Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “decision analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Multi-Metric Sustainability Analysis

A readily accessible framework that allows for evaluating impacts and comparing tradeoffs among factors in energy policy, expansion planning, and investment decision making is lacking. Recognizing this, the Joint Institute for Strategic Energy Analysis (JISEA) funded an exploration of multi-metric sustainability analysis (MMSA) to provide energy decision makers with a means to make more comprehensive comparisons of energy technologies. The resulting MMSA tool lets decision makers simultaneously compare technologies and potential deployment locations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review and Analysis of Remote Sensing Capability for Air Quality Measurements as a Potential Decision Support Tool Conducted by the NASA DEVELOP Program

This project focused on a comprehensive utilization of air quality model products as decision support tools (DST) needed for public health applications. A review of past and future air quality measurement methods and their uncertainty, along with the relationship of air quality to national and global public health, is vital. This project described current and future NASA satellite remote sensing and ground sensing capabilities and the potential for using these sensors to enhance the prediction, prevention, and control of public health effects that result from poor air quality. The qualitative uncertainty of current satellite remotely sensed air quality, the ground-based remotely sensed air quality, the air quality/public health model, and the decision making process is evaluated in this study. Current peer-reviewed literature suggests that remotely sensed air quality parameters correlate well with ground-based sensor data. A satellite remote-sensed and ground-sensed data complement is needed to enhance the models/tools used by policy makers for the protection of national and global public health communities

Ross, A.↗

Risk-Informed Margin Management (RIMM) Industry Applications IA1 - Integrated Cladding ECCS/LOCA Performance Analysis - Problem Statement

The U. S. NRC is currently proposing rulemaking designated as “10 CFR 50.46c” to revise the LOCA/ECCS acceptance criteria to include the effects of higher burnup on cladding performance as well as to address some other issues. The NRC is also currently resolving the public comments with the final rule expected to be issued in the summer of 2016. The impact of the final 50.46c rule on the industry will involve updating of fuel vendor LOCA evaluation models, NRC review and approval, and licensee submittal of new LOCA evaluations or reanalyses and associated technical specification revisions for NRC review and approval. The rule implementation process, both industry and NRC activities, is expected to take 5-10 years following the rule effective date. The need to use advanced cladding designs is expected. A loss of operational margin will result due to the more restrictive cladding embrittlement criteria. Initial and future compliance with the rule may significantly increase vendor workload and licensee cost as a spectrum of fuel rod initial burnup states may need to be analyzed to demonstrate compliance. Consequently there will be an increased focus on licensee decision making related to LOCA analysis to minimize cost and impact, and to manage margin.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

LandScan mosaic enables high-resolution gridded population estimates with explicit uncertainty

Gridded population datasets represent high-resolution distributions of human occupancy, enabling informed decision-making across a broad range of fields. These data products are valuable for assessing environmental risk, urban development, disaster preparedness and resource allocation—areas where accurate population estimates directly enhance policy effectiveness and optimize resource distribution. Despite the importance of gridded population datasets, traditional population modeling approaches often overlook inherent uncertainties in the estimation process. This limitation can create a false sense of certainty in population estimates, potentially leading to flawed decisions by those who rely on the data. To address this methodological gap, we introduce a probabilistic machine learning modeling framework, LandScan Mosaic, that explicitly incorporates uncertainty into the population modeling process. Our approach systematically quantifies uncertainty in three key modeling parameters of the LandScan HD gridded population dataset: building use types, floor counts, and occupancy rates. By employing Monte Carlo simulations, we propagate these uncertainties through the modeling process, yielding probability distributions of population counts in place of deterministic point estimates. We demonstrate the practical application of this framework in Iloilo City, Philippines, using structured decision-making techniques and our probabilistic estimates to identify and prioritize areas most affected by projected flooding, supporting targeted interventions that address both economic and social risks. In doing so, we propose a population-specific approach for incorporating confidence into structured decision making processes. Through a comparative analysis with conventional deterministic approaches and point estimate approaches, including LandScan HD and WorldPop, we evaluate how the incorporation of machine learning and uncertainty influences decision rankings. This research advances population distribution modeling by offering a robust, quantitative approach that explicitly accounts for uncertainty in the underlying data, along with guidance for how users can apply uncertainty in their decision-making.

