Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployable payload mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.

Sauerwein, Timothy A.↗

Design study of an integrated aerobraking orbital transfer vehicle

An aerobraking orbital transfer vehicle (AOTV) concept, which has an aerobrake structure that is integrated with the propulsion stage, is discussed. The concept vehicle is to be assembled in space and is space-based. The advantages of aeroassist over an all propulsive vehicle are discussed and it is shown that the vehicle considered is very competitive with inflatable and deployable concepts from mass and performance aspects. The aerobrake geometry is an ellipsoidally blunted, raked-off, elliptical wide-angle cone with a toroidal skirt. Propellant tanks, engines, and subsystems are integrated into a closed, isogrid aerobrake structure which provides rigidity. The vehicle has two side-firing, gimbaled RL-10 type engines and carries 38,000 kg of useable propellant. The trajectory during aerobraking is determined from an adaptive guidance logic, and the heating is determined from engineering correlations as well as 3-D Navier-Stokes solutions. The AOTV is capable of placing 13,500 kg payload into geosynchronous Earth orbit (GEO) or carrying a LEO-GEO-LEO round-trip payload of 7100 kg. A two-stage version considered for lunar missions results in a lunar surface delivery capability of 18,000 kg or a round-trip capability of 6800 kg with 3860 kg delivery-only capability.

Scott, C. D.↗

From the Rocket Equation to Maxwell's Equations: Electrodynamic Tether Propulsion Nears Space Test

The US space program is facing a growing challenge to its decades-long, global leadership position, as current launch costs consume valuable resources and limit achievements in science, exploration, and commercial development. More than 40% of projected launches over the next 10 years have payloads with intended destinations beyond low-Earth orbit. Therefore, more cost-effective upper stages and on-board propulsion systems are critical elements in reducing total space transportation costs. A new type of space propulsion, using electrodynamic tethers, may be capable of performing multiple sequential missions without resupply and have a potential usable lifetime of several years. They may provide an in-space infrastructure that has a very low life cycle cost and greatly enhanced mission flexibility, thus supporting the goal of reducing the cost of access to space. Electrodynamic tether thrusters work by virtue of the force the Earth's magnetic field exerts on a wire carrying an electrical current. The effect is the basis for electric motors and generators. The Propulsive Small Expendable Deployer System (ProSEDS) experiment, planned for launch in the summer of 2000, will demonstrate the use electrodynamic tether thrust by lowering the altitude of a Delta-H rocket's upper stage on which it will be flying. Applications of the technology include a passive deorbit system for spacecraft at their end-of-life, reusable Orbit Transfer Vehicles, propellantless reboost of the International Space Station, and propulsion and power generation for future missions to Jupiter.

Johnson, Les↗

Multiplying Mars Lander Opportunities with Marsdrop Microlanders

From canyons to glaciers, from geology to astrobiology, the amount of exciting surface science awaiting us at Mars greatly outstrips available mission opportunities. Based on the thrice -flown Aerospace Corporation Earth Reentry Breakup Recorder (REBR), we present a method for accurate landing of small instrument payloads on Mars, utilizing excess cruise -stage mass on larger missions. One to a few such microlanders might add 1-5% to the cost of a primary mission with inconsequential risk. Using the REBR and JPL Deep Space 2 starting points for a passively stable entry vehicle provides a low mass and low ballistic coefficient, enabling subsonic d employment of a steerable parawing glider, capable of 10+ km of guided flight at a 3:1 glide ratio. Originally developed for the Gemini human space program, the parawing is attractive for a volume -limited microprobe, minimizing descent velocity, and providing sufficient remaining volume for a useful scientific payload. The ability to steer the parawing during descent opens unique opportunities, including terrain- relative navigation for landing within tens of meters of one of several specified targets within a given uncertainty ellipse. In addition to scientific value, some Mars human exploration Strategic Knowledge Gaps could be addressed with deployment of focused instruments at multiple locations.

