Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “storage resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Data preservation at the Fermilab Tevatron

The Fermilab Tevatron collider's data-taking run ended in September 2011, yielding a dataset with rich scientific potential. The CDF and D0 experiments each have approximately 9 PB of collider and simulated data stored on tape. A large computing infrastructure consisting of tape storage, disk cache, and distributed grid computing for physics analysis with the Tevatron data is present at Fermilab. The Fermilab Run II data preservation project intends to keep this analysis capability sustained through the year 2020 and beyond. To achieve this goal, we have implemented a system that utilizes virtualization, automated validation, and migration to new standards in both software and data storage technology and leverages resources available from currently-running experiments at Fermilab. Lastly, these efforts have also provided useful lessons in ensuring long-term data access for numerous experiments, and enable high-quality scientific output for years to come.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Highly Integrated Quality Assurance – An Empirical Case

Highly Integrated Quality Assurance – An Empirical Case Drake Kirkham1, Amy Powell2, Lucas Rich3 1Quality Manager, Radioisotope Power Systems (RPS) Program, Idaho National Laboratory, P.O. Box 1625 M/S 6122, Idaho Falls, ID 83415-6122 2Quality Engineer, RPS Program, Idaho National Laboratory 3Quality Engineer, RPS Program, Idaho National Laboratory Contact: Voice: (208) 533-7550 Email: Drake.Kirkham@inl.gov Abstract. The Radioisotope Power Systems Program of the Idaho National Laboratory makes an empirical case for a highly integrated Quality Assurance function pertaining to the preparation, assembly, testing, storage and transportation of 238Pu fueled radioisotope thermoelectric generators. Case data represents multiple campaigns including the Pluto/New Horizons mission, the Mars Science Laboratory mission in progress, and other related projects. Traditional Quality Assurance models would attempt to reduce cost by minimizing the role of dedicated Quality Assurance personnel in favor of either functional tasking or peer-based implementations. Highly integrated Quality Assurance adds value by placing trained quality inspectors on the production floor side-by-side with nuclear facility operators to enhance team dynamics, reduce inspection wait time, and provide for immediate, independent feedback. Value is also added by maintaining dedicated Quality Engineers to provide for rapid identification and resolution of corrective action, enhanced and expedited supply chain interfaces, improved bonded storage capabilities, and technical resources for requirements management including data package development and Certificates of Inspection. A broad examination of cost-benefit indicates highly integrated Quality Assurance can reduce cost through the mitigation of risk and reducing administrative burden thereby allowing engineers to be engineers, nuclear operators to be nuclear operators, and the cross-functional team to operate more efficiently. Applicability of this case extends to any high-value, long-term project where traceability and accountability are determining factors.

99 GENERAL AND MISCELLANEOUS↗

Transportability of exogenous microbial community correlates with interwell connectivity in deep aquifers

Subsurface resource engineering operations often utilize continuous injection of externally-sourced water into geological reservoirs for formation pressure maintenance, resource recovery or energy/waste storage. Such injected water generally contains naturally occurring microbes. Little is known, however, about how the injectate microbes transport through geological media as a community, how such transportability is affected by injector-producer connectivity, and whether such knowledge can be utilized for flowpath characterization. In this study, we analyzed daily-to-weekly timeseries microbial community data from the injected- and produced-fluids of a ten-month flow test at a deep, well-characterized engineered aquifer. We found that the injectate microbial community was distinct from the indigenous community at the amplicon sequence variant (ASV) level, and that the transportability of injectate community towards a given producer, quantified by an “nASV-Overlap” metric we propose, had strong and significant positive correlation with known injector-producer connectivities at our site. This suggests that the better the connectivity, the higher the probability for more injectate species to flow through the interwell region and arrive at a producer. Because interwell connectivity is an important yet usually unknown parameter in subsurface resource engineering, such correlation in turn points to nASV-Overlap as a useful indicator of interwell connectivity for aquifer characterization and long-term monitoring. Based on our findings, an nASV-Overlap-based microbial tracing approach was developed for characterizing and monitoring the relative connectivities across multiple producers with a given injector. A side-by-side comparison between the new nASV-Overlap approach and traditional artificial tracer methods is presented, and their respective strengths and limitations are discussed.

