Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load flexibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Using energy storage systems to extend the life of hydropower plants

Despite their advantages, distributed energy resources (DERs) bring inherent uncertainty and variability into the landscape of modern power systems. As DER penetration grows, conventional generators like hydropower plants have to respond more often to arrest the imbalance in the net load. Hydropower turbines provide their best operational performance with minimal wear and tear when operating at regions of maximum efficiency. However, the current needs for hydropower plants require them to operate under varying load conditions and thus sub-optimal operating points leading to additional stress. To relieve the hydropower plants, this paper proposes a hybridization strategy where a hydropower unit is paired with an energy storage system (ESS) to increase operational flexibility and mitigate damage to the hydro plant. Models are developed to represent the operation of the hybrid system, quantify degradation, and assess economic benefits. Moreover, an innovative controller disaggregates the market dispatch signal into separate control setpoints for the ESS and hydropower unit. In case studies performed on a real-world hydropower facility, it was found that the ESS-based hybridization can extend the life of the hydropower plant by 5% on average. Notably, the economic benefits from reduced maintenance and deferred investment are estimated to be around $3.6 million.

13 HYDRO ENERGY↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Analysis of Electric Vehicle Charging Behavior Patterns with Function Principal Component Analysis Approach

This manuscript focused on analyzing electric vehicles’ (EV) charging behavior patterns with a functional data analysis (FDA) approach, with the goal of providing theoretical support to the EV infrastructure planning and regulation, as well as the power grid load management. 5-year real-world charging log data from a total of 455 charging stations in Kansas City, Missouri, was used. The focuses were placed on analyzing the daily usage occupancy variability, daily energy consumption variability, and station-level usage variability. Compared with the traditional discrete-based analysis models, the proposed FDA modeling approach had unique advantages in preserving the smooth function behavior of the data, bringing more flexibility in the modeling process with little required assumptions or background knowledge on independent variables, as well as the capability of handling time series data with different lengths or sizes. In addition to the patterns revealed in the EV charging station’s occupancy and energy consumption, the differences between EV driver’s charging time and parking time were analyzed and called for the needs for parking regulation and enforcement. The different usage patterns observed at charging stations located on different land-use types were also analyzed.

Engineering↗

Plasma Ignition and Combustion Stabilization Technology to Improve Flexible Operation, Reliability and Economics of an Existing Coal-Fired Boiler

GE Steam Power, Inc. (GE) proposed to improve reliability, flexibility, and economics of an existing coal-fired power plant by applying a new advanced technology developed by GE, a plasma-assisted pulverized fuel firing system. The objective of this program is to demonstrate the achievement of lower load by improved flame stabilization and therefore lower operating costs in a full-scale field installation at coal-fired electric utility. GE’s Plasma Ignition and Combustion Stabilization System is designed to operate continuously to support low load operation. With the plasma on, the flame will be attached and stable, removing the firing system as a limitation to low load operation. In addition, GE’s exclusively from ABENZ company licensed AC based technology has a 90+% system efficiency compared to all other systems at which are DC and operate with ~75% efficiency. Plant operating costs are lowered by eliminating use of expensive support fuel as well as the ability to operate at lower loads. The utilities’ ability to better match the demand curve will result in significant savings. Maintenance is lower for an AC system than a DC system as it operates at lower current. This eliminates the need for a demineralized cooling water system and provides longer electrode life which translates into both material and labor savings. It is the objective of GE to not only demonstrate the additional low load achievable with a plasma system after best achievable tuning, sensor and software approach has been exhausted, but also the increased stability of the flame at all loads with plasma assistance as well as cost savings at all low loads using plasma instead of oil. Upon successful completion of this project, GE will have sufficient field experience to rapidly deploy the Plasma Technology. The project objectives were achieved through the implementation of plasma ignitor technology at PacifiCorp Hunter Station Unit 3. A plasma ignitor system was retrofitted on ten wall-fired burners, Mill 3-4 combustion system. The Plasma Ignitors installed at Hunter proved that this GE technology is a direct and complete replacement for the original oil ignitors. The Hunter Unit 3 burner management system allows the plasma system to be used in all applications that originally required oil to be burned. This includes any time the Mill 3-4 is started or stopped for any reason including boiler starts, load changes, and low load support.

