Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reports”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Software-defined Networking for Energy Delivery Systems (SDN4EDS): An Architectural Blueprint (Final Summary Report)

This is the initial version of a reference for suppliers and energy companies of all sizes to deploy networks based on software-defined networking technology (SDN) to improve reliability, reduce cyber security attack surface, and facilitate mitigation of adversarial behavior. It is a living document and will progress over the life cycle of the Software-Defined Networking for Energy Delivery Systems (SDN4EDS) project. Version 2 of this report provides information on the Red Team tabletop assessment performed against the initial reference architecture. Version 3 of this report updates the reference architecture with lessons learned from the Red Team tabletop assessment, as well as provides additional details for the use cases. It also provides information on the decision process that could be used by an organization when considering deploying SDN in their environment. The final version of this report consolidates all the interim reports generated by the project into a final report. It also draws from PNNL’s experience in deploying SDN to make recommendations on how SDN could be deployed in a utility environment, and provides rationale for those decisions allowing individual utilities to make risk-based and knowledge-based decisions on how to best deploy SDN in their own environment. This summary report provides a higher-level overview of the project reports. Readers interested in additional detail, including results of the Red Team assessments and the final configuration, are encouraged to read the full final report.

97 MATHEMATICS AND COMPUTING↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2021)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment, CAU 91, Area 3 U-3fi Injection Well, CAU 92, Area 6 Decon Pond Facility, CAU 110, Area 3 WMD U-3ax/bl Crater, CAU 111, Area 5 WMD Retired Mixed Waste Pits, and CAU 112, Area 23 Hazardous Waste Trenches. This report covers calendar year 2021. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Ames National Laboratory Annual Site Environmental Report for CY2021

The primary purpose of this report is to summarize the performance of Ames National Laboratory’s environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2021. This report is a working requirement of Department of Energy Order 231.1B, Environment, Safety and Health Reporting. It includes descriptions of the Laboratory’s site, mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames National Laboratory is located on the campus of Iowa State University (ISU) and occupies 13 buildings owned by the Department of Energy (DOE). See the Laboratory’s Web page for location and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2021, the Laboratory accumulated and disposed of hazardous waste under a U.S. Environmental Protection Agency (EPA) issued generator number. All waste was handled according to applicable EPA, State, and local regulations and DOE Orders. The Laboratory operates as a Small Quantity Generator (SQG) of hazardous waste. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2021 (See U.S. Department of Energy Air Emissions Annual Report in Appendix A.) The Laboratory has an established Environmental Radiological Protection Program (Plan 10200.041) per DOE Order 458.1 requirements. Plans, policies, and procedures are in place to protect the public and the environment against undue risk from radiation associated with DOE radiological activities. As indicated in prior Site Environmental Reports, formal pollution prevention awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2017 with Iowa State University’s shift toward single-stream recycling. Included in recycling efforts are items such as batteries, monitors, corrugated cardboard, lamps, miscellaneous electronic office equipment, mixed paper, newsprint, food/beverage containers, and laboratory glassware. Ames National Laboratory also recycles/reuses salvageable metal, used oil, and foamed polystyrene peanuts, and encourages chemical redistribution and sharing among research groups. Ames National Laboratory reported its contractual performance to DOE-Ames Site Office (AMSO) through the Laboratory’s Performance Evaluation Measurement Plan (PEMP), and a performance level of “B+” was achieved in 2021 for Sustain Excellence and Enhance Effectiveness of Integrated Safety, Health, and Environmental Protection As reported in Site Environmental Reports for prior years, the Laboratory’s Environmental Management System (EMS) has been integrated into the Laboratory’s Integrated Safety Management System (ISMS) since 2005. The integration of EMS into Laboratory business practices allows the Laboratory to systematically review, address and respond to environmental impacts. In addition to DOE-identified objectives and targets, the EMS Steering Committee recommends annual environmental goals for the Laboratory. Due to the COVID-19 pandemic and limited onsite work staff, goals of reducing water usage and travel/commuting to promote the reduction of scope 3 greenhouse gases were achieved. All contract deliverables and environmental compliance activities were still met during this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2020 (Rev. 2)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment; 2) CAU 91, Area 3 U-3fi Injection Well; 3) CAU 92, Area 6 Decon Pond Facility; 4) CAU 110, Area 3 WMD U-3ax/bl Crater; 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits; 6) CAU 112, Area 23 Hazardous Waste Trenches The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110, the site fence, gate, lock, and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

