Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

A Manual Control Test for the Detection and Deterrence of Impaired Drivers

A brief manual control test and a decision strategy were developed, laboratory tested, and field validated which provide a means for detecting human operator impairment from alcohol or other drugs. The test requires the operator to stabilize progressively unstable controlled element dynamics. Control theory and experimental data verify that the human operator's control ability on this task is constrained by basic cybernetic characteristics, and that task performance is reliably affected by impairment effects on these characteristics. Assessment of human operator control ability is determined by a statistically based decision strategy. The operator is allowed several chances to exceed a preset pass criterion. Procedures are described for setting the pass criterion based on individual ability and a desired unimpaired failure rate. These procedures were field tested with apparatus installed in automobiles that were designed to discourage drunk drivers from operating their vehicles. This test program demonstrated that the control task and detection strategy could be applied in a practical setting to screen human operators for impairment in their basic cybernetic skills.

Stein, A. C.↗

Design Optimization and Analysis of a Composite Honeycomb Intertank

Intertanks, the structure between tanks of launch vehicles, are prime candidates for weight reduction of rockets. This paper discusses the optimization and detailed analysis of a 96 in (2.44 m) diameter, 77 in (1.85 m) tall intertank. The structure has composite face sheets and an aluminum honeycomb core. The ends taper to a thick built up laminate for a double lap bolted shear joint. It is made in 8 full length panels joined with bonded double lap joints. The nominal load is 4000 lb/in (7 x 10(exp 5) N/m). Optimization is by Genetic Algorithm and minimizes weight by varying C, core thickness, number and orientation of acreage and buildup plies, and the size, number and spacing of bolts. A variety of cases were run with populations up to 2000 and chromosomes as long as 150 bits. Constraints were buckling, face stresses (normal, shear, wrinkling and dimpling, bolt stress, and bolt hole stresses (bearing, net tension, wedge splitting, shear out and tension/shear out). Analysis is by a combination of theoretical solutions and empirical data. After optimization, a series of coupon tests were performed in conjunction with a rigorous analysis involving a variety of finite element models. The analysis and test resulted in several small changes to the optimized design. The intertank has undergone a 250,000 lb (1.1 x 10(exp 6) N) limit load test and been mated with a composite liquid hydrogen tank. The tank/intertank unit is being installed in a test stand where it will see 200 thermal/load cycles. Afterwards the intertank will be demated and loaded in compression to failure.

Finckenor, Jeffrey↗

Design Optimization and Analysis of a Composite Honeycomb Intertank

Intertanks, the structure between tanks of launch vehicles, are prime candidates for weight reduction of rockets. This paper discusses the optimization and detailed follow up analysis and testing of a 96 in. diameter, 77 in. tall intertank. The structure has composite face sheets with an aluminum honeycomb core. The ends taper to a thick built up laminate for a double lap bolted splice joint interface. It is made in 8 full length panels joined with bonded double lap joints. The nominal load is 4000 lb/in. Optimization is by Genetic Algorithm and minimizes weight by varying core thickness, number and orientation of acreage and buildup plies, and the size, number and spacing of bolts. A variety of design cases were run with populations up to 2000 and chromosomes as long as 150 bits. Constraints were buckling; face stresses (normal, shear, wrinkling and dimpling); bolt stress; and bolt hole stresses (bearing, net tension, wedge splitting, shear out and tension/shear out). Analysis is by a combination of elasticity solutions and empirical data. After optimization, a series of coupon tests were performed in conjunction with a rigorous analysis involving a variety of finite element models. This analysis and testing resulted in several small changes to the optimized design. The equation used for hole bearing strength was found to be inadequate, resulting in thicker ends. The core thickness increased 0.05", and potting compound was added in the taper to strengthen the facesheet bond. The intertank has undergone a 250,000 lb limit load test and been mated with a composite liquid hydrogen tank. The tank/intertank unit is being installed in a test stand where it will see 200 thermal/load cycles. Afterwards the intertank will be demated and loaded in compression to failure.

