Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “task management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗

The growing importance of costs and ways to maintain cost control on a large program in today's competitive environment

Discussion of management techniques that make it possible to overcome inflationary and developmental cost rises while holding schedule and performance fixed in scientific space programs. The techniques reviewed pertain to high personnel motivation, continual review of contract rigidity for de facto modification by senior judgment, standardization vs design innovation, cooperative customer/contractor goal orientation vs task orientation, and deep real-time management visibility.

Newman, J. J.↗

MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center

Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or green according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.

60 APPLIED LIFE SCIENCES↗

Crew workload strategies in advanced cockpits

Many methods of measuring and predicting operator workload have been developed that provide useful information in the design, evaluation, and operation of complex systems and which aid in developing models of human attention and performance. However, the relationships between such measures, imposed task demands, and measures of performance remain complex and even contradictory. It appears that we have ignored an important factor: people do not passively translate task demands into performance. Rather, they actively manage their time, resources, and effort to achieve an acceptable level of performance while maintaining a comfortable level of workload. While such adaptive, creative, and strategic behaviors are the primary reason that human operators remain an essential component of all advanced man-machine systems, they also result in individual differences in the way people respond to the same task demands and inconsistent relationships among measures. Finally, we are able to measure workload and performance, but interpreting such measures remains difficult; it is still not clear how much workload is too much or too little nor the consequences of suboptimal workload on system performance and the mental, physical, and emotional well-being of the human operators. The rationale and philosophy of a program of research developed to address these issues will be reviewed and contrasted to traditional methods of defining, measuring, and predicting human operator workload. Viewgraphs are given.

Hart, Sandra G.↗

EMP, Attachment 2: Data Management Plan

This Data Management Plan (DMP) is an attachment to the Pacific Northwest National Laboratory Environmental Radiological Air Monitoring Plan (EMP). PNNL is a U.S. Department of Energy Office of Science national laboratory. Radioactive effluent monitoring and environmental surveillance for PNNL operations in Washington State are the responsibility of the PNNL Environmental Protection and Regulatory Programs division and are conducted by the Environmental Radiation Task staff. This DMP describes the data management processes for PNNL radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance activities.

40 CFR 61 Subpart H↗

Management and control of Skylab missions

The flight operations task, as developed in support of the Skylab Program, was evolutionary in nature and, to a great extent, was an orderly extension of the flight control concepts used in the Apollo Program, tempered by the nature of the Skylab Program. During the terminal portion of the Apollo Program, many of the operating concepts proposed for Skylab were tested and used for Apollo support to obtain a realistic evaluation of these new techniques. The principal concept developed in the Apollo Program and augmented in support of the Skylab Program was one wherein a professional operations team would provide support to the scientists in the areas of mission integration, experiment, and experiment support systems, monitoring and control, and data retrieval.

Roach, J. W.↗

Digital processing of mesoscale analysis and space sensor data

The mesoscale analysis and space sensor (MASS) data management and analysis system on the research computer system is presented. The MASS data base management and analysis system was implemented on the research computer system which provides a wide range of capabilities for processing and displaying large volumes of conventional and satellite derived meteorological data. The research computer system consists of three primary computers (HP-1000F, Harris/6, and Perkin-Elmer 3250), each of which performs a specific function according to its unique capabilities. The overall tasks performed concerning the software, data base management and display capabilities of the research computer system in terms of providing a very effective interactive research tool for the digital processing of mesoscale analysis and space sensor data is described.

Hickey, J. S.↗

Shuttle Abort Flight Management (SAFM) - Application Overview

One of the most demanding tasks that must be performed by the Space Shuttle flight crew is the process of determining whether, when and where to abort the vehicle should engine or system failures occur during ascent or entry. Current Shuttle abort procedures involve paging through complicated paper checklists to decide on the type of abort and where to abort. Additional checklists then lead the crew through a series of actions to execute the desired abort. This process is even more difficult and time consuming in the absence of ground communications since the ground flight controllers have the analysis tools and information that is currently not available in the Shuttle cockpit. Crew workload specifically abort procedures will be greatly simplified with the implementation of the Space Shuttle Cockpit Avionics Upgrade (CAU) project. The intent of CAU is to maximize crew situational awareness and reduce flight workload thru enhanced controls and displays, and onboard abort assessment and determination capability. SAFM was developed to help satisfy the CAU objectives by providing the crew with dynamic information about the capability of the vehicle to perform a variety of abort options during ascent and entry. This paper- presents an overview of the SAFM application. As shown in Figure 1, SAFM processes the vehicle navigation state and other guidance information to provide the CAU displays with evaluations of abort options, as well as landing site recommendations. This is accomplished by three main SAFM components: the Sequencer Executive, the Powered Flight Function, and the Glided Flight Function, The Sequencer Executive dispatches the Powered and Glided Flight Functions to evaluate the vehicle's capability to execute the current mission (or current abort), as well as more than IS hypothetical abort options or scenarios. Scenarios are sequenced and evaluated throughout powered and glided flight. Abort scenarios evaluated include Abort to Orbit (ATO), Transatlantic Abort Landing (TAL), East Coast Abort Landing (ECAL) and Return to Launch Site (RTLS). Sequential and simultaneous engine failures are assessed and landing footprint information is provided during actual entry scenarios as well as hypothetical "loss of thrust now" scenarios during ascent.

