Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “task work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Managed Development Environment Successes for MSFC's VIPA Team

This paper outlines the best practices of the Vehicle Design Team for VIPA. VIPA is the Vehicle Integrated Performance Analysis Team at MSFC. This team was created to reconnect the individual engineering disciplines to be able to perform system level technical assessments in support of program decisions. The functions of the VIPA Vehicle Design (VVD) discipline team are to maintain the controlled reference geometry and provide linked, simplified geometry for each of the other discipline analyses. The core of the VVD work, and the approach for VVD s first task of controlling the reference geometry, involves systems engineering, top-down, layout-based CAD modeling within a Product Data Manager (PDM) development environment. The topdown approach allcws for simple contrnl of very large, integrated assemblies and greatly enhances the ability to generate trade configurations and reuse data. The second W D task, model simplification for analysis, is handled within the managed environment through application of the master model concept. In this approach, there is a single controlling, or master, product definition dataset. Connected to this master model are reference datasets with live geometric and expression links. The referenced models can be for drawings, manufacturing, visualization, embedded analysis, or analysis simplification. A discussion of web based interaction, including visualization, between the design and other disciplines is included. Demonstrated examples are cited, including the Space Launch Initiative development cycle, the Saturn V systems integration and verification cycle, an Orbital Space Plane study, and NASA Exploration Office studies of Shuttle derived and clean sheet launch vehicles. The VIPA Team has brought an immense amount of detailed data to bear on program issues. A central piece of that success has been the Managed Development Environment and the VVD Team approach to modeling.

Finckenor, Jeff↗

Managed Development Environment Successes for MSFC's VIPA Team

This paper outlines the best practices of the Vehicle Design Team for VIPA. The functions of the VIPA Vehicle Design (VVD) discipline team are to maintain the controlled reference geometry and provide linked, simplified geometry for each of the other discipline analyses. The core of the VVD work, and the approach for VVD s first task of controlling the reference geometry, involves systems engineering, top-down, layout-based CAD modeling within a Product Data Manager (PDM) development environment. The top- down approach allows for simple control of very large, integrated assemblies and greatly enhances the ability to generate trade configurations and reuse data. The second VVD task, model simplification for analysis, is handled within the managed environment through application of the master model concept. In this approach, there is a single controlling, or master, product definition dataset. Connected to this master model are reference datasets with live geometric and expression links. The referenced models can be for drawings, manufacturing, visualization, embedded analysis, or analysis simplification. A discussion of web based interaction, including visualization, between the design and other disciplines is included. Demonstrated examples are cited, including the Space Launch Initiative development cycle, the Saturn V systems integration and verification cycle, an Orbital Space Plane study, and NASA Exploration Office studies of Shuttle derived and clean sheet launch vehicles. The VIPA Team has brought an immense amount of detailed data to bear on program issues. A central piece of that success has been the Managed Development Environment and the VVD Team approach to modeling.

Finckenor, Jeff↗

Space Shuttle Operations and Infrastructure: A Systems Analysis of Design Root Causes and Effects

This NASA Technical Publication explores and documents the nature of Space Shuttle operations and its supporting infrastructure and addresses fundamental questions often asked of the Space Shuttle program why does it take so long to turnaround the Space Shuttle for flight and why does it cost so much? Further, the report provides an overview of the cause-and effect relationships between generic flight and ground system design characteristics and resulting operations by using actual cumulative maintenance task times as a relative measure of direct work content. In addition, this NASA TP provides an overview of how the Space Shuttle program's operational infrastructure extends and accumulates from these design characteristics. Finally, and most important, the report derives a set of generic needs from which designers can revolutionize space travel from the inside out by developing and maturing more operable and supportable systems.