Deep biosphere↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is organized into the following five major areas: 1) Consent-Based Siting, 2) IWM Facilities and Equipment Concepts and Development, 3) Transportation Capability Analysis and Support, 4) Information Technology Solutions and Support, and 5) System Integration Analysis and Support. This paper discusses the activities ongoing in the IWMP System Integration Analysis and Support area. Two main areas of research in system integration are data and tools development, as well as system analysis assessments. One of the tools being developed in the system integration area is the Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS) tool. It is being developed as a foundational resource for DOE-NE to manage SNF data, along with several compatible analysis tools for time-dependent characterization of SNF and related systems. UNF-ST&DARDS has the unparalleled ability to track SNF through the entire back end of the fuel cycle—from the time the fuel is discharged from a reactor through its disposal in a geological repository. UNF ST&DARDS interfaces with the SCALE code system for nuclear analysis and COBRA-SFS for thermal analysis. Another main tool being developed is the Next Generation System Analysis Model (NGSAM). NGSAM is an agent-based simulation software tool expressly designed to be capable of modeling the waste management system. NGSAM has been developed to enable informed decision-making by providing the capability of analyzing various potential system options for the management of SNF and HLW. Using NGSAM, system architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analysis assessments may investigate the implications of various strategies such as different acceptance rates, acceptance queues, facility capacities and options, standardized canisters, and different assumed system operation start dates. Recently, some system analysis effort has begun to look at how the waste management system might operate for advanced reactor fuel cycles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

North Carolina Water Utility Builds Resilience with Distributed Energy Resources

As the frequency and duration of grid outages increase, backup power systems are becoming more important for ensuring that critical infrastructure continues to provide essential services. Most facilities rely on diesel generators, which may be ineffective during long outages owing to limited fuel supplies and high generator failure rates. Distributed energy resources such as solar, storage, and combined-heat-and-power systems, coupled with on-site biofuel production, offer an alternative source of on-site generation that can provide both cost savings and resilience (i.e., the ability to respond to catastrophic events with longer-term consequences). A mixed-integer linear program minimizes costs and maximizes resilience at a wastewater treatment plant in Wilmington, North Carolina. We find that the plant can reduce life-cycle energy costs by 3.1% through the installation of a hybrid combined-heat-and-power, photovoltaic, and storage system. When paired with existing diesel generators, this system can sustain full load for seven days while saving $664,000 over 25 years and reducing diesel fuel use by 48% compared with the diesel-only solution. This analysis informed a decision by the Cape Fear Public Utility Authority to allocate funds for the implementation of a combined-heat-and-power system at the wastewater treatment plant in fiscal year 2023. Finally, the benefits of deploying hybrid combined-heat-and-power technologies and the utilization of on-site biofuel production extend, on a national scale, to thousands of wastewater treatment facilities and other types of critical infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling distributed energy resource aggregations in security constrained unit commitment and economic dispatch

The Federal Energy Regulatory Commission (FERC) recently issued Order 2222, which requires all wholesale electricity markets in the US to allow distributed energy resources (DERs) to participate in the market as aggregated resources. These DER aggregations may be composed of many individual resources that are offered and dispatched by the market as a single entity. We present here a model of a distributed energy resource aggregator (DERA) that is scheduled by a market operator’s security constrained unit commitment (SCUC) and security constrained economic dispatch (SCED). The DERA model includes constraints for battery energy storage systems (BESSs), demand response resources (DRRs), and a simple distributed energy resource (DER). This paper describes a model for each resource type and presents two methods for the DERA to generate market offer curves: a profit-maximizing optimization to compute cost curves and a direct cost algorithm to determine dispatch costs for each resource and combine into cost curves. Once all participating DERAs are scheduled in SCUC/SCED, the model is then modified to dispatch individual DERs to maximize profit or minimize schedule deviation of the DERAs. A simulation of a representative day illustrates the DERA offers, the scheduled generation, and the DERA dispatch. Findings show the potential for unavoidable schedule deviations due to internal DER constraints and due to economic incentives to deviate from the SCUC/SCED schedules. This highlights the importance of DERA offer construction on market efficiency and system reliability. Novel aspects of our approach include: (1) We consider the asymmetry of price incentives impacting DERAs from the wholesale market compared to those impacting consumers from the retail market, as imposed by current regulations and laws. (2) We model aggregate consumer response through statistically parameterizable utility functions rather than a potentially impractical approach of modeling each individual consumer. (3) We show how to use the DERA operational dispatch model to create offers into the wholesale electricity market. (4) We show how DERAs may fail to meet their scheduled dispatch because the market offer format may not permit them to fully express their operational features such as intertemporal costs and constraints to the market.

aggregations↗

Unleashing the Frequency: Multi-Megawatt Demonstration of 100% Renewable Power Systems with Decentralized Communication-Less Control Scheme

