At least 613 records · Page 34

Switching Device-Cognizant Sequential Distribution System Restoration

This paper presents an optimization framework for sequential reconfiguration using an assortment of switching devices and repair process in distribution system restoration. Compared to existing studies, this paper considers types, capabilities and operational limits of different switching devices, making it applicable in practice. We develop a novel multi-phase method to find the optimal sequential operation of various switching devices and repair faulted areas. We consider circuit breakers, reclosers, sectionalizers, load breaker switches, and fuses. The switching operation problem is decomposed into two mixed-integer linear programming (MILP) subproblems. The first subproblem determines the optimal network topology and estimates the number of steps to reach that topology, while the second subproblem generates a sequence of switching operations to coordinate the switches. For repairing the faults, we design an MILP model that dispatches repair crews to clear faults and replace melted fuses. After clearing a fault, we update the topology of the network by generating a new sequence of switching operations, and the process continues until all faults are cleared. To improve the computational efficiency, a network reduction algorithm is developed to group line sections, such that only switchable sections are present in the reduced network. The proposed method is validated on the IEEE 123-bus and 8500-bus systems.

distribution system↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Transport Electrification Demand and Charging Schedules on Electricity Markets and Nuclear Generators

As the U.S. pursues deep decarbonization targets, electric vehicles (EVs) are likely to become a major driver of demand growth and a major determinant of daily demand patterns. This study analyzes a possible future ERCOT-like electricity grid, and examines the impact of different types of EV charging schedules on grid and market outcomes. This analysis demonstrates the significant impact of EV charging patterns on capacity expansion simulations. Even without EVs, the overall daily demand profile in a market can have significant impacts on prices and grid stability in that system, especially if non-dispatchable renewable generators (e.g. wind and solar) make up a significant fraction of the generation mix. EV demand will not necessarily follow this preexisting demand profile, so its daily trends may significantly change what generation portfolio would optimally serve the system. Furthermore, the effects of EV demand can alter the profitability of different types of units, by altering the frequency of market events like extreme-demand hours or zero-price hours. These effects are explored in this study. The EV demand levels were derived from MARKAL simulations of the West-South-Central North American Electric Reliability Corporation (NERC) region for the year 2050, using a carbon tax of $100/ton. The baseline MARKAL simulation forecasted that 23% of the region’s annual electricity demand in 2050 would be attributable to EVs, and broke out demand projections for EV and non-EV end-use in that year. To model lower EV penetration into the system, an additional case was explored which assumed that EVs only achieved 75% of the demand level projected by MARKAL.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-operator Production Cost Modeling

As contiguous power systems are often operated by several regional system operators, optimization models have traditionally been designed to generate optimal system-wide scheduling decisions. This report introduces an approach to reflect the existence of multiple system operators making scheduling decisions within an interconnected power system. The approach is explicitly designed to reflect each operator's limited knowledge about other regions when making scheduling decisions. Detailed analysis using a modified IEEE Reliability Test System reveals that the approach mimics real system operations by providing imperfect information to each operator about external operations and external constraints. The approach scales to a 78,000-bus model of the Eastern Interconnection, where a regression analysis provides quantitative insight into which constraints cause inefficiencies when improperly managed in a multi-operator simulation. Because the approach generates distinct regional scheduling problems, unit commitment and economic dispatch simulations can be applied to individual regions and solved in parallel, enabling production cost simulations at a previously intractable scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Convex Q-Learning in Continuous Time with Application to Dispatch of Distributed Energy Resources

Convex Q-learning is a recent approach to reinforcement learning, motivated by the possibility of a firmer theory for convergence, and the possibility of making use of greater a priori knowledge regarding policy or value function structure. This paper explores algorithm design in the continuous time domain, with a finite-horizon optimal control objective. The main contributions are (i) The new Q-ODE: a model-free characterization of the Hamilton-Jacobi-Bellman equation. (ii) A formulation of Convex Q-learning that avoids approximations appearing in prior work. The Bellman error used in the algorithm is defined by filtered measurements, which is necessary in the presence of measurement noise. (iii) Convex Q-learning with linear function approximation is a convex program. It is shown that the constraint region is bounded, subject to an exploration condition on the training input. (iv) The theory is illustrated in application to resource allocation for distributed energy resources, for which the theory is ideally suited.