Staehle, Robert L.↗

Thermal Control System of the ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS)

The ECOSystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS) is a thermal infrared imaging multispectral scanner science mission. ECOSTRESS is designed and built by the NASA Jet Propulsion Laboratory and will be deployed on the International Space Station (ISS). ECOSTRESS will measure the water loss from growing leaves and the evaporation from the soil by measuring the temperature of plants and will gather data on the health of the agriculture system on Earth. The ISS orbit will allow ECOSTRESS to take observations at different times during each day over the seasons to provide coverage over the contiguous United States. The ECOSTRESS Thermal Control System (TCS) consists of a combination of active and passive components to maintain the ECOSTRESS components within the allowable flight temperature (AFT) limits. The active thermal control systems include mechanical cryocoolers, heaters and a single-phase pumped fluid loop for Instrument and Payload. The focal plane detector is cooled to 65K by a pair of mechanical cryocoolers and a third mechanical cryocooler cools an intermediate cold shield to 130K. The pumped fluid loop transfers the instrument waste heat to JAXA’s Japanese Exposed Module External Facility (JEM-EF) provided external fluid loop before rejection to space from the ISS radiators. The passive TCS includes multi-layer and single layer insulations, flexible thermal links and coatings on the radiometer. This paper describes the ECOSTRESS instrument TCS architecture, instrument thermal requirements and key design drivers, the top level thermal design and analysis approach, and reports preliminary test results.

Carroll, Brian↗

Lunar Flashlight: Mapping Lunar Surface Volatiles Using a Cubesat

Water ice and other volatiles may be located in the Moon's polar regions, with sufficient quantities for in situ extraction and utilization by future human and robotic missions. Evidence from orbiting spacecraft and the LCROSS impactor suggests the presence of surface and/or nearsurface volatiles, including water ice. These deposits are of interest to human exploration to understand their potential for use by astronauts. Understanding the composition, quantity, distribution, and form of water/H species and other volatiles associated with lunar cold traps is identified as a NASA Strategic Knowledge Gap (SKG) for Human Exploration. These polar volatile deposits could also reveal important information about the delivery of water to the Earth- Moon system, so are of scientific interest. The scientific exploration of the lunar polar regions was one of the key recommendations of the Planetary Science Decadal Survey. In order to address NASA's SKGs, the Advanced Exploration Systems (AES) program selected three lowcost 6-U CubeSat missions for launch as secondary payloads on the first test flight (EM1) of the Space Launch System (SLS) scheduled for 2017. The Lunar Flashlight mission was selected as one of these missions, specifically to address the SKG associated with lunar volatiles. Development of the Lunar Flashlight CubeSat concept leverages JPL's Interplanetary Nano- Spacecraft Pathfinder In Relevant Environment (INSPIRE) mission, MSFC's intimate knowledge of the Space Launch System and EM-1 mission, small business development of solar sail and electric propulsion hardware, and JPL experience with specialized miniature sensors. The goal of Lunar Flashlight is to determine the presence or absence of exposed water ice and its physical state, and map its concentration at the kilometer scale within the permanently shadowed regions of the lunar south pole. After being ejected in cislunar space by SLS, Lunar Flashlight deploys its solar panels and solar sail and maneuvers into a low-energy transfer to lunar orbit. The solar sail and attitude control system work to bring the satellite into an elliptical polar orbit spiraling down to a perilune of 30-10 km above the south pole for data collection. Lunar Flashlight uses its solar sail to shine reflected sunlight into permanently shadowed regions, measuring surface albedo with a four-filter point spectrometer at 1.1, 1.5 1.9, and 2.0 microns. Water ice will be distinguished from dry regolith from these measurements in two ways: 1) spatial variations in absolute reflectance (water ice is much brighter in the continuum channels), and 2) reflectance ratios between absorption and continuum channels. Derived reflectance and reflectance ratios will be mapped onto the lunar surface in order to distinguish the composition of the PSRs from that of the sunlit terrain. Lunar Flashlight enables a low-cost path to in-situ resource utilization (ISRU) by identifying operationally useful deposits (if there are any), which is a game-changing capability for expanded human exploration.

