Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Orbit transfer vehicle engine study. Volume 2: Technical report

The orbit transfer vehicle (OTV) engine study provided parametric performance, engine programmatic, and cost data on the complete propulsive spectrum that is available for a variety of high energy, space maneuvering missions. Candidate OTV engines from the near term RL 10 (and its derivatives) to advanced high performance expander and staged combustion cycle engines were examined. The RL 10/RL 10 derivative performance, cost and schedule data were updated and provisions defined which would be necessary to accommodate extended low thrust operation. Parametric performance, weight, envelope, and cost data were generated for advanced expander and staged combustion OTV engine concepts. A prepoint design study was conducted to optimize thrust chamber geometry and cooling, engine cycle variations, and controls for an advanced expander engine. Operation at low thrust was defined for the advanced expander engine and the feasibility and design impact of kitting was investigated. An analysis of crew safety and mission reliability was conducted for both the staged combustion and advanced expander OTV engine candidates.

Source record↗

Conceptual design for a food production, water and waste processing, and gas regeneration module

During the first six month period, the RECON (Regenerative Concepts Group) team collected reference material, made visits to consult with other researchers, and invited distinguished visitors to speak on the status of closed life support activities. A decision was made to develop the data base and modeling such that artificial intelligence (AI) methods could be used to manipulate data and examine concept alternatives. Six discrete tasks and a project schedule were outlined for the first year. The first two tasks have been essentially completed and have resulted in a sample set of assumptions for general use in defining candidate systems and for the specification of closed system characteristics. To model a closed environment, decisions were necessary to establish the amounts of food, air, water and waste products. Although recognized that data would eventually be normalized on the basis of a single human, the amount of data in existence for four person crews led to the decision to use this as a baseline. Information on existing concepts was collected from NASA sources, from industry, and libraries. Concept modeling was begun, hardware and software obtained, technical tasks identified and experimental work initiated.

Nicks, O. W.↗

Crew Factors in Flight Operations: A Survey of Fatigue Factors in Regional Airline Operations - 11

This report is the eleventh in a series on the physiological effects of flight operations on flight crews. A 119-question survey was completed by 1,424 flight crewmembers from 26 regional carriers to identify factors contributing to fatigue in regional airline operations. Eighty-nine percent of crewmembers identified fatigue as a moderate or serious concern with 88% reporting that it was a common occurrence and 92% reporting that, when it occurs, fatigue represents a moderate or serious safety issue. However, 86% reported they received no company training addressing fatigue issues. Identified fatigue factors included multiple flight segments, scheduling considerations, varying regulations, and others. The two most commonly cited fatigue factors regarded flying multiple (more than four) segments. Scheduling factors accounted for nine of the ten most common recommendations to reduce fatigue in regional operations. Differing requirements among regulations were cited as contributing to fatigue. Other identified factors were the flight deck environment, automation, and diet. The data suggested specific recommendations, including education of industry personnel about fatigue issues and examination of scheduling practices. Education plays a critical role in any effort to address fatigue. Analyzing scheduling practices and identifying potential improvements may result in reduced fatigue as well as other benefits to operations.

Co, Elizabeth L.↗

Ares I Crew Launch Vehicle Project: Forward Plan to Preliminary Design Review

The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, conducted the Ares I Crew Launch Vehicle System Requirements Review (SRR) at the end of 2006, a mere year after the project team was assembled. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the operability, reliability, and affordability goals outlined by the Constellation Program. As directed in NASA Procedure and Regulation (NPR) 7123, NASA Systems Engineering Procedural Requirements, the Ares I SRR examined "the functional and performance requirements defined for the system and the preliminary program or project plan and ensures that the requirements and the selected concept will satisfy the mission." The SRR was conducted to ensure the system- and element-level design and interface requirements are defined prior to proceeding into the project's design phase. The Exploration Launch Projects Control Board convened on December 19,2006, and accepted the findings of the SRR and the go-forward plan proceeding to PDR. Based upon these findings, the Ares project believes that operability must drive the vehicle's design, and that a number of design challenges, including system mass and reliability, must be addressed as part of the progress to PDR.