McCleskey, Carey M.↗

CEOS Contributions to Informing Energy Management and Policy Decision Making Using Space-Based Earth Observations

Earth observations are playing an increasingly significant role in informing decision making in the energy sector. In renewable energy applications, space-based observations now routinely augment sparse ground-based observations used as input for renewable energy resource assessment applications. As one of the nine Group on Earth Observations (GEO) societal benefit areas, the enhancement of management and policy decision making in the energy sector is receiving attention in activities conducted by the Committee on Earth Observation Satellites (CEOS). CEOS has become the "space arm" for the implementation of the Global Earth Observation System of Systems (GEOSS) vision. It is directly supporting the space-based, near-term tasks articulated in the GEO three-year work plan. This paper describes a coordinated program of demonstration projects conducted by CEOS member agencies and partners to utilize Earth observations to enhance energy management end-user decision support systems. I discuss the importance of engagement with stakeholders and understanding their decision support needs in successfully increasing the uptake of Earth observation products for societal benefit. Several case studies are presented, demonstrating the importance of providing data sets in formats and units familiar and immediately usable by decision makers. These projects show the utility of Earth observations to enhance renewable energy resource assessment in the developing world, forecast space-weather impacts on the power grid, and improve energy efficiency in the built environment.

Eckman, Richard S.↗

Next Generation Life Support Project: Development of Advanced Technologies for Human Exploration Missions

Next Generation Life Support (NGLS) is one of several technology development projects sponsored by the National Aeronautics and Space Administration s Game Changing Development Program. NGLS is developing life support technologies (including water recovery, and space suit life support technologies) needed for humans to live and work productively in space. NGLS has three project tasks: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, and Alternative Water Processing. The selected technologies within each of these areas are focused on increasing affordability, reliability, and vehicle self sufficiency while decreasing mass and enabling long duration exploration. The RCA and VOR tasks are directed at key technology needs for the Portable Life Support System (PLSS) for an Exploration Extravehicular Mobility Unit (EMU), with focus on prototyping and integrated testing. The focus of the Rapid Cycle Amine (RCA) swing-bed ventilation task is to provide integrated carbon dioxide removal and humidity control that can be regenerated in real time during an EVA. The Variable Oxygen Regulator technology will significantly increase the number of pressure settings available to the space suit. Current spacesuit pressure regulators are limited to only two settings while the adjustability of the advanced regulator will be nearly continuous. The Alternative Water Processor efforts will result in the development of a system capable of recycling wastewater from sources expected in future exploration missions, including hygiene and laundry water, based on natural biological processes and membrane-based post treatment. The technologies will support a capability-driven architecture for extending human presence beyond low Earth orbit to potential destinations such as the Moon, near Earth asteroids and Mars.

Barta, Daniel J.↗

In Situ Manufacturing is a Necessary Part of Any Planetary Architecture

The key to any sustainable presence in space is the ability to manufacture necessary tools, parts, structures, spares, etc. in situ and on demand. Cost, volume, and up-mass constraints prohibit launching everything needed for long-duration or long-distance missions from Earth, including spare parts and replacement systems. There are many benefits to building items as-needed in situ using computer aided drafting (CAD) models and additive manufacturing technology: (1) Cost, up-mass, and volume savings for launch due to the ability to manufacture specific parts when needed. (2) CAD models can be generated on Earth and transmitted to the station or spacecraft, or they can be designed in situ for any task. Thus, multiple people in many locations can work on a single problem. (3) Items can be produced that will enhance the safety of crew and vehicles (e.g., latches or guards). (4) Items can be produced on-demand in a small amount of time (i.e., hours or days) compared to traditional manufacturing methods and, therefore, would not require the lengthy amount of time needed to machine the part from a solid block of material nor the wait time required if the part had to be launched from Earth. (5) Used and obsolete parts can be recycled into powder or wire feedstock for use in later manufacturing. (6) Ultimately, the ability to produce items as-needed will reduce mission risk, as one will have everything they need to fix a broken system or fashion a new part making it available on a more timely basis.

