Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “geodesy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

The International DORIS Service (IDS) - Recent Developments in Preparation for ITRF2013

The International DORIS Service (IDS) was created in 2003 under the umbrella of the International Association of Geodesy (IAG) to foster scientific research related to the French DORIS tracking system and to deliver scientific products, mostly related to the International Earth rotation and Reference systems Service (IERS). We first present some general background related to the DORIS system (current and planned satellites, current tracking network and expected evolution) and to the general IDS organization (from Data Centers, Analysis Centers and Combination Center). Then, we discuss some of the steps recently taken to prepare the IDS submission to ITRF2013 (combined weekly time series based on individual solutions from several Analysis Centers). In particular, recent results obtained from the Analysis Centers and the Combination Center show that improvements can still be made when updating physical models of some DORIS satellites, such as Envisat, Cryosat-2 or Jason-2. The DORIS contribution to ITRF2013 should also benefit from the larger number of ground observations collected by the last generation of DGXX receivers (first instrument being onboard Jason-2 satellite). In particular for polar motion, sub-millarcsecond accuracy seems now to be achievable. Weekly station positioning internal consistency also seems to be improved with a larger DORIS constellation.

tracking↗

Sheshan VLBI Station Report for 2012

This report summarizes the observing activities at the Sheshan station (SESHAN25) in 2012. It includes international VLBI observations for astrometry, geodesy, and astrophysics and domestic observations for satellite tracking. We also report on updates and on development of the facilities at the station.

Xia, Bo↗

Geodetic Observatory Wettzell - 20-m Radio Telescope and Twin Telescope

In the year 2012, the 20-m radio telescope at the Geodetic Observatory Wettzell, Germany again contributed very successfully to the International VLBI Service for Geodesy and Astrometry observing program. Technical changes, developments, improvements, and upgrades were made to increase the reliability of the entire VLBI observing system. In parallel, the new Twin radio telescope Wettzell (TTW) got the first feedhorn, while the construction of the HF-receiving and the controlling system was continued.

Neidhardt, Alexander↗

Instituto Geografico Nacional of Spain

This report updates the description of the space geodesy facilities of the Spanish National Geographic Institute (IGN). The current 40-meter radio telescope at Yebes, a network station for IVS, has performed geodetic VLBI observations regularly since September 2008. In addition to this, the project to establish an Atlantic Network of Geodynamical and Space Stations (RAEGE) is progressing with the construction of the first antenna, which is being erected at Yebes.

Colomer, Francisco↗

Tsukuba VLBI Correlator

The K5/VSSP software correlator (Figure 1), located in Tsukuba, Japan, is operated by the Geospatial Information Authority of Japan (GSI). It is fully dedicated to processing the geodetic VLBI sessions of the International VLBI Service for Geodesy and Astrometry. All of the weekend IVS Intensives (INT2) and the Japanese domestic VLBI observations organized by GSI were processed at the Tsukuba VLBI Correlator.

Kurihara, Shinobu↗

CDDIS Data Center Summary for the IVS 2012 Annual Report

This report summarizes activities during 2012 and future plans of the Crustal Dynamics Data Information System (CDDIS) with respect to the International VLBI Service for Geodesy and Astrometry (IVS). Included in this report are background information about the CDDIS, the computer architecture, staff supporting the system, archive contents, and future plans for the CDDIS within the IVS.

Noll, Carey↗

BKG/DGFI Combination Center Annual Report 2012

This report summarizes the activities of the Federal Agency for Cartography and Geodesy (Bundesamt fuer Kartographie und Geodaesie, BKG) and the German Geodetic Research Institute (Deutsches Geodaetisches Forschungsinstitut, DGFI)BKG/DGFI Combination Center in 2011 and outlines the planned activities for the year 2012. The main focus was to stabilize outlier detection and to update the Web presentation of the combined products.

Bachmann, Sabine↗

Matera CGS VLBI Analysis Center

This paper reports the VLBI data analysis activities at the Space Geodesy Center (CGS), Matera, from January 2012 through December 2012, and the contributions that the CGS intends to provide for the future as an IVS Analysis Center.