Dumbacher, Daniel L.↗

Game Changing: NASA's Space Launch System and Science Mission Design

NASA s Marshall Space Flight Center (MSFC) is directing efforts to build the Space Launch System (SLS), a heavy-lift rocket that will carry the Orion Multi-Purpose Crew Vehicle (MPCV) and other important payloads far beyond Earth orbit (BEO). Its evolvable architecture will allow NASA to begin with Moon fly-bys and then go on to transport humans or robots to distant places such as asteroids and Mars. Designed to simplify spacecraft complexity, the SLS rocket will provide improved mass margins and radiation mitigation, and reduced mission durations. These capabilities offer attractive advantages for ambitious missions such as a Mars sample return, by reducing infrastructure requirements, cost, and schedule. For example, if an evolved expendable launch vehicle (EELV) were used for a proposed mission to investigate the Saturn system, a complicated trajectory would be required - with several gravity-assist planetary fly-bys - to achieve the necessary outbound velocity. The SLS rocket, using significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, reducing trip time and cost. As this paper will report, the SLS rocket will launch payloads of unprecedented mass and volume, such as "monolithic" telescopes and in-space infrastructure. Thanks to its ability to co-manifest large payloads, it also can accomplish complex missions in fewer launches. Future analyses will include reviews of alternate mission concepts and detailed evaluations of SLS figures of merit, helping the new rocket revolutionize science mission planning and design for years to come.

Creech, Stephen D.↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the moon and eventually enable a human Mars mission. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the crew health and performance (CHP) research and technology development (R&D) necessary to enable these future missions. These organizations include flight programs as well as other organizations such as the Health and Medical Technical Authority (HMTA), Human Research Program, Space Technology Mission Directorate, and System Capability Leadership Teams, each of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for the management of risks and strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA for identifying and prioritizing R&D needs. Alignment and evolution of these strategic planning constructs is ongoing and will allow for alignment and traceability between M2M objectives and R&D investments at a detailed level. While this reorganization is ongoing, and even after it is established, there is a recognized need among stakeholder organizations to identify and communicate the highest CHP R&D priorities in a unified and digestible way that synthesizes the considerations and perspectives of the CHP community across NASA. To achieve this, the HMTA facilitated a series of group discussions with representatives of NASA’s CHP community, which culminated in a product identifying the eight highest priority mission-enabling CHP capabilities for human missions to Mars, referred to as the “Top Human System Capability Needs for Mars”. The list includes Earth-Independent Human Operations; Mars Duration Food System; Mars Duration Effects on Human Physiology; Risks Mitigations for Vehicle Atmospheres; Computational Injury & Anthropometric Models; Exploration Exercise Countermeasures; Individual Variability in Responses to Spaceflight; and Sensorimotor Countermeasures. Existing strategic planning and risk management tools and processes were considered, as well as practicalities of technical, cost, and schedule feasibility associated with potential R&D risk mitigations and technology solutions. The product is not owned by any one organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. It is anticipated that this list will be re-evaluated periodically based on R&D progress and the evolving M2M architecture.

Life Support↗

Building on the Past - Looking to the Future. Part 2: A Focus on Expanding Horizons

The history of space endeavors stretches far from the first liquid-fueled rocket created by the father of modern rocketry, Robert Goddard, in 1926 and will certainly extend far beyond the construction of the International Space Station (ISS) scheduled to be complete with the addition of the Permanent Multipurpose Module on STS-133/ULF5. National Aeronautics and Space Administration (NASA) and the ISS International Partners (IPs) will be the unrelenting venue used to satisfy the curiosities of man as we seek an understanding of space through various experiments (also referred to as payloads) conducted in microgravity. The NASA Payload Safety Review Panel (PSRP) continues to serve as the lead for the review and assessment of payload hardware to assure facility and crew safety. This is the second in a series of papers and presentations that illustrate challenges and lessons learned in the areas of communication, safety requirements, and processes which have been vital to the PSRP.

Nash, Sally K.↗

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable Exploration

Development of NASA's Space Launch System exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated for December 2017. In recognition of the current fiscal realities, SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. Current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. It is this version that will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. This configuration is also designed to evolve to 130 t lift capability that offers several benefits, such as reduced mission costs, simplified payload design, faster trip times, and lower overall risk for missions of national significance. The SLS Program formally transitioned from the formulation phase to implementation during the past year, passing its Preliminary Design Review in 2013 and completion of Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015. Among the Program's many accomplishments are manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and the main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. The result is a launch vehicle that will carry human and robotic exploration on the history-making missions in the coming decades. This paper will discuss the program and technical successes over the past year and provide a look at the milestones and challenges ahead.

