 School Workforce Development and Training

This fact sheet summarizes some of the available materials, trainings, and certification courses for building operators of rural K-12 school facilities who wish to expand their energy efficiency knowledge and apply it to their schools.

Energy Efficiency, K-12, K-12 Schools, Education, ↗

2021 Prototype Installation and Testing Awardee: XFlow Energy Company

XFlow Energy Company (XFlow Energy) aims to reduce the cost of wind energy by designing vertical-axis wind turbines (VAWTs), which have a cheaper blade manufacturing process and a mechanically simpler design than traditional wind turbines, among other cost-saving advantages. However, a lack of modeling or simulation tools that can predict the coupling between aerodynamic and structural forces poses a significant challenge to developers of VAWTs. Known as aeroelastic models, these are not just important design tools - they're critical for certifying VAWTs of 25 kilowatts (kW), which is the size of XFlow Energy's prototype wind turbine. Without certification, XFlow Energy will not be able to deliver an independently validated product to its customers, and those customers will not be eligible for state and federal incentives. An accurate aeroelastic model could provide less-conservative structural optimization tactics than are currently used, resulting in a wind turbine with lower capital costs.

CIP↗

Meeting Building Energy Performance Standards at The Westory

The Westory office building used Washington, DC's Building Energy Performance Standard as an impetus for energy efficiency improvements and certification with the assistance of Cushman & Wakefield's Energy & Sustainability Services.

Energy Performance Standards, Energy Audit, ENERGY↗

Status of planned change requests for the waste isolation pilot plant

At the submittal of the initial abstract to the Waste Management Symposium, the U.S. Department of Energy (DOE) had submitted and contemplated submitting a total of four planned change requests (PCRs) for U.S. Environmental Protection Agency (EPA) action before March of 2009. That date is the regulatory deadline for submitting the second Compliance Re-certification Application (CRA-2009) to the EPA. The Panel Closure PCR has subsequently been withdrawn in favor of postponing a final decision until after sufficient data has been obtained from the monitoring of hydrogen and methane in waste-filled rooms. A proposal to change a set of performance assessment (PA) parameters and a conceptual model has been removed from consideration due to schedule constraints. These parameters were the shear strength of the waste and the extent and evolution of the disturbed rock zone surrounding the rooms. A PCR was submitted to the EPA in April 2006 to reduce the mass of magnesium oxide (MgO) that must be emplaced in the repository. The EPA is currently reviewing the information submitted by DOE. A PCR was submitted to the EPA in November 2007 to allow emplacement of remote-handled transuranic (RH-TRU) waste in shielded containers on the floor of the repository. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of SAP Waste Management System

The Y-12 National Security Complex (Y-12) assumed responsibility for newly generated waste on October 1, 2005. To ensure effective management and accountability of newly generated waste, Y-12 has opted to utilize SAP, Y-12's Enterprise Resource Planning (ERP) tool, to track low-level radioactive waste (LLW), mixed waste (MW), hazardous waste, and non-regulated waste from generation through acceptance and disposal. SAP Waste will include the functionality of the current waste tracking system and integrate with the applicable modules of SAP already in use. The functionality of two legacy systems, the Generator Entry System (GES) and the Waste Information Tracking System (WITS), and peripheral spreadsheets, databases, and e-mail/fax communications will be replaced by SAP Waste. Fundamentally, SAP Waste will promote waste acceptance for certification and disposal, not storage. SAP Waste will provide a one-time data entry location where waste generators can enter waste container information, track the status of their waste, and maintain documentation. A benefit of the new system is that it will provide a single data repository where Y-12's Waste Management organization can establish waste profiles, verify and validate data, maintain inventory control utilizing hand-held data transfer devices, schedule and ship waste, manage project accounting, and report on waste handling activities. This single data repository will facilitate the production of detailed waste generation reports for use in forecasting and budgeting, provide the data for required regulatory reports, and generate metrics to evaluate the performance of the Waste Management organization and its subcontractors. SAP Waste will replace the outdated and expensive legacy system, establish tools the site needs to manage newly generated waste, and optimize the use of the site's ERP tool for integration with related business processes while promoting disposition of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ESBWR - Robust design for natural circulation and stability performance effectiveness