2022 Site Environmental Report: Idaho National Laboratory

The INL Site’s operations, as well as the ongoing cleanup mission involve a commitment to environmental stewardship and full compliance with environmental protection laws. As part of this commitment, the INL Site Environmental Report is prepared annually to inform the public, regulators, stakeholders, and other interested parties of the INL Site’s environmental performance during the year. This report is published for U.S. Department of Energy, Idaho Operations Office (DOE-ID) in compliance with DOE O 231.1B, “Environment, Safety and Health Reporting.” The purpose of the report is to provide the following: (1) Present the INL Site, mission, and programs, (2) Report compliance status with applicable federal, state, and local regulations, (3) Describe the INL Site environmental programs and activities, (4) Summarize results of environmental monitoring, (5) Discuss potential radiation doses to the public residing in the vicinity of the INL Site, (6) Report on ecological monitoring and research conducted by contractors and affiliated agencies and by independent researchers through the Idaho National Environmental Research Park, (7) Describe quality assurance methods used to ensure confidence in monitoring data, and (8) Provide supplemental technical data and reports that support the INL Site Environmental Report (https://idahoeser.inl.gov/publications.html).

54 ENVIRONMENTAL SCIENCES↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Renewable Portfolio Standards in the United States - A Status Report with Data Through 2007

Renewables portfolio standards (RPS) have proliferated at the state level in the United States since the late 1990s. In combination with Federal tax incentives, state RPS requirements have emerged as one of the most important drivers of renewable energy capacity additions. The focus of most RPS activity in the U.S. has been within the states. Nonetheless, the U.S. House of Representatives and Senate have, at different times, each passed versions of a Federal RPS; a Federal RPS, however, has not yet been signed into law. The design of an RPS can and does vary, but at its heart an RPS simply requires retail electricity suppliers (also called load-serving entities, or LSEs) to procure a certain minimum quantity of eligible renewable energy. An RPS establishes numeric targets for renewable energy supply, applies those targets to retail electricity suppliers, and seeks to encourage competition among renewable developers to meet the targets in a least-cost fashion. RPS purchase obligations generally increase over time, and retail suppliers typically must demonstrate compliance on an annual basis. Mandatory RPS policies are backed by various types of compliance enforcement mechanisms, and many--but not all--such policies include the trading of renewable energy certificates (RECs). Renewables portfolio standards are a relatively recent addition to the renewable energy policy landscape, and these policies continue to evolve. Keeping up with the design, early experience, and projected impacts of these programs is a challenge. This report seeks to fill this need by providing basic, factual information on RPS policies in the United States. It focuses on state-level initiatives, though a later section briefly discusses Federal developments as well. The report does not cover municipal-level renewable energy goals, unless required by state law. Similarly, this report focuses on mandatory state RPS requirements, though it also touches on non-binding renewable energy goals, especially when those goals are developed by state law or regulation. This report is the first of what is envisioned to be an ongoing series; as such, it concentrates on key recent developments, while also providing basic information on historical RPS experience and design. The report begins with an overview of state RPS policies: where they have been developed, when, and with what design features. Though most RPS programs are still in their infancy, the report summarizes the early impacts of these policies on renewable energy development, and provides a forecast of possible future impacts. It then turns to the implications of the growing trend towards solar and/or distributed generation set-asides within state RPS programs. Next, the report highlights state RPS compliance levels, enforcement actions, and cost impacts, as well as key developments in REC markets. Finally, the report provides a brief overview of Federal RPS proposals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Site Environmental Report for 2009, Volume 2