Askins, Bruce↗

Flight Avionics Hardware Roadmap

The Avionics Technology Roadmap takes an 80% approach to technology investment in spacecraft avionics. It delineates a suite of technologies covering foundational, component, and subsystem-levels, which directly support 80% of future NASA space mission needs. The roadmap eschews high cost, limited utility technologies in favor of lower cost, and broadly applicable technologies with high return on investment. The roadmap is also phased to support future NASA mission needs and desires, with a view towards creating an optimized investment portfolio that matures specific, high impact technologies on a schedule that matches optimum insertion points of these technologies into NASA missions. The roadmap looks out over 15+ years and covers some 114 technologies, 58 of which are targeted for TRL6 within 5 years, with 23 additional technologies to be at TRL6 by 2020. Of that number, only a few are recommended for near term investment: 1. Rad Hard High Performance Computing 2. Extreme temperature capable electronics and packaging 3. RFID/SAW-based spacecraft sensors and instruments 4. Lightweight, low power 2D displays suitable for crewed missions 5. Radiation tolerant Graphics Processing Unit to drive crew displays 6. Distributed/reconfigurable, extreme temperature and radiation tolerant, spacecraft sensor controller and sensor modules 7. Spacecraft to spacecraft, long link data communication protocols 8. High performance and extreme temperature capable C&DH subsystem In addition, the roadmap team recommends several other activities that it believes are necessary to advance avionics technology across NASA: center dot Engage the OCT roadmap teams to coordinate avionics technology advances and infusion into these roadmaps and their mission set center dot Charter a team to develop a set of use cases for future avionics capabilities in order to decouple this roadmap from specific missions center dot Partner with the Software Steering Committee to coordinate computing hardware and software technology roadmaps and investment recommendations center dot Continue monitoring foundational technologies upon which future avionics technologies will be dependent, e.g., RHBD and COTS semiconductor technologies

Some, Raphael↗

Space Station Freedom - An overview

NASA's Space Station Freedom has been designed with a built-in upgrading capability. Permanently manned status is scheduled for fiscal year 2000; it will at that point be able to offer its users fully 30 kW of electrical power, by means of which either numerous experiments can be run simultaneously, or a single piece of unique hardware with high power requirements can be supplied the power. During this permanently manned phase, NASA will contribute, in addition to the three power modules furnishing 30 kW, a 27-ft long laboratory module with 12 user racks, and equally long habitation module for a crew of 4, and design features allowing growth to accommodate a crew of 8 and power supplies of 75 kW.

Kohrs, Richard H.↗

Using NASA's Space Launch System to Enable Game Changing Science Mission Designs

NASA's Marshall Space Flight Center is directing efforts to build the Space Launch System (SLS), a heavy-lift rocket that will help restore U.S. leadership in space by carrying the Orion Multi-Purpose Crew Vehicle and other important payloads far beyond Earth orbit. Its evolvable architecture will allow NASA to begin with Moon fly-bys and then go on to transport humans or robots to distant places such as asteroids, Mars, and the outer solar system. Designed to simplify spacecraft complexity, the SLS rocket will provide improved mass margins and radiation mitigation, and reduced mission durations. These capabilities offer attractive advantages for ambitious missions such as a Mars sample return, by reducing infrastructure requirements, cost, and schedule. For example, if an evolved expendable launch vehicle (EELV) were used for a proposed mission to investigate the Saturn system, a complicated trajectory would be required with several gravity-assist planetary fly-bys to achieve the necessary outbound velocity. The SLS rocket, using significantly higher C3 energies, can more quickly and effectively take the mission directly to its destination, reducing trip times and cost. As this paper will report, the SLS rocket will launch payloads of unprecedented mass and volume, such as monolithic telescopes and in-space infrastructure. Thanks to its ability to co-manifest large payloads, it also can accomplish complex missions in fewer launches. Future analyses will include reviews of alternate mission concepts and detailed evaluations of SLS figures of merit, helping the new rocket revolutionize science mission planning and design for years to come.