Hu, Howard↗

Workload: Measurement and Management

Poster: The workload research project has as its task to survey the available literature on: (1) workload measurement techniques; and (2) the effects of workload on operator performance. The first set of findings provides practitioners with a collection of simple-to-use workload measurement techniques along with characterizations of the kinds of tasks each technique has been shown reliably address. This allows design practitioners to select and use the most appropriate techniques for the task(s) at hand. The second set of findings provides practitioners with the guidance they need to design for appropriate kinds and amounts of workload across all tasks for which the operator is responsible. This guidance helps practitioners design systems and procedures that ensure appropriate levels of engagement across all tasks, and avoid designs and procedures that result in operator boredom, complacency, loss of awareness, undue levels of stress, or skill atrophy that can result from workload that distracts operators from the tasks they perform and monitor, workload levels that are too low, too high, or too consistent or predictable. Only those articles that were peer reviewed, long standing and generally accepted in the field, and applicable to a relevant range of conditions in a select domain of interest, in analogous "extreme" environments to those in space were included. In addition, all articles were reviewed and evaluated on uni-dimensional and multi-dimensional considerations. Casner & Gore also examined the notion of thresholds and the conditions that may benefit mostly from the various methodological approaches. Other considerations included whether the tools would be suitable for guiding a requirement-related and design-related question. An initial review of over 225 articles was conducted and entered into an EndNote database. The reference list included a range of conditions in the domain of interest (subjective/objective measures), the seminal works in workload, as well as summary works

Gore, Brian Francis↗

Water management requirements for animal and plant maintenance on the Space Station

Long-duration Space Station experiments that use animals and plants as test specimens will require increased automation and advanced technologies for water management in order to free scientist-astronauts from routine but time-consuming housekeeping tasks. The three areas that have been identified as requiring water management and that are discusseed are: (1) drinking water and humidity condensate of the animals, (2) nutrient solution and transpired water of the plants, and (3) habitat cleaning methods. Automation potential, technology assessment, crew time savings, and resupply penalties are also discussed.

Johnson, C. C.↗

Remembering the Important Things: Semantic Importance in Stream Reasoning

Reasoning and querying over data streams rely on the abil- ity to deliver a sequence of stream snapshots to the processing algo- rithms. These snapshots are typically provided using windows as views into streams and associated window management strategies. Generally, the goal of any window management strategy is to preserve the most im- portant data in the current window and preferentially evict the rest, so that the retained data can continue to be exploited. A simple timestamp- based strategy is rst-in-rst-out (FIFO), in which items are replaced in strict order of arrival. All timestamp-based strategies implicitly assume that a temporal ordering reliably re ects importance to the processing task at hand, and thus that window management using timestamps will maximize the ability of the processing algorithms to deliver accurate interpretations of the stream. In this work, we explore a general no- tion of semantic importance that can be used for window management for streams of RDF data using semantically-aware processing algorithms like deduction or semantic query. Semantic importance exploits the infor- mation carried in RDF and surrounding ontologies for ranking window data in terms of its likely contribution to the processing algorithms. We explore the general semantic categories of query contribution, prove- nance, and trustworthiness, as well as the contribution of domain-specic ontologies. We describe how these categories behave using several con- crete examples. Finally, we consider how a stream window management strategy based on semantic importance could improve overall processing performance, especially as available window sizes decrease.

RDF↗

Prospects and Challenges in the Management of Non-Retrievable Radioactive Waste in the Russian Federation - 17212

In 2011, the Federal Law 'On the Management of Radioactive Waste' was enacted in the Russian Federation setting a framework for the Unified State System for Radioactive Waste Management and establishing a mandatory requirement for safe radioactive waste (RW) disposal. Particular category of 'non-retrievable RW' was defined given the amount of RW generated by that time, the issues associated with relevant sites, as well as the experience gained during the implementation of nuclear legacy programs. It was specified that in situ disposal is the preferred management option for this category of waste rather than RW retrieval and re-disposal due to relevant radiation and financial aspects. In 2011 - 2015, a set of high-priority tasks on taking the inventory of accumulated RW was accomplished. This work also provided for demonstrating the feasibility and making key decisions on the final stages on their lifecycle and relevant end-state strategies. Facilities holding non-retrievable RW were divided into two categories: - subject to transition into near-surface storage facilities by constructing additional safety barriers; - subject to controlled long-term storage followed by remediation. Efforts on a number of surface liquid RW storage water reservoirs falling under the first category launched back in the 20. century were completed. The new federal program provides for a set of follow-up efforts to be completed at 12 facilities. As it comes to the second category, the main task was to develop a set of safety management options, as well as some computational methods to demonstrate the feasibility of the selected end-state strategies. The most considerable efforts were made at the Techa Cascade of water reservoirs being the largest liquid radioactive waste (LRW) storage facility in the world that holds over 360 million m{sup 3} of waste with uncertain legal status, the lack of relevant computational models to predict its state. The paper summarizes the data on defining the end states of non-retrievable RW, completed and scheduled efforts on implementing relevant long-term safety strategies. The paper focuses on subsurface repositories and near-surface LRW storage reservoirs considered as common types of facilities holding non-retrievable RW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Mexico Small Business Assistance Program: Management Sciences Inc. (Final Report)

