Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “dynamic scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Automation of orbit determination functions for National Aeronautics and Space Administration (NASA)-supported satellite missions

The Flight Dynamics Facility (FDF) at Goddard Space Flight Center (GSFC) provides spacecraft trajectory determination for a wide variety of National Aeronautics and Space Administration (NASA)-supported satellite missions, using the Tracking Data Relay Satellite System (TDRSS) and Ground Spaceflight and Tracking Data Network (GSTDN). To take advantage of computerized decision making processes that can be used in spacecraft navigation, the Orbit Determination Automation System (ODAS) was designed, developed, and implemented as a prototype system to automate orbit determination (OD) and orbit quality assurance (QA) functions performed by orbit operations. Based on a machine-resident generic schedule and predetermined mission-dependent QA criteria, ODAS autonomously activates an interface with the existing trajectory determination system using a batch least-squares differential correction algorithm to perform the basic OD functions. The computational parameters determined during the OD are processed to make computerized decisions regarding QA, and a controlled recovery process isactivated when the criteria are not satisfied. The complete cycle is autonomous and continuous. ODAS was extensively tested for performance under conditions resembling actual operational conditions and found to be effective and reliable for extended autonomous OD. Details of the system structure and function are discussed, and test results are presented.

Mardirossian, H.↗

Automation of orbit determination functions for National Aeronautics and Space Administration (NASA)-supported satellite missions

The Flight Dynamics Facility (FDF) at Goddard Space Flight Center (GSFC) provides spacecraft trajectory determination for a wide variety of National Aeronautics and Space Administration (NASA)-supported satellite missions, using the Tracking Data Relay Satellite System (TDRSS) and Ground Spaceflight and Tracking Data Network (GSTDN). To take advantage of computerized decision making processes that can be used in spacecraft navigation, the Orbit Determination Automation System (ODAS) was designed, developed, and implemented as a prototype system to automate orbit determination (OD) and orbit quality assurance (QA) functions performed by orbit operations. Based on a machine-resident generic schedule and predetermined mission-dependent QA criteria, ODAS autonomously activates an interface with the existing trajectory determination system using a batch least-squares differential correction algorithm to perform the basic OD functions. The computational parameters determined during the OD are processed to make computerized decisions regarding QA, and a controlled recovery process is activated when the criteria are not satisfied. The complete cycle is autonomous and continuous. ODAS was extensively tested for performance under conditions resembling actual operational conditions and found to be effective and reliable for extended autonomous OD. Details of the system structure and function are discussed, and test results are presented.

Mardirossian, H.↗

The Challenges of Field Testing the Traffic Management Advisor (TMA) in an Operational Air Traffic Control Facility

The Traffic Management Advisor (TMA), the sequence and schedule tool of the Center/TRACON Automation System (CTAS), was evaluated at the Fort Worth Center (ZFW) in the summer of 1996. This paper describes the challenges encountered during the various phases of the TMA field evaluation, which included system (hardware and software) installation, personnel training, and data collection. Operational procedures were developed and applied to the evaluation process that would ensure air safety. The five weeks of field evaluation imposed minimal impact on the hosting facility and provided valuable engineering and human factors data. The collection of data was very much an opportunistic affair, due to dynamic traffic conditions. One measure of the success of the TMA evaluation is that, rather than remove TMA after the evaluation until it could be fully implemented, the prototype TMA is in continual use at ZFW as the fully operational version is readied for implementation.

Hoang, Ty↗

Improving the Near-Earth Micrometeoroid and Orbital Debris Environment Definition with LADC

