Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Calendar Year 2020 Post-Closure Monitoring Report for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Underground Test Area, Nevada National Security Site, Nevada (Rev. 1)

This report presents the results of monitoring conducted for water quality, water levels, and institutional controls in calendar year (CY) 2020 by the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity at Corrective Action Unit (CAU) 99, Rainier Mesa/Shoshone Mountain (RM/SM), at the Nevada National Security Site (NNSS), Nevada. This report also presents analytical laboratory results (including results of quality assurance/quality control samples, such as field duplicates [FDs]), and verification of use restrictions (URs), institutional controls, and water usage. Groundwater samples were collected; water levels were measured; and well site surveillance was conducted in support of the Underground Test Area Closure Report (CR) for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Nevada National Security Site, Nevada (DOE/EMNV, 2020). Rainier Mesa (RM) was the site of 61 underground nuclear tests, and Shoshone Mountain (SM) was the site of 6 underground nuclear tests. As a result of these activities, which took place from 1957 to 1992, radionuclides (RNs) were released in the subsurface in the vicinity of the detonations. These 67 underground nuclear tests are associated with 66 specific corrective action site (CAS) numbers, as listed in the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). Two tests, HURON LANDING and DIAMOND ACE (conducted simultaneously), are included within one CAS. The CR (DOE/EMNV, 2020) establishes the regulatory boundaries and regulatory boundary objectives, monitoring program, UR boundaries and URs, and other institutional controls agreed to by EM Nevada Program and the Nevada Division of Environmental Protection (NDEP) for closure of CAU 99. Regulatory boundaries for the RM/SM CAU were established to protect receptors of groundwater from RN contamination within the three downgradient groundwater basins that receive recharge from RM. The SM regulatory boundary was established to verify that RN contamination does not reach the lower carbonate aquifer below SM. The UR boundaries were established based on contaminant simulation forecasts from the flow and transport simulations with consideration of site-specific topographical controls. The URs associated with the UR boundaries were identified to protect onsite workers and the public from inadvertent exposure to contaminated groundwater as forecasted to occur assuming current conditions. The UR is intended to restrict activities that might expose workers to contaminated groundwater within the UR area. In addition to the URs, other institutional controls are established to monitor and limit access to groundwater. These include federal ownership and management in perpetuity, controlled access of the NNSS and surrounding areas, and reporting water use on the NNSS and surrounding hydrographic basins.

54 ENVIRONMENTAL SCIENCES↗

Progressive TDI Measurements with the PACE OCI ETU

The Plankton Aerosol Cloud ocean Ecosystem (PACE) Ocean Color Instrument (OCI) has completed the ground test program for its engineering unit (ETU) and testing of the flight unit will begin in the near future. OCIis a grating spectrometer with hyperspectral coverage from about 340 nm to 885 nm with 9 additional filtered channels in the SWIR. Two CCDs are used as detectors for the hyperspectral channels. One important operating mode of the CCDs on OCI is progressive time delay integration (or PTDI). In this mode, the charge in the CCD can be held for multiples of the nominal integration times. A series of these measurements can be made with progressively increasing multiples of the nominal integration time as the instrument scans across a uniform source. Ground testing with this operating mode on OCI ETU has shown promising results. This work will present measurements taken with the PTDI mode and the analysis of OCI ETU linearity and dynamic range

PACE↗

Pre-Installation Acceptance (PIA) Functional Performance of the Design Verification Test (DVT) Exploration Extra-vehicular Mobility Unit (xEMU)

