Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Extraction-Scrub-Strip test results from the interim Salt Disposition Program Macrobatch 9 Tank 21H qualification samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). The Salt Batch 9 characterization results were previously reported. An Extraction-Scrub-Strip (ESS) test was performed to determine cesium distribution ratios (D (Cs) ) and cesium concentration in the strip effluent and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a blend solvent prepared by SRNL that mimics the solvent composition currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D (Cs) value of 52.4. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This compares well against the predicted value of 56.5 from a recently created D (Cs) model

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scoping Study for Fast Flux Testing in the Advanced Test Reactor

The value of fast spectrum reactors remains prominent in the nuclear technology portfolio. The performance of these reactors can be maximized with advancements in nuclear fuel technologies, but development of these technologies is currently held back by lack of fast spectrum test reactors available to the United States. Spectral modification of experiment positions in the thermal spectrum Advanced Test Reactor (ATR) has long been used to support fast reactor fuel development, but these methods have not been progressed to their full potential. This study investigated the use of concentric rings of aluminum-clad fuel plates in ATR flux traps and thermal neutron absorbing filters to increase fast neutron flux on test specimens. This concept was termed the Boosted Energy Advanced Spectrum Test (BEAST). This approach will enable irradiation of advanced fuel designs in prototypic-length fuel pins and representative flux environment to support post irradiation exams, enable transient testing, and produce the type of data that will permit lead test assembly irradiations in true Sodium Fast Reactors (SFRs) when they become available. Neutronic predictions were performed to investigate BEAST design options and thermal hydraulic models were produced to ensure feasibility of BEAST. Two versions were considered based on the geometric limitations of ATR’s small and large flux traps. The small version was found to be preferable due to slightly higher fast flux and fast-to-thermal neutron ratio. Perhaps more influentially, the small flux trap option was also preferred to avoid conflict with ongoing very high temperature reactor fuel irradiation programs in ATR’s large northeast flux trap. The small flux trap option provided less than half the test volume of the large version, but still had adequate volume for seven SFR pins in cross section which could be stacked two-high in ATR’s 1.2m long core to accommodate up to 14 EBR-II size pins. The preference for the small flux trap configuration should be revisited if additional collaborative test programs emerge with the need to irradiate a significant volume of additional specimens. Calculations were performed regarding a lithium deuteride ring to convert thermal neutrons into 14 MeV fusion neutrons. At the time this report was written these calculations were partially complete and it remains to be seen whether the concept would be worth including in BEAST. Given the preference for the small flux trap option, which does not afford enough room for the 14 MeV ring, it was concluded to defer future work on the lithium deuteride ring. This decision could be revisited if fusion material research programs emerge for collaborative testing in BEAST. A cadmium-lined specimen holder design was found to be adequate in filtering thermal neutrons and preferred over other neutron absorbers based on past experience with cadmium baskets. It was acknowledged that cadmium-bearing hardware would become depleted and need to be replaced occasionally, which appeared feasible from a mechanical design perspective. Neutronic studies investigated different enrichment levels in the booster fuel using uranium-molybdenum alloy dispersion fuel which has performed well in past ATR irradiations. Both options were able to drive fuel pins to SFR-like fission heating rates. The high enriched booster fuel option outperformed the low enriched option by ~20% on key metrics including fast flux and fast-to-thermal ratio, but the low enriched option was favored in order to broaden options for potential fuel suppliers. The preferred BEAST design options including cadmium filter with low enriched booster fuel in the small flux trap configuration was predicted to achieve 6.2E14 n/cm2sec fast flux (>0.1 MeV) with a fast-to-thermal ratio of 44.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modeling the use of mobile modular gas samplers in near-field detection

The Wireless Independent Noble Gas Sampler (WINGS) is a mobile, modular gas sampling system designed for use in low infrastructure environments. In the case of a suspected underground nuclear explosion (UNE), WINGS units could be deployed to detect noble gases emanating from the suspected explosion site or identify gases originating from another source entering the local area from offsite. In conclusion, this work uses the atmospheric transport modeling tool inline WRF-HYSPLIT to test the effectiveness of WINGS units around a suspected UNE site as a function of sampler density and distance from the emission point of gases from a UNE.