Finckenor, Jeff↗

Status of the RBCC Direct-Connect Mixer Combustor Experiment

The NASA Glenn Research Center is developing hydrogen based combined cycle propulsion technology for a single-stage-to-orbit launch vehicle application under a project called GTX. Rocket Based Combined Cycle (RBCC) propulsion systems incorporate one or more rocket engines into an airbreathing flow path to increase specific impulse as compared to an all rocket-powered vehicle. In support of this effort, an RBCC direct-connect test capability was established at the Engine Components Research Laboratory to investigate low speed, ejector ramjet, and initial ramjet operations and performance. The facility and test article enables the evaluation of two candidate low speed operating schemes; the simultaneous mixing and combustion (SMC) and independent ramjet stream (IRS). The SMC operating scheme is based on the fuel rich operations of the rocket where performance depends upon mixing between the rocket plume and airstream. In contrast, the IRS scheme fuels the airstream separately and uses the rocket plume to ignite the fuel-air mixture. This paper describes the test hardware and facility upgrades installed to support the RBCC tests. It also defines and discusses low speed technical challenges being addressed by the experiments. Finally, preliminary test results, including rocket risk mitigating tests, unfueled airflow tests, and the integrated system hot fire test will be presented.

Walker, James F.↗

Status of the RBCC Direct-Connect Mixer Combustor Experiment

The NASA Glenn Research Center is developing hydrogen based combined cycle propulsion technology for a single-stage-to-orbit launch vehicle application under a project called GTX. Rocket Based Combined Cycle (RBCC) propulsion systems incorporate one or more rocket engines into an airbreathing flow path to increase specific impulse as compared to an all rocket-powered vehicle. In support of this effort, an RBCC direct-connect test capability was established at the Engine Components Research Laboratory to investigate low speed, ejector ramjet, and initial ramjet operations and performance. The facility and test article enables the evaluation of two candidate low speed operating schemes; the simultaneous mixing and combustion (SMC) and independent ramjet stream (IRS). The SMC operating scheme is based on the fuel rich operations of the rocket where performance depends upon mixing between the rocket plume and airstream. In contrast, the IRS scheme fuels the airstream separately and uses the rocket plume to ignite the fuel-air mixture. This paper describes the test hardware and facility upgrades installed to support the RBCC tests. It also defines and discusses low speed technical challenges being addressed by the experiments. Finally, preliminary test results, including rocket risk mitigating tests, unfueled airflow tests, and the integrated system hot fire test will be presented.

Walker, James F.↗

Overview of the Exploration Exercise Device Validation Study Plans

The NASA has determined that a multi-functional exercise device will be developed for use as an exercise device during exploration missions. The device will allow for full body resistance and metabolic exercise necessary to minimize physiological losses during space flight and to maintain fitness necessary to perform critical mission tasks. Prior to implementation as an exercise device on an Exploration vehicle, there will be verification and validation testing completed to determine device efficacy at providing the necessary training stimuli to achieve desired goals. Because the exploration device will be new device that has yet be specified, specific Verification and Validation (V&V) protocols have yet to be developed. Upon delivery of an exploration exercise device training unit, stakeholders throughout NASA will develop V&V plans that include ground-based testing and testing on the International Space Station (ISS). Stakeholders will develop test protocols that include success criterion for the device. Ground tests will occur at NASA Johnson Space Station prior to flight testing. The intents of the ground tests are to allow crew, spaceflight medicine, science, engineering, Astronaut Strength, Conditioning, and Reconditioning staff, and others to gain experience in the best utilization of the device. The goal is to obtain an evidence base for recommending use of the device on the ISS. The developed protocol will be created to achieve multiple objectives, including determining if the device provides an adequate training stimulus for 5th - 95th percentile males and females, allows for exercise modalities that protect functional capability, and is robust and can withstand extensive human use. Although protocols are yet to be determined, current expectations include use of the device by test subjects and current crew in order to obtain quantitative and qualitative feedback. Information obtained during the ground tests may be used to influence device modifications during design iterations. Assuming successful ground tests, the device will be installed on the ISS for testing during space flight. Spaceflight testing is envisioned to include an activation and checkout (ACO) phase and a V&V phase. During the ACO phase, 1-2 crewmembers will exercise with the device to ensure proper function. ACO is expected to last multiple months because of the many modes and methods of exercise that need to be assessed. However, the goal is to complete the ACO as quickly as possible. Once successful ACO occurs, the crew will be free to use the device for normal exercise pending concurrence from stakeholders. V&V tests on the ISS will ideally consist of crew using the device for all of their exercise for an entire mission. Exercise prescriptions will be supplied that replicate expected prescriptions during exploration missions. Crew that are not enrolled in the V&V studies would be also free to use the device as their schedule permits. As experience is gained by users, exercise protocols could change. The intent of all V&V testing is to ensure that all have thorough understanding of experience at optimizing device capability

DeWitt, J. K.↗

Analytical Performance, Loads, and Aeroelastic Stability of a Full-Scale Isolated Proprotor