In an effort that began with technology investment by NASA in a few key components during the Constellation Program and then evolved to demonstrate a packaged Portable Life Support System (PLSS) as part of the Advanced Exploration Systems (AES) Program, the next evolution of the PLSS is now a key component of the Exploration Extra-vehicular Mobility Unit (xEMU) and is assembled as a Design Verification Test (DVT) unit. The xEMU has been detailed with respect to completing a demonstration on the International Space Station (ISS) with support of units for initial lunar capability. The xEMU completed the Preliminary Design Review (PDR) with subsequent Safety Review Panel (SRP) Phase I reviews in 2019-2020. The objectives for DVT are to validate requirements, train the team, learn how to fabricate the hardware with appropriate process controls, assemble the hardware, test the hardware, determine the failure mechanisms/limits of the hardware design and buy down the most risk possible for the qualification and flight phases of the development. With completion of the assembly and initial functional testing of the DVT PLSS in laboratory ambient conditions and vacuum conditions the xEMU has progressed significantly into the DVT objectives. A key part of the test sequences for DVT and all future phases is the Pre-Installation Acceptance (PIA) functional testing which validates the performance of integrated systems including: primary thermal control, auxiliary thermal control, suit ventilation, primary oxygen, secondary oxygen, power distribution, as well as caution and warning all with respect to the applied requirements. This discussion will include an overview of the assembly, summary of the PIA functional testing, lessons learned, and corrective actions implemented moving forward into the remainder of the DVT phase for xEMU.

Colin Campbell↗

REGULATORY TESTING AND 3D SCANNING METHODOLOGY OF THE DPP-1 TYPE SHIPPING CONTAINER FOR NCT AND HAC TESTS

The safe transportation of radioactive material using appropriately designed and certified transportation packages is important to protect the public and environment. In the United States of America all transportation of radioactive material is regulated by the Department of Transportation (DOT) along with input by the Nuclear Regulatory Commission (NRC). All packages that contain radioactive material requires that it be transported and regulated by the requirements set by the DOT Class 7 hazardous material transportation. Federal regulations place strict administrative controls on the transport of radioactive materials. The two main goals for transporting radioactive materials are 1. Safety should be the primarily focused on the package because it is the first line of defense. 2. Package integrity should be directly related to the degree of the hazard of the radioactive material contents. The two-part goal ensures that the right package is used. Type B packages are designed to transport radioactive materials with the highest level of radioactivity. Examples of material transported in Type B packagings include spent nuclear fuel, high-level radioactive waste, and high concentrations of other radioactive materials. The purpose of this test protocol is to determine the effects of drop and thermal testing on package performance in a Type B shipping package (DPP-1). Required physical tests for the DPP-1 package include free drop, crush, puncture, penetration, compression, vibration, water spray, water immersion, and thermal. The preparation, regulatory testing, and post-test evaluation of a Type B shipping package tested to the 10 CFR 71.71 and 10 CFR 71.73 requirements will be presented. Six packages were tested and the responses when subjected to the HAC sequence of free drop, puncture, and thermal tests according to 10 CFR 71.73(c)(1), (c)(2), (c)(3) and (c)(4) were measured. The Free Drop, Crush and Puncture tests were performed at the NTRC in Knoxville, TN, and the Thermal tests were performed Southwest Research Institute in San Antonio, TX. The test units were subjected to a pre-operational leak testing before the NCT and HAC tests and a post-operational leak test and a helium leak test once regulatory testing was complete. Finally, all test units were scanned with a handheld blue light scanner to capture a 3D CAD geometry of the test units in the deformed shape. The handheld scanner provided the most effective and reliable way to acquire accurate 3D measurements of the test unit. The scanned geometry was sectioned in areas with deformation and the cross-section profile was measured to determine accurate and repeatable results of the deformed shape of the test units.

Martinez, Oscar↗

Hubble Space Telescope EVA Multisetting Torque Limiter redesign

The Hubble Space Telescope (HST) Multisetting Torque Limiter will be used by astronauts during the First Servicing Mission STS-61. It was designed to replace several individual torque limiters. This replacement reduces the number of tools required as well as reduce the time required for servicing. The Multisetting Torque Limiter design specified five separate torque settings: 2, 5.3, 9, 35 and 45 ft-lbs. This original units were tested at the 2, 5.3, and 9 ft-lbs settings and did not meet the design specifications. The 35 ft-lb and 45 ft-lb torque settings were not incorporated into the original flight design. The objective of the Goddard Space Flight Center (GSFC) redesign effort is to incorporate all five torque settings into a flight design which means the requirements for the first HST Servicing Mission. The first target of the redesign effort focused on the spring chamber and ball detent design. The original design used belleville springs in parallel; the new design changed this configuration to belleville springs stacked in series. The current engineering unit was successfully tested in ambient environment at all five settings. A flight design will soon undergo thermal vacuum testing to evaluate its performance at the temperature extremes.