Power systems, which range in size from small microgrids to island systems to large regional grids, are typically managed by a central controller that requires complex communication methods and can be unreliable and pose cyber security risks in certain applications, especially when controlling a larger number of nodes. We propose an inherently robust, scalable method of integration using multiple energy storage systems and distributed energy resources, which does not require any means of dedicated communication. This method moves beyond the paradigm of controlling grid frequency at a fixed value (e.g., 60 Hz), instead allowing the frequency to fluctuate within certain limits (e.g., 59.6-60.4 Hz). With a greater operating range, the frequency can carry necessary information from energy storage systems to highly variable distributed energy resources like photovoltaics, wind, hydro, etc.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Containment Analysis Capability of UNF-ST&DARDS

The Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS) methodology to perform automated containment analyses for potential transportation packages based on canister loading map information is described in this paper, and its capability is illustrated with example results. The allowable leakage rate is calculated with the procedures provided in ANSI N14.5-2014 and NUREG/CR-6487, which were adapted for containment analysis of a transportation package containing fuel assemblies with different nuclear characteristics (e.g., initial enrichment, burnup, and cooling time) and clad integrity (intact or damaged). UNF-ST&DARDS applies different source term calculation methodologies for low-burnup fuel (LBF) (i.e., <45 GWd/tonne U) assemblies and high-burnup fuel (HBF) (i.e., ≥45 GWd/tonne U) assemblies. The LBF radionuclide activities are based on actual fuel assembly burnup, initial enrichment, and cooling time. Bounding radionuclide activities based on a fuel pellet burnup value of 65 GWd/tonne U and actual fuel assembly cooling time are used for HBF assemblies. The fraction of failed fuel rods and the release fractions for the contributors to releasable source terms recommended in NUREG-1617 are used in the containment analysis regardless of fuel assembly burnup. However, UNF-ST&DARDS supports different parameter values for LBF and HBF assemblies. Finally, the containment analysis methodology for as-loaded transportation packages is presented in detail, and the UNF-ST&DARDS containment analysis capability is illustrated with results for simulated transportation packages containing spent nuclear fuel canisters in dry storage at selected sites.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The decommissioning imperative - motivating progress in us used fuel management - 15185

When the Yucca Mountain project was terminated in 2010 there was approximately 3500 metric tons of used fuel stored at Independent Spent Fuel Storage Installations (ISFSIs) at which there was no operating reactor (10 shutdown plant sites and the GE Morris facility). By 2015, four additional sites with five reactors will have shut down, causing the amount of used fuel 'stranded' at sites where there is no operating reactor to nearly double to approximately 6900 metric tons which will be stored at a total of 15 sites. At each of these sites, once the reactors are decommissioned, the only thing preventing the land from being returned to communities for other uses is the remaining presence of the used fuel. The cost of maintaining 15 stand-alone ISFSIs is born by electric ratepayers and taxpayers. Going forward, the costs of maintaining stand-alone ISFSIs is certain to grow even if the number of stand-alone ISFSIs does not grow beyond the already announced shutdown of the Oyster Creek reactor in 2019 (which would increase the amount of stranded used fuel by another 10% and create a 16. stand-alone ISFSI). One reason for this cost escalation will be the need for ISFSI owners to renew storage licenses, and implement aging management programs to support these renewals, due to the continued delay in the federal program for removing the used fuel. Storage licenses at 10 of 16 stand-alone ISFSIs will expire by 2021, which is the earliest projected date at which the Department of Energy (DOE) has indicated it could have a pilot interim storage facility available - and nearly 3 decades before DOE projects a repository will be available. The burden and cost of continuing to renew storage licenses - and manage aging storage facilities - at 16 stand-alone sites instead of moving stranded used fuel to a single consolidated storage location or repository will likely be significant. Industry resources are increasingly being channeled into dry storage aging management activities as public and regulator interest in potential long-term degradation mechanism continues to grow. Whether the ultimate destination for used fuel is Yucca Mountain or some other location, the current stalemate preventing progress in the federal program to move it must be broken - and the increasing prominence of the decommissioned reactor quandary may very well be a pivotal factor in breaking that stalemate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operations Concept for Responding to Urgent Requests for NASA-ISRO Synthetic Aperture Radar (NISAR)