Lanotte, Roberto↗

Vienna Special Analysis Center Annual Report 2012

The main activities of the VLBI group at the Department of Geodesy and Geoinformation of the Vienna University of Technology were related to the development of the Vienna VLBI Software VieVS (http://vievs.hg.tuwien.ac.at/) and its application for various studies. For example, we dealt with scheduling, satellite tracking, and the estimation of geodynamical and astronomical parameters from VLBI observations. One highlight was the release of VieVS 2.0 just before the third VieVS User Workshop in September 2012.

Boehm, Johannes↗

The Goal of the IAU/IAG Joint Working Group on the Theory of Earth Rotation

In 2012 the International Association of Geodesy (IAG) and the International Astronomical Union (IAU) initiated a process to establish a Joint Working Group (JWG) on theory of Earth rotation with the purpose of promoting the development of improved theories of the Earth rotation which reach the accuracy required to meet the needs of the near future as recommended by, e.g. GGOS, the Global Geodetic Observing System of the IAG. The JWG was approved by both organizations in April 2013 with the chairs being the two authors of this paper. Its structure comprises three Sub Working Groups (SWGs) addressing Precession/Nutation, Polar Motion and UT1, the Numerical Solutions and Validation, respectively. The SWGs should work in parallel for the sake of efficiency, but should keep consistency as an overall goal. This paper offers a view of the objectives and scope of the JWG and reports about its initial activities and plans.

Ferrandiz, J. M.↗

2016 Mars Insight Mission Design and Navigation

Scheduled for a launch in the 2016 Earth to Mars opportunity, the Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) Mission will arrive to Mars in late September 2016 with the primary objective of placing a science lander on the surface of the Red Planet followed by the deployment of two science instruments to investigate the fundamental processes of terrestrial planet formation and evolution. In order to achieve a successful landing, the InSight Project has selected a launch/arrival strategy that satisfies the following key and driving requirements: (1) Deliver a total launch mass of 727 kg, (2) target a nominal landing site with a cumulative Delta V99 less than 30 m/s, and (3) approach EDL with a V-infinity upper limit of 3.941 km/s and (4) an entry flight-path angle (EFPA) of -12.5 +/- 0.26 deg, 3-sigma; the InSight trajectories have been designed such that they (5) provide UHF-band communications via Direct-To-Earth and MRO from Entry through landing plus 60 s, (6) with injection aimpoints biased away from Mars such that the probability of the launch vehicle upper stage impacting Mars is less than 1.0 X 10(exp 4) for fifty years after launch, and (7) non-nominal impact probabilities due to failure during the Cruise phase less than 1.0 X 10(exp 2).

Landers↗

Using Mean Orbit Period in Mars Reconnaissance Orbiter Maneuver Design

Mars Reconnaissance Orbiter (MRO) has provided communication relays for a number of Mars spacecraft. In 2016 MRO is expected to support a relay for NASA's Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) spacecraft. In addition, support may be needed by another mission, ESA's ExoMars EDL Demonstrator Module's (EDM), only 21 days after the InSight coverage. The close proximity of these two events presents a unique challenge to a conventional orbit synchronization maneuver where one deterministic maneuver is executed prior to each relay. Since the two events are close together and the difference in required phasing between InSight and EDM may be up to half an orbit (yielding a large execution error), the downtrack timing error can increase rapidly at the EDM encounter. Thus, a new maneuver strategy that does not require a deterministic maneuver in-between the two events (with only a small statistical cleanup) is proposed in the paper. This proposed strategy rests heavily on the stability of the mean orbital period. The ability to search and set the specified mean period is fundamental in the proposed maneuver design as well as in understanding the scope of the problem. The proposed strategy is explained and its result is used to understand and solve the problem in the flight operations environment.