Air sampling↗

ACCELERATING MICROREACTOR DEVELOPMENT AND DEPLOYMENT THROUGH JOINT PUBLIC TEST BEDS AND PRIVATE ADVANCED REACTOR DEVELOPMENT

The United States Department of Energy (DOE) has funded the National Reactor Innovation Center (NRIC) to accelerate the development and commercialization of small modular reactors and other advanced reactor technologies. As part of this effort NIRC is building two strategic assets at the Idaho National Laboratory (INL) to facilitate public-private partnerships for the development and testing of advanced nuclear microreactors and Small Modular Reactors (SMR). One will provide a safe, secure, and affordable location for High-Assay Low Enriched Uranium (HALEU) fueled reactors and a second for Highly Enriched Uranium (HEU) fueled reactors. Together these testbeds fill a nuclear testing infrastructure gap. The availability of such comprehensive testing facilities at the national labs eliminates the significant financial and operational burdens associated with each developer building and licensing their own test facilities. Consequently, this approach will not only accelerate technological innovation and reduce time-to-market for advanced nuclear solutions but it also underscores the DOE's commitment to fostering an ecosystem where nuclear energy will thrive as a clean, reliable, and efficient source of power. The Demonstration of Microreactor Experiments (DOME) and Laboratory for Operations and Testing in the United States (LOTUS) have planned availability in 2026, and 2027 respectively.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LONG-TERM DEMONSTRATION OF SORBENT ENHANCEMENT ADDITIVE TECHNOLOGY FOR MERCURY CONTROL

Long-term demonstration tests of advanced sorbent enhancement additive (SEA) technologies have been completed at five coal-fired power plants. The targeted removal rate was 90% from baseline conditions at all five stations. The plants included Hawthorn Unit 5, Mill Creek Unit 4, San Miguel Unit 1, Centralia Unit 2, and Hoot Lake Unit 2. The materials tested included powdered activated carbon, treated carbon, scrubber additives, and SEAs. In only one case (San Miguel) was >90% removal not attainable. The reemission of mercury from the scrubber at this facility prevented >90% capture.

20 FOSSIL-FUELED POWER PLANTS↗

Challenges and Solutions for Fast Neutron Irradiation of Bulk Material Specimens

Reactor developers continue to recognize opportunities for further enhancing fast spectrum reactor designs with advanced core materials, but all the material test reactors currently available to the United States are thermal spectrum designs. Fortunately, the Advanced Test Reactor and High Flux Isotope Reactor are versatile high flux facilities where spectral modification strategies can be used to reduce undesirable thermal neutron capture transmutation damage and augment fast flux delivered to specimens. New opportunities to leverage high flux regions and specially designed fast flux boosting experiment configurations can be used to achieve meaningful fast fluences on large specimens in ATR. New optimization potentials can be employed to achieve even higher fluences, albeit for smaller specimens, using thermal neutron filters in HFIR test positions. These capabilities, while not true fast reactors, can provide highly relevant environments for researchers needing to study the effects of fast neutron damage in bulk material specimens.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Closure Report for Corrective Action Unit 414: Clean Slate III Plutonium Dispersion (TTR) Tonopah Test Range, Nevada

The purpose of this CR is to provide documentation and justification for the clean closure of CAU 414 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, closureactivities conducted at the site, and the results of verification samples. Clean closure activities included excavating and disposing of radiologically contaminated soil and debris in the vicinity of ground zero, and collecting verification samples to support the corrective action of clean closure. Results confirmed that further corrective action is not required at CAU 414. Based on the corrective action activities conducted, clean closure of the site is complete; the closure objectives established in the CADD/CAP have been achieved; and no further corrective action at the site is required.

54 ENVIRONMENTAL SCIENCES↗

Simulating the Heterogeneity in Braided Channel Belt Deposits: 2. Examples of Results and Comparison to Natural Deposits