Lu, Fan↗

Scale and Regionality of Nonelectric Markets for U.S. Nuclear Light Water Reactors

This study assesses existing and potential industries that could conceivably be directly coupled to existing nuclear reactors. The goal is to identify the scale, location, and accessibility of the candidate industrial-product markets, as well as process feedstocks that are available near the plants to establish new industries. For example, CO 2 as a feedstock can be combined with H 2 to produce formic acid (FA), transportation fuels, and lubricants. These new plants can be entirely supported with the heat and electricity provided by a nearby NPP. The potential demand for nonelectric industrial products was assessed by documenting current and possible growth of nonelectricity product markets considered. This assessment used DOE- and industry-supported tools, data, and projections to capture regional industrial market opportunities. Electricity-capacity markets that reward large and reliable generators, such as NPPs, were considered because the electricity market will likely continue to be an important revenue source to NPPs. The key is to balance the needs of energy customers so as to optimize revenue for the affiliated energy customers or partners. In most cases, flexible plant energy delivery and power generation for the grid will require either energy storage or a stock of intermediate products to sustain the industrial customers when the NPP dispatches electricity to the grid. A diverse mix of temperate regions with operating NPPs around the U.S.—representing a variety of operating markets, local generation mix, and seasonal climates—were chosen for this market study. Both current and future market opportunities for candidate industrial-product markets surrounding these NPPs were studied. Figure 2 illustrates the regions chosen for this study. The success of developing nonelectric industrial-product markets as alternative revenue-generating sources for LWRs depends, not only on demand from growing existing markets, such as petroleum refining and NH 3 production, but also on the development of new markets such as light-duty (LD) and heavy-duty (HD) hydrogen FCEVs, synfuels, chemical production, biofuels, metal refining, injection of hydrogen into NG pipelines for gas power-generating units, FA, polymers, and close-coupled industrial heat applications, all of which can significantly increase demand relative to current levels while decarbonizing energy sectors. This study also presents a sample analysis of the economics of hydrogen production in an area of Minnesota, considering the capital and operating costs of a hydrogen plant as well as the local market demand for hydrogen. It includes some assumptions on electricity-grid pricing, showing how hydrogen could be integrated with an NPP and be competitive with the incumbent hydrogen-production process, steam methane reforming (SMR). The objectives of this study include: Provide U.S. NPP operators a robust sampling of the market demand location, scale, and accessibility (including storage and transportation) of the wide variety of industrial-product choices that can be produced using nuclear thermal energy and electricity proximate to a subset of U.S. NPPs to inform the industry of the potential opportunity; show examples and trade-off analyses of how U.S. LWR operators can access these markets, including storage and transportation of industrial products to their intended markets; and present a general analysis example for one industrial product (hydrogen) in one region (Minnesota area), including production, storage, and transportation, to show how nuclear-hybrid integrated energy systems (IESs) could access local markets and improve the profitability of an NPP.

03 NATURAL GAS↗

Proactive Operations and Investment Planning via Stochastic Optimization to Enhance Power Systems Extreme Weather Resilience

We present novel stochastic optimization models to improve power systems resilience to extreme weather events. We consider proactive redispatch, transmission line hardening, and transmission line capacity increases as alternatives for mitigating expected load shed due to extreme weather. Our model is based on linearized or "DC" optimal power flow, similar to models in widespread use by independent system operators (ISOs) and regional transmission operators (RTOs). Our computational experiments indicate that proactive redispatch alone can reduce the expected load shed by as much as 25% relative to standard economic dispatch. This resiliency enhancement strategy requires no capital investments and is implementable by ISOs and RTOs solely through operational adjustments. We additionally demonstrate that transmission line hardening and increases in transmission capacity can, in limited quantities, be effective strategies to further enhance power grid resiliency, although at significant capital investment cost. We perform a cross validation analysis to demonstrate the robustness of proposed recommendations. Our proposed model can be augmented to incorporate a variety of other operational and investment resilience strategies, or combination of such strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Constraint Screening for Production Cost Modeling at Scale

Transmission constraint calculation and screening, for both unit commitment and economic dispatch, is a critical feature of a performant solution method, but one that is often overlooked in the literature. In this talk, we will discuss the transmission constraint calculation and screening algorithm implemented in the open-source Egret package for electrical grid optimization and compare it against the more straightforward approach Egret originally implemented. Finally, we discuss the implications for transmission constraint sharing within a production cost modeling simulation.