Edmunson, Jennifer E.↗

Next Generation Life Support Project Status

Next Generation Life Support (NGLS) is one of several technology development projects sponsored by NASA s Game Changing Development Program. The NGLS Project is developing life support technologies (including water recovery and space suit life support technologies) needed for humans to live and work productively in space. NGLS has three project tasks: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, and Alternative Water Processor (AWP). The RCA swing bed and VOR tasks are directed at key technology needs for the Portable Life Support System (PLSS) for an Advanced Extravehicular Mobility Unit, with focus on test article development and integrated testing in an Advanced PLSS in cooperation with the Advanced Extra Vehicular Activity (EVA) Project. An RCA swing-bed provides integrated carbon dioxide removal and humidity control that can be regenerated in real time during an EVA. The VOR technology will significantly increase the number of pressure settings available to the space suit. Current space suit pressure regulators are limited to only two settings whereas the adjustability of the advanced regulator will be nearly continuous. The AWP effort, based on natural biological processes and membrane-based secondary treatment, will result in the development of a system capable of recycling wastewater from sources expected in future exploration missions, including hygiene and laundry water. This paper will provide a status of technology development activities and future plans.

Barta, Daniel J.↗

Development of a Methodology to Conduct Usability Evaluation for Hand Tools that May Reduce the Amount of Small Parts that are Dropped During Installation while Processing Space Flight Hardware

Foreign object debris (FOD) is an important concern while processing space flight hardware. FOD can be defined as "The debris that is left in or around flight hardware, where it could cause damage to that flight hardware," (United Space Alliance, 2000). Just one small screw left unintentionally in the wrong place could delay a launch schedule while it is retrieved, increase the cost of processing, or cause a potentially fatal accident. At this time, there is not a single solution to help reduce the number of dropped parts such as screws, bolts, nuts, and washers during installation. Most of the effort is currently focused on training employees and on capturing the parts once they are dropped. Advances in ergonomics and hand tool design suggest that a solution may be possible, in the form of specialty hand tools, which secure the small parts while they are being handled. To assist in the development of these new advances, a test methodology was developed to conduct a usability evaluation of hand tools, while performing tasks with risk of creating FOD. The methodology also includes hardware in the form of a testing board and the small parts that can be installed onto the board during a test. The usability of new hand tools was determined based on efficiency and the number of dropped parts. To validate the methodology, participants were tested while performing a task that is representative of the type of work that may be done when processing space flight hardware. Test participants installed small parts using their hands and two commercially available tools. The participants were from three groups: (1) students, (2) engineers / managers and (3) technicians. The test was conducted to evaluate the differences in performance when using the three installation methods, as well as the difference in performance of the three participant groups.

Miller, Darcy↗

TASAR Certification and Operational Approval Requirements - Analyses and Results

This report documents the results of research and development work performed by Rockwell Collins in addressing the Task 1 objectives under NASA Contract NNL12AA11C. Under this contract Rockwell Collins provided analytical support to the NASA Langley Research Center (LaRC) in NASA's development of a Traffic Aware Strategic Aircrew Requests (TASAR) flight deck Electronic Flight Bag (EFB) application for technology transition into operational use. The two primary objectives of this contract were for Rockwell Collins and the University of Iowa OPL to 1) perform an implementation assessment of TASAR toward early certification and operational approval of TASAR as an EFB application (Task 1 of this contract), and 2) design, develop and conduct two Human-in-the-Loop (HITL) simulation experiments that evaluate TASAR and the associated Traffic Aware Planner (TAP) software application to determine the situational awareness and workload impacts of TASAR in the flight deck, while also assessing the level of comprehension, usefulness, and usability of the features of TAP (Task 2 of this contract). This report represents the Task 1 summary report. The Task 2 summary report is provided in [0].

Koczo, Stefan, Jr.↗

ESDIS Standards Office (ESO): Requirements, Standards and Practices

The ESDIS Standards Office assists the ESDIS Project in formulating standards policy for NASA Earth Science Data Systems (ESDS), coordinates standards activities within ESDIS, and provides technical expertise and assistance with standards related tasks within the NASA Earth Science Data System Working Groups (ESDSWG). This poster summarizes information found on the earthdata.nasa.gov site that describes the ESO.