Environmental sciences↗

Improving The Discipline of Cost Estimation and Analysis

The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning many program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility. This paper presents the plans for the newly established role. Described is how the Independent Program Assessment Office, working with all NASA Centers, NASA Headquarters, other Government agencies, and industry, is focused on creating cost estimation and analysis as a professional discipline that will be recognized equally with the technical disciplines needed to design new space and aeronautics activities. Investments in selected, new analysis tools, creating advanced training opportunities for analysts, and developing career paths for future analysts engaged in the discipline are all elements of the plan. Plans also include increasing the human resources available to conduct independent cost analysis of Agency programs during their formulation, to improve near-term capability to conduct economic cost-benefit assessments, to support NASA management's decision process, and to provide cost analysis results emphasizing "full-cost" and "full-life cycle" considerations. The Agency cost analysis improvement plan has been approved for implementation starting this calendar year. Adequate financial and human resources are being made available to accomplish the goals of this important effort, and all indications are that NASA's cost estimation and analysis core competencies will be substantially improved within the foreseeable future.

Piland, William M.↗

Situation Awareness Information Requirements for Commercial Airline Pilots

Situation awareness is presented as a fundamental requirement for good airmanship, forming the basis for pilot decision making and performance. To develop a better understanding of the role of situation awareness in flying, an analysis was performed to determine the specific situation awareness information requirements for commercial aircraft pilots. This was conducted as a goal-directed task analysis in which pilots' major goals, subgoals, decisions, and associated situation awareness information requirements were delineated based on elicitation from experienced commercial airline pilots. A determination of the major situation awareness information requirements for visual and instrument flight was developed from this analysis, providing a foundation for future system development which seeks to enhance pilot situation awareness and provide a basis for the development of situation awareness measures for commercial flight.

Endsley, Mica R.↗

Accident Tolerant Fuel Analysis

Safety is central to the design, licensing, operation, and economics of Nuclear Power Plants (NPPs). Consequently, the ability to better characterize and quantify safety margin holds the key to improved decision making about light water reactor design, operation, and plant life extension. A systematic approach to characterization of safety margins and the subsequent margins management options represents a vital input to the licensee and regulatory analysis and decision making that will be involved. The purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development (R&D) is to support plant decisions for risk-informed margins management by improving economics and reliability, and sustaining safety, of current NPPs. Goals of the RISMC Pathway are twofold: (1) Develop and demonstrate a risk-assessment method coupled to safety margin quantification that can be used by NPP decision makers as part of their margin recovery strategies. (2) Create an advanced “RISMC toolkit” that enables more accurate representation of NPP safety margin. In order to carry out the R&D needed for the Pathway, the Idaho National Laboratory is performing a series of case studies that will explore methods- and tools-development issues, in addition to being of current interest in their own right. One such study is a comparative analysis of safety margins of plants using different fuel cladding types: specifically, a comparison between current-technology Zircaloy cladding and a notional “accident-tolerant” (e.g., SiC-based) cladding. The present report begins the process of applying capabilities that are still under development to the problem of assessing new fuel designs. The approach and lessons learned from this case study will be included in future Technical Basis Guides produced by the RISMC Pathway. These guides will be the mechanism for developing the specifications for RISMC tools and for defining how plant decision makers should propose and evaluate margin recovery strategies.