In Part 1 of this series we presented a methodology and a code for modeling the hierarchical sedimentary architecture in braided channel belt deposits. Here, in Part 2, the code was used to create a digital model of this architecture, and the corresponding spatial distribution of permeability. The simulated architecture was compared to the real stratal architecture observed in an abandoned channel belt of the Sagavanirktok River, Alaska by Lunt et al. (2004). The comparisons included assessments of similarity which were both qualitative and quantitative. From the qualitative comparisons we conclude that a synthetic deposit created by the code has unit types, at each level, with a geometry which is generally consistent with the geometry of unit types observed in the field. The digital unit types would generally be recognized as representing their counterparts in nature, including cross stratasets, lobate and scroll bar deposits, channel fills, etc. Furthermore, the synthetic deposit has a hierarchical spatial relationship among these units which represents how the unit types are observed in field exposures and in geophysical images. In quantitative comparisons the proportions and the length, width, and height of unit types at different scales, across all levels of the stratal hierarchy compare well between the digital and the natural deposits. A number of important attributes of the channel belt model were shown to be influenced by more than one level within the hierarchy of stratal architecture. First, the high-permeability open-framework gravels percolated at all levels and thus formed preferential flow pathways. Open framework gravels are indeed known to form preferential flow pathways in natural channel belt deposits. The nature of a percolating cluster changed across different levels of the hierarchy of stratal architecture. As a result of this geologic structure, the percolation occurs at proportions of open-framework gravels below the theoretical percolation threshold for random infinite media. Second, when the channel belt model was populated with permeability distributions by lowest-level unit type, the composite permeability semivariogram contained structures that were identifiable at more than one scale, and each of these structures could be directly linked to unit types of different scales existing at different levels within the hierarchy of strata. These collective results are encouraging with respect to our goal that this model be relevant as a base case in future studies for testing ideas in research addressing the upscaling problem in aquifers and reservoirs with multi-scale heterogeneity.

54 ENVIRONMENTAL SCIENCES↗

SU-F-T-475: An Evaluation of the Overlap Between the Acceptance Testing and Commissioning Processes for Conventional Medical Linear Accelerators

Purpose: This work’s objective is to determine the overlap of processes, in terms of sub-processes and time, between acceptance testing and commissioning of a conventional medical linear accelerator and to evaluate the time saved by consolidating the two processes. Method: A process map for acceptance testing for medical linear accelerators was created from vendor documentation (Varian and Elekta). Using AAPM TG-106 and inhouse commissioning procedures, a process map was created for commissioning of said accelerators. The time to complete each sub-process in each process map was evaluated. Redundancies in the processes were found and the time spent on each were calculated. Results: Mechanical testing significantly overlaps between the two processes - redundant work here amounts to 9.5 hours. Many beam non-scanning dosimetry tests overlap resulting in another 6 hours of overlap. Beam scanning overlaps somewhat - acceptance tests include evaluating PDDs and multiple profiles but for only one field size while commissioning beam scanning includes multiple field sizes and depths of profiles. This overlap results in another 6 hours of rework. Absolute dosimetry, field outputs, and end to end tests are not done at all in acceptance testing. Finally, all imaging tests done in acceptance are repeated in commissioning, resulting in about 8 hours of rework. The total time overlap between the two processes is about 30 hours. Conclusion: The process mapping done in this study shows that there are no tests done in acceptance testing that are not also recommended to do for commissioning. This results in about 30 hours of redundant work when preparing a conventional linear accelerator for clinical use. Considering these findings in the context of the 5000 linacs in the United states, consolidating acceptance testing and commissioning would have allowed for the treatment of an additional 25000 patients using no additional resources.

60 APPLIED LIFE SCIENCES↗

A novel electro-hydraulic unit design based on a shaftless integration of an internal gear machine and a permanent magnet electric machine

In recent years, increasingly stringent emission regulations have spurred an electrification trend in off-highway vehicle technology. To address challenges such as the high cost of power electronics components, limited battery capacity, and the substantial modifications required for the vehicles, there is a pressing need to develop high-speed, cost-effective, compact, and efficient electro-hydraulic units capable of powering vehicle functions. In response to these demands, this paper introduces an innovative morphology for an electro-hydraulic unit and outlines the integration method for a crescent-type internal gear machine with a permanent magnet synchronous electric machine. The proposed morphology aims to minimize component count through a shaftless solution while incorporating a cooling system that utilizes the same working fluid as the hydraulic machine. The design approach utilizes a genetic algorithm optimization process to maximize overall energy efficiency and compactness. Insights gained from the optimization results shed light on the relationship between key design parameters and unit performance, enhancing the understanding of this electro-hydraulic unit. A prototype of the unit was manufactured and tested, demonstrating a volumetric efficiency ranging from 81 % to 97 % at a maximum rotational velocity of the pinion of 6000 rpm. Finally, these results validate both the morphology and the design approach, indicating the feasibility of designing compact electro-hydraulic units that leverage hydraulic machines with higher maximum rotational velocities than commercially available counterparts as a mean to enhance efficiency and compactness.

