Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “site characterization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Environmental Monitoring Plan (Revision 6)

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 458.1, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies.

54 ENVIRONMENTAL SCIENCES↗

Supported Aluminum Catalysts for Olefin Hydrogenation

Three-coordinate alkylaluminum sites were developed on a catechol-containing porous organic polymer support (CatPOP A2B1). The CatPOP-based alkylaluminum sites were characterized by solid-state attenuated total reflectance IR spectroscopy, 1H and 27Al magic-angle-spinning NMR spectroscopy, pair-distribution function X-ray absorption spectroscopy, and elemental analysis. The low-coordinate organoaluminum sites can hydrogenate and isomerize a range of mono- and disubstituted alkenes and alkynes under mild conditions (75–100 °C, 5–14 bar H2, 20 h). Results of experimental and computational mechanistic investigations suggest a heterolytic mechanism for the observed hydrogenation–isomerization activity.

alkene hydrogenation↗

High-Resolution Near-Surface Imaging at the Basin Scale Using Dark Fiber and Distributed Acoustic Sensing: Toward Site Effect Estimation in Urban Environments

Near-surface seismic structure, particularly the shear wave velocity (V s ), can strongly affect local site response, and should be accurately estimated for ground motion prediction during seismic hazard assessment. The Imperial Valley (California), occupying the southern end of the Salton Trough, is a seismically active basin with thick surficial lacustrine sedimentary deposits. In this study, we utilize ambient noise records and local earthquake events for high-resolution near-surface characterization and site effect estimation with an unlit fiber-optic telecommunication infrastructure (dark fiber) in Imperial Valley by using the distributed acoustic sensing (DAS) technique. We apply ambient noise interferometry to retrieve coherent surface waves from DAS records, and evaluate performances of three different surface wave methods on DAS ambient noise dispersion imaging. We develop a quality control workflow to improve the dispersion measurement of noisy portions of the DAS data set by using a data selection strategy. Using the joint inversion of both the fundamental mode and higher overtones of Rayleigh waves, a high resolution two-dimensional (2D) V s structure down to 70 m depth is obtained. We successfully achieve an improved V s 30 (the time-averaged shear-wave velocity in the top 30 m) model with higher spatial-resolution and reliability compared to the existing community model for the area. We also explore the potential for utilizing DAS earthquake events for site amplification estimation. The preliminary results reveal a clear anti-correlation between the approximated site response and the V s 30 profile. In conclusion, our results indicate the potential utility of DAS deployed on dark fiber for near-surface characterization in appropriate contexts.

58 GEOSCIENCES↗

Environmental Monitoring Plan, Revision 5

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for ensuring that this work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 5400.5, Radiation Protection of the Public and the Environment, and DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 450.1A, DOE Order 5400.5, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies. (See LLNL [1992] and LLNL [2008] for information about LLNL's CERCLA activities).

54 ENVIRONMENTAL SCIENCES↗

A Classification of Commercial Nuclear Reactor Sites and the Subsequent Impacts on Preparing Spent Nuclear Fuel for Shipment - 17355

The US Department of Energy is conducting analyses to inform future decisions regarding an integrated waste management system for the acceptance of spent nuclear fuel (SNF) from commercial nuclear reactor sites. The ability to prepare SNF for shipment from reactor sites is likely to be restricted by ongoing operations at those sites. This report examines the extent to which those operations will restrict the reactor sites' availability to prepare SNF for shipment. Specifically, the analysis focuses on the impact and frequency of refueling operations within the commercial reactor sites in the US. In this report, a characterization of reactor sites into families is described. This characterization is based on the number of operating reactors on site, the length of refueling cycles for those reactors, and the configuration of spent fuel pools on site. Each reactor family is analyzed to estimate the amount of time for which each reactor site in the family would be available to prepare SNF shipments. This analysis is a work in progress, and the results are used to inform the development of new models of an integrated waste management system for commercial SNF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Permeability Heterogeneity on Area of Review