Chung, Min-Kun J.↗

Interplanetary CubeSat Navigational Challenges

CubeSats are miniaturized spacecraft of small mass that comply with a form specification so they can be launched using standardized deployers. Since the launch of the first CubeSat into Earth orbit in June of 2003, hundreds have been placed into orbit. There are currently a number of proposals to launch and operate CubeSats in deep space, including MarCO, a technology demonstration that will launch two CubeSats towards Mars using the same launch vehicle as NASA's Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) Mars lander mission. The MarCO CubeSats are designed to relay the information transmitted by the InSight UHF radio during Entry, Descent, and Landing (EDL) in real time to the antennas of the Deep Space Network (DSN) on Earth. Other CubeSatts proposals intend to demonstrate the operation of small probes in deep space, investigate the lunar South Pole, and visit a near Earth object, among others. Placing a CubeSat into an interplanetary trajectory makes it even more challenging to pack the necessary power, communications, and navigation capabilities into such a small spacecraft. This paper presents some of the challenges and approaches for successfully navigating CubeSats and other small spacecraft in deep space.

MarCo↗

Measurements of Parachute Dynamics in the World's Largest Wind Tunnel by Stereo Photogrammetry

Between 2012 and 2017, parachutes for four NASA Projects were tested in the 80- by 120-Ft test section of the National Full-Scale Aerodynamic Complex (NFAC) at NASA Ames Research Center. These projects were: (1) Low-Density Supersonic Decelerator (LDSD); (2) Capsule Parachute Assembly System (CPAS, for Orion); (3) Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight, a Mars mission); and (4) Mars 2020. In all tests stereo photogrammetry was used to measure time-dependent positions of features on the canopies. For the LDSD and CPAS tests, where the purpose was to study the trade-off between stability and drag of different parachute designs, the pendulum motion of the canopies about the riser attachment point was measured by calibrated cameras in the diffuser. The CPAS test also included static measurements where the inflated parachutes were pulled to the side by a system of tethers. The Insight tests were structural qualification tests where each canopy was packed in a bag and launched from a mortar. Cameras in the diffuser measured the trajectory of the bag and the stripping of the bag from the canopy. The Mars 2020 test was a workmanship verification test where the canopies were either launched from a mortar or deployed from a sleeve stretched along the tunnel axis. The deployments were recorded from many directions by thirteen high-speed cameras distributed in the diffuser and test section. Photogrammetry was not planned; however, after a tunnel-related accident ended the test prematurely, photogrammetric measurements were bootstrapped from the images to support the accident investigations. This paper describes how the photogrammetry measurements were made in each test and presents typical results.

Schairer, Edward T.↗

2018 Mars Insight Mission Design and Navigation Overview

Originally scheduled for a launch in the 2016 Earth to Mars opportunity, NASA’s Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) mission will launch the next lander to Mars in May-June 2018 arriving to the Red Planet in November 2018. Derived from the Phoenix mission which successfully landed on Mars in May 2008, the InSight Entry, Descent, and Landing system will place a lander in the Elysium Planitia region. This paper specifies the mission and navigation requirements set by the Project and how the final mission and navigation design satisfies those requirements.

Abilleira, Fernando↗

Final Mission and Navigation Design for the 2016 Mars InSight Mission

NASA’s Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) mission was scheduled to launch the next lander to Mars in March 2016 arriving to the Red Planet in the fall. Derived from the Phoenix mission which successfully landed on Mars in May 2008, the InSight Entry, Descent, and Landing system will place a lander in the Elysium Planitia region. This paper specifies the mission and navigation requirements set by the Project and how the final mission and navigation design satisfies those requirements. Background information affecting navigation including spacecraft modeling and the physical environment which influences the spacecraft motion are included. (Note from the author: The InSight launch in 2016 was suspended due to critical issues with the Seismic Experiment for Interior Structure (SEIS) instrument that could not be fixed prior to the planned launch period. This paper represents the state of the design for the 2016 mission. No attempt has been made to reflect the latest developments).

Abilleira, Fernando↗

Boarding Pass: InSight Lander Mission to Mars

Join us on a journey from Integration and Test through to launch and landing on Mars for the Mars InSight Lander. InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) launched from Vandenberg Air Force Base in California on May 5, 2018 at 4:05 AM and landed on Mars on November 26, 2018 in Elysium Planitia. InSight was the first planetary launch from the West Coast and is the first Mars mission to attempt to measure Marsquakes. InSight is also poised to measure the thermal properties of Mars' interior and the planet's wobble. Enjoy an amazing photographic journey into the inner workings of life before launch and at landing on Mars.

Pugel, Betsy↗