30 DIRECT ENERGY CONVERSION↗

Testing of an Integrated Nitrogen Oxide Catcher

A gas-purification system with maximum capacity 50 m{sup 3}/h was developed, fabricated, and tested to catch nitrogen oxides released during hydrometallurgical processing of spent fuel from the BREST reactor. To catch nitrogen oxides, the setup employs water aerosols introduced into the gas duct; it also includes a tank for mixing water aerosols with gas flow, coarse and fine filters, and BRUNS and SMOG apparatus. The filtering complex (mixing tank, FCGO and FAROS filters) gave 72–76% conversion of nitrogen dioxide with initial concentration of 11 g/m{sup 3}; this confirmed that aerosol fiberglass filters can be used to catch nitrogen dioxide. In the tests, the complex of units comprising the setup gave 95.4–98.5% conversion of nitrogen oxide with initial concentration 11–50 g/m{sup 3}. After the design of the mixing tanks is improved and remote extraction of the cartridges of the gas purification apparatus is organized, the tested gas purification setup can be used in radiochemical production.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Perspectives on Tailoring Neutron Energy Spectra in Material Test Reactors

Material test reactors (MTRs) are used to irradiate nuclear fuels and materials to develop data for how they endure neutron bombardment in or near reactor cores. Most historic MTRs, and all that remain operational in the US today, are water-cooled types and produce a thermalized neutron flux. New irradiation facilities are needed which can produce neutron energy spectra relevant to fast and fusion reactor environments. Construction of these facilities will take several years of steadfast funding to complete, which poses a formidable schedule challenge for current fast and fusion reactor developers. Irradiation designs which modify the neutron energy spectra delivered to test specimens in thermal spectrum MTRs, an approach referred to as “spectral tailoring”, can be used to approximate several relevant phenomena in the materials needed to enable fast and fusion reactor technologies. This approach is imperfect, but still valuable in the present situation. Here, the two highest flux MTRs operational in the United States, the Advanced Test Reactor (ATR) and High Flux Isotope Reactor (HFIR), have rich histories, ongoing developments, and new potentials for spectral tailoring that will be reviewed and discussed in this paper.

36 MATERIALS SCIENCE↗

A Step Towards the Final Frontier: Lessons Learned from Acceptance Testing of the First HPE/Cray EX 3000 System at ORNL

In this paper, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800-node supercomputers, Fawbush and Miller, with access to two independent and identical Lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager (HPCM) software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom’s Meteorological Office’s Unified Model (UM) and 4DVAR. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility (OLCF) portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed Lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Veronica↗

Residential Integrated Heat Pump to Meet All the Home Comfort Needs

This paper will introduce development and field trial of a residential air-source integrated heat pump for cold climates. The heat pump is multi-functional to meet all the home comfort demands, including space cooling, space heating, domestic water heating. The integrated heat pump is an ideal solution to decarbonize northern homes via providing efficient space heating and water heating to replace natural gas. It uses a three-stage compressor and a single set of heat exchangers and valves to deliver all the functions, and thus achieve cost reduction. We developed an innovative system configuration and related controls to solve typical charge unbalance, accelerate charge migration and smoothen mode transition in integrated heat pumps. Laboratory investigations were conducted for individual modes and verified the control functions. Laboratory tests demonstrated that the unit delivered outstanding performance. It achieved 17.0 SEER (seasonal cooling energy efficiency rating) and 11.0 HSPF (heating seasonal performance factor). In the most efficient mode (combined space cooling and water heating mode), the unit reached a total energy efficiency > 30.0 EER and required only 25 minutes to heat a 50-gallon tank of water. One heat pump prototype is going through a field trial since April, 2023 in Syracuse, New York. The one-year field test results are summarized.