DCOPF↗

Capacity Optimization of a Centralized Charging Station in Joint Operation with a Wind Farm

In the context of large-scale wind power integration and rapid development of electric vehicles (EVs), a joint operation pattern was proposed to use a centralized charging station (CCS) to address high uncertainties incurred by wind power integration. Additionally, this would directly remove the significant indeterminacy of wind power. Because the CCS is adjacent to a wind power gathering station, it could work jointly with wind farms to operate in power system as an independent enterprise. By combining the actual operational characteristics of the wind farm and the CCS, a multidimensional operating index evaluation system was created for the joint system. Based on the wind farm’s known capacity, a multi-target capacity planning model was established for CCS to maximize the probability of realizing diverse indices of the system based on dependent-chance goal programming. In this model, planning and dispatching are combined to improve the feasibility of results in the operational stage. This approach takes the effects of randomness into account for wind power and battery swapping. The model was solved through combining Monte Carlo simulation and a genetic algorithm (GA) based on segmented encoding. Finally, as shown in the simulation results, the proposed model could comprehensively include factors such as initial investment, wind power price, battery life, etc., to optimize CCS capacity and to ultimately improve the operating indices of the joint system.

17 WIND ENERGY↗

Evaluating grid stress and reliability in future electricity grids across a range of demand, generation mix, and weather trends

The reliability of power grids in the future will depend on how system planners account for the integration of new technologies, extreme weather events, and uncertainties in demand growth from increased electrification and data centers. This study introduces an open-source, multisectoral, multiscale modeling framework that projects grid stress and reliability trends between 2020 and 2055 in the Western Interconnection of the United States. The framework integrates global to national energy-water-land dynamics with power plant siting and hourly grid operations modeling. We analyze future wholesale electricity price shocks and unserved energy events across eight scenarios spanning a range of population growth and economic change, generation mixes, and weather conditions. Our results show future grids with high percentage of non-renewable generation and strong economic growth are characterized by higher reliability and lower wholesale electricity prices than lower growth scenarios because of larger reliance on dispatchable generators and lower fossil fuel extraction costs. Scenarios with high percentage of renewable resources have lower median but more volatile wholesale electricity prices as well as more frequent and severe unserved energy events compared to scenarios relying more on dispatchable generators. These events occur because higher proportion of solar and wind energy causes net demand curves to deepen during midday (duck curves get progressively severe), exacerbating the challenge of meeting demand during summer evening peaks. This study suggests that robust and co-optimized transmission and energy storage planning could help maintain low wholesale electricity prices and high reliability levels in future electricity grids across uncertainties in generation mixes.

Electric grid reliability↗

REopt Lite User Manual

REopt Lite evaluates the economic viability of grid-connected solar photovoltaics, wind, combined heat and power, and electric and thermal storage at commercial and small industrial sites. It allows building owners to identify the system sizes and dispatch strategies that minimize the site’s life cycle cost of energy. REopt Lite also estimates the amount of time on-site generation and storage can sustain the site's critical load during a grid outage and allows the user the choice of optimizing for energy resilience. It is primarily used to inform project development decisions and to support research on the factors that drive project feasibility for market development and policy analysis. It is available through a web interface, application programing interface, and open-source code. This user manual provides an overview of the model, including its capabilities and typical applications; inputs and outputs; economic calculations; technology descriptions; and model parameters, variables, and equations. The model is highly flexible and is continually evolving to meet the needs of each analysis. Therefore, this report is not an exhaustive description of all capabilities, but rather a summary of the core components of the model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Augmented lagrange hopfield network for economic dispatch with multiple fuel options

This paper proposes an augmented Lagrange Hopfield network (ALHN) for solving economic dispatch (ED) problem with multiple fuel options. The proposed ALHN method is a continuous Hopfield neural network with its energy function based on augmented Lagrangian function. The advantages of ALHN over the conventional Hopfield neural network are easier use, more general applications, faster convergence, better optimal solution, and larger scale of problem implementation. The method solves the problem by directly searching the most suitable fuel among the available fuels of each unit and finding the optimal solution for the problem based on minimization of the energy function of the continuous Hopfield neural network. The proposed method is tested on systems up to 100 units and the obtained results are compared to those from other methods in the literature. The results have shown that the proposed method is efficient for solving the ED problem with multiple fuel options and favorable for implementation in large scale problems.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

REopt® web tool FKA: REopt Lite® [SWR-19-21]

The REopt® web tool (formerly known as REopt Lite®) evaluates the economic viability of grid-connected solar photovoltaics (PV), wind and battery storage at a commercial site. It allows building owners to identify the system sizes and dispatch strategy that minimize the site's life cycle cost of energy. REopt Lite® also estimates the amount of time a PV and/or wind and battery system can sustain the site's critical load during a grid outage and allows the user the choice of optimizing for energy resilience. The REopt® web tool may be found here: https://reopt.nrel.gov/tool/.