99 GENERAL AND MISCELLANEOUS↗

Accident Tolerant Fuel Analysis

Safety is central to the design, licensing, operation, and economics of Nuclear Power Plants (NPPs). Consequently, the ability to better characterize and quantify safety margin holds the key to improved decision making about light water reactor design, operation, and plant life extension. A systematic approach to characterization of safety margins and the subsequent margins management options represents a vital input to the licensee and regulatory analysis and decision making that will be involved. The purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development (R&D) is to support plant decisions for risk-informed margins management by improving economics and reliability, and sustaining safety, of current NPPs. Goals of the RISMC Pathway are twofold: (1) Develop and demonstrate a risk-assessment method coupled to safety margin quantification that can be used by NPP decision makers as part of their margin recovery strategies. (2) Create an advanced “RISMC toolkit” that enables more accurate representation of NPP safety margin. In order to carry out the R&D needed for the Pathway, the Idaho National Laboratory is performing a series of case studies that will explore methods- and tools-development issues, in addition to being of current interest in their own right. One such study is a comparative analysis of safety margins of plants using different fuel cladding types: specifically, a comparison between current-technology Zircaloy cladding and a notional “accident-tolerant” (e.g., SiC-based) cladding. The present report begins the process of applying capabilities that are still under development to the problem of assessing new fuel designs. The approach and lessons learned from this case study will be included in future Technical Basis Guides produced by the RISMC Pathway. These guides will be the mechanism for developing the specifications for RISMC tools and for defining how plant decision makers should propose and evaluate margin recovery strategies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Mission Planning Lab: A Visualization and Analysis Tool

Simulation and visualization are powerful decision making tools that are time-saving and cost-effective. Space missions pose testing and e valuation challenges that can be overcome through modeling, simulatio n, and visualization of mission parameters. The National Aeronautics and Space Administration?s (NASA) Wallops Flight Facility (WFF) capi talizes on the benefits of modeling, simulation, and visualization to ols through a project initiative called The Mission Planning Lab (MPL ).

Daugherty, Sarah C.↗

Survey of Cyber Risk Analysis Techniques for Use in the Nuclear Industry

Using traditional probabilistic risk analysis methods for severe accident safety risk management on non-digital systems, structures, and components at nuclear power plants is well-established. In contrast, cyber risk analysis of digital assets is still an immature field with unproven techniques due, in part, to the continuously changing threat environment and the challenge of digital assets failing in unexpected ways. As the nuclear fleet continues to adopt digital instrumentation and control systems, it is increasingly important to have effective and efficient cyber risk analysis techniques to support risk management decisions, such as risk elimination by system redesign or risk mitigation by implementation of prioritized security controls. To understand the state of the art in cyber risk analysis for future research, we surveyed 36 publications across ten application domains. We describe our survey methodology and rate each technique based upon scope, adoptability, and repeatability. In this work, we examine the unique constraints of the nuclear industry and outline the strengths and weaknesses of using the cyber risk analysis techniques in the industry, highlighting gaps with current techniques. We also discuss challenges and potential research directions for advancing the science for both existing and new advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design Considerations for a New Terminal Area Arrival Scheduler

Design of a terminal area arrival scheduler depends on the interrelationship between throughput, delay and controller intervention. The main contribution of this paper is an analysis of the above interdependence for several stochastic behaviors of expected system performance distributions in the aircraft s time of arrival at the meter fix and runway. Results of this analysis serve to guide the scheduler design choices for key control variables. Two types of variables are analyzed, separation buffers and terminal delay margins. The choice for these decision variables was tested using sensitivity analysis. Analysis suggests that it is best to set the separation buffer at the meter fix to its minimum and adjust the runway buffer to attain the desired system performance. Delay margin was found to have the least effect. These results help characterize the variables most influential in the scheduling operations of terminal area arrivals.