The Large Area Debris Collector (LADC) is a 10 m(sup 2) aerogel and acoustic sensor system designed to characterize and collect submillimeter micrometeoroids and orbital debris on the International Space Station (ISS). The project is led by the U.S. Naval Research Laboratory (NRL) with major collaboration by the NASA Orbital Debris Program Office at Johnson Space Center. The U.S. Department of Defense Space Test Program (STP) is responsible for the integration, deployment, and retrieval of the system. The deployment is scheduled for August 2007 with an orbital collection period of one to two years. The combined area time product of LADC will provide a much needed orbital debris population update in the size regime that is important to the safety community - 100 mm and larger. Another key element for LADC is the source identification of the collected samples. Impact features such as track length and track volume can be used to estimate the impact speed and direction of any selected residual embedded in aerogel. Acoustic sensors can provide impact timing and impact location information. The combined dynamical signatures make it possible to reconstruct the orbits of some of the collected samples and lead to their source identification. Compositional analysis on the residuals can also separate debris from meteoroids and provide additional population breakdown for orbital debris (e.g., Al, paint, steel, Al2O3). To maximize the science return and minimize potential contamination from other ISS modules, a careful selection of the location and orientation of LADC on the ISS is needed. Key issues and engineering constraints encountered during mission preparation, and the expected science return based on the mission configuration, are summarized in this paper.

Liou, J.-C.↗

Prediction-based dynamic load-sharing heuristics

The authors present dynamic load-sharing heuristics that use predicted resource requirements of processes to manage workloads in a distributed system. A previously developed statistical pattern-recognition method is employed for resource prediction. While nonprediction-based heuristics depend on a rapidly changing system status, the new heuristics depend on slowly changing program resource usage patterns. Furthermore, prediction-based heuristics can be more effective since they use future requirements rather than just the current system state. Four prediction-based heuristics, two centralized and two distributed, are presented. Using trace driven simulations, they are compared against random scheduling and two effective nonprediction based heuristics. Results show that the prediction-based centralized heuristics achieve up to 30 percent better response times than the nonprediction centralized heuristic, and that the prediction-based distributed heuristics achieve up to 50 percent improvements relative to their nonprediction counterpart.

Goswami, Kumar K.↗

A SIMULINK environment for flight dynamics and control analysis: Application to the DHC-2 Beaver. Part 1: Implementation of a model library in SIMULINK. Part 2: Nonlinear analysis of the Beaver autopilot

The design of advanced Automatic Aircraft Control Systems (AACS's) can be improved upon considerably if the designer can access all models and tools required for control system design and analysis through a graphical user-interface, from within one software environment. This MSc-thesis presents the first step in the development of such an environment, which is currently being done at the Section for Stability and Control of Delft University of Technology, Faculty of Aerospace Engineering. The environment is implemented within the commercially available software package MATLAB/SIMULINK. The report consists of two parts. Part I gives a detailed description of the AACS design environment. The heart of this environment is formed by the SIMULINK implementation of a nonlinear aircraft model in block-diagram format. The model has been worked out for the old laboratory aircraft of the Faculty, the De Havilland DHC-2 'Beaver', but due to its modular structure, it can easily be adapted for other aircraft. Part I also describes MATLAB programs which can be applied for finding steady-state trimmed-flight conditions and for linearization of the aircraft model, and it shows how the built-in simulation routines of SIMULINK have been used for open-loop analysis of the aircraft dynamics. Apart from the implementation of the models and tools, a thorough treatment of the theoretical backgrounds is presented. Part II of this report presents a part of an autopilot design process for the 'Beaver' aircraft, which clearly demonstrates the power and flexibility of the AACS design environment from part I. Evaluations of all longitudinal and lateral control laws by means of nonlinear simulations are treated in detail. The AACS design environment from part I proved to be a very useful tool for designing the control laws of the 'Beaver' autopilot within a very tight time-schedule. The autopilot design process itself will be used as a guideline for future AACS research at the Faculty of Aerospace Engineering. Flight tests of the 'Beaver' autopilot, done after evaluating the control laws in the SIMULINK package, proved to be quite successful. In the future, the AACS design package will evolve into a standardized, integrated design environment which can be applied to virtually any type of aircraft. The AACS design cycle will be shortened further by developing tools for automatically porting control laws from the MATLAB/SIMULINK environment to a piloted real-time flight simulator and the Flight Control Computers of the aircraft.