Volume II of the Site Environmental Report for 2009 is provided by Ernest Orlando Lawrence Berkeley National Laboratory as a supplemental appendix to Volume I, which contains the body of the report. Volume II contains the environmental monitoring and sampling data used to generate summary results of routine and nonroutine sampling at the Laboratory, except for groundwater sampling data, which may be found in the reports referred to in Chapter 4 of Volume I. The results from sample collections are more comprehensive in Volume II than in Volume I: for completeness, all results from sample collections that began or ended in calendar year (CY) 2009 are included in this volume. However, the samples representing CY 2008 data have not been used in the summary results that are reported in Volume I. (For example, although ambient air samples collected on January 6, 2009, are presented in Volume II, they represent December 2008 data and are not included in Table 4-2 in Volume I.) When appropriate, sampling results are reported in both conventional and International System (SI) units. For some results, the rounding procedure used in data reporting may result in apparent differences between the numbers reported in SI and conventional units. (For example, stack air tritium results reported as < 1.5 Bq/m3 are shown variously as < 39 and < 41 pCi/m3. Both of these results are rounded correctly to two significant digits.)

57↗

Save Energy Now Assessments Results 2008 Summary Report

In October 2005, U.S. Department of Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy savings assessment. The approach for these assessments drew heavily on the existing resources of ITP's technology delivery component. Over the years, ITP Technology Delivery has worked with industry partners to assemble a suite of respected software tools, proven assessment protocols, training curricula, certified energy experts, and strong partnerships for deployment. The Save Energy Now assessments conducted in calendar year 2006 focused on natural gas savings and targeted many of the nation's largest manufacturing plants - those that consume at least 1 TBtu of energy annually. The 2006 Save Energy Now assessments focused primarily on assessments of steam and process heating systems, which account for an estimated 74% of all natural gas use by U.S. manufacturing plants. Because of the success of the Save Energy Now assessments conducted in 2006 and 2007, the program was expanded and enhanced in two major ways in 2008: (1) a new goal was set to perform at least 260 assessments; and (2) the assessment focus was expanded to include pumping, compressed air, and fan systems in addition to steam and process heating. DOE ITP also has developed software tools to assess energy efficiency improvement opportunities in pumping, compressed air, and fan systems. The Save Energy Now assessments integrate a strong training component designed to teach industrial plant personnel how to use DOE's opportunity assessment software tools. This approach has the advantages of promoting strong buy-in of plant personnel for the assessment and its outcomes and preparing them better to independently replicate the assessment process at the company's other facilities. Another important element of the Save Energy Now assessment process is the follow-up process used to identify how many of the recommended savings opportunities from individual assessments have been implemented in the industrial plants. Plant personnel involved with the Save Energy Now assessments are contacted 6 months, 12 months, and 24 months after individual assessments are completed to determine implementation results. A total of 260 Save Energy Now assessments were successfully completed in calendar year 2008. This means that a total of 718 assessments were completed in 2006, 2007, and 2008. As of July 2009, we have received a total of 239 summary reports from the ESAs that were conducted in year 2008. Hence, at the time that this report was prepared, 680 final assessment reports were completed (200 from year 2006, 241 from year 2007, and 239 from year 2008). The total identified potential cost savings from these 680 assessments is $1.1 billion per year, including natural gas savings of about 98 TBtu per year. These results, if fully implemented, could reduce CO{sub 2} emissions by about 8.9 million metric tons annually. When this report was prepared, data on implementation of recommended energy and cost savings measures from 488 Save Energy Now assessments were available. For these 488 plants, measures saving a total of $147 million per year have been implemented, measures that will save $169 million per year are in the process of being implemented, and plants are planning implementation of measures that will save another $239 million per year. The implemented recommendations are already achieving total CO{sub 2} reductions of about 1.8 million metric tons per year. This report provides a summary of the key results for the Save Energy Now assessments completed in 2008; details of the 6-month, 12-month, and 24-month implementation results obtained to date; and an evaluation of these implementation results. This report also summarizes key accomplishments, findings, and lessons learned from all the Save Energy Now assessments completed to date. A separate report (Wright et al. 2010) provides more detailed information on key results for all of the 2008 assessments of steam, process heating, pumping, compressed air, and fan systems. Two prior reports (Wright et al. 2007 and Wright et al. 2009) detail the results from the 2006 and 2007 assessments and discuss the major components of the assessment process and improvements in the process made in 2007.