Thipphavong, Jane↗

Implementing EVM Data Analysis Adding Value from a NASA Project Manager's Perspective

Data Analysis is one of the keys to an effective Earned Value Management (EVM) Process. Project Managers (PM) must continually evaluate data in assessing the health of their projects. Good analysis of data can assist PMs in making better decisions in managing projects. To better support our P Ms, National Aeronautics and Space Administration (NASA) - Marshall Space Flight Center (MSFC) recently renewed its emphasis on sound EVM data analysis practices and processes, During this presentation we will discuss the approach that MSFC followed in implementing better data analysis across its Center. We will address our approach to effectively equip and support our projects in applying a sound data analysis process. In addition, the PM for the Space Station Biological Research Project will share her experiences of how effective data analysis can benefit a PM in the decision making process. The PM will discuss how the emphasis on data analysis has helped create a solid method for assessing the project s performance. Using data analysis successfully can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces

Counts, Stacy↗

An expert system for geologic mapping with imaging spectrometers

Techniques have been developed for the extraction and characterization of absorption features from visible and infrared reflectance spectra and an expert system has been designed, implemented, and successfully tested that allows automated identification of minerals based on their spectral characteristics. A suite of laboratory spectra of common minerals was analyzed and the absorption band characteristics tabulated and used to develop a generalized knowledge base for analysis of the reflectance spectra. A tree hierarchy was designed to emulate the decision process followed by an experienced analyst for analysis of laboratory and field reflectance spectra and aircraft imaging spectrometer spectra. Good results were obtained with the expert system for all three types of spectra, with the critical factor in the analysis being the signal-to-noise ratio of the spectral data.

Kruse, F. A.↗

RECOVER: An Automated Cloud-Based Decision Support System for Post-fire Rehabilitation Planning

RECOVER is a site-specific decision support system that automatically brings together in a single analysis environment the information necessary for post-fire rehabilitation decision-making. After a major wildfire, law requires that the federal land management agencies certify a comprehensive plan for public safety, burned area stabilization, resource protection, and site recovery. These burned area emergency response (BAER) plans are a crucial part of our national response to wildfire disasters and depend heavily on data acquired from a variety of sources. Final plans are due within 21 days of control of a major wildfire and become the guiding document for managing the activities and budgets for all subsequent remediation efforts. There are few instances in the federal government where plans of such wide-ranging scope and importance are assembled on such short notice and translated into action more quickly. RECOVER has been designed in close collaboration with our agency partners and directly addresses their high-priority decision-making requirements. In response to a fire detection event, RECOVER uses the rapid resource allocation capabilities of cloud computing to automatically collect Earth observational data, derived decision products, and historic biophysical data so that when the fire is contained, BAER teams will have a complete and ready-to-use RECOVER dataset and GIS analysis environment customized for the target wildfire. Initial studies suggest that RECOVER can transform this information-intensive process by reducing from days to a matter of minutes the time required to assemble and deliver crucial wildfire-related data.

cloud computing↗

ASCR Workshop on In Situ Data Management: Enabling Scientific Discovery from Diverse Data Sources

In January 2019, the U.S. Department of Energy, Office of Science program in Advanced Scientific Computing Research, convened a workshop to identify priority research directions for in situ data management (ISDM). The workshop defined ISDM as the practices, capabilities, and procedures to control the organization of data and enable the coordination and communication among heterogeneous tasks, executing simultaneously in a high-performance computing system, cooperating toward a common objective. The workshop revealed two primary, interdependent motivations for processing and managing data in situ. The first motivation is that the in situ methodology enables scientific discovery from a broad range of data sources over a wide scale of computing platforms: leadership-class systems, clusters, clouds, workstations, and embedded devices at the edge. The successful development of ISDM capabilities will benefit real-time decision-making, design optimization, and data-driven scientific discovery. The second motivation is the need to decrease data volumes. ISDM can make critical contributions to managing large data volumes from computations and experiments to minimize data movement, save storage space, and boost resource efficiency, often while simultaneously increasing scientific precision. A fundamental finding of this workshop is that the methodologies used to manage data among a variety of tasks in situ can be used to facilitate scientific discovery from many different data sources—simulation, experiment, and sensors, for example—and that being able to do so at numerous computing scales will benefit real-time decision-making, design optimization, and data-driven scientific discovery across the Office of Science mission space. Applications wanting to use the in situ capabilities include those where data analysis feeds back to the simulation, decisions are made autonomously, big data or machine learning is among the tasks to be coordinated, and computations need to be completed in real time. The workshop identified six priority research directions that highlight the components and capabilities needed for ISDM to be successful for the wide variety of applications discussed: making ISDM capabilities more pervasive, controllable, composable, and transparent, with a focus on greater coordination with the software stack and a diversity of fundamentally new data algorithms.