The Area of Review is one of the most important aspects of a geologic CO 2 storage site permit application and regulatory requirement. The US Environmental Protection Agency (EPA) has implemented an Area of Review (AoR) requirement for Class VI CO 2 injection wells for geologic sequestration. Reservoir permeability is one of the most important parameters controlling AoR evolution but is generally highly heterogeneous and difficult to constrain. We have used a numerical model for Rock Springs Uplift in Wyoming as an example site to characterize how the heterogeneity in reservoir permeability affects AoR. We have performed multiple reservoir simulations using multiple, equally-likely realizations of heterogeneous permeability. We considered multiple CO 2 injection scenarios with varying injection rates as well as varying injection and post-site durations. Results of our study demonstrate that uncertainty in permeability heterogeneity can significantly influence AoR for both CO 2 saturation and pressure. In our example, the CO 2 AoR varied by as much as 2-3 times while the pressure AoR varied over 1.5 – 2 times. Lastly, such type of variability can have significant implications in defining AoR for site permit applications.

58 GEOSCIENCES↗

Fluidized Bed Asbestos Sampler Design and Testing

A large number of samples are required to characterize a site contaminated with asbestos from previous mine or other industrial operations. Current methods, such as EPA Region 10’s glovebox method, or the Berman Elutriator method are time consuming and costly primarily because the equipment is difficult to decontaminate between samples. EPA desires a shorter and less costly method for characterizing soil samples for asbestos. The objective of this was to design and test a qualitative asbestos sampler that operates as a fluidized bed. The proposed sampler employs a conical spouted bed to vigorously mix the soil and separate fine particulate including asbestos fibers on filters. The filters are then analyzed using transmission electron microscopy for presence of asbestos. During initial testing of a glass prototype using ASTM 20/30 sand and clay fines as asbestos surrogates, fine particulate adhered to the sides of the glass vessel and the tubing to the collection filter – presumably due to static charge on the fine particulate. This limited the fines recovery to ~5% of the amount added to the sand surrogate. A second prototype was constructed of stainless steel, which improved fines recovery to about 10%. Fines recovery was increased to 15% by either humidifying the inlet air or introducing a voltage probe in the air space above the sample. Since this was not a substantial improvement, testing using the steel prototype proceeded without using these techniques. Final testing of the second prototype using asbestos suggests that the fluidized bed is considerably more sensitive than the Berman elutriator method. Using a sand/tremolite mixture with 0.005% tremolite, the Berman elutriator did not segregate any asbestos structures while the fluidized bed segregated an average of 11.7. The fluidized bed was also able to segregate structures in samples containing asbestos at a 0.0001% concentration, while the Berman elutriator method did not detect any fibers at this concentration. Opportunities for improvement with the fluidized bed include improving reproducibility among replicates, increasing mass recovery, improving the lid gasket seal.

42 ENGINEERING↗

Characterization of novel borides in Ti-Nb-Zr-Ta + 2B metal-matrix composites

Metal-matrix composites consisting of a complex quaternary Ti-35Nb-7Zr-5Ta alloy reinforced by borides have been successfully deposited from a powder feedstock consisting of a blend of elemental titanium, niobium, zirconium, tantalum, and, titanium diboride (TiB{sub 2}) powders, using the laser engineered net-shaping (LENS{sup TM}) process. The microstructures of the as-deposited composites have been characterized using scanning electron microscopy, orientation microscopy, and, transmission electron microscopy. Both primary and eutectic boride precipitates, exhibiting the orthorhombic B27 structure, are observed in these as-deposited composites. The complex primary borides exhibit an unusual compositional variation within the same precipitate, which has been investigated in detail using site-specific characterization with a transmission electron microscope. The ability to form near-net shape components using the Laser Engineered Net Shaping process makes these laser-deposited composites promising candidates for wear-resistant applications in biomedical implants.