03 NATURAL GAS↗

Save Energy Now Assessments Results 2008 Detailed Report

In October 2005, U.S. Department of Energy Secretary Bodman launched his Easy Ways to Save Energy campaign with a promise to provide energy assessments to 200 of the largest U.S. manufacturing plants. DOE's Industrial Technologies Program (ITP) responded to the Secretary's campaign with its Save Energy Now initiative, featuring a new and highly cost-effective form of energy savings assessment. The approach for these assessments drew heavily on the existing resources of ITP's technology delivery component. Over the years, ITP Technology Delivery has worked with industry partners to assemble a suite of respected software tools, proven assessment protocols, training curricula, certified energy experts, and strong partnerships for deployment. The Save Energy Now assessments conducted in calendar year 2006 focused on natural gas savings and targeted many of the nation's largest manufacturing plants - those that consume at least 1 TBtu of energy annually. The 2006 Save Energy Now assessments focused primarily on assessments of steam and process heating systems, which account for an estimated 74% of all natural gas use by U.S. manufacturing plants. Because of the success of the Save Energy Now assessments conducted in 2006 and 2007, the program was expanded and enhanced in two major ways in 2008: (1) a new goal was set to perform at least 260 assessments; and (2) the assessment focus was expanded to include pumping, compressed air, and fan systems in addition to steam and process heating. DOE ITP also has developed software tools to assess energy efficiency improvement opportunities in pumping, compressed air, and fan systems. The Save Energy Now assessments integrate a strong training component designed to teach industrial plant personnel how to use DOE's opportunity assessment software tools. This approach has the advantages of promoting strong buy-in of plant personnel for the assessment and its outcomes and preparing them better to independently replicate the assessment process at the company's other facilities. Another important element of the Save Energy Now assessment process is the follow-up process used to identify how many of the recommended savings opportunities from individual assessments have been implemented in the industrial plants. Plant personnel involved with the Save Energy Now assessments are contacted 6 months, 12 months, and 24 months after individual assessments are completed to determine implementation results. A total of 260 Save Energy Now assessments were successfully completed in calendar year 2008. This means that a total of 718 assessments were completed in 2006, 2007, and 2008. As of July 2009, we have received a total of 239 summary reports from the ESAs that were conducted in year 2008. Hence, at the time that this report was prepared, 680 final assessment reports were completed (200 from year 2006, 241 from year 2007, and 239 from year 2008). The total identified potential cost savings from these 680 assessments is $1.1 billion per year, including natural gas savings of about 98 TBtu per year. These results, if fully implemented, could reduce CO{sub 2} emissions by about 8.9 million metric tons annually. When this report was prepared, data on implementation of recommended energy and cost savings measures from 488 Save Energy Now assessments were available. For these 488 plants, measures saving a total of $147 million per year have been implemented, measures that will save $169 million per year are in the process of being implemented, and plants are planning implementation of measures that will save another $239 million per year. The implemented recommendations are already achieving total CO{sub 2} reductions of about 1.8 million metric tons per year. This report provides a summary of the key results for the Save Energy Now assessments completed in 2008; details of the 6-month, 12-month, and 24-month implementation results obtained to date; and an evaluation of these implementation results. This report also summarizes key accomplishments, findings, and lessons learned from all the Save Energy Now assessments completed to date. A separate report (Wright et al. 2010) provides more detailed information on key results for all of the 2008 assessments of steam, process heating, pumping, compressed air, and fan systems. Two prior reports (Wright et al. 2007 and Wright et al. 2009) detail the results from the 2006 and 2007 assessments and discuss the major components of the assessment process and improvements in the process made in 2007.