01 COAL, LIGNITE, AND PEAT↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Enhancing heat pump water heater performance with embedded phase change materials thermal energy storage: First hour rating improvement and demand response operation

The increasing global emphasis on energy efficiency and sustainability has put heat pump water heaters (HPWHs) in the spotlight as an energy-efficient alternative to traditional water heating systems. However, their widespread adoption is limited by challenges such as insufficient First Hour Rating (FHR), suboptimal control mechanisms, and limited flexibility for demand response operations. Here, to address these limitations, this study proposes an innovative HPWH system integrated with embedded phase change material (PCM)-based thermal energy storage (TES). The research introduces a novel design and control strategy that leverages optimized PCM integration to enhance thermal storage capacity, improve hot water delivery during peak demand, and increase load-shifting potential. A combination of system modeling, performance simulation, and demand response control strategy evaluation was employed to quantify the benefits of PCM integration. Results demonstrate that the proposed PCM-TES HPWH system significantly enhances FHR, with an optimal 7.0 lb. of PCM increasing FHR by over 26 %—from 62 to 78 gal—for a standard 50-gal HPWH. Additionally, under advanced demand response operation using a preheat strategy, the system reduces the percentage of control temperature out-of-band time from 65 % (conventional HPWH) to just 11.6 %, enabling a more stable and efficient hot water supply. This research contributes a novel PCM-embedded HPWH design and control framework that addresses both performance and grid-interactivity challenges. The findings offer a viable pathway to enhancing the operational efficiency, flexibility, and grid responsiveness of residential water heating systems.

Demand response control↗

Robust Combined Heat and Hybrid Power (CHHP) for High Electrical Efficiency Cogeneration

Georgia Tech (Prime Recipient), the University of Texas at El Paso (UTEP) and the National Energy Technology Laboratory (NETL) investigated a hybrid fuel cell/ gas turbine system concept as a combined heat and hybrid power (CHHP) system for both robust and high power-to-process heat ratio cogeneration. The novelty of the proposed system entailed the distinct, elevated electrical efficiencies it maintains while simultaneously supporting a broad span of heating needs (e.g., supply temperatures) demanded across variable heat loads. The scope included: 1) leveraging a pioneering national lab facility configured for dynamic system operability development of hybrid fuel cell/gas turbine cycles; 2) enabling technology development to adjust and modulate the quality and quantity of thermal supply to bottoming heat loads via novel extreme temperature gas bypass valves. Hybrid fuel cell/gas turbine systems have primarily been reduced-to-practice in a constrained (e.g., initial proof-of-concept) manner and have still demonstrated considerable electrical efficiencies. However, these pre-pilot systems have focused upon electrical efficiencies and electrical power generation as the exclusive energy demand. Such hybrid systems had not been extensively researched or developed for flexible and variable operation consisting of both power and heat demands; however, these variable combined power and heat demands are characteristic of many types of manufacturers such as animal/poultry processing, bakeries and milk/flour/pastry manufacturing, textile mills, and electrochemical processing. Commercially, developing the system into a working combined heat and power system benefits these types of manufacturers by allowing them to meet their power and heat demands at a lower cost, higher efficiency, and/or through onsite generation. Therefore, the technical scope of this project was largely to study and facilitate these hybrid systems as combined heat and hybrid power (CHHP) systems that include dynamic operability for variable heat and power loads and/or grid dynamics for various types of manufacturers. Simulation results were used to predict the performance of the CHHP system and conceptually develop it to achieve desired dynamic operability. Experimentally, the primary goal was to design, manufacture, and experiment upon a high-temperature bypass valve. Experimental data included air mass flow rates through the valve orifice when the valve was changed to variable extent between fully closed and fully open. The experimental data was then used to create a semi-empirical computational model of the bypass valve. Concluded simulation goals for the research included developing computational heat exchanger models for the hybrid system inclusive of the bottoming heat exchanger and the recuperative heat exchanger, and then combining the computational recuperator model with the computational valve model. Afterwards, the computational models were then integrated to predict the dynamic operation of hybrid fuel cell/gas turbine cycles throughout a design space and reporting such. The scope stated in the preceding paragraph was packaged into five specific goals: 1) enabling the simulation of dynamic combined heat and power through the creation of computational, modular heat exchanger models; 2) simulation and exploration of the CHHP system’s performance by integrating the heat exchanger models with the national lab’s pre-existing hybrid system (computational) simulation, but without the recuperator bypass valve concept in order to initially determine how the (baseline) system behaves and can be controlled in order to meet variable heat and power demands; 3) development and initial deployment of the high-temperature recuperator bypass valve technology in order to confirm and characterize the approach; 4) usage of the experimental data for the valve to create a semi-empirical computational model for the bypass valve which could then be combined with the heat exchanger computational models; 5) repeat of the second task of simulating and exploring the system’s performance, but this time including the bypass valve to resolve its efficacy. Tasks were successfully completed, and the general notion of flexibly operating, high electrical efficiency CHHP was further corroborated. Supportive details are provided in the report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Positive Power with Negative Emission Flexible NGCC Enable by Modular Direct Air Capture (Final Report)

