Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “initial”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Overview of the NASA Earth Action Strategies Wildland Fire Initiative

As part of NASA’s new Earth Action strategy, the Wildland Fire initiative was established, which includes both the NASA Wildland Fire Program (WFP) and the FireSense project. NASA has over 50 years of experience generating data and technology to enhance fire science and operational management. The WFP’s mission is threefold: 1) assemble communities of practice through collaborative efforts with government, academia, and the private sector; 2) co-develop knowledge and applications with relevant partners and stakeholders in the wildfire community; and 3) improve wildland fire management through the transitioning of NASA data, technology, tools, and science to stakeholder organizations. The WFP is focusing on supporting proactive fire management, including situational awareness, preparedness, and risk mitigation. This will be accomplished through selected projects that identify management challenges, relevant to partners and end users, and the NASA data that will be utilized to deliver innovative solutions to enhance the management of wildland fires. Examples include: i) investigation of evaporative stress from OpenET to help predict the risk of wildfire occurrence in watersheds; ii) incorporation of space based LiDAR for the generation of 3-dimensional forest fuel metrics, used to improve wildfire risk and behavior models; iii) integration of global, multi-platform geostationary active-fire data in near-real-time into NASA’s Fire Information for Resource Management System (FIRMS); and iv) identification of post-fire ecohydrological conditions using thermal, multispectral, synthetic aperture radar (SAR), and hyperspectral remotely-sensed data to improve flood hazard forecast models. The FireSense project is a US-focused 5-year project that will focus on delivering NASA’s unique Earth science and technological capabilities to operational agencies, striving towards enhancing fire fighting and air quality management. The project will include airborne campaigns and new technology that will likely have global implications. Initial stakeholder engagement led FireSense to focus on four use-cases focused on the characterization and measurement of: (i) pre-fire fuels conditions, (ii) active fire-dynamics; (iii) post-fire impact and threats; and iv) air quality impacts and forecasting, each-developed with identified stakeholders.

Wildland Fire program↗

Initial Development of an Upper Class E Traffic Management (ETM) System for Stratospheric Flight Operations

Advances in technologies across multiple areas have spurred the motivation and development of new entrants and use cases for the national airspace system to accommodate. The stratosphere, encompassing Upper Class E airspace, is of particular interest due to the types of aircraft that can operate there and the unique missions that can be carried out. The diversity of aircraft that plan to operate and the long durations envisioned presents a challenge for the management of that airspace in a manner that does not burden the current paradigm of air traffic service provision. Upper Class E Traffic Management (ETM) is an approach pioneered by NASA and FAA to enable the cooperative management of high-altitude airspace through operations in cooperative areas facilitated by information exchanges and coordination based on common operating practices. NASA has developed, implemented, and commenced initial tests of the underlying systems and architecture to enable ETM operations. The implementation is the first of its kind and meant to serve as a reference for broader adoption. This paper will present the architecture and details of the system components as well as how it has been implemented for the test. Summary results of initial connectivity tests are included to highlight the functionality of the ETM system, which provides the path forward for more complex operations and interactions at a greater scale.

Upper Class E Traffic Management↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, the Intuitive Machines IM-1 NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan Anzalone↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, Intuitive Machines NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan J Anzalone↗

NASA’s Astrophysics Cross-Observatory Science Support (ACROSS) Initiative: Enabling Time-Domain and Multimessenger

The Astro2020 Decadal Survey recommended an investment in Time-Domain and 4 Multimessenger Astrophysics (TDAMM) as the top-priority sustaining activity in space for the 5 coming decade. One aspect of NASA’s response to this recommendation is a pilot project, 6 the Astrophysics Cross-Observatory Science Support (ACROSS) initiative, designed to provide 7 support to both missions and observers as they pursue TDAMM science. Here, we present our 8 observations of needs in the community and initial plans for ACROSS activities, including services 9 to facilitate and improve cross-mission follow-up planning and execution; a multimessenger web portal with links to existing mission resources, community tools, and information targeted for 11 TDAMM general observers; development of “Smart target-of-opportunity submission page” proof-12 of-concepts; and ongoing development of a potential TDAMM general observing competitive 13 grant solicitation. As the ACROSS pilot phase begins, we invite discussion of our plans with both 14 missions and observers to better understand their needs and concerns.