03 NATURAL GAS↗

CLOSEOUT REPORT FOR HYBRID SULFUR PRESSURIZED BUTTON CELL TEST FACILITY

This document is the Close-Out Report for design and partial fabrication of the Pressurized Button Cell Test Facility at Savannah River National Laboratory (SRNL). This facility was planned to help develop the sulfur dioxide depolarized electrolyzer (SDE) that is a key component of the Hybrid Sulfur Cycle for generating hydrogen. The purpose of this report is to provide as much information as possible in case the decision is made to resume research. This report satisfies DOE Milestone M3GSR10VH030107.0. The HyS Cycle is a hybrid thermochemical cycle that may be used in conjunction with advanced nuclear reactors or centralized solar receivers to produce hydrogen by watersplitting. The HyS Cycle utilizes the high temperature (>800 C) thermal decomposition of sulfuric acid to produce oxygen and regenerate sulfur dioxide. The unique aspect of HyS is the generation of hydrogen in a water electrolyzer that is operated under conditions where dissolved sulfur dioxide depolarizes the anodic reaction, resulting in substantial voltage reduction. Low cell voltage is essential for both high thermodynamic efficiency and low hydrogen cost. Sulfur dioxide is oxidized at the anode, producing sulfuric acid that is sent to the high temperature acid decomposition portion of the cycle. Sulfur dioxide from the decomposer is cycled back to electrolyzers. The electrolyzer cell uses the membrane electrode assembly (MEA) concept. Anode and cathode are formed by spraying a catalyst, typically platinized carbon, on both sides of a Proton Exchange Membrane (PEM). SRNL has been testing SDEs for several years including an atmospheric pressure Button Cell electrolyzer (2 cm{sup 2} active area) and an elevated temperature/pressure Single Cell electrolyzer (54.8 cm{sup 2} active area). SRNL tested 37 MEAs in the Single Cell electrolyzer facility from June 2005 until June 2009, when funding was discontinued. An important result of the final months of testing was the development of a method that prevents the formation of a sulfur layer previously observed in MEAs used in the Hybrid Sulfur Cycle electrolyzer. This result is very important because the sulfur layer increased cell voltage and eventually destroyed the MEA that is the heart of the cell. Steimke and Steeper [2005, 2006, 2007, 2008] reported on testing in the Single Cell Electrolyzer test facility in several periodic reports. Steimke et. al [2010] issued a final facility close-out report summarizing all the testing in the Single Cell Electrolyzer test facility. During early tests, significant deterioration of the membrane occurred in 10 hours or less; the latest tests ran for at least 200 hours with no sign of deterioration. Ironically, the success with the Single Cell electrolyzer meant that it became dedicated to long runs and not available for quick membrane evaluations. Early in this research period, the ambient pressure Button Cell Electrolyzer test facility was constructed to quickly evaluate membrane materials. Its small size allowed testing of newly developed membranes that typically were not available in sizes large enough to test in the Single Cell electrolyzer. The most promising membranes were tested in the Single Cell Electrolyzer as soon as sufficient large membranes could be obtained. However, since the concentration of SO{sub 2} gas in sulfuric acid decreases rapidly with increasing temperature, the ambient pressure Button Cell was no longer able to achieve the operating conditions needed to evaluate the newer improved high temperature membranes. Significantly higher pressure operation was required to force SO{sub 2} into the sulfuric acid to obtain meaningful concentrations at increased temperatures. A high pressure (200 psig), high temperature (120 C) Button Cell was designed and partially fabricated just before funding was discontinued in June 2009. SRNL completed the majority of the design of the test facility, including preparation of a process and instrument drawing (P&ID) and preliminary designs for the major components. SRNL intended to complete the designs and procure or fabricate the specialized equipment, including all wetted-parts for handling the SO{sub 2}/sulfuric acid reactants. The portion of the P&ID that included commercial equipment, standard tubing, controls, and structural systems was procured from a commercial partner (Giner Electrochemical Systems LLC). This report summarizes the objectives, preliminary design, and status of the test facility. At the time of this report, SRNL was continuing discussions with potential partners for transfer of the technology for use under other programs.