Interoperability↗

Information Management Platform for Data Analytics and Aggregation (IMPALA) System Design Document

The System Design document tracks the design activities that are performed to guide the integration, installation, verification, and acceptance testing of the IMPALA Platform. The inputs to the design document are derived from the activities recorded in Tasks 1 through 6 of the Statement of Work (SOW), with the proposed technical solution being the completion of Phase 1-A. With the documentation of the architecture of the IMPALA Platform and the installation steps taken, the SDD will be a living document, capturing the details about capability enhancements and system improvements to the IMPALA Platform to provide users in development of accurate and precise analytical models. The IMPALA Platform infrastructure team, data architecture team, system integration team, security management team, project manager, NASA data scientists and users are the intended audience of this document. The IMPALA Platform is an assembly of commercial-off-the-shelf (COTS) products installed on an Apache-Hadoop platform. User interface details for the COTS products will be sourced from the COTS tools vendor documentation. The SDD is a focused explanation of the inputs, design steps, and projected outcomes of every design activity for the IMPALA Platform through installation and validation.

Carnell, Andrew↗

Labor Estimation and Trending in an Operations Environment

Accurate cost estimation for future work is important for ensuring that organizations have the personnel and resources needed to complete a task successfully. Operations support in particular provides additional challenges for estimating cost. Unlike manufacturing-based work, it may be difficult to derive a "cost per product," and projects that appear to be similar may have drastically different underlying assumptions. In addition, for critical operations, a certain level of adaptability to changing circumstances is expected. Responding to contingencies or anomalies requires additional support and troubleshooting, and could result in increases to project cost. Labor estimation is one of the most important inputs for estimating the cost of an operations-based project, especially in a pre-established facility. Various methods are needed to develop reliable estimates. These methods include a bottom-up summarization of known or expected work items, and a top-down estimate generated by trending and scaling actual labor from past analogous operations support.

Laing, Jason↗

NASA ESDIS Standards Office

The ESDIS Standards Office (ESO) assists NASA’s Earth Science Data and Information System (ESDIS) project in formulating standards policy for NASA Earth Science Data Systems, coordinates standards activities within ESDIS, and provides technical expertise and assistance with standards related tasks within the NASA Earth Science Data System Working Groups (ESDSWG).

Enloe, Yonsook↗

UAM Noise Working Group Meeting Subgroup 2: Ground & Flight Testing

The Urban Air Mobility Noise Working Group (UNWG) Sub-Group 2 is tasked with development of a research measurement protocol for UAM vehicle ground and flight testing to determine the impact of representative vehicles on community noise. This briefing is a bi-annual update to the UNWG participants at large regarding the activities of SG2, specifically the status of the group’s measurement protocols document under development.

Urban Air Mobility↗

A Comparison of a Brain-Based Adaptive System and a Manual Adaptable System for Invoking Automation

Two experiments are presented that examine alternative methods for invoking automation. In each experiment, participants were asked to perform simultaneously a monitoring task and a resource management task as well as a tracking task that changed between automatic and manual modes. The monitoring task required participants to detect failures of an automated system to correct aberrant conditions under either high or low system reliability. Performance on each task was assessed as well as situation awareness and subjective workload. In the first experiment, half of the participants worked with a brain-based system that used their EEG signals to switch the tracking task between automatic and manual modes. The remaining participants were yoked to participants from the adaptive condition and received the same schedule of mode switches, but their EEG had no effect on the automation. Within each group, half of the participants were assigned to either the low or high reliability monitoring task. In addition, within each combination of automation invocation and system reliability, participants were separated into high and low complacency potential groups. The results revealed no significant effects of automation invocation on the performance measures; however, the high complacency individuals demonstrated better situation awareness when working with the adaptive automation system. The second experiment was the same as the first with one important exception. Automation was invoked manually. Thus, half of the participants pressed a button to invoke automation for 10 s. The remaining participants were yoked to participants from the adaptable condition and received the same schedule of mode switches, but they had no control over the automation. The results showed that participants who could invoke automation performed more poorly on the resource management task and reported higher levels of subjective workload. Further, those who invoked automation more frequently performed more poorly on the tracking task and reported higher levels of subjective workload. and the adaptable condition in the second experiment revealed only one significant difference: the subjective workload was higher in the adaptable condition. Overall, the results show that a brain-based, adaptive automation system may facilitate situation awareness for those individuals who are more complacent toward automation. By contrast, requiring operators to invoke automation manually may have some detrimental impact on performance but does appear to increases subjective workload relative to an adaptive system.