Flight Control System Design↗

In Situ Water Vapor Measurements Using Coupled UV Fragment Fluorescence/Absorption Spectroscopy in Support of CRYSTAL-FACE

Understanding the coupling of dynamics, chemistry, and radiation within the context of the NASA Earth Science Enterprise (ESE) and the national Climate Change Science Program (CCSP) requires, as a first-order priority, high spatial resolution, high-accuracy observations of water in its various phases. Given the powerful diagnostic importance of the condensed phases of water for dynamics and the impact of phase changes in water on the radiation field, the accurate, in situ observation of water vapor is of central importance to CRYSTAL FACE (CF). This is clear both from the defined scientific objectives of the NRA and from developments in the coupled fields of stratosphere/troposphere exchange, cirrus cloud formation/removal and mechanisms for the distribution of water vapor in the middle/upper troposphere. Accordingly, we were funded under NASA Grant NAG5-11548 to perform the following tasks for the CF mission: 1. Prepare the water vapor instrument for integration into the WB57F and test flights scheduled for Spring 2002. 2. Calibrate and prepare the water vapor instrument for the Summer 2002 CF science flights based in Jacksonville, Florida. 3. Provide both science and engineering support for the above-mentioned efforts. 4. Analyze and interpret the CF data in collaboration with other mission scientists. 5. Attend the science workshop in Spring 2003. 6. Publish the data and analysis in peer-reviewed journals.

Anderson, James G.↗

Ongoing Study of Supersonic Retro-Propulsion Using Structured Overset Grids and OVERFLOW

The interest in supersonic retro-propulsion (SRP) as a means of deceleration during planetary entry increases with the desire to land high mass vehicles on Mars. Since it is difficult to obtain flight data or properly simulate this type of flow field in a wind tunnel, the use of computational fluid dynamics (CFD) becomes increasingly important, as does the need to verify the current CFD methods. This presentation will show results from structured overset grids and OVERFLOW, a Reynolds Averaged Navier-Stokes solver, obtained during the continuing CFD verification process. Flow structure, surface pressure, forces, and moments are compared to historic and modern wind tunnel data as well as to other Navier-Stokes solvers, DPLR and FUN3D. Cases include single and multiple nozzle cases from the Jarvinen and Adams experiment,i the Daso et al experiment, and a recent test in the NASA Langley Unitary Wind Tunnel (scheduled for June 2010).

Schauerhamer, Daniel Guy↗

Steady-state and dynamic evaluation of the electric propulsion system test bed vehicle on a road load simulator

The propulsion system of the Lewis Research Center's electric propulsion system test bed vehicle was tested on the road load simulator under the DOE Electric and Hybrid Vehicle Program. This propulsion system, consisting of a series-wound dc motor controlled by an infinitely variable SCR chopper and an 84-V battery pack, is typical of those used in electric vehicles made in 1976. Steady-state tests were conducted over a wide range of differential output torques and vehicle speeds. Efficiencies of all of the components were determined. Effects of temperature and voltage variations on the motor and the effect of voltage changes on the controller were examined. Energy consumption and energy efficiency for the system were determined over the B and C driving schedules of the SAE J227a test procedure.

Dustin, M. O.↗

Efficient GO2/GH2 Injector Design: A NASA, Industry and University Cooperative Effort

Developing new propulsion components in the face of shrinking budgets presents a significant challenge. The technical, schedule and funding issues common to any design/development program are complicated by the ramifications of the continuing decrease in funding for the aerospace industry. As a result, new working arrangements are evolving in the rocket industry. This paper documents a successful NASA, industry, and university cooperative effort to design efficient high performance GO2/GH2 rocket injector elements in the current budget environment. The NASA Reusable Launch Vehicle (RLV) Program initially consisted of three vehicle/engine concepts targeted at achieving single stage to orbit. One of the Rocketdyne propulsion concepts, the RS 2100 engine, used a full-flow staged-combustion cycle. Therefore, the RS 2100 main injector would combust GO2/GH 2 propellants. Early in the design phase, but after budget levels and contractual arrangements had been set the limitations of the current gas/gas injector database were identified. Most of the relevant information was at least twenty years old. Designing high performance injectors to meet the RS 2100 requirements would require the database to be updated and significantly enhanced. However, there was no funding available to address the need for more data. NASA proposed a teaming arrangement to acquire the updated information without additional funds from the RLV Program. A determination of the types and amounts of data needed was made along with test facilities with capabilities to meet the data requirements, budget constraints, and schedule. After several iterations a program was finalized and a team established to satisfy the program goals. The Gas/Gas Injector Technology (GGIT) Program had the overall goal of increasing the ability of the rocket engine community to design efficient high-performance, durable gas/gas injectors relevant to RLV requirements. First, the program would provide Rocketdyne with data on preliminary gas/gas injector designs which would enable discrimination among candidate injector designs. Secondly, the program would enhance the national gas/gas database by obtaining high-quality data that increases the understanding of gas/gas injector physics and is suitable for computational fluid dynamics (CFD) code validation. The third program objective was to validate CFD codes for future gas/gas injector design in the RLV program.