The primary project objective was to synthesize a retrofit design of a natural gas combined cycle plant (Fseries gas turbines in 2x1 configuration) to integrate post-combustion (PCC) and direct air carbon capture (DAC) systems that could produce power with negative emissions across a wide range of loads, see table below. The IP-LP crossover and LP steam system of the NGCC were reconfigured to enable 97% CO2 capture in the PCC system at all loads, and heat integration with the DAC reduced the parasitic load of carbon capture by recovering the heat of condensation of the steam. Similar results were found for Hseries gas turbines.

03 NATURAL GAS↗

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗

Complete separation of benzene-cyclohexene-cyclohexane mixtures via temperature-dependent molecular sieving by a flexible chain-like coordination polymer

Abstract The separation and purification of C6 cyclic hydrocarbons (benzene, cyclohexene, cyclohexane) represent a critically important but energy intensive process. Developing adsorptive separation technique to replace thermally driven distillation processes holds great promise to significantly reduce energy consumption. Here we report a flexible one-dimensional coordination polymer as an efficient adsorbent to discriminate ternary C6 cyclic hydrocarbons via an ideal molecular sieving mechanism. The compound undergoes fully reversible structural transformation associated with removal/re-coordination of water molecules and between activated and hydrocarbon-loaded forms. It exhibits distinct temperature- and adsorbate-dependent adsorption behavior which facilitates the complete separation of benzene, cyclohexene and cyclohexane from their binary and ternary mixtures, with the record-high uptake ratios for C 6 H 6 /C 6 H 12 and C 6 H 10 /C 6 H 12 in vapor phase and highest binary and ternary selectivities in liquid phase. In situ infrared spectroscopic analysis and ab initio calculations provide insight into the host-guest interactions and their effect on the preferential adsorption and structural transformation.

36 MATERIALS SCIENCE↗

An Assessment of Impacts on Electric End-Use Load Profile of a Typical Residential Building from a Ground Source Heat Pump Systems Integrated with Underground Thermal Energy Storage

Buildings are the primary users of electricity, and a considerable amount of electric energy consumed in residential and commercial buildings is for meeting thermal demands (e.g., space heating/cooling, water heating, etc.). Therefore, integrating thermal energy storage with a building’s energy system has the potential to reshape the electric load profile of the building and mitigate the mismatch between the renewable power supply and the thermal demands of buildings. A novel ground-source heat pump system (GSHP) integrated with underground thermal energy storage (UTES) has been developed to enable flexible electric demand at buildings while meeting their thermal demands with an energy-efficient GSHP system. This paper assessed the potential impacts of the proposed system on the peak electrical demand and annual electricity consumption in a typical residential building at various climate zones in the United States. The results show that by replacing the conventional HVAC system (air conditioner and natural gas furnace) with the UTES integrated GSHP system, summer peak electric demand can be reduced by 27% to 50% depending on the weather. Although the winter peak electrical demand could be increased by up to 70% if the proposed system replaces natural gas furnace, the existing electricity supply system for single-family homes in most regions of the United States have adequate capacity for the replacement. While eliminating the natural gas consumption for space heating, the proposed system consumes more electricity on an annual basis in heating-dominated regions. However, it consumes less electricity in cooling dominated regions. The resulting variance in annual electricity consumption in various climate zones is within 15% compared with the baseline system.