Shen, Bo↗

A step towards the final frontier: Lessons learned from acceptance testing of the first HPE/Cray EX 3000 system at ORNL

Summary In this article, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800‐node supercomputers, Fawbush and Miller, with access to two independent and identical lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom's Meteorological Office's Unified Model and 4‐dimensional variational data assimilation. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Verónica G.↗

Low-Energy Solvents For Carbon Dioxide Capture Enabled By A Combination Of Enzymes And Vacuum Regeneration

An integrated bench-scale system combining the attributes of the bio-renewable enzyme carbonic anhydrase (CA) with low-enthalpy CO 2 absorption solvents and vacuum regeneration was designed, built and operated for 500 hours using simulated flue gas. The objective was to develop a CO 2 capture process with improved efficiency and sustainability when compared to NETL Case 10 monoethanolamine (MEA) scrubbing technology. The use of CA accelerates inter-conversion between dissolved CO 2 and bicarbonate ion to enhance CO 2 absorption, and the use of low enthalpy CO 2 absorption solvents makes it possible to regenerate the solvent at lower temperatures relative to the reference MEA-based solvent. The vacuum regeneration-based integrated bench-scale system operated successfully for an accumulated 500 hours using aqueous 23.5 wt% K 2 CO 3 -based solvent containing 2.5 g/L enzyme to deliver an average 84% CO 2 capture when operated with a 20% enzyme replenishment rate per ~7 hour steady-state run period. The total inlet gas flow was 30 standard liters per minute with 15% CO 2 and 85% N 2 . The absorber temperature was 40°C and the stripper operated under 35 kPa pressure with an approximate 77°C stripper bottom temperature. Tests with a 30°C absorber temperature delivered >90% capture. On- and off-line operational measurements provided a full process data set, with recirculating enzyme, that allowed for enzyme replenishment and absorption/desorption kinetic parameter calculations. Dissolved enzyme replenishment and conventional process controls were demonstrated as straightforward approaches to maintain system performance. Preliminary evaluation of a novel flow-through ultrasonically enhanced regeneration system was also conducted, yet resulted in CO2 release within the range of temperature-dependent release, and further work would be needed to validate the benefits of ultrasonic enhanced stripping. A full technology assessment was completed in which four techno-economic cases for enzyme-enhanced aqueous K 2 CO 3 solvent with vacuum stripping were considered and a corresponding set of sensitivity studies were developed. The cases were evaluated using bench-scale and laboratory-based observations, AspenPlus® process simulation and modeling, AspenTech’s CCE® Parametric Software, current vendor quotations, and project partners’ know-how of unit operations. Overall, the DOE target of 90% CO 2 capture could be met using the benign enzyme-enhanced aqueous K 2 CO 3 -based alternative to NETL Case 10. The model-predicted plant COE performance, scaled to 550 MWe net output, was 9% higher than NETL Case 10 for an enzyme-activated case with minimized technical risk and highest confidence in physical system performance utilizing commercially available equipment. A COE improvement of 2.8% versus NETL Case 10 was predicted when favorable features of improved enzyme longevity and additional power output from a very low pressure (VLP) turbine were combined, wherein corresponding high capital and operational costs limited the level of COE benefit. The environmental, health and safety (EH&S) profile of the system was found to be favorable and was compliant with the Federal EH&S legislation reviewed. Further work on a larger scale test unit is recommended to reduce the level of uncertainty inherent in extrapolating findings from a bench-scale unit to a full scale PCC plant, and to further investigate several identified opportunities for improvement. Production feasibility and suitability of carbonic anhydrases for scale-up testing was confirmed both through the current project and through parallel efforts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

NBL Pu CRM (Phase 1 Progress Report)

Several 100 μg aliquots of NBL CRM 137 Pu sulfate tetrahydrate were prepared in 20 mL glass vials at some time in the past and are expected to have similar chemical composition and similar concentrations of contaminants as the bulk 250 mg CRM 137 Pu sulfate tetrahydrate units. Thus, these units were characterized and used to test Pu purification chemistry to be employed on the larger unit. For preliminary characterization, the residue of bottle 6 was dissolved in 4 M HNO3/0.01 M HF and transferred quantitatively to a pre-weighed 30 mL Savillex Teflon vial with a total solution mass of approximately 18 g. A gravimetric aliquot was removed from this solution for characterization and the remaining solution was dried down and reconstituted in 8 M HNO 3 to test the anion exchange purification column.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