Richards, Paul W.↗

Post-Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada for Calendar Year 2016 (January 2016–December 2016), Revision 0

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are evaluated to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Additionally, monitoring data are used to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries (CBs) calculated with the models are the primary basis of the UR boundaries. In summary, the monitoring results from 2016 indicate the regulatory controls on the closure of CAU 98 remain effective in protection of human health and the environment. Recommendations resulting from this first year of monitoring activities include formally incorporating wells UE-5 PW-1, UE-5 PW-2, and UE-5 PW-3 into the groundwater-level monitoring network given their strategic location in the basin; and early development of a basis for trigger levels for the groundwater-level monitoring given the observed trends. Additionally, it is recommended to improve the Real Estate/Operations Permit process for capturing information important for evaluating the impact of activities on groundwater resources, and to shift the reporting requirement for this annual report from the second quarter of the federal fiscal year (end of March) to the second quarter of the calendar year (end of June).

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada for Calendar Year 2016 (January 2016–December 2016), Revision 1

Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2016. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. The tritium concentration in both wells is slowly decreasing. The water-level monitoring network includes 16 wells. Depth to water measured in 2016 in all wells is consistent with recent measurements. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of Environmentally Friendly Solvents for the Extravehicular Mobility Unit Secondary Oxygen Pack Cold Trap Testing

Freon-113(TradeMark) has been used as a chemistry lab sampling solvent at NASA/JSC for EMU (extravehicular Mobility Unit) SOP (Secondary Oxygen Pack) oxygen testing Cold Traps utilized at the USA (United Space Alliance) Houston facility. Similar testing has occurred at the HSWL (Hamilton Sundstrand Windsor Locks) facility. A NASA Executive Order bans the procurement of all ODS (ozone depleting substances), including Freon-113 by the end of 2009. In order to comply with NASA direction, HSWL began evaluating viable solvents to replace Freon-113 . The study and testing effort to find Freon-113 replacements used for Cold Trap sampling is the subject of this paper. Test results have shown HFE-7100 (a 3M fluorinated ether) to be an adequate replacement for Freon-113 as a solvent to remove and measure the non-volatile residue collected in a Cold Trap during oxygen testing. Furthermore, S-316 (a Horiba Instruments Inc. high molecular weight, non-ODS chlorofluorocarbon) was found to be an adequate replacement for Freon-113 as a solvent to reconstitute non-volatile residue removed from a Cold Trap during oxygen testing for subsequent HC (hydrocarbon) analysis via FTIR (Fourier Transform Infrared Spectroscopy).

Steele, John↗

Field-Scale Testing of a High-Efficiency Membrane Reactor (MR)—Adsorptive Reactor (AR) Process for H2 Generation and Pre-Combustion CO2 Capture

The study objective was to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift reaction process employing a carbon molecular sieve membrane (CMSM)-based membrane reactor (MR) followed by an adsorptive reactor (AR) for pre-combustion CO2 capture. The project was carried out in two different phases. In Phase I, the field-scale experimental MR-AR system was designed and constructed, the membranes, and adsorbents were prepared, and the unit was tested with simulated syngas to validate functionality. In Phase II, the unit was installed at the test site, field-tested using real syngas, and a technoeconomic analysis (TEA) of the technology was completed. All project milestones were met. Specifically, (i) high-performance CMSMs were prepared meeting the target H2 permeance (>1 m3/(m2.hbar) and H2/CO selectivity of >80 at temperatures of up to 300 °C and pressures of up to 25 bar with a <10% performance decline over the testing period; (ii) pelletized adsorbents were prepared for use in relevant conditions (250 °C < T < 450 °C, pressures up to 25 bar) with a working capacity of >2.5 wt.% and an attrition rate of <0.2; (iii) TEA showed that the MR-AR technology met the CO2 capture goals of 95% CO2 purity at a cost of electricity (COE) 30% less than baseline approaches.