Tucker, P. K.↗

Cassini Radio Science Experiments on Saturn and Titan Preserved Because of Lewis Analysis

The Cassini mission to Saturn is an international venture with participation from NASA, the European Space Agency, and the Italian Space Agency. The Cassini spacecraft was launched from Cape Canaveral in October 1997 and is scheduled to arrive at Saturn in July 2004. After arrival, the spacecraft will orbit Saturn about 60 times over a period of 4 years. During this time, the Cassini Radio Science Subsystem will be used to investigate the atmosphere and rings of Saturn and the atmosphere of its largest moon, Titan--which is larger than Mercury and is the only moon in our solar system with a dense atmosphere. A critical component in Cassini s Radio Science Subsystem is a traveling-wave tube (TWT) that was designed at the NASA Lewis Research Center and built by Hughes Electronic Dynamics Division (ref. 1). This TWT will amplify downlink microwave signals at a frequency of 32 GHz for the Deep Space Network and will be involved in a number of experiments. These include occultation experiments in which the microwave signal will be beamed through rings and atmospheres toward Earth. Researchers will analyze the received signals to determine the sizes and distributions of the particles in the rings and the structure and composition of the atmospheres. The Radio Science Subsystem also will also be used to more accurately determine the mass and size of Saturn and its moons, to investigate the solar corona, and to search for gravity waves from outside the solar system.

Wilson, Jeffrey D.↗

The new 34-meter antenna

The new 34-m high efficiency Azimuth - Elevation antenna configuration, including its features, dynamic characteristics and performance at 8.4-GHz frequencies is described. The current-technology features of this antenna produce a highly reliable configuration by incorporation of a main wheel and track azimuth support, central pintle pivot bearing, close tolerance surface panels and all-welded construction. Also described are basic drive controls that, as slaved to three automatic microprocessors, provide accurate and safe control of the antenna's steering tasks. At this time antenna installations are completed at Goldstone and Canberra and have operationally supported the Voyager - Uranus encounter. A third installation is being constructed currently in Madrid and is scheduled for completion in late 1986.

Pompa, M. F.↗

Improving Project Management with Simulation and Completion Distribution Functions

Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

Cates, Grant R.↗

A multi-item maintenance center inventory model for low-demand reparable items

In many military and commercial contexts, complex equipment undergoes scheduled maintenance overhauls at regular intervals during which all failed components are replaced. Failure to have replacements on hand for all failed parts requires emergency measures at premium cost. When reparable parts are highly reliable and expensive, both holding and shortage costs are high. This model determines the reparable parts inventory for a maintenance center under three alternative criteria: (1) maximizing job-completion rate subject to constraint on total holding costs, (2) minimizing total holding costs plus expected job noncompletion costs, and (3) minimizing total holding costs subject to a required minimum job-completion rate. Exact solutions may be obtained using dynamic programming. Approximate solutions, found easily by marginal analysis, have readily computed bounds on possible error. The solution methods for the three formulations are illustrated in a simple example.

