Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electric power grids”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

A 75 kVA Intelligent Power Stages (IPS) Unit Design for Future Grid-interface Application

The demand for grid-interface converter with flexible dc bus is driven by the fast development of energy storage system (ESS), electric vehicle (EV) charging system, and versatile residential load. This paper first proposes a two-stage intelligent power stage (IPS) unit for future grid-interface applications. To achieve zero common-mode (CM) voltage emissions, step-up and step-down voltage gain, a 3-level four-switch buck-boost (3-L FSBB) dc-dc converter is adopted with fully zero voltage switching (ZVS). In one IPS unit, an advanced fiberoptic communication with sub-nanosecond synchronization is developed for different enhanced gate drivers. Moreover, an enhanced gate driver integrated current and voltage sensors is designed for monitoring and diagnostics. To achieve a whole low-profile design, three 12 oz heavy copper planar ac inductors are designed and implemented. Finally, a 75 kVA IPS unit was built to verify both the thermal and electrical design.

Cao, Yuliang↗

Thermal energy storage heat exchanger: Molten salt heat exchanger design for utility power plants

The use of thermal energy storage (TES) in the latent heat of molten salts as a means of conserving fossil fuels and lowering the cost of electric power was evaluated. Public utility systems provided electric power on demand. This demand is generally maximum during late weekday afternoons, with considerably lower overnight and weekend loads. Typically, the average demand is only 60% to 80% of peak load. As peak load increases, the present practice is to purchase power from other grid facilities or to bring older less efficient fossil-fuel plants on line which increase the cost of electric power. The widespread use of oil-fired boilers, gas turbine and diesel equipment to meet peaking loads depletes our oil-based energy resources. Heat exchangers utilizing molten salts can be used to level the energy consumption curve. The study begins with a demand analysis and the consideration of several existing modern fossil-fuel and nuclear power plants for use as models. Salts are evaluated for thermodynamic, economic, corrosive, and safety characteristics. Heat exchanger concepts are explored and heat exchanger designs are conceived. Finally, the economics of TES conversions in existing plants and new construction is analyzed. The study concluded that TES is feasible in electric power generation. Substantial data are presented for TES design, and reference material for further investigation of techniques is included.

Ferarra, A.↗

Online Detection of Power Grid Anomalies via Federated Learning

Data from sensors is critical for advanced applica- tions that support efficient, reliable, and resilient electric grid operations. Historically, data from phasor measurement units (PMU) has been utilized to develop a wide variety of wide area control and protection applications suitable for power grid control centers. However, until now, most of these could not be deployed for automated operations due to a set of data corruption challenges and uncertainty in the incoming data pipeline. In this paper, we address the problem of detecting different variety of anomalies that are evident in different high- speed power grid measurements. The paper discusses a workflow for handling problems with data acquisition and highlights some of the key findings suitable for anomaly detection in a centralized and distributed environment. The effectiveness of the proposed method was demonstrated with results utilizing realistic PMU datasets

Shinkle, Matthew W.↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ICE Calculator 2.0: Final Report for Phase 1 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE 2.0 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE 2.0 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 of the ICE 2.0 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 1 involved 11 customer interruption cost survey activities representing a total of 24 electricity distribution service territories, 23 of them located in the Eastern and Midwestern regions of the U.S. and one located in the Pacific Northwest. ICE 2.0 vs. 1.0 Comparison This memorandum compares customer power interruption costs estimated using the recently updated Interruption Cost Estimate (ICE) Calculator (“ICE 2.0”) to the original ICE Calculator (“ICE 1.0”). ICE 1.0 was developed in 2009 based on 15 independent power interruption cost surveys conducted by 10 electric utilities between 1989 and 2012. ICE 2.0 was developed in 2025 through a national initiative based on a consistent set of power interruption cost surveys and 11 surveying efforts conducted across 24 electric utility service territories between 2022 and 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