36 MATERIALS SCIENCE↗

A New View of the Lunar South Pole from the Lunar Orbiter Laser Altimeter (LOLA)

Upcoming missions to the lunar south pole require detailed maps over large areas to fully characterize landing sites locally and regionally and to place their data into proper geologic context. To that end, we enhanced the Lunar Orbiter Laser Altimeter (LOLA) altimetry dataset for the south polar region, from which we produced new maps of topography, topographic roughness, and permanently shadowed regions (PSRs). The roughness maps reveal a diversity of terrains characterized by hectometer-scale roughness which is controlled in this region primarily by cratering and downslope mass transport. The south polar region is littered with linear roughness features of order ~1 – 10 km wide and ~10s – 100s of km long hypothesized to be secondary impacts within extended ejecta rays. Non uniformities in these features could reflect variations in secondary impactor properties and/or target terrain properties. Poleward of 80° S, the PSR cumulative size-frequency distribution (CSFD) shows an approximately power-law behavior whose exponent has a spatial variation of ~10%. PSRs with areas < 1 km2 contain 15 ± 5% of the total PSR area. Finally, we studied the effect of false positives and false negatives on the accuracy of the measured PSR cumulative size-frequency distribution (CSFD) and on the area for any individual PSR. The new maps presented here have many applications in the science and exploration of the lunar south polar region, such as geologic mapping and traverse planning.

Michael K. Barker↗

Characterization of Direct-Push Vadose Zone Sediments from the 241-B and 241-BX Tank Farms

Geochemical tests provide evidence for the transit of a plume of caustic waste solution through the sediment column at the Hanford 241-B and -BX Tank Farms. Direct-push samples recovered from boreholes surrounding Tanks 241-B-110 and 241-BX-102 and related waste transfer lines and diversion boxes included sediments typical of those previously recovered from other localities on the Hanford Site. The Hanford formation sediments are dominantly quartzo-feldspathic sands strewn with lithic fragments, displaying a range of particle size distributions and sorting characteristics. Some moderately well-sorted, fine-grained lithologies are interpreted as lenticular bodies irregularly dispersed in coarser-grained, more poorly sorted sediments. Tier I tests conducted on the vadose zone sediments revealed an inverse correlation between moisture content and sediment size fraction (i.e., there is greater moisture content in finer-grained sediments). The Tier I tests also showed that the pore water solutions were likely sodium-rich, moderately saline, and possessed higher pH values than background (untainted) sediments. These data are characteristic of sediments that have encountered sodium-rich, saline, caustic waste solution, as documented in other reports at other suspect contamination sites around Hanford. Analyses of solutions from 1:1 water extracts reveal relatively balanced cation and anion concentrations, indicating that most of the geochemical species have been accounted for. The water extract data for affected sediments also indicate unusually high concentrations of aluminum, iron, and phosphorus. The relatively high concentrations of aluminum and iron may be the result of dissolution of secondary amorphous phases that precipitated after a reactive plume partially dissolved aluminum- and iron-bearing phases as it migrated through the sediment column. On the other hand, the presence of elevated concentrations of phosphorous may be the tell-tale signature of wastes derived from the bismuth phosphate separation process. Elements typically mobile in the geosphere, such as technetium-99, are present at either low concentrations or are below the analytical detection limit. However, we expect that the mobile elements would be present mainly along a narrow plume front, and if this front had passed deeper into the sediment profile than depths sampled, the retention of these elements would be minor. On the other hand for the direct push sediments from around BX Tank Farm, uranium-238 was detected in nearly all sediment specimens (by acid extract experiments) at concentrations above the natural crustal average (0.763 pCi/g), and we also detected the presence of several anthropogenic radioisotopes, such as cobalt-60, cesium-137, europium-154, and europium-155 (by gamma energy analysis). These data are direct confirmation of contamination of the sediments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quenched crystal-field disorder and magnetic liquid ground states in Tb 2 Sn 2 - x Ti x O 7 [Crystal field disorder in the quantum spin ice ground state of Tb2Sn2-xTixO7]