08 HYDROGEN↗

Apollo experience report: Mission evaluation team postflight documentation

The various postflight reports prepared by the mission evaluation team, including the final mission evaluation report, report supplements, anomaly reports, and the 5-day mission report, are described. The procedures for preparing each report from the inputs of the various disciplines are explained, and the general method of reporting postflight results is discussed. Recommendations for postflight documentation in future space programs are included. The official requirements for postflight documentation and a typical example of an anomaly report are provided as appendixes.

Dodson, J. W.↗

Marketing information: The technical report as product

Technical reports constitute a product, the primary means for communicating the results of research to the user. The Langley scientific and technical information (STI) review and evaluation project undertook a review of the technical report as an effective product for information communication. Style manuals describing theory and practice in technical report preparation; publication manuals covering such factors as design, layout, and type style; and copies of technical reports were obtained from industrial, academic, governmental, and research organizations. Based on an analysis of this material, criteria will be established for the report components, for the relationship of the components within the report context, and for the overall report organization. The criteria will be used as bench marks and compared with the publication standards currently used to prepare NASA technical reports.

Stoher, F. F.↗

Survey of reader preferences concerning the format of NASA technical reports

A survey was conducted to determine the opinions of readers concerning the format (organization) of NASA technical reports and usage of technical report components. A survey questionnaire was sent to 513 LaRC engineers and scientists and 600 engineers and scientists from three (3) professional/technical societies. The response rates were 74 and 85 percent, respectively. The questionnaire included the order in which users read report components, the components reviewed or read to determine whether to read a report, report components which could be deleted, the desirability of a table of contents, the desirability of both a summary and abstract, the location of the symbols list and glossary, the integration of illustrative material, the preferred format for reference citations, column layout and right margin treatment, and person/voice. The results of the reader preference survey indicated that the conclusion was the component most often ready by survey respondents. The summary, conclusion, abstract, title page, and introduction were the components used most frequently to determine if a report would actually be read. Respondents indicated that a summary as well as an abstract should be included, that the definition of symbols and glossary of terms should be located in the front of the report, and that illustrative material should be integrated with the text rather than grouped at the end of the report. Citation by number was the preferred format for references. A one-column, ragged right margin was preferred. Third person, passive voice was the style of writing preferred by the respondents.

Pinelli, T. E.↗

NASAwide electronic publishing system: Electronic printing and duplicating, stage-2 evaluation report (GSFC)

The NASA Scientific and Technical Information Office was assigned the responsibility to continue with the expansion of the NASAwide networked electronic duplicating effort by including the Goddard Space Flight Center (GSFC) as an additional node to the existing configuration of networked electronic duplicating systems within NASA. The subject of this report is the evaluation of a networked electronic duplicating system which meets the duplicating requirements and expands electronic publishing capabilities without increasing current operating costs. This report continues the evaluation reported in 'NASA Electronic Publishing System - Electronic Printing and Duplicating Evaluation Report' (NASA TM-106242) and 'NASA Electronic Publishing System - Stage 1 Evaluation Report' (NASA TM-106510). This report differs from the previous reports through the inclusion of an external networked desktop editing, archival, and publishing functionality which did not exist with the previous networked electronic duplicating system. Additionally, a two-phase approach to the evaluation was undertaken; the first was a paper study justifying a 90-day, on-site evaluation, and the second phase was to validate, during the 90-day evaluation, the cost benefits and productivity increases that could be achieved in an operational mode. A benchmark of the functionality of the networked electronic publishing system and external networked desktop editing, archival, and publishing system was performed under a simulated daily production environment. This report can be used to guide others in determining the most cost effective duplicating/publishing alternative through the use of cost/benefit analysis and return on investment techniques. A treatise on the use of these techniques can be found by referring to 'NASA Electronic Publishing System -Cost/Benefit Methodology' (NASA TM-106662).

