Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “data requests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Final work plan : indoor air and ambient air sampling near the former CCC/USDA grain storage facility in Everest, Kansas.

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at the western edge of Everest, Kansas, from the early 1950s to the early 1970s. Sampling by the Kansas Department of Health and Environment (KDHE) in 1997 resulted in the detection of carbon tetrachloride in one domestic well (the Nigh well) northwest of the former facility. On behalf of the CCC/USDA, Argonne National Laboratory subsequently conducted a series of investigations to characterize the contamination (Argonne 2003, 2006a,b,c). Automatic, continuous monitoring of groundwater levels began in 2002 and is ongoing at six locations. The results have consistently indicated groundwater flow toward the north-northwest from the former CCC/USDA property to the Nigh property, then west-southwest from the Nigh property to the intermittent creek. Sitewide periodic groundwater and surface water sampling with analysis for volatile organic compounds (VOCs) began in 2008. Argonne's combined data indicate no significant downgradient extension of contamination since 2000. At present, the sampling is annual, as approved by the KDHE (2009) in response to a plan developed for the CCC/USDA (Argonne 2009). This document presents a plan for collecting indoor air samples in homes located along and adjacent to the defined extent of the carbon tetrachloride contamination. The plan was requested by the KDHE. Ambient air samples to represent the conditions along this pathway will also be taken. The purpose of the proposed work is to satisfy KDHE requirements and to collect additional data for assessing the risk to human health due to the potential upward migration of carbon tetrachloride and its primary degradation product (chloroform) into homes located in close proximity to the former grain storage facility, as well as along and within 100 ft laterally from the currently defined plume emanating from the former Everest facility. Investigation of the indoor air environment was not a defined objective during the previous investigations of the Everest site (Argonne 2003, 2006a,b,c) as they predated the more recent regulatory concern regarding potential health risks associated with the vapor contaminant pathway.

54 ENVIRONMENTAL SCIENCES↗

Next Generation RivGen Power System: Kvichak River, AK Overwinter Ice Study

The University of Alaska Fairbanks (UAF) Alaska Hydrokinetic Energy Research Center was tasked with developing a real-time data telemetry / remote power generation system to monitor frazil ice conditions in the Kvichak River in support of the U.S. Department of Energy funded "Next Generation MHK River Power System Optimized for Performance, Durability and Survivability" project. A real-time telemetry system was requested because of the short time span between the end of the frazil ice season when the instruments would be recovered, limited vessel availability and the project end-date. To meet the project objectives, UAF designed and assembled a remote power/real-time data telemetry system that included an auto start propane generator, a small PV array, a small battery bank and line-of-sight radios as well as two sonar systems to monitor river velocity and water column acoustic backscatter strength. Both sonars included internal batteries for powering the instruments in case of failure of the shore based power system. The sonars, deployed in ~5 m of water on the bed of the Kvichak River, adjacent to the Village of Igiugig, Alaska were tethered to shore via a waterproof armored cable that conveyed power to the subsurface instruments and data from the instruments to the shore based telemetry system. The instruments were programmed to record data internally as well as to transmit data serially over the cables to the shore based system. The system was in-place between November, 2016 and June, 2017. While the real-time data telemetry system was not successful and the remote power generation power system was only partially successful, the system design included sufficient redundant power in the form of internal instrument batteries to enable the collection of nearly three months of overlapping velocity and backscatter data (from November through February) and a record of acoustic backscatter strength spanning the entire ~150 day frazil ice season between November, 2016 and ~April, 2017. This submission includes the overwinter ice study plan, raw data, and report.

16 TIDAL AND WAVE POWER↗

Method and apparatus for two-layer copy-on-write

A system, apparatus and method are provided in which a range of virtual memory addresses and a copy of that range are mapped to the same first system address range in a data processing system until an address in the virtual memory address range, or its copy, is written to. The common system address range includes a number of divisions. Responsive to a write request to an address in a division of the common address range, a second system address range is generated. The second system address range is mapped to the same physical addresses as the first system address range, except that the division containing the address to be written to and its corresponding division in the second system address range are mapped to different physical addresses. First layer mapping data may be stored in a range table buffer and updated when the second system address range is generated.

