Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

The Challenger tragedy was caused by an Apollo mistake, terminating risk analysis

NASA’s view of risk changed between early Apollo and the Space Shuttle. Risk was a known serious problem at the beginning of Apollo and the risk estimates were disturbingly high. To avoid public concern, risk analysis was discontinued. Risk analysis was avoided in Shuttle, leading to an unnecessarily risky design. The immediate cause of the Challenger tragedy was the mistaken decision to launch in cold weather. The fundamental cause was the high risk of the Shuttle design. Before Challenger, management thought and testified that the probability of an accident was 1 in 100,000. After Challenger, Probabilistic Risk Analysis (PRA) found a roughly 1 in 100 chance of a Shuttle failure. The recent Orion design uses the safer Apollo approach, with a hardened capsule, launch abort escape, and the crew placed above the rocket tanks and engines. During Apollo it was estimated that, “assuming all elements from propulsion to rendezvous and life support were done as well or better than ever before, that 30 astronauts would be lost before 3 were returned safely to the Earth.” The chance of astronaut survival was only 10%. After the Apollo 1 tragedy, the awareness of risk led to an intense focus on achieving safety. “The only possible explanation for the astonishing success – no losses in space and on time – was that every participant at every level in every area far exceeded the norm of human capabilities.” During Apollo, a NASA PRA found that the chance of success was “less than 5 percent.” The NASA Administrator felt that “the numbers could do irreparable harm,” and discontinued numerical risk assessment. This led to decreasing understanding of risk. The head of Apollo reliability and safety decided, “Statistics don’t count for anything,” and that risk is reduced by “attention taken in design.” The great and initially unexpected success of Apollo appeared to validate the neglect of PRA. Continuing to neglect the mathematical estimation of risk led Shuttle into a high risk design that produced tragic results. The initial design of the Shuttle emphasized increasing capability and reducing cost without analysis or even mention of risk. A retired NASA official stated, “some NASA people began to confuse desire with reality. … One result was to assess risk in terms of what was thought acceptable without regard for verifying the assessment. … Note that under such circumstances real risk management is shut out.” Not computing risk led to removing launch abort, removing crew escape, selecting less reliable Solid Rocket Boosters, placing the crew compartment next to the rocket boosters, and accepting more stressed shielding tile designs. Accepting these specific risks directly caused the shuttle disasters. The Challenger tragedy is frequently taught as a case of management failure. The focus is on the Challenger launch decision hours before, which is a dramatic example of bad management. However, the true cause of the Challenger disaster occurred decades earlier in the Apollo era. When the easily predictable failures occurred, failure investigations focused on how they might have been avoided. The Shuttle was cancelled after the space station was completed because of its high risk. The ultimate cause of the Shuttle tragedies was the choice by the Apollo-era NASA administrator to avoid a negative public reaction to realistic risk analysis.

Harry W. Jones↗

Progress of the NASA/USGS Lunar Regolith Simulant Project

Beginning in 2004 personnel at MSFC began serious efforts to develop a new generation of lunar simulants. The first two products were a replication of the previous JSC-1 simulant under a contract to Orbitec and a major workshop in 2005 on future simulant development. Beginning in 2006 the project refocused its efforts and approached simulant development in a new and more comprehensive manner, examining new approaches in simulant development and ways to more accurately compare simulants to actual lunar materials. This led to a multi-year effort with five major tasks running in parallel. The five tasks are Requirements, Lunar Analysis, Process Development, Feed Stocks, and Standards. Major progress has been made in all five areas. A substantial draft of a formal requirements document now exists and has been largely stable since 2007. It does evolve as specific details of the standards and Lunar Analysis efforts proceed. Lunar Analysis has turned out to be vastly more difficult than anticipated. After great effort to mine existing published and gray literature, the team has realized the necessity of making new measurements of the Apollo samples, an effort that is currently in progress. Process development is substantially ahead of expectations in 2006. It is now practical to synthesize glasses of appropriate composition and purity. It is also possible to make agglutinate particles in significant quantities. A series of minerals commonly found on the Moon has been synthesized. Separation of mineral constituents from starting rock material is also proceeding. Customized grinding and mixing processes have been developed and tested are now being documented. Identification and development of appropriate feedstocks has been both easier and more difficult than anticipated. The Stillwater Mining Company, operating in the Stillwater layered mafic intrusive complex of Montana, has been an amazing resource for the project, but finding adequate sources for some of the components remains a difficult problem. For example the ratio of clino- to ortho-pyroxenes in the Stillwater is not an exact match for lunar materials. One of the sources being examined as an alternative pyroxene source is the Bushveld Complex in South Africa. Standards have been a major success for the project. The Figure of Merit algorithms have been created, tested, and are being considered for an ISO standard. Agreement has been reached in the community about how to make many of the critical measurements. There remains much work to do: (1) driving down the cost of simulants remains a major obstacle; (2) documentation and cost data analysis have not kept up with progress; (3) educating users in the complexity of the lunar regolith and the use of simulants remains a major task. In summary the project has made enormous progress and is successfully placing simulant development and use on a rigorous, scientifically defensible, engineering basis.

Rickman, Doug↗

Space shuttle low cost/risk avionics study

All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.