Tuey, Richard C.↗

International VLBI Service for Geodesy and Astrometry: 1999 Annual Report

This volume of reports is the 1999 Annual Report of the International VLBI Service for Geodesy and Astrometry -IVS. The individual reports were contributed by VLBI groups in the international geodetic community who constitute the components of IVS. The 1999 Annual Report documents the work of the IVS components for the year ending March 1, 1999, the official inauguration date of IVS. As the newest of the space technique services, IVS decided to publish this Annual Report as a reference to our organization and its components. The entire contents of this Annual Report also appear on the IVS website at: http://ivscc.gsfc.nasa.gov/pub/arl999. The IVS 1999 Annual Report will be a valuable reference for information about IVS and its components. This Annual Report will serve as a baseline from which we can measure the anticipated progress of IVS in coming years.

Vandenberg, Nancy R.↗

Early Warning: Development of Confidential Incident Reporting Systems

Accidents hardly ever happen without warning. The combination, or sequence, of failures and mistakes that cause an accident may indeed be unique but the individual failures and mistakes rarely are. In the USA in 1974 the crews on two different aircraft misunderstood the same aeronautical chart and descended towards their destination dangerously early towards a mountain. The first crew were in good weather conditions and could see the mountain and resolved their misinterpretation of the chart. The second crew six weeks later were not so lucky. In cloud they had no clues to point out their mistake nor the presence of the mountain. The resulting crash and the ensuing inquiry, which brought to light the previous incident, shocked the country but gave it the impetus to instigate a safety reporting system. This system eventually became the NASA's Aviation Safety Reporting System (ASRS). The programme collects incident reports from pilots, controllers, mechanics, cabin attendants and many others involved in aviation operations. By disseminating this safety information the ASRS has helped enormously to give US airlines and airspace the highest safety standards. Accident prevention is a goal sought by everyone in the aviation industry and establishing effective incident reporting programmes can go a long way toward achieving that goal. This article will describe the steps and issues required to establish an incident reporting system. The authors summarize the lessons learned from the ASRS, now in its twentieth year of operation and from the Confidential Human Factors Reporting (HER) Programme run by British Airways, an airline that is a recognized world leader in safety reporting and analysis. The differences between government and airline operation of confidential safety reporting systems will be addressed.

OLeary, Mike J.↗

Challenges in Evaluating Relationships Between Quantitative Data (Carbon Dioxide) and Qualitative Data (Self-Reported Visual Changes)

Understanding the nuances in clinical data is critical in developing a successful data analysis plan. Carbon dioxide (CO2) data are collected on board the International Space Station (ISS) in a continuous stream. Clinical data on ISS are primarily collected via conversations between individual crewmembers and NASA Flight Surgeons during weekly Private Medical Conferences (PMC). Law, et.al, 20141 demonstrated a statistically significant association between weekly average CO2 levels on ISS and self-reported headaches over the reporting period from March 14, 2001 to May 31, 2012. The purpose of this analysis is to describe the evaluation of a possible association between visual changes and CO2 levels on ISS and to discuss challenges in developing an appropriate analysis plan. METHODS & PRELIMINARY RESULTS: A first analysis was conducted following the same study design as the published work on CO2 and self-reported headaches1; substituting self-reported changes in visual acuity in place of self-reported headaches. The analysis demonstrated no statistically significant association between visual impairment characterized by vision symptoms self-reported during PMCs and ISS average CO2 levels over ISS missions. Closer review of the PMC records showed that vision outcomes are not well-documented in terms of clinical severity, timing of onset, or timing of resolution, perhaps due to the incipient nature of vision changes. Vision has been monitored in ISS crewmembers, pre- and post-flight, using standard optometry evaluations. In-flight visual assessments were limited early in the ISS program, primarily consisting of self-perceived changes reported by crewmembers. Recently, on-orbit capabilities have greatly improved. Vision data ranges from self-reported post-flight changes in visual acuity, pre- to postflight changes identified during fundoscopic examination, and in-flight progression measured by advanced on-orbit clinical imaging capabilities at predetermined testing intervals. In contrast, CO2 data are recorded in a continuous stream over time; however, for the initial analysis this data was categorized into weekly averages.

Mendez, C. M.↗