97 MATHEMATICS AND COMPUTING↗

EV Watts Public Database

With the rapid increase in vehicle electrification, there is a need for up-to-date, publicly available national data to understand end user charging and driving patterns, as well as vehicle and infrastructure performance, to inform research planning. Energetics worked with various partners to collect and analyze plug-in electric vehicle (PEV) and electric vehicle supply equipment (EVSE) data from 2019 to 2022. All sensitive attributes have been removed from this publicly available dataset. Researchers from one of the partner national labs under non-disclosure agreement (NDA) can request access to additional attributes by reaching out to evwattsdata@energetics.com.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SRNL Report on Vendor Solicitation and Selective Ion-Electrode Testing

Effective operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) will require information collected from sampling and/or monitoring to maintain environmental compliance, product quality, and operating efficiency. The U.S. Department of Energy (DOE) – Office of River Protection (ORP) recognizes the potential long-term benefit of developing real-time, in-line monitoring (RTIM) at the WTP to improve the current strategy of collecting tens of thousands of samples and analyzing them. In-line monitoring can decrease processing time associated with waiting for sample analysis, reduce workers’ exposure to radiation and chemical hazards, decrease secondary waste volumes, potentially improve product quality, and provide production support and enhance overall operational control. The Assistant Manager, WTP chartered an Integrated Technical Team (ITT), which includes personnel from the Savannah River National Laboratory (SRNL), Bechtel National, Inc., and DOE-ORP, to evaluate the capability and potential benefits of replacing routine sample collection requirements with real-time, in-line monitoring. The initial focus of the ITT is the Direct Feed Low Activity Waste (DFLAW) Program. This work scope is being performed in multiple phases. Phase 1 is Requirements and Opportunities Analysis, Phase 2 is Applications and Benefits Determination, and Phase 3 is Qualification and Demonstration. Phase 1 included 6 tasks and was completed by SRNL in 2017. The tasks in Phase 1 were: (1) determining the functional requirements for determining analytes and properties of streams, (2) determining the technical basis for process control, (3) determining the sampling points within the Low Activity Waste (LAW) facility and Effluent Management Facility (EMF), (4) data quality and management, (5) process control challenges, and (6) preparing a Preliminary Analysis Plan. DOE-ORP was briefed on the findings from the Phase 1 tasks and requested that Phase 2 work focus on establishing a basis for a materials balance approach that minimized process sampling. The Phase 2 work scope contains tasks to evaluate a materials balance only approach as well as continuing scoping evaluations for instruments that could be used for RTIM. The Phase 2 work scope was completed by both SRNL and Pacific Northwest National Laboratory (PNNL). The tasks performed in Phase 2 were: 1. Overall program administration and technical oversight 2. Evaluation of a Material Balance Approach, a. Evaluation of uncertainty of this approach compared to uncertainty of current methods b. Evaluation of automating the material balance within the framework of existing control software, c. Development of the methodology to obtain and evaluate data during cold commissioning to support a material balance approach, and d. Development of a framework to utilize during presentation of the revised approach to stakeholders and regulators. 3. Screening Evaluations of Instruments to Supplement the Material Balance Approach, a. AP-105 melter condensate evaluations, and b. Screening testing with simulants. 4. Evaluation of the current DFLAW feed qualification program to identify analytes that could be eliminated, a. Inorganic analytes, b. Radionuclides, and c. Organic analytes. This report describes the results of Task 3b, Screening testing with simulants. The Savannah River National Laboratory requested demonstrations of commercially available analytical instruments by the vendors or laboratory demonstration. The techniques tested included: Raman spectroscopy, Infrared spectroscopy (IR), laser induced breakdown spectroscopy (LIBS), X-Ray Fluorescence Spectroscopy (XRF), and ion-selective electrochemical probes. Additionally, the instrumentation would need to be durable enough to withstand the environment of the plant, preferably with little to no maintenance. The insertion point of the instrument would be dependent upon the instrumentation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating the Healthcare Enterprise in Radiation Oncology Plug and Play-The Future of Radiation Oncology?