Solid-solutions of the "soft" quantum spin ice pyrochlore magnets Tb 2 B 2 O 7 with B=Ti and Sn display a novel magnetic ground state in the presence of strong B-site disorder, characterized by a low susceptibility and strong spin fluctuations to temperatures below 0.1 K. These materials have been studied using ac-susceptibility and muSR techniques to very low temperatures, and time-of-flight inelastic neutron scattering techniques to 1.5 K. Remarkably, neutron spectroscopy of the Tb 3+ crystal field levels appropriate to at high B-site mixing (0.5 < x < 1.5 in Tb 2 Sn 2-x Ti x O 7 ) reveal that the doublet ground and first excited states present as continua in energy, while transitions to singlet excited states at higher energies simply interpolate between those of the end members of the solid solution. The resulting ground state suggests an extreme version of a random-anisotropy magnet, with many local moments and anisotropies, depending on the precise local configuration of the six B sites neighboring each magnetic Tb 3+ ion.

36 MATERIALS SCIENCE↗

Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiological materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural, vibrational, thermal, and magnetic properties of mullite-type NdMnTiO 5 ceramic

Mullite-type $R$Mn 2 O 5 ($R$ = Y, rare-earth element) ceramics are of ongoing research attention because of their interesting crystal-chemical and magnetic properties. We report nuclear and magnetic structures of NdMnTiO 5 together with its spectroscopic, thermogravimetric, and magnetic properties. The polycrystalline sample is prepared by solid-state synthesis and characterized from neutron and X-ray powder diffraction data Rietveld refinements. NdMnTiO 5 crystallizes in the orthorhombic space group $Pbam$ with metric parameter $a$ = 755.20(1) pm, $b$ = 869.91(1) pm, $c$ = 582.42(1) pm, and $V$ = 382.62(1) 10 6 pm 3 . The Mn 3+ and Ti 4+ cations are observed to be located in the octahedral and pyramidal sites, respectively. The vibrational features in these polyhedral sites are characterized by Raman and Fourier transform infrared spectroscopes. The higher decomposition temperature of NdMnTiO 5 , compared to other $R$Mn 2 O 5 phases, is explained in terms of the higher bond strength of Ti-O bonds than those of Mn-O bonds. Temperature-dependent DC magnetic susceptibility suggests a paramagnetic to antiferromagnetic phase transition at 43(1) K. Inverse susceptibility in the paramagnetic region above 120 K follows the Curie-Weiss law, resulting in a magnetic moment of 6.33(1) μ B per formula unit. Neutron diffraction data collected at 7.5 K reveal that the magnetic moments of Nd 3+ and Mn 3+ in NdMnTiO 5 are incommensurately ordered with a propagation vector $k$ = (0, 0.238, 0.117).

36 MATERIALS SCIENCE↗

Site Classification for Standard Modular Hydropower Development: Characterizing Stream Reaches by Module Need

The objective of site classification for Standard Modular Hydropower (SMH) development is to develop a framework for classifying potential SMH sites in terms useful for informing SMH development, such as module need and module design requirements. While the current vision for SMH has focused on applications for new stream-reach development, these site classifications are equally useful for other applications, such as modular development at non-powered dams and other hydropower co-development opportunities. We used K-means clustering to classify sites (i.e., stream reaches) into clusters (i.e., groups of sites with similar attributes) based on simultaneous consideration of physical and biological attributes of those sites. Stream reaches included were confined to those with mean annual flow > 50 cfs and < 25,000 cfs (~350,000 reaches). Site Classification was conducted separately for six modules: hydroelectric generation, water quality, sediment passage, fish passage, foundation support, and recreation. About 340,000 stream reaches across the contiguous US were classified into 10 groups for each of the 6 different module categories. For each module category, clusters are visualized on US maps and described based on the defining variables that differentiate clusters from each other.