97 MATHEMATICS AND COMPUTING↗

Control Decision and Control Development of Hanford Tank Farms First Two ISA-84 Safety Instrumented Systems - 17370

Hanford's 242-A Evaporator has had the mission of reducing waste volume in the Hanford Tank Farms since the late 1970's. Until 2014, the Documented Safety Analysis for the 242-A facility considered protection and controls of the collocated worker (workers outside the facility) and the public. In 2010, Tank Farms Nuclear Safety engineers initiated a significant revision of the Documented Safety Analysis to implement DOE-STD-3009, Change Notice 3, which requires the protection of the facility worker in addition to the collocated worker and public. Through the use of an extensive process hazards analysis performed on the facility, it was concluded that it was essential to control conditions in the primary evaporation vessel (C-A-1) such that flammable gasses could not build up to the Lower Flammability Limit, and that another control was necessary to ensure that the C-A-1 vessel could not overflow. Early control decision meetings held during the development of the Documented Safety Analysis revision yielded no simple solution to the protection of workers from a flammable gas deflagration. Controls selected for the waste overflow accident were all mitigative in nature (i.e. the detection of a waste overflow after it already happened). Engineering could not replace the mitigative controls with preventive controls without attempting to credit some of the existing facility interlocks associated with the C-A-1 vessel operations. Software and hard-wired interlocks had been used at the facility to prevent overheating of the waste and overfilling of the C-A-1 vessel. These interlocks were considered useful to the prevention of the flammable gas deflagration and vessel overfilling accidents, but lacked the pedigree and reliability necessary to credit the interlocks as safety significant. It was at this stage of the Documented Safety Analysis control decision and control development that engineering became aware of the DOE's acceptance of the ISA-84 instrumented system standard. It became apparent that the ideal solution was not to attempt to credit existing interlock systems, but to develop a new system of 'safety interlocks' to the ISA-84 standard. A meeting was held with upper management of both engineering and operations to propose the use of safety instrumented systems at the 242-A facility. URS Corporation (now AECOM), who had recently supported the Savanah River site in developing ISA-84 controls, was consulted to support the development of two new instrumented systems for the 242-A facility. In addition to the use of the newly adopted ISA-84 standard, the failure modes and effect analysis process was implemented in a very effective manner to support the development of the new safety instrumented systems. Through a brand new methodology, and through a very dedicated and hard-working engineering, projects, and operations team, the new controls were designed, built, tested, and commissioned. At this time, five successful waste reduction campaigns have been performed at the facility with the new safety instrumented systems. During these waste processing campaigns, trips and spurious trips of the SIS have occurred - all of which acted properly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance-based ECCS cladding acceptance criteria: A new simulation approach

The U. S. Nuclear Regulatory Commission is currently proposing rulemaking to revise the Loss Of Coolant Accident (LOCA) and therefore the Emergency Core Cooling System (ECCS) acceptance criteria, to include the effects of higher burnup on cladding performance as well as to address other technical issues. As motivated by the new rule, the need to use advanced cladding designs may be a result. A loss of operational margin may result due to the more restrictive cladding embrittlement criteria. Initial and future compliance with the rule may significantly increase vendor workload and licensee cost, as a spectrum of fuel rod initial burnup states may need to be analyzed to demonstrate compliance. Consequently, there will be an increased focus on licensee decision making related to LOCA analysis to minimize cost and impact, and to manage margin. The study here presented has been part of a big project used to investigate technical issues and approaches for future industrial applications within the Risk-Informed Safety Margin Characterization (RISMC) Pathway. Specifically, the primary aim of this study is to lay out a roadmap to demonstrate the application of the new methodology. Furthermore, the present analysis shows a simplified version of the methodology of an industrial application on the Core Design and the Multi-Cycle Analysis.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