Sandia National Laboratories will, as time and budget allow, perform the following tasks as part of a New Mexico Small Business Assistance (NMSBA) Program project for Management Sciences, Inc. (MSI): 1. Set up a thermal radar in Sandia's Technical Area (TA) III test bed. 2. Collect alarm data from the thermal radar and a radio frequency (RF) radar during simulated intrusion tests to estimate detection performance, based on the Department of Energy (DOE) threat definition. 3. Collect nuisance alarm data caused by weather and non-intruder-related stimuli, to estimate nuisance alarm rate performance. 4. Provide data to the requester, allowing them to process the data. 5. Provide the requester, as a stretch goal, with live radar and thermal radar sensor feeds, allowing real-time processing of the RF radar and the thermal radar. A key technical issue that will influence the success of this activity is the range accuracy of the thermal radar. If issues are encountered, Sandia will work with the requester to correct the range issues.

42 ENGINEERING↗

A Study on Optimized Management Options for the Wolsong Low- and Intermediate - Level Waste Disposal Center in Korea - 13479

The safe and effective management of radioactive waste is a national task required for sustainable generation of nuclear power and for energy self-reliance in Korea. Currently, for permanent disposal of low- and intermediate-level waste (LILW), the Wolsong LILW Disposal Center (WLDC) is under construction. It will accommodate a total of 800,000 drums at the final stage after stepwise expansion. As an implementing strategy for cost-effective development of the WLDC, various disposal options suitable for waste classification schemes would be considered. It is also needed an optimized management of the WLDC by taking a countermeasure of volume reduction treatment. In this study, various management options to be applied to each waste class are analyzed in terms of its inventory and disposal cost. For the volume reduction and stabilization of waste, the vitrification and plasma melting methods are considered for combustible and incombustible waste, respectively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An overview of the Space Station Technology/Advanced Development Program

The Advanced Technology Plan of the Fiscal Year (FY) 1986 is designed to focus on the most promising technology options applicable to the Space Station (SS), selected from the list of tasks identified by the FY 1984 Technology Program as the most critical technologies to be developed for the initial SS Initial Operating Capability. Most of the current activities are in the stages of manufacture and life tests of specific SS subsystems. Special attention is given to major technologies, which include power systems (PSs) (with emphasis on a Solar Dynamic PS concept); the thermal control system (with the focus on the 'thermal bus' concept); the environmental control and life support system; and the data management system; all are illustrated schematically. Other tasks, including dynamics, communications, extravehicular activities, mechanics, propulsion, and fluid, as well as the tasks of cost, maintainability, automation and robotics, and productivity are discussed.

Carlisle, R. F.↗

Continuous Risk Management: An Overview

Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

Rosenberg, Linda↗

Centrally managed unified shared virtual address space

Systems, apparatuses, and methods for managing a unified shared virtual address space. A host may execute system software and manage a plurality of nodes coupled to the host. The host may send work tasks to the nodes, and for each node, the host may externally manage the node's view of the system's virtual address space. Each node may have a central processing unit (CPU) style memory management unit (MMU) with an internal translation lookaside buffer (TLB). In one embodiment, the host may be coupled to a given node via an input/output memory management unit (IOMMU) interface, where the IOMMU frontend interface shares the TLB with the given node's MMU. In another embodiment, the host may control the given node's view of virtual address space via memory-mapped control registers.

97 MATHEMATICS AND COMPUTING↗

A Unified Testing Platform to Mature Blockchain Applications for Grid Emulation Environments

Blockchain technology is a relatively novel technology that can be used to develop more decentralized, autonomous and tamper-evident solutions. A feature that can aid Transactive Energy Systems to reach their goals by enabling individual actors to communicate and reach consensus with other participants in a more decentralized fashion. However, technical barriers to evaluate and adopt this type of technology within the electrical domain still exist. To facilitate this task, BLOSEM Unified Testing Platform (UTP), a DOE-sponsored, multi-lab effort intends to accelerate the development of solutions by offering a common set of reusable services that can be used to interconnect existent grid tools with blockchain services. UTP is intended to serve as development platform that can provide application engineers with the technical means to evaluate potential blockchain solutions, by enabling them to concentrate on the actual application functionalities while at the same time abstracting the connectivity and performance measurement tasks. The use of BLOSEM UTP is further demonstrated by implementing two potential use cases that are intended to validate both the feasibility of implementing these applications as blockchain-based solutions while also demonstrating the features provided by UTP.

blockchain co-simulation↗