T B Humensky↗

NASA MUREP-DEAP Institutes - Year 1 Updates on Capacity Building, Community Building and Research Initiatives

Through the Minority University Research and Education Project (MUREP), NASA engages underrepresented populations via various initiatives, including by means of three year competitive awards for Data Science Equity, Access, and Priority in Research and Education (DEAP) Institutes led by Historically Black Colleges and Universities (HBCUs). MUREP DEAP Institutes, multi-institutional consortia, conduct data science research and capacity building initiatives that aim to enhance the research, academic, and technological capabilities of the participating HBCUs while providing NASA-specific knowledge, skills and opportunities for students and faculty who have historically been underrepresented and underserved in the STEM workforce. Three MUREP DEAP Institutes, led by Bethune-Cookman University, North Carolina A&T University, and North Carolina Central University, are conducting data science and natural hazard related research utilizing remote sensing and earth observations, with mentorship for the Institutes provided by scientists from NASA’s Marshall Space Flight Center. Each Institute has unique capabilities, needs, and goals, but overlap in their common interest to conduct cutting edge data science and natural hazard related research and to build capacity, broaden participation, and increase retention of a diverse group of participating students and faculty​. Here, successes and challenges from the first year of activities at each MUREP DEAP institute are discussed, where activities focused primarily on the recruitment of a diverse group of students and the upskilling of students and faculty in data science and remote sensing concepts. The planned activities and goals of each DEAP Institute for the upcoming two years of activities will also be discussed, both from research and community-building perspectives.

Ronan Lucey↗

An Augmented Ground Station Architecture for Spacecraft-Initiated Communication Service Requests

Spacecraft performing science and exploration missions have increasingly complex and event-driven objectives, making communication needs difficult to predict in advance. Additional flexibility is required in space communication provider networks to effectively meet time-varying demand. We envision a framework for automated resource allocation in which requests for communications service are initiated by spacecraft based on current mission needs. We propose an augmented ground station configuration featuring a wide field-of-view antenna to receive transmissions from spacecraft requesting high-rate communications. A software suite to automate the service fulfillment process, including interfacing with external scheduling systems such as NASA’s Near Space Network, is described. Experimental results characterizing the physical-layer link between the wide field-of-view antenna and a software-defined radio testbed on the International Space Station are presented. We also discuss long-duration software testing on a ground-based testbed. Taken together, these proof-of-concept results demonstrate the feasibility of the concept to improve the responsiveness of space communications.

user-initiated service↗

MAPGEN : mixed initiative planning and scheduling for the Mars '03 MER mission

The Mars Exploration Rovers Mars '03 mission is one of NASA's most ambitious science missions to date. The rovers will be launched in the summer of 2003 with each rover carrying instruments to conduct remote and in-situ observation to elucidate the planet's past climate, water activity, and habitability. Science is the primary driver of MER and, as a consequence, making best use of the scientific instruments, within the available resources, is a crucial aspect of the mission. To address this critically, the MER project has selected MAPGEN (Mixed-Initiative Activity Plan GENerator) as an activity planning tool. MAPGEN combines two exiting systems, each with a strong heritage: APGEN the Activity Planning tool from the Jet Propulsion Laboratory and the Europs Planning/Scheduling system from NASA Ames Research Center. This paper discusses the issues arising from combining these tools in the context of this mission.

planning and scheduling↗

Initial Field Deployment Results of Green PCB Removal from Sediment Systems (GPRSS)

The goal of this task order was to complete optimization and development of the Green PCB Remediation from Sediment Systems(GPRSSs) technology, culminating in the production of functioning demonstration test units which would be deployed at a suitable demonstration location. This location would be selected in conjunction with Toxicological & Ecological Associates who have entered into a SAA with NASA to partner with and further develop this technology. The GPRSSs technology was initially developed under ESC Task Order 83 with the purpose of providing a green remediation technology capable of in-situ removal and remediation of polychlorinated biphenyls (PCBs) from contaminated sediments. The core concept of the technology, a polymeric blanket capable of absorbing PCBs when in contact with contaminated sediments was then transitioned to Task Order 165 where the primary objective was to fully design and optimize a functioning test unit capable of testing the theoretical and laboratory scale concepts in a real world situation. Results from both task orders are included in this report for completeness, although Task Order 165 focused on the blanket design and the small scale field demonstration in which is currently still ongoing in Altavista, VA.

Deployment↗

Automated Identification of Initial Storm Electrification and End-of-Storm Electrification Using Electric Field Mill Sensors

Kennedy Space Center (KSC) operations are located in a region which experiences one of the highest lightning densities across the United States. As a result, on average, KSC loses almost 30 minutes of operational availability each day for lightning sensitive activities. KSC is investigating using existing instrumentation and automated algorithms to improve the timeliness and accuracy of lightning warnings. Additionally, the automation routines will be warning on a grid to minimize under-warnings associated with not being located in the center of the warning area and over-warnings associated with encompassing too large an area. This study discusses utilization of electric field mill data to provide improved warning times. Specifically, this paper will demonstrate improved performance of an enveloping algorithm of the electric field mill data as compared with the electric field zero crossing to identify initial storm electrification. End-of-Storm-Oscillation (EOSO) identification algorithms will also be analyzed to identify performance improvement, if any, when compared with 30 minutes after the last lightning flash.

initial storm electrification↗