BI-LEVEL OPTIMIZATION FOR ELECTRICITY TRANSACTION IN SMART COMMUNITY WITH MODULAR PUMP HYDRO STORAGE

Grid integration of the increasing distributed energy resources could be challenging in terms of new infrastructure investment, power grid stability, etc. To resolve more renewables locally and reduce the need for extensive electricity transmission, a community energy transaction market is assumed with market operator as the leader whose responsibility is to generate local energy prices and clear the energy transaction payment among the prosumers (followers). The leader and multi-followers have competitive objectives of revenue maximization and operational cost minimization. This non-cooperative leader-follower (Stackelberg) game is formulated using a bi-level optimization framework, where a novel modular pump hydro storage technology (GLIDES system) is set as an upper level market operator, and the lower level prosumers are nearby commercial buildings. The best responses of the lower level model could be derived by necessary optimality conditions, and thus the bi-level model could be transformed into single level optimization model via replacing the lower level model by its Karush-Kuhn-Tucker (KKT) necessary conditions. Several experiments have been designed to compare the local energy transaction behavior and profit distribution with the different demand response levels and different local price structures. The experimental results indicate that the lower level prosumers could benefit the most when local buying and selling prices are equal, while maximum revenue potential for the upper level agent could be reached with non-equal trading prices.

Chen, Yang↗

Will Solar Panels Help When the Power Goes Out? Planning for PV Resilience

PV systems, like all energy systems, must chart a difficult course in order to improve resilience. They need to simultaneously withstand extreme conditions that cause grid power disruptions, be configured in a way that allows electricity to be delivered to meet the PV user's needs, and overcome disruptions arising from solar resource intermittency. Certain considerations reveal themselves as key to a PV system's resilience benefits. Choice of hardware is critical, as is site selection for the PV array. Voluminous evidence in a hurricane context demonstrates that durable hardware, properly maintained and sited, leads to PV systems surviving extreme weather with their functionality intact. Structurally weak or poorly maintained PV equipment, on the other hand, has demonstrated failures during extreme weather events. PV system stakeholders should ensure that best practices are followed for hardware procurement and siting. It is also important to understand that PV systems are not one-size-fits-all. While incorporating islanding capabilities and energy storage into the system's electrical topology will typically enhance resilience, the user's needs will determine the optimally resilient conformation of any given system. These factors - appropriate hardware, siting, maintenance, and system design - are the primary drivers of PV resilience. PV systems possess high potential for resilient energy generation due to their distributed, abundant, and free fuel supply, but the technology itself does not inherently lead to resilient outcomes. Realizing PV's potential for resilience requires consideration of these determinative factors.

14 SOLAR ENERGY↗

A Guide to Case Studies of Grid Enhancing Technologies

This document has been developed as a resource for the electric power industry to rapidly understand the scale and history with which certain new technologies have been installed on or otherwise simulated to impact the transmission system. This document is attempting to address the findings of the 2022 U.S. Department of Energy (DOE) Report "Grid Enhancing Technologies: A Case Study on Ratepayer Impact", which identified the need for workforce development and training materials to transition new technologies from a state of “pilots” and “case studies” to “business-as-usual.” The authors go beyond typical survey-style literature reviews in that the key details and notes about each project are identified. Still, as will become evident, there is a need for more work to be done to increase the industry’s public knowledge on important topics related to the implementation of grid enhancing technology on the transmission system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Characterization of InCharge™ ICE-66 V2X Bidirectional DC Fast Charger

Vehicle-to-grid (V2G) technology extends the role of Plug-in Hybrid Vehicle’s (PHEV) and Battery Electric Vehicle’s (BEV) batteries beyond transportation by enabling bidirectional power transfer between the vehicle's onboard energy storage and the utility grid. Modern battery-powered vehicles are equipped with high-capacity battery packs that remain stationary and underutilized for the majority of their operational life. A vehicle used for daily commuting may be parked and connected to charging infrastructure for 18–20 hours per day, representing a significant untapped energy resource. When considered at scale, the aggregated storage capacity of a modest fleet of 10–15 vehicles within a single parking facility can reach the MWh range, sufficient to partially offset peak demand for a mid-size commercial building or contribute meaningful ancillary services to the local grid. The ability to charge during off-peak periods when electricity prices are low and discharge during peak demand when prices are high positions EV batteries as distributed energy arbitrage assets, with the potential to offset vehicle ownership and charging costs. Beyond energy arbitrage, V2G-capable assets can provide ancillary grid services through active and reactive power injections. Active power supports grid frequency regulation, while reactive power supports local voltage regulation. Together, these capabilities establish V2G as a technically promising and economically relevant pathway toward greater integration of battery-powered vehicles into the broader energy system.