Shi, Liang↗

Dual-season thermal energy storage-integrated heat pump system for load shifting: experiments, modeling and nationwide analysis

Here, this paper proposes and validates a dual-season thermal energy storage-integrated heat pump (TES-HP) system that shifts building electric load in both cooling and heating modes using a single phase-change TES. The design uses the TES as a heat sink for the condenser in summer and a heat source for the evaporator in winter, thereby reducing on-peak electric demand while ensuring compatible with existing air-distribution systems. A 14-kW TES-HP prototype with six operating modes and novel refrigerant charge management strategies was experimentally tested under varied conditions. Subsequently, data-driven polynomial performance curves were developed and validated against experiments, then coupled with a phase change material (PCM) model and a calibrated building model within a rule-based controller. Single-day case studies demonstrated effective on-peak demand reduction while maintaining thermal comfort. During cooling, hourly power was lowered by up to 1.5 kW; in heating, average hourly power decreased from over 3.5 kW to 1.8 kW, compared to an HP-only system, achieving 64.5 % load shifting, and the need for resistance heating was eliminated. Seasonal simulations showed typical on-peak electricity savings of 25–35 % in cooling and 40–65 % in heating, with the largest benefits on the hottest and coldest days. Extended response-surface analysis and nationwide mapping quantified load shifting as functions of ambient and TES temperatures, revealing a seasonal trade-off in TES phase-change temperature. These results demonstrate the TES-HP system as a practical and scalable solution for grid-interactive buildings that reduces on-peak demand and electricity use while maintaining thermal comfort and enhancing grid flexibility and reliability.

Grid-interactive buildings↗

Improving operational flexibility of integrated energy system with uncertain renewable generations considering thermal inertia of buildings

Insufficient flexibility in system operation caused by traditional "heat-set" operating modes of combined heat and power (CHP) units in winter heating periods is a key issue that limits renewable energy consumption. In order to reduce the curtailment of renewable energy resources through improving the operational flexibility, a novel optimal scheduling model based on chance-constrained programming (CCP), aiming at minimizing the lowest generation cost, is proposed for a small-scale integrated energy system (IES) with CHP units, thermal power units, renewable generations and representative auxiliary equipments. In this model, due to the uncertainties of renewable generations including wind turbines and photovoltaic units, the probabilistic spinning reserves are supplied in the form of chance-constrained; from the perspective of user experience, a heating load model is built with consideration of heat comfort and inertia in buildings. To solve the model, a solution approach based on sequence operation theory (SOT) is developed, where the original CCP-based scheduling model is tackled into a solvable mixed-integer linear programming (MILP) formulation by converting a chance constraint into its deterministic equivalence class, and thereby is solved via the CPLEX solver. We report the simulation results on the modified IEEE 30-bus system demonstrate that the presented method manages to improve operational flexibility of the IES with uncertain renewable generations by comprehensively leveraging thermal inertia of buildings and different kinds of auxiliary equipments, which provides a fundamental way for promoting renewable energy consumption.

30 DIRECT ENERGY CONVERSION↗

Floating membrane reservoir system

An improved system and method of storing water for a closed-loop pumped storage hydroelectric system is provided. The method includes providing a floating reservoir, positioning the floating reservoir in a waterbody, loading the floating reservoir with a volume of water from a source other than the surrounding waterbody, and transferring water from within the floating reservoir to an upper or lower reservoir of a pumped storage hydroelectric system. The floating reservoir includes a flexible membrane defining one or more reservoir cells including a vertically collapsible sidewall, such that each reservoir cell defines a depth varying in proportion to its internal volume of water. Each reservoir cell is buoyed by pontoons adjacent an outer periphery of the reservoir cell and is anchored to the shore or streambed.

13 HYDRO ENERGY↗

Gains in operational flexibility, safety margins, and cost efficiencies via integrated Plant Reload Optimization platform

The U.S. Department of Energy Light Water Reactor Sustainability Program Risk-Informed Systems Analysis Pathway Plant Reload Optimization Project aims to develop an integrated, comprehensive framework offering an all-in-one solution for reload evaluations with a special focus on optimizing core design. Optimizing the fuel loading pattern is one of the most important considerations in reducing the amount of new fuel used in the core. Due to thousands of possible core configuration options, finding optimal solutions is an unachievable task for a human. The Plant ReLoad Optimization platform, which supports artificial-intelligence-based reactor core designing, is now fully capable of handling realistic problems. The Plant ReLoad Optimization platform development project aims to build a reactor core design tool that includes reactor safety and fuel performance analyses and uses artificial intelligence to support the optimization of core design solutions. The NSGA-II (Non-dominated Sorting Genetic Algorithm II) optimizer was developed and tested within RAVEN (Risk Analysis and Virtual ENvironment) to handle many constraints by using an augmented objectives methodology. The demonstration was performed with constrained multiobjective optimization of a 17 × 17 pressurized-water reactor core loading patterns to minimize fuel cost and maximize fuel cycle length.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Bridging Control and Deployment: A Cross-Layer Analysis of Scalable Building Cluster Control