13 HYDRO ENERGY↗

Leveraging Regional Exploration to Develop Geologic Framework for CO2 Storage in Deep Formations in Midwestern United States

Obtaining subsurface data for developing a regional framework for geologic storage of CO{sub 2} can require drilling and characterization in a large number of deep wells, especially in areas with limited pre-existing data. One approach for achieving this objective, without the prohibitive costs of drilling costly standalone test wells, is to collaborate with the oil and gas drilling efforts in a piggyback approach that can provide substantial cost savings and help fill data gaps in areas that may not otherwise get characterized. This leveraging with oil/gas drilling also mitigates some of the risk involved in standalone wells. This collaborative approach has been used for characterizing in a number of locations in the midwestern USA between 2005 and 2009 with funding from U.S. Department of Energy's National Energy Technology Laboratory (DOE award: DE-FC26-05NT42434) and in-kind contributions from a number of oil and gas operators. The results are presented in this final technical report. In addition to data collected under current award, selected data from related projects such as the Midwestern Regional Carbon Sequestration Partnership (MRCSP), the Ohio River Valley CO{sub 2} storage project at and near the Mountaineer Plant, and the drilling of the Ohio Stratigraphic well in Eastern Ohio are discussed and used in the report. Data from this effort are also being incorporated into the MRCSP geologic mapping. The project activities were organized into tracking and evaluation of characterization opportunities; participation in the incremental drilling, basic and advanced logging in selected wells; and data analysis and reporting. Although a large number of opportunities were identified and evaluated, only a small subset was carried into the field stage. Typical selection factors included reaching an acceptable agreement with the operator, drilling and logging risks, and extent of pre-existing data near the candidate wells. The region of study is primarily along the Ohio River Valley corridor in the Appalachian Basin, which underlies large concentrations of CO{sub 2} emission sources. In addition, some wells in the Michigan basin are included. Assessment of the geologic and petrophysical properties of zones of interest has been conducted. Although a large number of formations have been evaluated across the geologic column, the primary focus has been on evaluating the Cambrian sandstones (Mt. Simon, Rose Run, Kerbel) and carbonates layers (Knox Dolomite) as well as on the Silurian-Devonian carbonates (Bass Island, Salina) and sandstones (Clinton, Oriskany, Berea). Factors controlling the development of porosity and permeability, such as the depositional setting have been explored. In northern Michigan the Bass Islands Dolomite appears to have favorable reservoir development. In west central Michigan the St. Peter sandstone exhibits excellent porosity in the Hart and Feuring well and looks promising. In Southeastern Kentucky in the Appalachian Basin, the Batten and Baird well provided valuable data on sequestration potential in organic shales through adsorption. In central and eastern Ohio and western West Virginia, the majority of the wells provided an insight to the complex geologic framework of the relatively little known Precambrian through Silurian potential injection targets. Although valuable data was acquired and a number of critical data gaps were filled through this effort, there are still many challenges ahead and questions that need answered. The lateral extent to which favorable potential injection conditions exist in most reservoirs is still generally uncertain. The prolongation of the characterization of regional geologic framework through partnership would continue to build confidence and greatly benefit the overall CO{sub 2} sequestration effort.

54 ENVIRONMENTAL SCIENCES↗

Investigation of gas hydrate-bearing sandstone reservoirs at the "Mount Elbert" stratigraphic test well, Milne Point, Alaska

In February 2007, the U.S. Department of Energy, BP Exploration (Alaska), Inc., and the U.S. Geological Survey conducted an extensive data collection effort at the "Mount Elbert #1" gas hydrates stratigraphic test well on the Alaska North Slope (ANS). The 22-day field program acquired significant gas hydrate-bearing reservoir data, including a full suite of open-hole well logs, over 500 feet of continuous core, and open-hole formation pressure response tests. Hole conditions, and therefore log data quality, were excellent due largely to the use of chilled oil-based drilling fluids. The logging program confirmed the existence of approximately 30 m of gashydrate saturated, fine-grained sand reservoir. Gas hydrate saturations were observed to range from 60% to 75% largely as a function of reservoir quality. Continuous wire-line coring operations (the first conducted on the ANS) achieved 85% recovery through 153 meters of section, providing more than 250 subsamples for analysis. The "Mount Elbert" data collection program culminated with open-hole tests of reservoir flow and pressure responses, as well as gas and water sample collection, using Schlumberger's Modular Formation Dynamics Tester (MDT) wireline tool. Four such tests, ranging from six to twelve hours duration, were conducted. This field program demonstrated the ability to safely and efficiently conduct a research-level openhole data acquisition program in shallow, sub-permafrost sediments. The program also demonstrated the soundness of the program's pre-drill gas hydrate characterization methods and increased confidence in gas hydrate resource assessment methodologies for the ANS.