Cohen, B. A.↗

International Space Station Columbus Payload SoLACES Degradation Assessment

SOLAR is a European Space Agency (ESA) payload deployed on the International Space Station (ISS) and located on the Columbus Laboratory. It is located on the Columbus External Payload Facility in a zenith location. The objective of the SOLAR payload is to study the Sun. The SOLAR payload consists of three instruments that allow for measurement of virtually the entire electromagnetic spectrum (17 nm to 100 um). The three payload instruments are SOVIM (SOlar Variable and Irradiance Monitor), SOLSPEC (SOLar SPECctral Irradiance measurements), and SolACES (SOLar Auto‐Calibrating Extreme UV/UV Spectrophotometers). The SolACES payload includes a set of 4 spectrometers that measure the solar EUV flux from 17 nm to 220 nm. One of these 4 spectrometers failed early on (before deployment). EUV data is important in understanding the solar dynamo. Also, EUV flux is the source of most of the ionization that produces the ionosphere plasma. Plasma production is important in understanding the ionosphere environment. The ionosphere conditions affect many subjects including spacecraft charging, dynamo processes, instabilities, and communications. The 3 remaining spectrometers have collected valuable data during the historically low solar cycle 24. Some of this data will be presented. A significant trend in degradation of the remaining SolACES spectrometers was observed towards the end of CY2010 (GMT 310) through mid CY 2011 (GMT 132). The Principle Investigators of SolACES initiated a Mission Evaluation Room (MER) Chit to request an investigation of the degradation in CY 2011 (GMT 230). The Boeing Space Environments team was asked to respond to the ESA initiated MER Chit request to investigate the cause of the degradation. This paper will discuss the findings of that investigation.

Harman, William↗

Near-nucleus trajectory design for Comet Penetrator-Lander data relay

A Comet Penetrator-Lander is included in the payload of the Comet Rendezvous Asteroid Flyby spacecraft; it will be deployed from an orbit about the comet nucleus and will implant itself in the nucleus at a pre-selected site. Throughout the following 9 days, the orbiting spacecraft must be in position to receive transmissions from the Penetrator-Lander at specified intervals. Using conic orbits and a simplified model of the nucleus, several types of trajectories have been identified which will allow the data relay requirements to be met. These are sensitive to the mass and rotational properties of the comet nucleus and to the latitude of the Penetrator-Lander impact site; no single orbital strategy can cover the entire range of possibilities. Frequent spacecraft maneuvers would provide more flexibility, but would result in a much more complicated mission scenario. More accurate modeling of the comet nucleus and the orbiter trajectories will refine the relay orbit options presented here.

Stetson, Douglas↗

STS-48 Space Shuttle mission report

The STS-48 Space Shuttle Program Mission Report is a summary of the vehicle subsystem operations during the forty-third flight of the Space Shuttle Program and the thirteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Discovery vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-42 (LUT-35); three Space Shuttle main engines (SSME's) (serial numbers 2019, 2031, and 2107 in positions 1, 2, and 3, respectively); and two Solid Rocket Boosters (SRB's) designated as BI-046. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each one of the SRB's were designated as 360L018A for the left SRB and 360L018B for the right SRB. The primary objective of the flight was to successfully deploy the Upper Atmospheric Research Satellite (UARS) payload.

Fricke, Robert W.↗

NASA's Space Launch System: Deep Space Access for CubeSats

NASA is embarking on a new generation of missions to the Moon, known as the Artemis program. The Agency’s new super heavy-lift launch vehicle, the Space Launch System (SLS), is a critical enabling capability for these efforts, which will serve as a proving ground for future crewed expeditions to Mars. SLS is designed to return astronauts to the Moon in the Orion spacecraft and to launch more mass and provide more volume for critical payloads than commercially available vehicles, giving NASA a unique asset for deep space exploration. When performance margin and volume is available, as it is on the first flight, Artemis I (previously Exploration Mission-1), SLS can offer CubeSats access to deep space, beyond Earth’s orbit. The Artemis I flight has 13 6U (14 kg) CubeSats manifested, and the Program is currently accepting proposals for 6U and 12U payloads for the Artemis II flight through the agency’s CubeSat Launch Initiative (CSLI) program. Proposals from U.S.-based payload developers to fly on Artemis II will be accepted through CSLI until November 4, 2019. When ridesharing on SLS deep space missions, CubeSats must demonstrate they will not interfere with primary mission objectives. The 13 Artemis I CubeSats that hail from industry, academia, NASA and its international partners represent an array of exciting deep space science investigations and technology demonstrations that may help inform future Artemis missions. The initial SLS Block 1 vehicle for the Artemis I flight is fully manufactured; several elements are complete and have been delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center (KSC), which has responsibility for integrating and launching the SLS and Orion stack. Completed elements of the Artemis I vehicle include the Orion Stage Adapter (OSA), which houses the 13 Artemis I CubeSats. With the Artemis I flight hardware and software nearing completion, work is in progress for the second Block 1 launcher, designated for the crewed Artemis II flight. Hardware is being manufactured for every element of the Artemis II vehicle. In this paper, the author will review the status of the Artemis I vehicle and the payloads manifested for the initial flight. Information on the Secondary Payload Deployment System (SPDS) that the SLS Program provides to payload developers will also be included.