33 ADVANCED PROPULSION SYSTEMS↗

Demand Response Potential from the Bulk Grid Perspective

Gain insight from an exploration of the potential value of demand response (DR) in future power systems. Using hourly DR resource estimates by sub-sector, electrical end-use, and grid service, we incorporate virtual generator models of DR resources into large-scale production cost models, and analyze the grid-level impacts in terms of the ability of DR to reduce system costs and potentially help integrate renewables or reduce system emissions. Additionally, we examine the value of DR, its revenue, and how these change under different system conditions. In this panel session, we will describe our input data and modeling methods, provide an overview of the production cost models used, and summarize key results from analyses in Florida and the western United States. Findings include variations in DR value by end-use and geography, an ability to increase economic PV deployment potential in high penetration systems, and mixed emissions outcomes depending on system composition and fuel prices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Challenge Posed by Geomagnetic Activity to Electric Power Reliability: Evidence from England and Wales

This paper addresses whether geomagnetic activity challenged the reliability of the electric power system during part of the declining phase of solar cycle 23. Operations by National Grid in England and Wales are examined over the period of 11 March 2003 through 31 March 2005. This paper examines the relationship between measures of geomagnetic activity and a metric of challenged electric power reliability known as the net imbalance volume (NIV). Measured in megawatt hours, NIV represents the sum of all energy deployments initiated by the system operator to balance the electric power system. The relationship between geomagnetic activity and NIV is assessed using a multivariate econometric model. The model was estimated using half-hour settlement data over the period of 11 March 2003 through 31 December 2004. The results indicate that geomagnetic activity had a demonstrable effect on NIV over the sample period. Based on the parameter estimates, out-of-sample predictions of NIV were generated for each half hour over the period of 1 January to 31 March 2005. Consistent with the existence of a causal relationship between geomagnetic activity and the electricity market imbalance, the root-mean-square error of the out-of-sample predictions of NIV is smaller; that is, the predictions are more accurate, when the statistically significant estimated effects of geomagnetic activity are included as drivers in the predictions.

Forbes, Kevin F.↗

Interoperability Maturity Roadmap Methodology, V1.3

The Interoperability Roadmap Methodology document supports the U.S. Department of Energy (DOE) Grid Modernization Laboratory Consortium (GMLC) Interoperability Project’s efforts to advance interoperability as an essential component for the successful and more seamless integration of intelligent, communicating technologies into the electric power system. This proposed methodology supports the strategic approach to advance interoperability described in the GMLC Interoperability Project’s Interoperability Strategic Vision: Enabling an Interactive Grid. That document proposes engaging an ecosystem of businesses interested in integrating smart technology with the electric power system to develop an interoperability roadmap using a methodical approach. This roadmap methodology is to be applied to technology integration ecosystems (e.g., electric vehicles, photovoltaic inverters, or automated buildings), using tools that measure the state of interoperability today, to identify the gaps and challenges that can be overcome to improve interoperability, and thereby, simplify the integration process.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of NuScale SMR Steam Heat Augmentation for Chemical Plant Decarbonization

Nearly 50% of the total energy consumed by the industrial sector in the United States is used to produce process steam with natural gas and coal-fired boilers1 . This project conducts a technoeconomic assessment of a NuScale Small Modular Reactor (SMR) coupled with a chemical plant as an Integrated Energy System (IES) where nuclear produces steam and electric power to meet the requirements of a large chemical plant. In a 2020 study, ORNL evaluated the feasibility of using advanced SMRs, including the NuScale design, to supply energy to the Eastman Chemical Plant. However, since that report was published, NuScale received NRC approval for its uprated 77 MWe design with 56% more power and has also introduced a high-temperature, high pressure, steam heat-augmentation system, a key focus of the new study. The new study also benefits from revised capital costs, a 10-day refueling outage time, reduced plant staffing, higher capacity factors, and a site boundary Emergency Planning Zone methodology. The study consists of a techno-economic assessment of two possible energy sources (nuclear and natural gas) in a number of steam and power generation configurations (NuScale Power Modules (NPMs), boilers and combinations of both) to satisfy the steam and power demand with the most reliable and cost competitive system. A total of 2,947.3 klb/hr of steam and 72.5 MWe of electricity are required for the demonstration case. A range of scenarios and solutions are explored, from a 12-NPM plant (3,000 MWth)—with excess capacity and redundancy, capable of supplying a significant amount of extra power to the grid—to a 4-NPM (1,000 MWth) plant—supplemented with existing boilers or grid power for redundancy. The study uses historical steam and power data from a chemical plant and examines the sensitivity to natural gas and grid power cost variations. Scenarios with up to two times gas and electricity costs were considered. Profitability in a 60-year time horizon was analyzed, consistent with NuScale’s design life specification. A steady-state site integration and reliability analysis was performed, and trade-offs were identified.