Schaefer, M. K.↗

Update of S-NPP VIIRS Thermal Emissive Bands Radiometric Calibration Stability Monitoring Using the Moon

The Suomi-NPP VIIRS thermal emissive bands (TEB) are radiometrically calibrated on-orbit with reference to an onboard blackbody (BB) regularly operated at approximately 292.5 K. The calibration stability at other temperature ranges can be evaluated based on the observations of remote targets with stable thermal properties, such as the Moon. VIIRS has scheduled viewings of the Moon on a nearly monthly basis at a phase angle of nearly -51 degrees. In this study, the brightness temperatures (BT) of the lunar surface retrieved using the detector gain coefficients calibrated with the BB are trended to monitor the calibration stability of VIIRS TEB. Since the Lunar surface temperatures are spatially non-uniform and vary greatly with the photometric geometry, the BT trending must be based on the same regions of the Moon under the same solar illumination condition. Also, the TEB lunar images are always partially saturated because the highest lunar surface temperatures are beyond the dynamic range of all VIIRS TEB detectors. Therefore, a temporally invariant dynamic mask is designed to clip a fraction of the lunar images corresponding to the regions of the Moon that may saturate the detector at any lunar event. The BT of the remaining hottest pixels are then trended. Results show that, since the launch of VIIRS to mid-2016, the radiometric calibration of all TEB detectors has been stable within 0.4 K at the BT range of as high as 350 K.

Wang, Zhipeng↗

Porting the Core Flight System to the Dellingr Cubesat

Dellingr is a 6U Cubesat developed by NASA Goddard Space Flight Center. It was delivered to the International Space Station in August 2017, and is scheduled to be deployed in November 2017. Compared to a typical NASA satellite, the Dellingr Cubesat had an extremely low budget and short schedule. Although the Dellingr Cubesat has minimal hardware resources, the cFS was ultimately chosen for the flight software. Using the cFS on the Dellingr Cubesat presented a few challenges, but also offered opportunities to help speed up development and verify the ACS flight software. This presentation will cover the lessons learned in porting the cFS to the Dellingr Cubesat, including working with the limited hardware resources, porting the cFS to FreeRTOS, and overcoming limitations related to data storage and file transfer. This presentation will also cover how hardware abstraction was used to run the flight software on multiple platforms and interface with the 42 dynamic simulator.

flight softwar↗

Large-scale Advanced Prop-fan (LAP) high speed wind tunnel test report

High Speed Wind Tunnel testing of the SR-7L Large Scale Advanced Prop-Fan (LAP) is reported. The LAP is a 2.74 meter (9.0 ft) diameter, 8-bladed tractor type rated for 4475 KW (6000 SHP) at 1698 rpm. It was designated and built by Hamilton Standard under contract to the NASA Lewis Research Center. The LAP employs thin swept blades to provide efficient propulsion at flight speeds up to Mach .85. Testing was conducted in the ONERA S1-MA Atmospheric Wind Tunnel in Modane, France. The test objectives were to confirm that the LAP is free from high speed classical flutter, determine the structural and aerodynamic response to angular inflow, measure blade surface pressures (static and dynamic) and evaluate the aerodynamic performance at various blade angles, rotational speeds and Mach numbers. The measured structural and aerodynamic performance of the LAP correlated well with analytical predictions thereby providing confidence in the computer prediction codes used for the design. There were no signs of classical flutter throughout all phases of the test up to and including the 0.84 maximum Mach number achieved. Steady and unsteady blade surface pressures were successfully measured for a wide range of Mach numbers, inflow angles, rotational speeds and blade angles. No barriers were discovered that would prevent proceeding with the PTA (Prop-Fan Test Assessment) Flight Test Program scheduled for early 1987.

Campbell, William A.↗

Numerical simulations of the electrodynamic interactions between the Tethered-Satellite-System and space plasma

The first Tethered-Satellite-System (TSS-1), scheduled for a flight in late 1992, is expected to provide relevant information related to the concept of generating an emf in a 20-km-long (or longer) conducting wire. This paper presents numerical simulations of the electrodynamic interactions between the TSS system and space plasma, using a 2D and 3D models of the system. The 2D case code simulates the motion of a long cylinder past a plasma, which is composed of electrons and H(+) ions. The system is solved by allowing the plasma to flow past the cylinder with an imposed magnetic field. The more complex 3D case is considered to study the dynamics in great detail. Results of 2D simulation show that the interaction of a satellite with plasma flowing perpendicularly to the magnetic field results in an enhancement in the current collection.

Vashi, Bharat I.↗