ESBWR is a 4500 MWt Generation III+ natural circulation reactor with an array of robust design features and passive safety systems to deliver highly effective plant performance during normal operation and to keep the reactor safe during postulated transients and accidents. With the submittal of the latest revision of the Design Control Document (DCD) to US Nuclear Regulatory Commission, ESBWR is nearing the completion of the US design certification process. This paper focuses on the natural circulation-driven plant performance aspects during normal operation, and stability evaluation of the robust ESBWR design. The TRACG computer code is used for the analysis of ESBWR plant performance, safety analysis, and stability margins. The paper describes the evaluation of ESBWR stability performance during normal power operation including operation in the Core Power-Feed Water Temperature Operating Domain. For ESBWR the normal power operation condition has the highest power/flow ratio and is limiting from the perspective of stability. The paper includes results from detailed evaluation of the most limiting decay ratio for out-of-phase regional oscillations calculated by perturbing the core inlet flow rate in this out-of-phase mode about the line of symmetry for the azimuthal harmonic mode. The paper also summarizes the ESBWR regional mode stability evaluations during a limiting transient (Loss of Feedwater Heating), and during ATWS (Anticipated Transient without Scram). Nominal decay ratios of limiting Channel oscillation, Core wide oscillation and Regional oscillation are within the maximum acceptance criterion of 0.8, at 95% content and 95% confidence. These stability evaluation results indicate decay ratio is within design limits. The paper also describes the evaluation of ESBWR stability performance during plant startup, and summarizes the defense-in-depth stability solution for ESBWR. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Benefits of creating a cross-country data framework for energy efficiency

As manufacturers now sell a similar range of consumer electronics and home appliances to major markets around the world, the task of identifying a product’s energy efficiency rating has usually been the responsibility of each country and its respective government agency. This has led to a multitude of energy efficiency testing procedures, ratings, and certifications, resulting in disparate data being captured on identical products. Furthermore, lack of consistent product identification criteria means product energy performance is not easily connected to relevant information about the product such as market availability, price or real world energy consumption. This paper presents a new data standard for reporting energy performance and related product information that can be adopted internationally. To inform the development of this standard, we explore the existing energy efficiency market data for the two example products of TVs and Room Air Conditioners. This paper discusses current/future use cases of appliance level energy efficiency data across all stakeholders, including consumers, retailers/manufacturers, global standards organizations, third party service providers, and regulatory agencies. It also explains the key benefits of moving to a common international data framework for energy efficiency, such as: 1) a centralized product information repository for comparing energy use, ratings/certifications, and pricing data 2) improved access to relevant consumer electronics and appliance data to facilitate new policy development and harmonization across markets 3) enablement of retailers and other third parties to embed actionable energy efficiency information as part of the consumer experience.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Land Use Manager Application Ensures Protectiveness Following Remediation on the Oak Ridge Reservation - 13355

Long-term stewardship is the set of activities necessary to return contaminated land to safe and beneficial use. The activities include physical and legal controls to prevent inappropriate exposure to contamination left in place at a site. It is the longest phase of the Department of Energy's Environmental Management Program and ensures the protection of human health and the environment for varied end uses. At the Department of Energy's Oak Ridge Reservation an automated program has been developed and implemented that tracks the multitude of long-term stewardship activities. The Oak Ridge Reservation is a large site that currently has over 50 actions requiring long-term stewardship activities. The Oak Ridge Reservation consists primarily of three plant sites, and long-term stewardship will enable these sites to be leased to private entities (East Tennessee Technology Park), modernized for an evolving national security mission (Y-12 National Security Complex), and revitalized to continue multi-disciplinary research (Oak Ridge National Laboratory). The varied site end uses of the individual plant sites coupled with the multitude of controls required by leaving waste in place presents challenges. A single remedial action may include surveillance and maintenance activities, media monitoring, property record notices as well as physical controls such as fences and signs. Thus, the array of long-term stewardship activities is complex and intermingled (over 200 inspections each year at various frequencies are required currently) and requires an effective tracking program, termed the Land Use Manager. The Land Use Manager is a web-based data management application for use by personnel responsible for implementing, maintaining, and verifying engineering and land use controls on the Oak Ridge Reservation. The program is a data entry and tracking tool, as well as a notification tool. The status and performance of engineering and land use controls are checked annually for evaluation in the required Remediation Effectiveness Report, and the automated Land Use Manager collects, maintains, tracks, notifies, monitors, and manages the information necessary to perform this evaluation. Land Use Manager tracks site information including type of contamination, regulatory requirements, locates land use controls; provides information on inspections, certification, and reporting; and provides reports. Most data access features, e.g., view, print, query, and download, are available to all users; however, data input, updating, and editing are restricted to the personnel directly responsible for monitoring and inspection. The Land Use Manager application was developed for the Department of Energy Oak Ridge Office by URS - CH2M Oak Ridge LLC, Restoration Services Incorporated, and MIJARA Corporation to meet the specific needs of long-term stewardship tracking on the Oak Ridge Reservation. The successful implementation of long-term stewardship enables the future government and private activities being planned on the Oak Ridge Reservation to proceed. (authors)