Source record↗

Modular space station Phase B extension

The modular space station concept and preliminary design are outlined. The premission operations, reference programs, baseline program costs, sortie analysis, and program options are covered.

Cole, E. G.↗

A look at V/STOL for business aircraft.

Attempt to ascertain the economic viability of the V/STOL capability for business aircraft and the manner in which this viability depends on the aircraft concept. A cost-benefit analysis is presented which indicates that a VTOL business aircraft would be more viable economically than a contemporary turbine-powered business aircraft. The combination of traveler's time value and trip distance for which each aircraft dominates is shown. The significance of disk loading in V/STOL concept application is discussed, and preliminary design configuration studies for three different business-aircraft-sized V/STOLs, using three concepts covering a range of disk loading, are presented as examples. Finally, a discussion of operational aspects of interest to future users of V/STOL business aircraft is presented which centers around the requirements for routine IFR terminal-area operations.

Feistel, T. W.↗

Ecological effects of strip mining in Ohio

The author has identified the following significant results. One result significant as a practical application and for cost benefit analysis is the relative ease with which ERTS-1 will monitor new and unclaimed stripping activities in Southeastern Ohio and in all of Appalachia. Band 5 resolution appears to be better than the often reported 80 meters. The strip mines stand out well enough to be easily identified without other graphic aids. Standing water within the strip mined area stands out in either bands 6 or 7. Areas of several acres are visible. Significant increases in surface extent of water of stripped areas should be detectable on a comparative basis. The degree of reclamation is observable in the imagery in rather gross percentage steps and for areas larger than the bare earth sizes in the table. The gradation in tones in the different bands indicates that probability density imagery using the four bands in CCT data (and statistical processing) is likely to separate degrees of vegetative reclamation.

Chase, P. E.↗

Solid propulsion powered spacecraft concept.

The feasibility and application of a solid propulsion powered spacecraft concept to implement high-energy missions independent of multiplanetary swingby opportunities are assessed. The characteristics of suitable missions and spacecraft were formulated to determine their effects upon propulsion system selection and design. A cost-effectiveness analysis was conducted to provide a meaningful basis of comparing candidate designs. The results substantiated the feasibility of the powered spacecraft concept when used in conjunction with several intermediate-sized launch vehicles as well as energy margins by which to exploit extended mission capabilities. An outgrowth of this study included a new high-mass-fraction solid motor staging design whose performance predictions further enhanced the candidacy of the baseline configuration.

Nakamura, Y.↗

Cost Modeling Techniques for Design Maturity

Cost modeling techniques and factors which either add to or subtract from these estimates are examined. The most important factors for increasing costs are interfacing subsystems, subsystem design and software maturity. Cost decrease depends on hardware, software, and support equipment availability. A cost modeling analysis for reentry shield and aerodynamic decelerator subsystems of a reentry vehicle is presented. Integration problems for the subsystems are also discussed.

Ruhland, E. W.↗

A shock spectra and impedance method to determine a bound for spacecraft structural loads

This paper proposes a method for the determination of design loads of a spacecraft mounted on a launch vehicle when the significant frequency ranges of the two structures overlap. The derived loads are realistic upper bounds of the flight loads. The method utilizes shock spectra of the spacecraft/launch vehicle interface directional accelerations for each event separately and introduces a reduction factor for the shock spectra which is based on the relative impedance of the spacecraft and launch vehicle. The main advantages of the method are low cost of analysis and timeliness in the design. These advantages are attained with only a slight expense of structural weight compared to the more exact transient analysis method.

Bamford, R.↗

Costs and benefits

Two models of cost benefit analysis are illustrated and the application of these models to assessing the economic scope of space applications programs was discussed. Four major areas cited as improvable through space derived information - food supply and distribution, energy sources, mineral reserves, and communication and navigation were - discussed. Specific illustrations are given for agriculture and maritime traffic.

Source record↗

STARPAHC Interim Evaluation Report, May 1975 - April 1976

The primary goals of the STARPAHC Program are to provide data for developing health care for future manned spacecraft, and to establish the feasibility of the STARPAHC concept for improving the delivery of health care to remote areas on earth. Accordingly, the hardware and medical evaluations initiated during the first 6 months of system operation were continued and expanded during the second 6-month period. The evaluations are based on what has proven to be a relatively stabilized 6-month period wherein system failures which occurred during the initial shakedown period in the first 6 months have been minimized. Early trends and performance data reported in the first semi-annual report were reexamined to either verify, modify or change earlier conclusions. The highlights are given of the total year of operation with emphasis on comparisons between the first and second semi-annual reporting period. In addition, an early analysis of costs is summarized.

Source record↗

STARPAHC operational report

The results of the first one and one-half years of operation of the STARPAHC system are presented. An operational cost summary analysis is included as well as the following; (1) Medical evaluation results, (2) system usage, and (3) hardware evaluation results.

Source record↗

Use of Landsat multispectral imagery in estimating snow areal extent and snow water content cost-effectively

Landsat color composites are used in conjunction with a limited amount of aerial survey data and ground-truth measurements in order to estimate snow areal extent and snow water content. The snow water content estimations are based on the inexpensive Landsat data and the much more expensively obtained information on ground snow courses. A cost-effectiveness analysis of the procedures showed the expenses involved in obtaining confidence intervals of 80, 90, 95 and 99% for the estimates.

Khorram, S.↗