Building cluster control has emerged as a promising approach for enabling flexible and coordinated operation of distributed building systems, yet its transition from pilot demonstrations to routine grid-interactive operation remains limited. This paper argues that this gap cannot be explained by control algorithms alone. Instead, it arises from interacting barriers in communication infrastructure, data and semantic interoperability, uncertainty management, stakeholder participation, market design, and policy support. Accordingly, the paper reviews both technical and non-technical barriers to building cluster control. Technical challenges include heterogeneous devices and protocols, communication latency and reliability, distributed decision-making, and uncertainty propagation across aggregated loads. Non-technical barriers include user participation, stakeholder coordination, incentive allocation, and data governance. Existing solution approaches are synthesized, including semantic interoperability frameworks, edge and hierarchical communication architectures, distributed and transactive control strategies, uncertainty-aware optimization, policy mechanisms, and market reforms. Based on this analysis, two research directions are identified: testing infrastructures that can evaluate control performance under realistic multi-building conditions, and abstraction methods that allow building clusters to interact with other energy sectors through standardized flexibility representations. Overall, the paper provides a structured review of how building cluster control can move from isolated demonstrations toward reproducible, market-compatible, and grid-relevant implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electrical and Thermal Load Impacts of Three District Heating and Cooling Designs for an Existing Community in Washington, DC

District energy systems that provide building heating and cooling are a promising option to provide low-cost, energy efficient heating and cooling solutions for communities. As some buildings move to electrified heating designs, there may be significant increases in electric grid demand, particularly in the winter. District energy systems may be able to help reduce these high electrical demands on the electric grid, while also providing decreased overall energy consumption with an increased flexibility in electrical energy usage. To evaluate and compare district options for district-based heating and cooling, an existing neighborhood of Washington, DC consisting of 35 existing buildings was selected as a case study. This study models and compares a fourth generation (4G) district heating and cooling systems that provide hot and chilled water from a central plant directly to each prosumer and a fifth generation (5G) district heating and cooling systems that provide near-ambient water via geothermal boreholes to interface with an energy transfer station with a heat pump at each prosumer. These district systems are compared against a baseline of the non-connected buildings with their self-contained and current HVAC systems. The neighborhood was selected as a good candidate for a district system for its diversity of loads (mix of different commercial and property types) and the availability of building characteristics. URBANopt District Energy Systems (DES) was used to model the buildings and create initial Modelica models for the district systems. Finally, the DES models were tuned and simulated in Dymola, and the outputs were post-processed for verification and to calculate the electrical and thermal grid impact metrics. This is the first documentation of this workflow and its complete analysis. The three designed systems are compared via their grid metrics including: total energy consumption, electrical demand peak loads, daily peak-to-valley ratios, and system ramping. A detailed discussion is provided about how each system impacts and interacts with the electric grid.

15 GEOTHERMAL ENERGY↗

A hybrid architecture for volt-var control in active distribution grids

Modern active distribution grids are characterized by the increasing penetration of distributed energy resources (DERs). The proper coordination and scheduling of a large numbers of these small-scale and spatially distributed DERs is necessary, and warrants the use of novel distributed approaches. In this paper, we propose a hybrid volt-var control architecture for the distribution grid, which leverages existing centralized and local approaches to planning, decision making, and control, and augments it with distributed optimization and distributed control for DER management. First, we propose a convex model to describe the power physics of distribution grids of meshed topology and unbalanced structure, based on current injection and McCormick Envelopes. Second, we employ the distributed proximal atomic coordination (PAC) algorithm to coordinate DERs to provide voltage support. We implement volt-var optimization by optimally coordinating DERs including PV smart inverters and demand response. We present results using the IEEE-34 bus network, using real data from a distribution feeder in Hawaii, to model load and PV generation. Different levels of DER penetration and objective functions are simulated. Finally, our results show the need for the coordination of DERs to improve voltage profiles, even in networks with existing voltage control devices. Further, we show the need for flexible reactive power capabilities to achieve desired grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