54 ENVIRONMENTAL SCIENCES↗

Testing of a Transport Cask for Research Reactor Spent Fuel - 13003

Since the beginning of the last decade three Latin American countries that operate research reactors - Argentina, Brazil and Chile - have been joining efforts to improve the regional capability in the management of spent fuel elements from the TRIGA and MTR reactors operated in the region. A main drive in this initiative, sponsored by the International Atomic Energy Agency, is the fact that no definite solution regarding the back end of the research reactor fuel cycle has been taken by any of the participating country. However, any long-term solution - either disposition in a repository or storage away from reactor - will involve at some stage the transportation of the spent fuel through public roads. Therefore, a licensed cask that provides adequate shielding, assurance of subcriticality, and conformance to internationally accepted safety, security and safeguards regimes is considered a strategic part of any future solution to be adopted at a regional level. As a step in this direction, a packaging for the transport of irradiated fuel for MTR and TRIGA research reactors was designed by the tri-national team and a half-scale model equipped with the MTR version of the internal basket was constructed in Argentina and Brazil and tested in Brazil. Three test campaigns have been carried out so far, covering both normal conditions of transportation and hypothetical accident conditions. After failing the tests in the first two test series, the specimen successfully underwent the last test sequence. A second specimen, incorporating the structural improvements in view of the previous tests results, will be tested in the near future. Numerical simulations of the free drop and thermal tests are being carried out in parallel, in order to validate the computational modeling that is going to be used as a support for the package certification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing and improving regulatory communication processes: the case of the WIPP CRA - 15151

This paper will focus on how and why effective communication is useful and meaningful for a multi-organizational project team and the concrete practices through which this team assessed and intervened in its communication. First, the effort generated five recommendations that may be useful in other similar projects. The five primary areas of improvement include the use of an electronic platform for collaboration and document sharing, the continued use of an in-house technical editor, improved direction for authors and technical editors, improved comment resolution process (development of Communication Guidelines) and improved management of the project schedule. These areas for improvement were translated into process changes that were identified and agreed upon by the team. Specific actions were assigned to members of the team with the intent to streamline the complex regulatory process. Second, and more importantly, we demonstrate how the assessment of communication, thinking about our communication practices together (reflexive engagement), and the implementation of insights about communication fit into a larger continuous improvement framework. Third, the experience of the interdisciplinary team provided preliminary evidence about the efficacy of the approach and the need for continuous engagement with communication. The intensified participation in the second assessment encouraged greater ownership and satisfaction with corrective actions. The substance of the recommendations was made more robust as well, focusing on improving communication within the project team. Early anecdotal evidence suggests that improvements in communications continue to enhance the project team's efficiency and efficacy of the planning phase through submittal of the Compliance Re-certification Application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of an additional exhaust shaft on WIPP performance - 15170

The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of transuranic (TRU) waste. WIPP performance assessment (PA) demonstrates repository performance from facility closure to 10,000 years after closure. The recent radiological release event at the WIPP site has temporarily halted waste emplacement activities at the facility. A modified ventilation system is envisioned that will provide sufficient airflow necessary for the resumption of full-rate disposal operations in the future. A primary component of the modified ventilation system is an additional exhaust shaft in the north end of the repository. There are four shafts currently in the repository north end, namely a salt handling shaft, an exhaust shaft, a waste shaft, and an air intake shaft. These shafts are combined into a single composite shaft in WIPP PA that captures the combined impacts of all of them. The proposed additional exhaust shaft is combined with the four existing shafts in the repository model to determine its impacts on long-term repository performance. Moreover, mined volume in the repository north end is modified in the repository representation so as to include additional drifts created to access the new shaft. Computed gas and brine flow behaviors corresponding to the repository with the additional exhaust shaft are compared to those obtained in the PA executed for the 2014 Compliance Re-certification Application (the CRA-2014 PA). Results show that the repository with an additional exhaust shaft and drifts yields brine and gas flow behaviors similar to the current repository configuration. It is concluded that WIPP continues to satisfy regulatory compliance limits with the addition of an exhaust shaft and its access drifts, with compliance curves like those found in the CRA-2014 PA for total normalized releases. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk considerations for WIPP passive institutional controls - 15173