42 ENGINEERING↗

Radiation hardness of Efratom M-100 rubidium frequency standard

The effects of nuclear radiation on rubidium gas cell frequency standards and components are presented, including the results of recent tests where a continuously operating rubidium frequency standard (Effratom, Model M-100) was subjected to simultaneous neutron/gamma radiation. At the highest neutron fluence 7.5 10 to the 12th power n/sq cm and total dose 11 krad(Si) tested, the unit operated satisfactorily; the total frequency change over the 2 1/2 hour test period due to all causes, including repeated retraction from and insertion into the reactor, was less than 1 x 10 to the -10th power. The effects of combined neutron/gamma radiation on rubidium frequency standard physics package components were also studied, and the results are presented.

English, T. C.↗

HYPULSE combustor analysis

The analysis of selected data from tests of unit fuel injectors in a generic scramjet combustor model is presented. The tests were conducted in the NASA HYPULSE expansion tube at conditions typical of flight at Mach 13.5 and 17. The analysis used a three-stream tube method, with finite-rate chemistry, in which the fuel, test gas, and mixing/combustive streams were treated independently but with the same static pressure. Performance of three candidate fuel injectors is examined based on deduced mixing and combustion efficiencies.

Rizkalla, O. F.↗

Testing Results from the Low Activity Waste Pretreatment System (LAWPS) Full-Scale Ion Exchange Column Test and Engineering Scale Integrated System Test - 18634

The U.S. Department of Energy (DOE), Office of River Protection's (ORP) primary mission is to retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Mixed radioactive waste is stored in 177 underground tanks at the Hanford Site as reported in DOE/ORP 2003- 02, Environmental Impact Statement for Retrieval, Treatment, and Disposal of Tank Waste and Closure of the Single Shell Tanks at the Hanford Site, Richland WA, Inventory and Source Term Data Package. The 177 underground tanks are estimated to contain about 56 million gallons of waste. The Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low activity waste (ILAW) by feeding LAW directly from Tank Farms to the Hanford Waste Treatment Plant's (WTP's) LAW Facility, bypassing the Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria. The LAWPS will also facilitate the return of secondary liquid wastes from the WTP LAW Vitrification Facility to the Tank Farms. In November of 2015 DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS), awarded a contract to the AECOM team to design, fabricate and operate two test platforms to generate performance data at two different scales and demonstrate technology maturation. The first platform models the ion exchange (IX) columns at full scale, and the second platform models the integrated flowsheet (cross flow filter (CFF) and IX) at 1/9. scale. Overarching technical objectives of performing the full-scale ion exchange test and the engineering-scale integrated test are to: 1. Test interactions between unit process operations; 2. Test removal of non-radioactive cesium from process stream; 3. Test removal of undissolved solids from process stream; 4. Confirm operational flow rate range and stability; 5. Confirm volumetric throughput of waste stream over flow operating range; 6. Confirm range of process temperatures over planned operating range; 7. Establish system hydraulics and process criteria; 8. Coordinate key control and monitoring components; 9. Establish treated product chemistry meets requirements (cesium, solids, and pH); and 10. Test the hazard control strategy for a no flow condition through the IX column. Data collected during testing will be used by WRPS to validate the preliminary design, inform the final design of the permanent plant equipment, and demonstrate that the critical technology elements have advanced to a technology readiness level of 6 (prototypical system validation in a relevant environment). Testing on both platforms started in fall of 2016 generating NQA-1 data. This paper covers test results from the first five phases of testing on the 1/9. scale integrated test platform. A further three phases of testing are currently being executed, these including a 5.6 M sodium simulant containing foulant, a high viscosity simulant and finally a run performed with a lower Cs concentration (all earlier tests were spiked to 4 x Cs to reduce volume and cost). Results from these tests were not available at the time of writing available. Results are also presented from the full scale IX testing. Eight test were performed covering column loading, elution and regeneration; column loading, elution and regeneration with upflow displacement; IX column loading and gas migration; resin removal; solids accumulation; and IX column emergency recirculation and vent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Battery-Free Solar Refrigerator