The NASA-ISRO Synthetic Aperture Radar, or NISAR, mission is an Earth-mapping radar observatory to be launched from Sriharikota (India) in 2022. This mission is a collaboration between the National Aeronautics and Space Administration (NASA) and the Indian Space Research Organization (ISRO). This spacecraft will carry two instruments that will operate at radar wavelengths (L and Sband) and will provide data for understanding changes in the Earth’s land surface. The scientific data from this mission will revolutionize our understanding of the causes and consequences of land surface changes on Earth, ranging from Solid Earth Deformation in the form of natural hazards like earthquakes, volcanic eruptions and landslides, to ecosystem disturbances, to changes in the cryosphere (measurements of polar ice caps, ice sheets and sea ice). A nominal Reference Observation Plan, that repeats roughly every 12-24 days, developed prior to launch by the NISAR Mission Planning team, in consultation with the Science Team, will form the basis of science data collection by the payload instruments onboard the NISAR observatory after launch. Scheduling of science observations for the mission requires accounting for limited spacecraft resources like onboard data storage, downlink capacity, energy/power, thermal limits and instrument duty cycles. In addition to nominal science data collection, the project has a Level 1 requirement to respond to requests for urgent data acquisition over disaster sites (natural or anthropogenic) by scheduling new acquisitions within 24 hrs of notification and delivering science data within 5 hours of data acquisition. This capability is to be exercised on a ‘best-efforts basis’. While the definition of what constitutes an ‘urgent request’, and how such requests would be submitted to the project, is within the domain of the Science Team, the Mission System team is responsible for developing the baseline operations concept and implementation approach for responding to such requests. Given the ‘best-efforts’ nature of this requirement, a few highlevel guidelines have been developed to help guide the formulation of the operations concept, and are presented in this paper. Requests for urgent response data will be accommodated following the guiding principle of minimal to no impact on nominal science and planned engineering activities. No change in satellite orbit or attitude will be made for urgent response. Restricting response approaches to only changing the downlink and/or ground processing priority for existing observations, and adding new observations only in areas where NISAR will not be nominally imaging, allows for minimal impact on the Reference science Observation Plan. No instrument mode changes will be allowed for urgent response (except for high-priority requests), and no new observations that impact either planned science or engineering activities will be scheduled. Additionally, data requests must fit within the available project resource margins (both spacecraft and ground resources are to be evaluated). Both JPL and ISRO will be involved at various steps of the implementation, irrespective of whether the urgent request is for L-SAR (NASA instrument) or S-SAR (ISRO instrument) or a joint dataset.

Sharma, Priyanka↗

Photovoltaic Analysis and Response Support (PARS) Platform for Solar Situational Awareness and Resiliency Services

The project's primary objective is to develop a digital-twin based Photovoltaic (PV) Analysis and Response Support (PARS) platform, which aims to provide real-time situational awareness and optimal response plans. This platform is designed to enhance the performance of hybrid PV systems, making them competitive with or even superior to conventional generation resources. The PARS platform enabled the project team to develop and evaluate an extensive suite of grid support functionalities for the hybrid PV systems to enhance grid performance, across key areas including visibility, dispatchability, security, resilience, and reliability. Given the global push toward achieving 100% clean energy by 2035, there is a significant increase in the integration of inverter-based resources (IBRs) throughout the energy grid. Effectively managing the inherent variability and uncertainty associated with IBRs is crucial for ensuring cost-effectiveness, reliability, and security in both the main grid and islanded microgrids. Constrained to a limited array of IEEE test systems or standard feeder models, traditional IBR modeling struggles to assimilate new field data, accurately reflect system dynamics, and adapt to the evolving energy landscape. In our project, we embraced a Digital Twin (DT) strategy for crafting the PARS platform. A digital twin acts as a precise virtual counterpart of a physical system, built on historical data and continuously honed with real-time insights. This enables the high-fidelity DT to accurately mirror current system operations and forecast future scenarios. Consequently, the PARS platform becomes an ideal environment for testing and refining monitoring, control, power, and energy management algorithms designed to boost hybrid PV system performance. The defining feature of the PARS platform, distinguishing it from other advanced simulation tools, is its exceptional adaptability. This is achieved by employing actual network topologies and utilizing real-time field data for fine-tuning and calibration, ensuring a close emulation of real-world conditions. The project deliverables include: 1) High-fidelity IBR models and tools for real-time parameterization, utilizing real-time field measurements to refine IBR models for enhanced accuracy and performance; 2) Grid-forming and Grid-following capabilities to deliver resilience services, including blackstart, voltage and frequency support, cold-load pick-up, power reserves, and three-phase load balancing across grid-connected and microgrid settings; 3) Machine learning-based forecasting tools and methods for generating synthetic data and topologies, creating diverse and realistic simulation environments for evaluating varied operational scenarios; 4) Advanced microgrid power and energy management algorithms for optimizing the integration and operation of PV, storage, and demand response resources within both feeder and community scales. The power grid data sets are provided by four utility companies in North Carolina and the New York Power Administration. Acting as industry advisors, our industry partners communicated stakeholder needs and regulatory standards to the research teams, aiding technology transfer by incorporating the developed methodologies into their daily operations. This collaboration ensures that the PARS platform, functioning as a power system digital twin, enhances our understanding of IBR dynamic behaviors and enables the development and evaluation of IBR control functions that match or exceed the capabilities of conventional synchronous generators.