Purpose: To describe the processes and benefits of the integrating healthcare enterprises in radiation oncology (IHE-RO). Methods: The IHE-RO process includes five basic steps. The first step is to identify common interoperability issues encountered in radiation treatment planning and the delivery process. IHE-RO committees partner with vendors to develop solutions (integration profiles) to interoperability problems. The broad application of these integration profiles across a variety of vender platforms is tested annually at the Connectathon event. Demonstration of the seamless integration and transfer of patient data to the potential users are then presented by vendors at the public demonstration event. Users can then integrate these profiles into requests for proposals and vendor contracts by institutions. Results: Incorporation of completed integration profiles into requests for proposals can be done when purchasing new equipment. Vendors can publish IHE integration statements to document the integration profiles supported by their products. As a result, users can reference integration profiles in requests for proposals, simplifying the systems acquisition process. These IHE-RO solutions are now available in many of the commercial radiation oncology-related treatment planning, delivery, and information systems. They are also implemented at cancer care sites around the world. Conclusions: IHE-RO serves an important purpose for the radiation oncology community at large.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Dynamometer Testing of a NW2200 Drivetrain (CRADA Final Report)

Northern Power Systems specializes in direct drive wind turbine designs. CRADA CRD-10-394 involved testing the NW2200 wind turbine power train. Power train testing is important because it allows validation of the generator design and some control algorithms prior to installation on a tower, where this data would be more difficult and time consuming to collect. In an effort to keep the commercialproduct schedule on time, Northern Power requested testing support from the National Renewable Energy Laboratory for this testing. The test program was performed using NREL's 2.5 MW dynamometer test bed at the National Wind Technology Center near Boulder, CO.

17 WIND ENERGY↗

2015 Long-Term Hydrologic Monitoring Program Sampling and Analysis Results Report for Project Rulison, Co

The U.S. Department of Energy (DOE) Office of Legacy Management conducted annual sampling at the Rulison, Colorado, Site for the Long-Term Hydrologic Monitoring Program (LTHMP) on May 20–22 and 27, 2015. Several of the land owners were not available to allow access to their respective properties, which created the need for several sample collection trips. This report documents the analytical results of the Rulison monitoring event and includes the trip report and the data validation package (Appendix A). The groundwater and surface water monitoring were shipped to the GEL Group Inc. laboratories for analysis. All requested analyses were successfully completed. Samples were analyzed for gamma-emitting radionuclides by high- resolution gamma spectrometry. Tritium was analyzed using two methods, the conventional tritium method, which has a detection limit on the order of 400 picocuries per liter (pCi/L), and the enriched method (for selected samples), which has a detection limit on the order of 3 pCi/L.

54 ENVIRONMENTAL SCIENCES↗

Thermal-Epithermal eXperiments – Hafnium Experiment Performed at the DOE’s National Criticality Experiments Research Center (NCERC)

The Thermal-Epithermal eXperiments (TEX) – Hafnium (TEX-Hf) experiments were completed in October 2022 at the DOE National Criticality Experiments Research Center (NCERC) at the Nevada National Security Site (NNSS). This measurement campaign provides seven unique configurations that can be used to validate the neutron absorption and scattering cross sections of hafnium in a highly enriched uranium (HEU) system. Hafnium is a strong neutron absorber important for marine propulsion systems. Mike Zerkle of the Naval Nuclear Laboratory (NNL) states, “The experiments were requested by Naval Reactors to provide a suite of unclassified, clean, and well-characterized benchmarks to drive improvements to hafnium nuclear data.” The experiments were a collaboration between Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), and NNL, funded by the Nuclear Criticality Safety Program (NCSP). The Hf was procured directly by NNL and provided for the experiment.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Illustration of bunch merge simulation in RHIC

Following are examples of a 4 to 2 to 1 merge of proton bunches in RHIC obtained by running the simulation code rhic2mrg23. As the code runs, the user is prompted to enter several numbers. For these examples, RF harmonic number 1440.0 is entered. An RF frequency of 112.597 696 626 MHz at this harmonic is entered. This gives a proton energy of 100 GeV. The merge simulation starts with a uniform distribution of unbunched protons. 2.0 eV-s is entered for the longitudinal emittance of the distribution. The code will recommend a voltage to capture the unbunched protons into 4 harmonic 1440 buckets. A capture voltage of 142.390 kV is recommended. 144.0 kV is entered. It is desirable to capture the protons as “adiabatically” as possible. A capture time of 3318 ms is recommended by the code. 3320.0 ms is entered. A 4 to 2 merge time of 1659 ms is recommended by the code. 1660.0 ms is entered. A 2 to 1 merge time twice that of the 4 to 2 merge is recommended by the code. 3320.0 ms is entered. The code requests a “time fraction” FQMRG to be entered. This is a number (from 0.1 to 1.0) that determines the time at which data are recorded during the 4 to 2 merge. The number 0.5 is entered. This encodes the recording of data halfway through the 4 to 2 merge.