Creech, Stephen D.↗

Development of Mini-Landers for Very Small Lunar Surface Payloads

Over the last 5 years, NASA has invested in development and risk-reduction activities for a new generation of planetary landers capable of carrying instruments and technology demonstrations to the lunar surface and other airless bodies. The Robotic Lunar Lander Development Project (RLLDP) is jointly implemented by NASA Marshall Space Flight Center (MSFC) and the Johns Hopkins University Applied Physics Laboratory (APL). The RLLDP team has produced mission architecture designs for multiple airless body missions to meet both science and human precursor mission needs. The mission architecture concept studies encompass small, medium, and large landers, with payloads from a few kilograms to over 1000 kg, to the Moon and other airless bodies. The payload and concept of operations for the U.S. contribution to the ILN was guided by an independent Science Definition Team, which required each node to operate for 6 years continuously, including through lunar eclipse periods, and to carry a seismometer, heatflow probe, retroreflector, and electromagnetic sounding instrument. Some configuration trades using penetrators, hard landers, and soft landers are discussed in [1, 2]; the preferred concept became soft-landing propulsive landers discussed in [3]. The landers were sized primairly according to their power systems: an ASRG lander configuration is estimated at 155 kg dry mass, which includes a payload suite estimated at 23 kg including payload accommodation and deployment; a solar array-battery (SAB) lander configuration is somewhat larger at 265 kg of dry mass including a 19 kg payload suite with payload accommodation

Cohen, B. A.↗

Goodard Space Flight Center/Wallops Flight Facility airborne geoscience support capability

Goddard Space Flight Center's Wallops Facility (GSFC/WFF), operates six aircraft which are used as airborne geoscience platforms. The aircraft complement consists of two UH-1B helicopters, one twin engine Skyvan, one twin jet T-39, and two four engine turboprop aircraft (P-3 and Electra) offering the research community a wide range of payload, altitude, speed, and range capabilities. WFF's support to a principal investigator include mission planning of all supporting elements, installation of equipment on the aircraft, fabrication of brackets, and adapters as required to adapt payloads to the aircraft, and planning of mission profiles to meet science objectives. The flight regime includes local, regional, and global missions. The WFF aircraft serve scientists at GSFC, other NASA centers, other government agencies, and universities. The WFF mode of operation features the walk on method of conducting research projects. The principal investigator requests aircraft support by letter to WFF and after approval is granted, works with the assigned mission manager to plan all phases of project support. The instrumentation is installed in WFF electronics racks, mounted on the aircraft, the missions are flown, and the equipment is removed when the scientific objectives are met. The principal investigator reimburses WFF for each flight hours, any overtime and travel expenses generated by the project, and for other mission-related expenses such as aircraft support services required at deployment bases.