20 FOSSIL-FUELED POWER PLANTS↗

Protection of 100% Inverter-dominated Power Systems with Grid-Forming Inverters and Protection Relays – Gap Analysis and Expert Interviews

This report summarizes a gap analysis resulting from a literature review and expert interviews conducted by subject matter experts from Sandia National Laboratory, Siemens, and the Electric Power Research Institute (EPRI) in Spring 2023. The gap analysis consists of two main parts: The fault-ride through (FRT) behavior of grid-forming (GFM) inverter-based resources (IBR) and the response of state-of-the-art protection relays to the fault currents and voltages from GFM IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SEIN: Breaking Barriers Resilient Energy System Analysis [Slides]

The Solar Energy Innovation Network (SEIN) is a collaborative research program that supports multi-stakeholder teams in researching and sharing solutions to real-world challenges associated with solar energy adoption. The Breaking Barriers project was selected to participate in the Solar Energy Innovation Network, Round 2, and was led by Groundswell, a D.C.-based clean energy project developer. The Breaking Barriers team included Partnership for Southern Equity, Atlanta University Center campus facility managers and professors, the City of Atlanta's Neighborhood Planning Unit T, and Georgia Power Company. The project aimed to design and construct innovative urban energy resiliency hubs integrating microgrid technology, solar generation, and energy storage in Atlanta colleges and communities. The hubs will help these historically Black colleges and universities (HBCUs) and the energy-burdened broader community in West Atlanta be more resilient, in addition to informing new course curricula at Atlanta University Center campuses. With many possible options for the system's battery size, the Breaking Barriers team needed insight into the relationships between BESS size, economic performance, and resilience at Spelman College's Manley Center. These insights are crucial for entering procurement negotiations with project developers, establishing resilience capabilities that the HBCU campuses can plan around, and guiding the team's fundraising targets. This analysis includes estimates of PV and battery performance, costs, savings, and resilience for multiple battery sizes. In order to provide power during a grid outage, the resilient energy system also needs to be connected to the Manley Center in a safe and island-able manner (electrically isolated from the grid). Analysis of potential electrical configurations and estimated setup costs is key to successfully entering a required interconnection agreement with Georgia Power, as well as informing requests for engineering firms to construct the system. This analysis includes conceptual options and rough order of magnitude cost estimates for electrically interconnecting the resilient energy system to the Manley Center and the grid. The Breaking Barriers team used this analysis to select preferred system characteristics and design for the resilient energy system.

14 SOLAR ENERGY↗

EVs@Scale Lab Consortium Semi-Annual Stakeholder Meeting

The U.S. Department of Energy (DOE) Electric Vehicles at Scale Lab Consortium (EVs@Scale Lab Consortium) is accelerating research to support the establishment of a secure and scalable national network of charging infrastructure. This network will be critical to support tens of millions of light-, medium-, and heavy-duty EVs on American roads by 2030. The EVs@Scale Lab Consortium brings together national laboratories and key stakeholders to conduct infrastructure research and development (R&D) that advances innovations in, and sets unified standards for, high-power and wireless charging. The effort will also develop technologies to integrate vehicle charging with the power grid, and develop cybersecurity measures to protect drivers, vehicles, equipment, and the grid. The first hybrid EVs@Scale Lab Consortium Semiannual Stakeholder Meeting was held at ANL on September 27-28, 2023, to identify research, development, and deployment needs to accelerate technology development for electric vehicles at scale and explore opportunities for collaboration across government, academia, and industry.

advanced charging and grid interface technologies↗