The prediction of the performance and loads of a full-scale isolated proprotor and the calculation of whirl flutter stability of the rotor installed in a wind tunnel are considered in this study. The comprehensive analysis CAMRAD II is used. The test article is a research proprotor based on the Bell 609 rotor and the wind tunnel test apparatus is the newly developed Tiltrotor Test Rig (TTR) installed in the USAF NFAC 40- by 80-Foot Wind Tunnel. The performance and loads predictions and the stability calculations cover the following operating conditions: hover, cruise, conversion, and helicopter mode. These pre-test analytical results are being obtained to identify test operating limits, ensure a safe wind tunnel test and predict test results. Eventually, the goal is to perform a correlation study, identify shortfalls in the analytical model and introduce improvements to the analytical model. Performance and loads test results to date show that rotor torque (and yoke lag moment) may limit the test envelope. Shake test data based stability analysis shows that the TTR/609 is solidly stable within the test envelope.

Proprotor↗

Field test and simulation evaluation of variable refrigerant flow systems performance

Our study aims to compare the performance of a Variable Refrigerant Flow (VRF) system with a Roof Top Unit, (RTU) and a variable-air-volume (VAV) system through field tests and energy simulations. The field test was conducted in as similar conditions as possible between the two systems, such as the installation and operating environments of heating, the ventilation and air conditioning (HVAC) system, including internal heat gain and outdoor conditions, including buildings to compare the performance of the two systems accurately. A VRF system and RTU were installed at the test building located in Oak Ridge, Tennessee, in the USA. The same internal heat gain was generated at the same operating time of the two systems using lighting, electric heaters, and humidifiers inside the building. The HVAC system was alternately operated between cooling and heating operations to acquire energy performance data and to compare energy usage. Furthermore, an hourly building energy simulation model was developed with regard to the VRF system and RTU, and then the model was calibrated using actual measured data. Then, annual energy consumption of the two systems were compared and analyzed using the calibrated model. Moreover, additional analysis was conducted when the controlled discharge air temperature in the RTU was changed. The field test result showed that when energy consumptions of two systems were compared at the same outdoor conditions, using the weather-normalized model, the VRF system exhibited an energy reduction of approximately 17% during cooling operation and of approximately 74% during heating operations. A comparison on the annual energy consumption using simulations showed that the VRF system reduced energy consumption more than that of the RTU by 60%. Furthermore, when the discharge air temperature in the RTU was controlled according to the outdoor air temperature, energy consumption of the RTU was reduced by 6% in cooling operations and by 18% in heating operation. As a result, energy consumption of the VRF system was reduced by more than that of the RTU by 55% approximately.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design, Fabrication and Start-up of Test Facilities for the LAWPS Full-Scale IX Column Test and Engineering Scale Test - 17418

The U.S. Department of Energy (DOE), Office of River Protection's (ORP) primary mission is to retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Mixed radioactive waste is stored in 177 underground tanks at the Hanford Site as reported in DOE/ORP 2003-02, Environmental Impact Statement for Retrieval, Treatment, and Disposal of Tank Waste and Closure of the Single Shell Tanks at the Hanford Site, Richland WA, Inventory and Source Term Data Package. The 177 underground tanks are estimated to contain about 56 million gallons of waste. The Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low activity waste (ILAW) by feeding LAW directly from Tank Farms to the Hanford Waste Treatment Plant's (WTP's) LAW Facility, bypassing the Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria. The LAWPS will also facilitate the return of secondary liquid wastes from the WTP LAW Vitrification Facility to the Tank Farms. In November of 2015 DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS), awarded a contract to the AECOM Team to design, fabricate and operate two test platforms to generate performance data at two different scales and demonstrate technology maturation. The first platform models the ion exchange (IX) columns at full scale, and the second platform models the integrated flowsheet (cross flow filter (CFF) and IX) at 1/9. scale. Both test platforms underwent shakedown and start-up testing in August 2016 and moved into actual testing and NQA-1 data generation shortly thereafter. This paper covers the engineering design, procurement, construction, installation, and acceptance testing of the test platforms (which are now operational) under an aggressive fast track schedule, and initial test data as available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spinning Reserve From Hotel Load Response: Initial Progress

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automatic calibration system for pressure transducers

Fifty-channel automatic pressure transducer calibration system increases quantity and accuracy for test evaluation calibration. The pressure transducers are installed in an environmental tests chamber and manifolded to connect them to a pressure balance which is uniform.