14 SOLAR ENERGY↗

Real-time Optimal Dispatch of Behind-the-Meter DERs for Secondary Frequency Regulation

Active distribution networks (ADNs) can provide grid services such as peak load shaving, loss reduction, VoltNar control, congestion management, and frequency regulation. The fast response of inverter-based distributed energy resources (DERs) and battery storage systems enables them to provide ramping support and frequency control. This paper proposes a real-time optimization approach for behind-the-meter DERs to participate in the secondary frequency regulation. The proposed approach determines optimal set-points of output power of DERs to respond to requests from system operators (SOs) in realtime to maintain the frequency of the system at the nominal value. To satisfy the real-time requirement for the secondary frequency control, the nonlinear AC power flow model is linearized considering power losses in the system to achieve both high computational speed and acceptable accuracy. The optimization problem is rerun in a closed loop manner until the mismatch between the requested power by the system operators and actual delivered power at the substation reaches an acceptable tolerance. Furthermore, the proposed approach is validated using modified versions of the IEEE 33-bus and IEEE 69-bus distribution systems. Although the contribution of a single distribution system in the frequency regulation may not be significant, stacked and coordinated contributions from several distribution systems can provide frequency regulation and other grid services at scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Financial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.

13 HYDRO ENERGY↗

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.

13 HYDRO ENERGY↗

Integration of microseismic monitoring data into coupled flow and geomechanical models with ensemble Kalman filter

Abstract Hydraulic stimulation of low‐permeability rocks in enhanced geothermal systems, shale resources, and CO 2 storage aquifers can trigger microseismic events, also known as microearthquakes (MEQs). The distribution of microseismic source locations in the reservoir may reveal important information about the distribution of hydraulic and geomechanical rock properties. In this paper, we present a framework for conditioning heterogeneous rock permeability and geomechanical property distributions on microseismic data. To simulate the multiphysics processes in these systems, we combine a fully coupled flow and geomechanical model with the Mohr‐Coulomb type rock failure criterion. The resulting multiphysics simulation constitutes the forecast model that relates microseismic source locations to reservoir rock properties. We adopt this forward model in an ensemble Kalman filter (EnKF) data assimilation framework to jointly estimate reservoir permeability and geomechanical property distributions from injection‐induced microseismic response measurements. We show that integration of a large number of spatially correlated microseismic data with practical ensemble sizes can lead to severe underestimation of ensemble spread, and eventually ensemble collapse. To mitigate the variance underestimation issue, two low‐rank data representation schemes are presented and discussed. In the first approach, microseismic data are projected onto a low‐dimensional subspace defined by the left singular vectors of the perturbed observation matrix. The second method uses a coarser grid for representing the microseismic data. A series of numerical experiments is presented to evaluate the performance of the proposed methods and to illustrate their applicability for assimilating microseismic data into coupled flow and geomechanical forward models to estimate multiphysics rock properties.

Tarrahi, Mohammadali↗

Software Framework for Federated Science Instruments

There is an unprecedented promise of enhanced capabilities for federations of leadership computing systems and experimental science facilities by leveraging software technologies for fast and efficient operations. These federations seek to unify different science instruments, both computing and experimental, to effectively support science users and operators to execute complex workflows. The FedScI project addresses the software challenges associated with the formation and operation of federated environments by leveraging recent advances in containerization of software and softwarization of hardware. We propose a software framework to streamline the federation usage by science users and it’s provisioning and operations by facility providers. A distinguishing element of our work is the support for improved interaction between experimental devices, such as beam-line instruments, and more traditional high-performance computing resources, including compute, network, storage systems. We present guiding principles for the software framework and highlight portions of a current prototype implementation. We describe our science use case involving neutron imaging beam-lines (SNAP/BL-3, Imaging/CG-1D) at the Spallation Neutron Source and High Flux Isotope Reactor facilities at Oak Ridge National Laboratory. Additionally, we detail plans for a more direct instrument interaction within a federated environment, which could enable more advanced workflows with feedback loops to shorten the time to science.

Naughton III, Thomas↗