The regulatory assurance measures for the Waste Isolation Pilot Plant (WIPP) include such things as active and passive institutional controls, monitoring, waste retrieval/removal capabilities and engineered barriers. Passive Institutional Controls (PICs) are an assurance measure intended to reduce the likelihood of humans unintentionally intruding the WIPP geologic radioactive waste disposal system for thousands of years after it is closed. The waste repository is designed such that it should not pose a significant risk to future populations if it is left undisturbed. The design has also been demonstrated through a performance assessment (PA) analysis to not pose a significant risk to future generations even if it is intruded upon by an inadvertent drilling intrusion [1, Appendix PA]. Through PA, it has been determined that the overall risk of the disposal system to people and the environment is small. The intent of the regulatory Assurance Requirements and PICs is to provide additional confidence that the repository will perform as expected after closure. However, the actual implementation of the proposed PICs design may pose a greater risk to the current population than they would potentially reduce for future generations. Specifically, the risks due to industrial accidents, construction and transportation risks incurred during the fabrication and construction of the permanent markers system may be greater than the overall reduction in risk to future generations due to the existence of the permanent markers. If this were true, implementation of the current PICs design may be counter to the intention of the regulatory requirement to include such assurance measures. As such, provisions for assurance measures used in geologic radioactive waste disposal facilities, such as PICs, should consider risk impacts. A provision of any disposal program's Regulatory Assurance Requirements should address the impacts of the known risks from all the components of the assurance-related systems. The initial WIPP PICs design was developed as part of the regulatory certification process in 1996 with the intent of being revised when the WIPP closes several decades from now [2, Appendix PIC]. The revised design that will be developed at closure should address the design's potential reduction to long-term risks from the repository and the risks due to the implementation of the final design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influencing future exploratory drilling rates-a potential approach for the waste isolation pilot plant - 15307

The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing activities related to the disposal of TRU and TRU-mixed waste in the geologic repository at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. The WIPP Compliance Certification Application had a reference concerning natural resources at the site of the Waste Isolation Pilot Plant. This reference suggested that resources could be withdrawn from under the repository area from a distance and not affect the integrity of the repository. This would not eliminate, but would certainly diminish, the rate of exploratory drilling in the distant future. Currently the only scenarios that result in releases from the repository are human intrusion scenarios, without human intrusion radioactive releases to the accessible environment are essentially zero for the very long term future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory testing options for FUSRAP projects - 15462

Remediation projects within the Formerly Used Sites Remedial Action Program (FUSRAP) have many options to consider when evaluating their analytical testing needs. Factors that should be considered in determination of a project's analytical testing needs include which parameter results are considered time-critical, the potential savings in reduction of construction-related delays when time-critical samples are analyzed onsite (including screening) instead of offsite, control of data quality for onsite versus offsite data, and the value of additional knowledge gained by programs such as FUSRAP by employing onsite laboratories. The most important factor turned out to be reduction in construction-related delays. We considered development of an optimum combination of onsite lab/offsite lab capability. This depends on: i. Time critical parameters and the methods required; ii. Estimated Cost for onsite lab construction or facility rental, maintenance, labor, chemicals (reagents and standards), and certification (if desired and deemed necessary) iii. Ability, flexibility, and cost of offsite lab sample testing using project-desired TATs and methods that will meet project action levels iv. Willingness of stakeholders, in particular regulators, in accepting some combination of onsite and offsite testing (for example, onsite screening followed by offsite confirmatory testing for certain parameters) Due to the significant costs in construction of an onsite lab and development of sample testing capability and all which that entails, the recommendations made in this paper will aid other FUSRAP projects in finding an acceptable combination of onsite and offsite testing that is acceptable to all stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