Creech, Stephen D.↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASAs Space Launch System

The engineering development of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS) requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The nominal and off-nominal characteristics of SLS's elements and subsystems must be understood and matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large and complex systems engineering challenge, which is being addressed in part by focusing on the specific subsystems involved in the handling of off-nominal mission and fault tolerance with response management. Using traditional model-based system and software engineering design principles from the Unified Modeling Language (UML) and Systems Modeling Language (SysML), the Mission and Fault Management (M&FM) algorithms for the vehicle are crafted and vetted in Integrated Development Teams (IDTs) composed of multiple development disciplines such as Systems Engineering (SE), Flight Software (FSW), Safety and Mission Assurance (S&MA) and the major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GNC), Thrust Vector Control (TVC), and liquid engines. These model-based algorithms and their development lifecycle from inception through FSW certification are an important focus of SLS's development effort to further ensure reliable detection and response to off-nominal vehicle states during all phases of vehicle operation from pre-launch through end of flight. To test and validate these M&FM algorithms a dedicated test-bed was developed for full Vehicle Management End-to-End Testing (VMET). For addressing fault management (FM) early in the development lifecycle for the SLS program, NASA formed the M&FM team as part of the Integrated Systems Health Management and Automation Branch under the Spacecraft Vehicle Systems Department at the Marshall Space Flight Center (MSFC). To support the development of the FM algorithms, the VMET developed by the M&FM team provides the ability to integrate the algorithms, perform test cases, and integrate vendor-supplied physics-based launch vehicle (LV) subsystem models. Additionally, the team has developed processes for implementing and validating the M&FM algorithms for concept validation and risk reduction. The flexibility of the VMET capabilities enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the developed algorithms utilizing actual subsystem models such as MPS, GNC, and others. One of the principal functions of VMET is to validate the M&FM algorithms and substantiate them with performance baselines for each of the target vehicle subsystems in an independent platform exterior to the flight software test and validation processes. In any software development process there is inherent risk in the interpretation and implementation of concepts from requirements and test cases into flight software compounded with potential human errors throughout the development and regression testing lifecycle. Risk reduction is addressed by the M&FM group but in particular by the Analysis Team working with other organizations such as S&MA, Structures and Environments, GNC, Orion, Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission (LOM) and Loss of Crew (LOC) probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and associated detection and responses to be tested in VMET to ensure reliable failure detection, and confirm responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - the ARINC 6535-partitioned Operating System, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM such as telemetry packing and processing. The baseline plan for use of VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by FSW. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure their effectiveness and performance in the exterior FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Mission description

The Apollo Soyuz mission was the first manned space flight conducted jointly by two nations. The United States and the U.S.S.R. achieved a substantial degree of success in: (1) obtaining flight experience for rendezvous and docking of manned spacecraft and developing a docking system that would be suitable for use as a standard international system, (2) demonstrating in-flight intervehicular crew transfer, and (3) conducting a series of science and applications experiments. The Apollo and Soyuz spacecraft, with minor exceptions, were similar to those flown on previous missions, but a new Apollo module, the docking module, was built specifically for this mission. The mission started with the Soyuz launch on July 15, 1975, followed by the Apollo launch on the same day. Docking of the two spacecraft occurred on July 17, and joint operations were conducted for 2 days. Both spacecraft landed safely and on schedule; the Soyuz landing in the U.S.S.R. occurred on July 21, and the Apollo landing near Hawaii occurred on July 24. Twenty-eight science experiments were performed during the mission.

Hardee, S. N.↗

NASA Platform for Autonomous Systems (NPAS)

NASA Platform for Autonomous Systems (NPAS) is a disruptive software platform and processes being developed by SSC Autonomous Systems Laboratory (ASL). Autonomous operations are critical for the success, safety and crew survival of NASA deep space missions beyond low Earth orbit, including Lunar Orbital Platform-Gateway, and for the future of cost-effective ground mission operations. NPAS represents the embodiment of an innovative implementation for "thinking" autonomy in contrast to brute-force autonomy. It also uniquely addresses the requirements and integrates five primary functionalities for autonomous operations including: (1) Integrated System Health Management (ISHM), (2) autonomy, guided by health and system concepts of operations; (3) knowledge models of applications; (4) infrastructure to create, schedule, and execute mission plans; and (5) infrastructure to integrate distributed autonomous applications across networks.