Source record↗

Orbiter Kapton wire operational requirements and experience

The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

Peterson, R. V.↗

Evaluation of Envelope Energy in a High-Performance Manufactured Home in California

There are important applications for a robust energy model for new construction manufactured homes that can characterize the individual performance of the opaque wall and ceiling components of the building envelope. The efficacy of different insulation materials can be assessed with the confidence that modeled performance will closely predict installed performance. This study uses careful calibration of a standard energy model with a short-term co-heating test in an installed manufactured home to de-aggregate the contributions of planar wall sections from overall building envelope thermal resistance. The methodology takes into account thermal mass effects, solar gains, and physical adjustments to the structure to achieve successful calibration and to inform adjustments to the test procedure for future study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AXAF-I Low Intensity-Low Temperature (LILT) Testing of the Development Verification Test (DVT) Solar Panel

The planned orbit of the AXAF-I spacecraft will subject the spacecraft to both short, less than 30 minutes for solar and less than 2 hours for lunar, and long earth eclipses and lunar eclipses with combined conjunctive duration of up to 3 to 4 hours. Lack of proper Electrical Power System (EPS) conditioning prior to eclipse may cause loss of mission. To avoid this problem, for short eclipses, it is necessary to off-point the solar array prior to or at the beginning of the eclipse to reduce the battery state of charge (SOC). This yields less overcharge during the high charge currents at sun entry. For long lunar eclipses, solar array pointing and load scheduling must be tailored for the profile of the eclipse. The battery SOC, loads, and solar array current-voltage (I-V) must be known or predictable to maintain the bus voltage within acceptable range. To address engineering concerns about the electrical performance of the AXAF-I solar array under Low Intensity and Low Temperature (LILT) conditions, Marshall Space Flight Center (MSFC) engineers undertook special testing of the AXAF-I Development Verification Test (DVT) solar panel in September-November 1997. In the test the DVT test panel was installed in a thermal vacuum chamber with a large view window with a mechanical "flapper door". The DVT test panel was "flash" tested with a Large Area Pulse Solar Simulator (LAPSS) at various fractional sun intensities and panel (solar cell) temperatures. The testing was unique with regards to the large size of the test article and type of testing performed. The test setup, results, and lessons learned from the testing will be presented.

Alexander, Doug↗

Challenges and Opportunities for Basic Efficiency Measures in Low-Income Homes: A Southeast Alaska Case Study

Juneau, Alaska, is the state's capital city and aims to reach 80% renewable energy for the space heating and transportation sectors by 2045. This goal highlights a need to electrify both sectors to take advantage of the inexpensive hydropower available from the local electric utility, Alaska Electric Light and Power. To that end, researchers examined the feasibility of deploying storm windows via a case study of installing storm windows in two local low-income homes. Newer models of storm windows provide an extra layer of insulation over existing windows while preserving operability and views. They can also improve comfort and reduce noise. In addition to conducting pre- and post-installation air leakage tests, energy monitoring, and occupant interviews, researchers worked with the regional housing authority and a local builder to install the storm windows and replace inoperable windows in the two houses in 2021. The team encountered several challenges, including a lack of egress windows, energy data from a wide variety of heating systems, extremely leaky homes, and installation issues, such as windows that were not square. These results point to several barriers to the widespread deployment of window upgrades in the area and open the door to opportunities to design deployment programs that improve safety and efficiency.

cold climate↗

An evaluation of factors affecting the flow quality in wind tunnels

Tests were conducted in a number of NASA wind tunnels to measure disturbance levels and spectra in their respective settling chambers, test sections, and diffusers to determine the sources of these disturbances. Results indicate that properly designed and located second minimum in transonic tunnels prevent fluctuation originating at struts and in diffusers from propagating upstream into the test section. The installation in or upstream of the settling chamber of carefully selected screens, honeycomb, and acoustic baffles could further reduce test section turbulence levels and scales without significant pressure losses. The performance of these modifications is strongly influenced by tunnel geometry and their influence on the mean flow around the circuit.

Owen, F. K.↗

Comparison of Test Stand and Helicopter Oil Cooler Bearing Condition Indicators

The focus of this paper was to compare the performance of HUMS condition indicators (CI) when detecting a bearing fault in a test stand or on a helicopter. This study compared data from two sources: first, CI data collected from accelerometers installed on two UH-60 Black Hawk helicopters when oil cooler bearing faults occurred, along with data from helicopters with no bearing faults; and second, CI data that was collected from ten cooler bearings, healthy and faulted, that were removed from fielded helicopters and installed in a test stand. A method using Receiver Operating Characteristic (ROC) curves to compare CI performance was demonstrated. Results indicated the bearing energy CI responded differently for the helicopter and the test stand. Future research is required if test stand data is to be used validate condition indicator performance on a helicopter.

Dempsey, Paula J.↗