43 PARTICLE ACCELERATORS↗

Illustration of bunch merge simulation in AGS

Following are examples of a 4 to 2 to 1 merge of proton bunches in AGS obtained by running the simulation code ags2mrg23. As the code runs, the user is prompted to enter several numbers. For these examples, RF harmonic number 12.0 is entered. An RF frequency of 4.453 913 448 73 MHz at this harmonic is entered. This gives proton G γ = 45.5. The merge simulation starts with a uniform distribution of unbunched protons. 2.0 eV-s is entered for the longitudinal emittance of the distribution. The code will recommend a voltage to capture the unbunched protons into 4 harmonic 12 buckets. A capture voltage of 0.0527 kV is recommended. 0.053 kV is entered. It is desirable to capture the protons as “adiabatically” as possible. Because of the long synchrotron period (372 ms), a capture time of 74,707 ms is recommended by the code. A shorter time, 10,000 ms, is entered to reduce the running time of the code. A 4 to 2 merge time of 37,353 ms is recommended by the code. 4000.0 ms is entered. A 2 to 1 merge time twice that of the 4 to 2 merge is recommended by the code. 8000.0 ms is entered. The code requests a “time fraction” FQMRG to be entered. This is a number (from 0.1 to 1.0) that determines the time at which data are recorded during the 4 to 2 merge. The number 0.5 is entered. This encodes the recording of data halfway through the 4 to 2 merge.

43 PARTICLE ACCELERATORS↗

Photothermal Interferometer (PTI) BBOP

Aerosol Light Absorption at 532 nm using Photothermal Interferometry Time resolution: 10 sec Data normalized to STP Location: Memphis (TN) or Pasco (WA) Calibration: NO2 DateTime_PTI: UTC Absorption coefficient (PTI): Mm-1 Comments or requests are to be directed to Art Sedlacek (sedlacek@bnl.gov)

54 ENVIRONMENTAL SCIENCES↗

Logical memory address regions

Systems, apparatuses, and methods for implementing logical memory address regions in a computing system. The physical memory address space of a computing system may be partitioned into a plurality of logical memory address regions. Each logical memory address region may be dynamically configured at run-time to meet changing application needs of the system. Each logical memory address region may also be configured separately from the other logical memory address regions. Each logical memory address region may have associated parameters that identify region start address, region size, cell-level mode, physical-to-device mapping scheme, address masks, access permissions, wear-leveling data, encryption settings, and compression settings. These parameters may be stored in a table which may be used when processing memory access requests.

97 MATHEMATICS AND COMPUTING↗

Data sharing report characterization of the surveillance and maintenance project miscellaneous process inventory waste items Oak Ridge National Laboratory, Oak Ridge, TN

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)—using the approved Waste Lot (WL) 108.1 profile—the Y-12 Sanitary Landfill (SLF) if appropriate; EnergySolutions Clive; and the Nevada National Security Site (NNSS) (ORAU 2013b). Finally, the evaluation of these wastes was more suited to a judgmental sampling approach rather than a statistical design, meaning data were collected for each individual item, thereby providing information for item-byitem disposition decisions. ORAU prepared a sampling and analysis plan (SAP) that outlined data collection strategies, methodologies, and analytical guidelines and requirements necessary for characterizing targeted items (ORAU 2013b). The SAP described an approach to collect samples that allowed evaluation as to whether or not the waste would be eligible for disposal at the EMWMF. If the waste was determined not to be eligible for EMWMF disposal, then there would be adequate information collected that would allow the waste to be profiled for one of the alternate TSDFs listed above.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Hierarchical VLSM-Based Demand Response Strategy for Coordinative Voltage Control between Transmission and Distribution Systems