Recent technology developments and a systems engineering design approach have led to the development of a practical battery-free solar refrigerator as a spin-off of NASA's aerospace refrigeration research. Off-grid refrigeration is a good application of solar photovoltaic (PV) power if thermal storage is incorporated and a direct connection is made between the cooling system and the PV panel. This was accomplished by integrating water as a phase-change material into a well insulated refrigerator cabinet and by developing a microprocessor based control system that allows direct connection of a PV panel to a variable speed compressor. This second innovation also allowed peak power-point tracking from the PV panel and elimination of batteries from the system. First a laboratory unit was developed to prove the concept and then a commercial unit was produced and deployed in a field test. The laboratory unit was used to test many different configurations including thermoelectric, Stirling and vapor compression cooling systems. The final configuration used a vapor compression cooling cycle, vacuum insulation, a passive condenser, an integral evaporator/ thermal storage tank, two 77 watt PV panels and the novel controller mentioned above. The system's only moving part was the variable speed BD35 compressor made by Danfoss. The 365 liter cabinet stayed cold with as little as 274 watt-hours per day average PV power. Battery-free testing was conducted for several months with very good results. The amount of thermal storage, size of compressor and power of PV panels connected can all be adjusted to optimize the design for a given application and climate. In the commercial unit, the high cost of the vacuum insulated refrigerator cabinet and the stainless steel thermal storage tank were addressed in an effort to make the technology commercially viable. This unit started with a 142 liter, mass-produced chest freezer cabinet that had the evaporator integrated into its inner walls. Its compressor was replaced with a Danfoss DC compressor slightly larger than the one used in the laboratory unit. The control system was integrated onto a single electronics card and packaged with its starting capacitors. The water for thermal storage was placed behind a liner that was made to fit inside the original factory liner. The original condenser was also augmented with additional surface area to improve performance. PV panels with a total rated power of 180 watts were used. The unit was tested with very successful results in an outside ambient environment, demonstrating its potential for widespread use in many off-grid applications for solar refrigeration.

Ewert, Michael K.↗

Postclosure Inspection and Monitoring Report for Surface Corrective Action Unit 417 at the Central Nevada Test Area, Nevada, Site

This report presents results of the biennial postclosure site inspection conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Central Nevada Test Area (CNTA), Nevada, Site (Figure 1) surface Corrective Action Unit (CAU) 417. The report has been prepared in accordance with the Post-Closure Monitoring Plan contained in the Closure Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada (NNSA/NV 2001), hereafter called the CAU 417 Closure Report. The site closure process was completed in 2001 in accordance with the amended Federal Facility Agreement and Consent Order (FFACO 1996, as amended) (FFACO) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Responsibility for environmental site restoration was transferred from the DOE National Nuclear Security Administration Nevada Field Office to LM on October 1, 2006. This report summarizes investigation activities associated with CAU 417 that LM conducted from September 2018 through August 2020. A postclosure inspection was conducted in 2020 to document the physical condition of the CAU 417 soil covers, monuments, signs, fencing, and use-restricted areas.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Integration Test of the High Voltage Hall Accelerator System Components

NASA Glenn Research Center is developing a 4 kilowatt-class Hall propulsion system for implementation in NASA science missions. NASA science mission performance analysis was completed using the latest high voltage Hall accelerator (HiVHAc) and Aerojet-Rocketdyne's state-of-the-art BPT-4000 Hall thruster performance curves. Mission analysis results indicated that the HiVHAc thruster out performs the BPT-4000 thruster for all but one of the missions studied. Tests of the HiVHAc system major components were performed. Performance evaluation of the HiVHAc thruster at NASA Glenn's vacuum facility 5 indicated that thruster performance was lower than performance levels attained during tests in vacuum facility 12 due to the lower background pressures attained during vacuum facility 5 tests when compared to vacuum facility 12. Voltage-Current characterization of the HiVHAc thruster in vacuum facility 5 showed that the HiVHAc thruster can operate stably for a wide range of anode flow rates for discharge voltages between 250 and 600 volts. A Colorado Power Electronics enhanced brassboard power processing unit was tested in vacuum for 1,500 hours and the unit demonstrated discharge module efficiency of 96.3% at 3.9 kilowatts and 650 volts. Stand-alone open and closed loop tests of a VACCO TRL 6 xenon flow control module were also performed. An integrated test of the HiVHAc thruster, brassboard power processing unit, and xenon flow control module was performed and confirmed that integrated operation of the HiVHAc system major components. Future plans include continuing the maturation of the HiVHAc system major components and the performance of a single-string integration test.

Hall propulsion system↗