Bailey, Nathan R.↗

WELDSMART: A vision-based expert system for quality control

This work was aimed at exploring means for utilizing computer technology in quality inspection and evaluation. Inspection of metallic welds was selected as the main application for this development and primary emphasis was placed on visual inspection, as opposed to other inspection methods, such as radiographic techniques. Emphasis was placed on methodologies with the potential for use in real-time quality control systems. Because quality evaluation is somewhat subjective, despite various efforts to classify discontinuities and standardize inspection methods, the task of using a computer for both inspection and evaluation was not trivial. The work started out with a review of the various inspection techniques that are used for quality control in welding. Among other observations from this review was the finding that most weld defects result in abnormalities that may be seen by visual inspection. This supports the approach of emphasizing visual inspection for this work. Quality control consists of two phases: (1) identification of weld discontinuities (some of which may be severe enough to be classified as defects), and (2) assessment or evaluation of the weld based on the observed discontinuities. Usually the latter phase results in a pass/fail judgement for the inspected piece. It is the conclusion of this work that the first of the above tasks, identification of discontinuities, is the most challenging one. It calls for sophisticated image processing and image analysis techniques, and frequently ad hoc methods have to be developed to identify specific features in the weld image. The difficulty of this task is generally not due to limited computing power. In most cases it was found that a modest personal computer or workstation could carry out most computations in a reasonably short time period. Rather, the algorithms and methods necessary for identifying weld discontinuities were in some cases limited. The fact that specific techniques were finally developed and successfully demosntrated to work illustrates that the general approach taken here appears to be promising for commercial development of computerized quality inspection systems. Inspection based on these techniques may be used to supplement or substitute more elaborate inspection methods, such as x-ray inspections.

Andersen, Kristinn↗

Investigation of automated task learning, decomposition and scheduling

The details and results of research conducted in the application of neural networks to task planning and decomposition are presented. Task planning and decomposition are operations that humans perform in a reasonably efficient manner. Without the use of good heuristics and usually much human interaction, automatic planners and decomposers generally do not perform well due to the intractable nature of the problems under consideration. The human-like performance of neural networks has shown promise for generating acceptable solutions to intractable problems such as planning and decomposition. This was the primary reasoning behind attempting the study. The basis for the work is the use of state machines to model tasks. State machine models provide a useful means for examining the structure of tasks since many formal techniques have been developed for their analysis and synthesis. It is the approach to integrate the strong algebraic foundations of state machines with the heretofore trial-and-error approach to neural network synthesis.

Livingston, David L.↗

Direct broadcast satellite-radio: Portable and mobile reception trade-offs

There has been considerable international effort in the areas of system studies, system development, and regulatory work for a Direct Broadcast Satellite Radio (DBS-R). An important milestone will be the 1992 World Radio Administrative Conference (WARC 1992) consideration of frequency allocation in the 500 - 3000 MHz range for such a service. There is an interagency agreement between Voice of America and the National Aeronautics and Space Administration for a coordinated program in DBS-R. This program includes seven tasks: systems tradeoff studies, propagation measurements, satellite experiment and demonstration, receiver development, market studies, regulatory studies, and WARC preparations. The findings of ongoing work under the first task, systems tradeoff studies, are discussed. Topics covered include digital bit rate and audio quality, propagation considerations and link margin estimates for portable reception, link margin estimates for mobile reception, coverage, and satellite size and cost estimates for a regional DBS-R coverage example.

Golshan, Nasser↗