Navarro, Roger L.↗

Mars Environmental Survey (MESUR): Science objectives and mission description

In-situ observations and measurements of Mars are objectives of a feasibility study beginning at the Ames Research Center for a mission called the Mars Environmental SURvey (MESUR). The purpose of the MESUR mission is to emplace a pole-to-pole global distribution of landers on the Martian surface to make both short- and long-term observations of the atmosphere and surface. The basic concept is to deploy probes which would directly enter the Mars atmosphere, provide measurements of the upper atmospheric structure, image the local terrain before landing, and survive landing to perform meteorology, seismology, surface imaging, and soil chemistry measurements. MESUR is intended to be a relatively low-cost mission to advance both Mars science and human presence objectives. Mission philosophy is to: (1) 'grow' a network over a period of years using a series of launch opportunities, thereby minimizing the peak annual costs; (2) develop a level-of-effort which is flexible and responsive to a broad set of objectives; (3) focus on science while providing a solid basis for human exploration; and (4) minimize project cost and complexity wherever possible. In order to meet the diverse scientific objectives, each MESUR lander will carry the following strawman instrument payload consisting of: (1) Atmospheric structure experiment, (2) Descent and surface imagers, (3) Meteorology package, (4) Elemental composition instrument, (5) 3-axis seismometer, and (6) Thermal analyzer/evolved gas analyzer. The feasibility study is primarily to show a practical way to design an early capability for characterizing Mars' surface and atmospheric environment on a global scale. The goals are to answer some of the most urgent questions to advance significantly our scientific knowledge about Mars, and for planning eventual exploration of the planet by robots and humans.

Hubbard, G. Scott↗

STS-112 Flight Day 5 Highlights

On this fifth day of the STS-112 mission, the crewmembers Atlantis will begin transferring equipment and supplies to the orbiting laboratory. The crew reviews procedures for Saturday's spacewalk. Mission Specialists, Dave Wolf and Piers Sellers will prepare the tools and other equipment for use during Saturday's spacewalk. The spacewalkers reverse positions for most of the EVA, with Sellers riding the arm and Wolf free-floating while tethered to the station. They will attach umbilicals, install a second camera, install spool positioning devices to quickly disconnect fittings on ammonia lines and release radiator beam launch locks. The crewmembers will move a number of scientific experiments back and forth between the vehicles to return completed experiments to Earth and deploy new experiments at the station. One experiment transferred includes a set of liver cell tissue samples from an experiment studying the function of human liver cells in micro-gravity experiments were moved from the station onto the shuttle for return to Earth. Payload experiments such as Marshall Space Flight Center's protein crystals in micro-gravity experiments were moved to and from the station.

Source record↗

Space Station Freedom Central Thermal Control System Evolution

The objective of the evolution study is to review the proposed growth scenarios for Space Station Freedom and identify the major CTCS hardware scars and software hooks required to facilitate planned growth and technology obsolescence. The Station's two leading evolutionary configurations are: (1) the Research and Development node, where the fundamental mission is scientific research and commercial endeavors, and (2) the Transportation node, where the emphasis is on supporting Lunar and Mars human exploration. These two nodes evolve from the from the assembly complete configuration by the addition of manned modules, pocket labs, resource nodes, attached payloads, customer servicing facility, and an upper and lower keel and boom truss structure. In the case of the R & D node, the role of the dual keel will be to support external payloads for scientific research. In the case of the Transportation node, the keel will support the Lunar (LTV) and Mars (MTV) transportation vehicle service facilities In addition to external payloads. The transverse boom is extended outboard of the alpha gimbal to accommodate the new solar dynamic arrays for power generation, which will supplement the photovoltaic system. The design, development, deployment, and operation of SSF will take place over a 30 year time period and new Innovations and maturation in technologies can be expected. Evolutionary planning must include the obsolescence and insertion of the new technologies over the life of the program, and the technology growth issues must be addressed in parallel with the development of the baseline thermal control system. Technologies that mature and are available within the next 10 years are best suited for evolutionary consideration as the growth phase begins in the year 2000. To increase TCS capability to accommodate growth using baseline technology would require some penalty in mass, volume, EVA time, manifesting, and operational support. To be cost effective the capabilities of the heat acquisition, transport, and rejection subsystems must be increased.