03 NATURAL GAS↗

Utilizing Site Disorder in the Development of New Energy-Relevant Semiconductors

We report controlling site disorder in ternary and multinary compounds enables tuning optical and electronic properties at fixed lattice constants and stoichiometries, moving beyond many of the challenges facing binary alloy systems. Here, we consider possible enhancements to energy-related applications through the integration of disorder-tunable materials in devices such as light-emitting diodes, photonics, photovoltaics, photocatalytic materials, batteries, and thermoelectrics. However, challenges remain in controlling and characterizing disorder. Focusing primarily on II–IV–V 2 materials, we identify three metrics for experimentally characterizing cation site disorder. Complementary to these experiments, we discuss simulation methods to understand disordered materials. Nonidealities, such as off-stoichiometry and oxygen incorporation, can occur while synthesizing metastable disordered materials. While nonidealities may seem undesirable, we describe how if harnessed they could provide another knob for tuning disorder and subsequently properties. To illustrate the effects of disorder on device-relevant properties, we provide case examples of disordered materials and their potential in device applications.

36 MATERIALS SCIENCE↗

Radiation Protection Considerations at USACE Formerly Utilized Sites Remedial Action Program (FUSRAP) Projects

The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initially authorized by Congress in 1974. FUSRAP was enacted to address residual radioactive contamination associated with numerous sites across the U.S. at which radioactive material (primarily Uranium ores and related milling products) had been processed in support of the nation's nuclear weapons program dating back to the Manhattan Project and the period immediately following World War II. In October 1997, Congress transferred the management of this program from the Department of Energy to the United States Corp of Engineers. Through this program, the Corps addresses the environmental remediation of certain sites once used by DOE's predecessor agencies, the Manhattan Engineer District and the Atomic Energy Commission. The waste at FUSRAP sites consists mainly of low levels of uranium, thorium and radium, along with some mixed wastes. Upon completion of remedial activities, these sites are transferred to DOE for long-term stewardship activities. This paper presents and contrasts the radiological conditions and recent monitoring results associated with five large ongoing FUSRAP projects including Maywood, N.J.; the Linde site near Buffalo, N.Y.; Colonie in Albany N.Y. and the St Louis, Mo. airport and downtown sites. The radiological characteristics of soil and debris at each site and respective regulatory clean up criteria is presented and contrasted. Some differences are discussed in the radiological characteristics of material at some sites that result in variations in radiation protection monitoring programs. Additionally, summary data for typical personnel radiation exposure monitoring results are presented. In summary: 1. The FUSRAP projects for which data and observations are reported in this paper are considered typical of the radiological nature of FUSRAP sites in general. 2. These sites are characterized by naturally occurring uranium and thorium series radionuclides in soil and debris, at concentrations typically < E4 pCi/ gram total activity. 3. Although external exposure rates are generally low resulting in few exposures above background, occasional 'hot spots' are observed in the 1- 10 mR / hr range or higher. However personnel and general area external exposure monitoring programs consistently demonstrate very low potential for external exposure at theses sites. 4. Potential for airborne exposure is controlled by wetting and misting techniques during excavation and movement of materials. Air sampling and bioassay programs confirm low potential for airborne exposure of workers at these sites. 5. Radiation protection and health physics monitoring programs as implemented at these sites ensure that exposures to personal are maintained ALARA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