This paper presents a two-stage hierarchical voltage-load sensitivity matrix (VLSM)-based demand response (DR) algorithm for regulating the voltage at distribution feeders while fulfilling the transmission system DR requests. This allows distributed energy resources be aggregated to provide transmission-level services without causing operational issues in the distribution grids. At the beginning of each operation interval, a transmission system controller will issue DR commands to distribution system controllers. In the first stage, the distribution system controller uses a VLSM-based dispatch algorithm to dispatch the available DR resources on the distribution feeder with an objective to minimize the total voltage deviations at the lowest cost. Then, power flow studies are conducted assuming that the DR commands have been executed. If voltage violations are detected, a second-stage VLSM-based DR dispatch will be performed to remove those violations. After that, the upper and lower DR limits calculated for the next operation interval are sent back to the transmission system controller so the transmission optimization algorithm can use them as operational constraints to make subsequent decisions. The DR resources include smart photovoltaic (PV) inverters that can curtail real power and provide reactive power support, controllable loads and capacitor banks. In conclusion, the IEEE 123-bus test system with 5-minute PV and load data is used to evaluate the performance of the algorithm. In conclusion, simulation results show that the proposed algorithm can fulfill the transmission-level DR requests while maintaining the voltage in the distribution system within limits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Fidelity Multiphysics Modeling of a Heat Pipe Microreactor Using BlueCrab

Researchers who are actively developing nuclear microreactors are planning to employ innovative designs and features using traditional commercial modeling tools that may be inadequate for their design and licensing activities. The codes developed under the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation (NEAMS) program provide flexibility in terms of geometry modeling and multiphysics coupling and are particularly well suited for modeling novel microreactor concepts. To test the maturity of these codes, this paper introduces a conceptual heat pipe microreactor (HP-MR) designed to gather various technologies of interest to microreactor developers such as control drums, heat pipes, and hydride moderators. Here, the objective of this effort is to demonstrate NEAMS tools capability to perform high-fidelity multiphysics simulations, using coupled neutronics (via the Griffin code), heat conduction (via the BISON code), heat pipe modeling (via the Sockeye code), and hydrogen redistribution in hydride metal moderator (via the SWIFT code). Codes are coupled in-memory through the Multiphysics Object-Oriented Simulation Environment (MOOSE) framework, which permits flexible multiphysics data transfer schemes. The analysis confirmed two key aspects of the HP-MR concept: (1) its ability to follow the power load requested from the heat pipe and (2) its ability to avoid heat pipe cascading failure unless designed with high power close to operating failure limits of its heat pipes. The developed computational model was distributed publicly on the Virtual Test Bed for training purposes to accelerate adoption by industry and to provide a high-fidelity multiphysics solution for benchmarking against other tools. Additional multiphysics analyses including other transients and coupled physics were identified as necessary future work, together with a focus on validating multiphysics behavior against experiments.

Microreactor↗

ECO: the Evidence and Conclusion Ontology, an update for 2022

The Evidence and Conclusion Ontology (ECO) is a community resource that provides an ontology of terms used to capture the type of evidence that supports biomedical annotations and assertions. Consistent capture of evidence information with ECO allows tracking of annotation provenance, establishment of quality control measures, and evidence-based data mining. ECO is in use by dozens of data repositories and resources with both specific and general areas of focus. ECO is continually being expanded and enhanced in response to user requests as well as our aim to adhere to community best-practices for ontology development. The ECO support team engages in multiple collaborations with other ontologies and annotating groups. Here we report on recent updates to the ECO ontology itself as well as associated resources that are available through this project. ECO project products are freely available for download from the project website (https://evidenceontology.org/) and GitHub (https://github.com/evidenceontology/evidenceontology). ECO is released into the public domain under a CC0 1.0 Universal license.

59 BASIC BIOLOGICAL SCIENCES↗

Classification of the Z-Pinch Waste Stream as Low-Level Waste for Disposal

The purpose of this document is to describe the waste stream from Z-Pinch Residual Waste Project that due to worker safety concerns and operational efficiency is a candidate for blending Transuranic and low level waste together and can be safely packaged as low-level waste consistent with DOE Order 435.1 requirements and NRC guidance 10 CFR 61.42. This waste stream consists of the Pu-ICE post-shot containment systems, including plutonium targets, generated from the Z Machine experiments requested by LANL and conducted by SNL/NM. In the past, this TRU waste was shipped back to LANL after Sandia sends the TRU data package to LANL to certify the characterization (by CCP), transport and disposition at WIPP (CBFO) per LANL MOU-0066. The Low Level Waste is managed, characterized, shipped and disposed of at NNSS by SNL/NM per Sandia MOU # 11-S-560.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