Figueroa, Fernando↗

The Second European Service Module (ESM-2) Evolutions, Production and Challenges

This paper presents an overview of the Second European Service Module (ESM-2), the second in a series of European Service Modules produced as part of the Barter agreement between NASA and ESA for the Orion Program. The European Industrial consortium is led by the ESA prime contractor Airbus Defence and Space in Bremen. ESA and Airbus signed the ESM-2 contract on 16 February 2017, for this key element of the Orion Exploration Mission 2 (EM-2). EM-2 is the first crewed mission for Orion and will take astronauts farther into the solar system than humanity has ever travelled. EM-2 will also be a historic mission for Europe, as the ESM-2 will be the first European spacecraft to be part of a human transportation system carrying humans beyond low Earth orbit. ESM-2 is mainly a recurring production following ESM-1. Nevertheless, there are a number of important changes being implemented, for example, to incorporate upgrades to further enhance safety and reliability. The challenging delivery schedule for ESM-2 has driven the need to commence manufacturing prior to completion of the qualification on ESM-1. In addition, some requirement deviations and non-compliances approved for ESM-1 have resulted in modifications for ESM-2. In order to manage the competing constraints effectively, the ESM-2 Team has put in place a number of novel approaches to manage schedule, risk, and technical changes. Airbus has set up multi-functional teams according to an approach known as "Major Spacecraft Deliveries" consisting of quality assurance, engineering and procurement. The risk of starting manufacturing prior to qualification is managed through a special risk share agreement. This agreement necessitates rigorous risk reviews across the board for all manufacturing, assembly, integration and test milestones. The ESM-2 changes are managed by Configuration Management, but Airbus has also introduced the Technical Baseline Matrix to provide a transparent top-level overview of the changes from ESM-1 to ESM-2. The tool provides the basis for ESM-2 design and development needs, decisions, as well as the input for the Orion EM-2 Critical Design Review (CDR). The main technical evolutions, status of the production and the novel management approaches for ESM-2 are presented and discussed in the paper.

Orion European Service Module Programme↗

New Accessory for Cleaning the Inside of the Machine Tool Cavity

The best way to extend the life of a metalworking fluid (MWF) is to make sure the machine tool and MWF delivery system are properly cleaned at least once per year. The dilemma the MWF manager is faced with is: How does one clean the machine tool and the MWF system on a large machine tool with an enclosure in a timely manner without impacting production schedules? Remember the walls and roof of the machine enclosure are coated with a film of dried contaminated MWF that must also be removed. If not removed, the deposits on these surfaces can recontaminate the fresh charge of MWF. I have found a product that with this revised procedure helps to shorten the machine tool down time involved with machine cleaning. (1) Discuss with your MWF supplier if they have a machine cleaning product that can be used with your current water based MWF during normal machining operations. Most MWF manufacturers have a machine cleaner that can be used at a lower concentration (1-2% vs. 5%) and can be used while still making production parts for a short period of time (usually 24-48 hours). (2) Make sure this machine cleaner is compatible with the work-piece material you are machining into product. Most cleaners are compatible with ferrous alloys. Because of the increased alkalinity of the fluid you might experience staining if you are machining copper or aluminum alloys. (3) Remove the chips from the chips pans and fluid channels. (4) During off shift hours circulate the MWF using a new product marketed by Rego-Fix called a 'Hydroball'. This device has a 5/8 inch diameter straight shank which allows it to be installed in any collet or solid quick change tool holder. It has multiple nozzles so that the user can control the spray pattern generated when the MWF is circulated. It allows the user to utilize the high pressure, through spindle MWF delivery capability of your machine tool for cleaning purposes. The high pressure MWF system can now be effectively used for cleaning purposes. This will also work with standard pressure system but you must reduce the number of nozzles utilized. By combining the movement of the machine axis around the operating envelope and the MWF circulation you can do a reasonably effective job of washing the inside of the machine tool operating cavity. Way covers will be moved and surfaces exposed because of axis movement. Spray direction will change to better wash fixtures and machine tool components. Deposits will start to breakdown and be washed into the machine tool sump. Since the cycle will run four or more hours it can be done with a weaker cleaning solution. The distributor states that the unit can be rotated up to 50 RPM. When running it has the same effect as the washing rotor inside of your home dishwasher. Inside the cavity on a machining center there is a lot of splash. During normal operations, MWF deposits buildup on the walls and roof of the enclosures. If these deposits (containing bacteria, mold and other contaminants) are not removed they will inoculate the fresh charge of MWF when they are resaturated. When you clean the inside of machine tool cavity, time is spent removing these deposits on the walls and roof of the enclosure. Getting to these surfaces is very difficult usually requiring that a member of the cleaning crew get inside the machine tool to reach them. The Hydro ball is effective in distributing the cleaning solution on all surfaces of the enclosure under high pressure. The only negative we have found is you get to find all the gaps and leaks in your machine tool enclosure. By running the hydro ball with the machine cleaner enriched MWF during off shift (4-8 hours) you can effectively remove these deposits and buildups on the internal surfaces of the cavity of the machine tool and wash them down into the sump. You also clean the internal components of the MWF system without interrupting normal scheduled work. (5) Pump out the spent MWF. You will have found that most of the deposits have been washed from the internal surfaces of the enclosure. For extremely dirty machines you might have to refill the machine tool with the normal machine cleaner mix. You will find that even heavy deposits will break down quicker because of this pre-wash cycle. (6) Rinse the machine cavity. (7) Clean the walls, bottom and screens in the MWF reservoir. The use of this tool and the dilute machine cleaner reduced the cleaning time considerately without affecting production schedules. (8) Refill with MWF and resume normal operations. What we like about this system is we can schedule these light cleanings just before a scheduled fluid change. Add the cleaner to the mix and run the Hydroball on second shift. The spent fluid is pumped out on third shift and the machine refilled. The machine tool with a fresh charge of MWF is ready for first shift without interrupting production schedules. We get better life from our MWFs and the machinists are happier about the condition of their machines.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Preliminary Results from the Joint Russian and US Field Test: Measurement of Sensorimotor and Cardiovascular Responses Immediately Following Landing of the Soyuz Spacecraft

Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short duration (Space Shuttle) and long duration (Mir and International Space Station) space flights. While the unloading paradigms associated with dry immersion and bed rest have do serve as acceptable flight analogs, testing of crew responses following the long duration flights does not begin until a minimum of 24 hours after landing. As a result it is not possible to estimate the nonlinear trend of the early (<24 hr) recovery process nor is it possible to accurately assess the full impact of the decrements associated with long duration flight. To overcome these limitations both the Russian and U.S. sides have implemented testing at the time of landing and before the flight crews have left the landing site. By joint agreement this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long duration space flight crews beginning as soon after landing as possible (< 2 hr) with one to three immediate follow-up measurements on the day of landing. This goal has both sensorimotor and cardiovascular elements including an evaluation of NASA's new anti-orthostatic compression garment as compared with the Russian Kentavr garment. Functional sensorimotor measurements will include, but are not limited to, assessment of hand/eye coordination, ability to egress from a seated position, walk normally without falling, measurement of dynamic visual acuity, ability to discriminate different forces generated with both the hands and legs, recovery from a fall, a coordinated walk involving tandem heel-to-toe placement and determination of postural ataxia while standing. The cardiovascular portion of the investigation includes blood pressure and heart rate measurements during a timed stand test in conjunction with postural ataxia testing. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired at a minimum of one to three more other times within the 24 hr following landing and continue until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of jointly agreed tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content, and implementation. The PFT is currently scheduled for the September 2013 landing of the Soyuz spacecraft (34S). Testing will include: (1) a sit-to-stand test, (2) recovery from a fall where the crewmember begins in the prone position on the ground and then stands for 3 min while cardiovascular stability is determined and postural ataxia data are acquired, and (3) a tandem heel-to-toe walk to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from body-worn inertial sensors and severity of postflight motion sickness will be available for analysis. It is our intent to present, at this celebratory symposium, a summary of these data obtained from two crewmembers. In summary, the level of functional deficit is expected to be most profound during the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Clearly measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiological data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers. Overall, these early functional and related physiological measurements will allow estimation of nonlinear sensorimotor and cardiovascular recovery trends to an accuracy that has not been previously captured in over 50 years of space flight.

Reschke, M. F.↗

Scheduling with genetic algorithms

In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

Fennel, Theron R.↗