Anderson, Kate↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Intelligent load pattern modeling and denoising using improved variational mode decomposition for various calendar periods

This paper proposes a novel approach to identify the load patterns considering calendar impact and denoising process, which advances the state of art of load identification and load forecasting to a more flexible and adaptive extent by revealing the correlation between load profile and the substantial influence factors. With the rapid development and the promising application of energy intemet and grid modernization, the accurate load modeling and forecasting especially by load pattern modeling (LPM) have become more and more critical to observe and estimate load profile so as to optimize the operation efficiency of the power grid. Traditional methods mostly focus on the static LPM itself which are unable to account the non-linear and highly dynamic load fluctuations in order to balance the demand of the power grid during various calendar period (VCP) scheduling. In this paper, a load pattern modeling method for power grid considering the impact of typical calendar effects is proposed using a combination of improved variational mode decomposition (IVMD) and deep belief network (DBN) algorithm. Firstly, an index of load curve curvature (LCC) is proposed to improve the selection of value K in the conventional VMD algorithm. The value K of the intrinsic modality is determined by adopting LCC to better quantify the average instantaneous frequency of the modal decomposition of the VMD and to reduce the elevated stochasticity of k. Secondly, an optimization formulation is developed based on adaptive segmented loop decomposition of the typical correlation coefficient to suppress the edge effect in VMD decomposition, which would enable the reconstructed curve to incorporate the variabilities from the initial data. Finally, the IVMD and DBN algorithms are jointly implemented to optimize the accuracy of VCP load pattern modeling curve regression. Numerical examples have been performed with the results proving that the proposed method significantly outperforms the state-of-art in reducing the modeling error of VCP load curve, improving the overall forecasting accuracy, and reducing load dispatching cost.

deep belief network↗

Security-Constrained Unit Commitment with Linearized AC Optimal Power Flow.

We propose a mathematical programming-based approach to optimize the security-constrained unit commitment problem with a full AC transmission network representation. Our approach is based on our previously introduced successive linear programming (SLP) approach to solving the non-linear, nonconvex AC optimal power flow (ACOPF) problem. By linearizing the ACOPF, we are able to leverage powerful commercial mixed-integer solvers to iteratively optimize the combined unit commitment plus ACOPF model. We demonstrate our approach on six-bus, IEEE RTS-96, and IEEE 118-bus test systems. We perform a comparative analysis of the relative impacts of singlebus, DC, and AC transmission network models on the unit commitment and dispatch solutions and their associated costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Market-Clearing and Pricing Considering Coordination of DSOs and ISO: An EPEC Approach

Distribution-level electricity market provides a platform for trading energy and grid services from large-amount of small-scale distributed energy resources (DERs) located on distribution grids. The behavior of the DERs in the distribution electricity market may ultimately impact the market-clearing and locational marginal prices (LMPs) in the wholesale market. This paper proposes a bi-level optimization model for distribution market clearing and distribution locational marginal pricing (DLMP) considering the interactions between distribution and transmission wholesale markets. In the proposed model, the upper-level model represents the distribution system operator (DSO) market-clearing and the lower-level model represents the wholesale market-clearing by the independent system operator (ISO). The LMP at the substation will impact the DER dispatch and power demands of the DSO as well as the DLMP. In turn, the power demands of the DSO will further impact the ISO market and its LMPs. The equilibrium problem with equilibrium constraints (EPEC) approach is applied to find the equilibria of multiple DSOs and the ISO. The EPEC problem is transformed into a single-level mixed-integer convex problem in order to allow for efficient solving. Finally, the effectiveness of the proposed model and solution method are demonstrated through case studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Intra-Hour Dispatch and Automatic Generator Control Demonstration with Solar Forecasting - Final Report

In this project we address multiple resource integration challenges associated with increasing levels of solar penetration that arise from the variability and uncertainty in solar irradiance. We will model the SMUD service region as its own balancing region, and develop an integrated, real-time operational tool that takes solar-load forecast uncertainties into consideration and commits optimal energy resources and reserves for intra-hour and intra-day decisions. The primary objectives of this effort are to reduce power system operation cost by committing appropriate amount of energy resources and reserves, as well as to provide operators a prediction of the generation fleet’s behavior in real time for realistic PV penetration scenarios. The proposed methodology includes the following steps: clustering analysis on the expected solar variability per region for the SMUD system, Day-ahead (DA) and real-time (RT) load forecasts for the entire service areas, 1-year of intra-hour CPR forecasts for cluster centers, 1-year of smart re-forecasting CPR forecasts in real-time for determination of irreducible errors, and uncertainty quantification for integrated solar-load for both distributed and central stations (selected locations within service region) PV generation.

14 SOLAR ENERGY↗