Bullock, Richard↗

Bioinspired engineering of exploration systems for NASA and DoD

A new approach called bioinspired engineering of exploration systems (BEES) and its value for solving pressing NASA and DoD needs are described. Insects (for example honeybees and dragonflies) cope remarkably well with their world, despite possessing a brain containing less than 0.01% as many neurons as the human brain. Although most insects have immobile eyes with fixed focus optics and lack stereo vision, they use a number of ingenious, computationally simple strategies for perceiving their world in three dimensions and navigating successfully within it. We are distilling selected insect-inspired strategies to obtain novel solutions for navigation, hazard avoidance, altitude hold, stable flight, terrain following, and gentle deployment of payload. Such functionality provides potential solutions for future autonomous robotic space and planetary explorers. A BEES approach to developing lightweight low-power autonomous flight systems should be useful for flight control of such biomorphic flyers for both NASA and DoD needs. Recent biological studies of mammalian retinas confirm that representations of multiple features of the visual world are systematically parsed and processed in parallel. Features are mapped to a stack of cellular strata within the retina. Each of these representations can be efficiently modeled in semiconductor cellular nonlinear network (CNN) chips. We describe recent breakthroughs in exploring the feasibility of the unique blending of insect strategies of navigation with mammalian visual search, pattern recognition, and image understanding into hybrid biomorphic flyers for future planetary and terrestrial applications. We describe a few future mission scenarios for Mars exploration, uniquely enabled by these newly developed biomorphic flyers.

Space Flight↗

STS-109 Mission Highlights Resource Tape: Flight Days 8 - 12 - Part 4 of 4

This video, Part 4 of 4, shows footage of crew activities from flight days 8 through 12 of STS-109. The crew included: Scott Altman, Commander; Duane Carey, Pilot; John Grunsfeld, Payload Commander; Nancy Currie, Richard Linnehan, James Newman, Michael Massimino, Mission Speicalists. The activities from other flights days can be seen on 'STS-109 Mission Highlights Resource Tape' Part 1 of 4 (internal ID 2002139471), 'STS-109 Mission Highlights Resource Tape' Part 2 of 4 (internal ID 2002137664), and 'STS-109 Mission Highlights Resource Tape' Part 3 of 4 (internal ID 2002139476). The primary activity on flight day 8 was an EVA (extravehicular activity) by Grunsfeld and Linnehan to install a cryocooler and radiator for the NICMOS (Near Infrared Camera and Multi-Object Spectrometer) on the HST (Hubble Space Telescope). Before returning to Columbia's airlock, the astronauts, with a cloudy background, hold onto the orbiter and offer their thoughts on the significance of their mission, the HST, and spaceflight. Footage from flight day 9 includes the grappling, unbearthing, and deployment of the HST from Columbia, and the crew coordinating and videotaping Columbia's departure. Flight day 10 was a relatively inactive day, and flight day 11 includes a checkout of Columbia's aerodynamic surfaces. Columbia landed on flight day 12, which is covered by footage of the crew members speaking during reentry, and their night landing, primarily shown through the orbiter's head-up display. The video includes numerous views of the HST, as well as views of the the Galapagos Islands, Madagascar, and Southern Africa with parts of the Atlantic, Indian, and Pacific Oceans, and part of the coast of Chile. The pistol grip space tool is shown in use, and the crew answers two messages from the public, including a message to Massimino from the Fire Department of New York.

Source record↗

Design of the unmanned Multiple Exploratory Probe System (MEPS) for Mars observations

The unmanned Multiple Exploratory Probe System (MEPS) is designed for Mars observations in preparation for manned missions to the planet early in the 21st century. MEPS will test vehicle systems, provide important data about the Martian surface and atmosphere, and assist the planning of manned missions. This mission will be a precursor to the manned missions. MEPS will consist of six primary systems. A Command Information Center (CIC) will be employed as an onboard mission control, communications link, and observation post. The Space Transportation Main Engine (STME) will be used to provide the thrust for Earth-Mars transit following vehicle construction near the Space Station. A polar lander/Orbital Transfer Vehicle (OTV) will be deployed during transit to achieve a polar orbit about Mars. A secondary propulsion will be used to place MEPS into orbit about Mars; this system and the aerobrake will circularize the orbit. Following orbit circulation, a satellite will be deployed to observe the Martian surface and atmosphere and to study the space environment. Polar and equatorial lander systems will land on Mars with rovers to collect surface and atmospheric samples while on-board laboratories will provide initial sample study. Two solid rocket booster/payload vehicles will launch samples into a low Mars orbit. The OTV will rendezvous with each payload capsule and then transfer the samples to Earth for hands-on observation.

Source record↗