Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Safety Analysis Report For Packaging, Y-12 National Security Complex, Model ES-3100 Package with Bulk HEU Contents

This safety analysis report for packaging (SARP) presents the results of the safety analysis prepared in support of the Consolidated Nuclear Security, LLC (CNS) request for licensing of the Model ES-3100 package with bulk highly enriched uranium (HEU) contents and issuance of a Type B(U) Fissile Material Certificate of Compliance. This SARP, published in the format specified in the U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide 7.9 and using information provided in UCID-21218 and NRC Regulatory Guide 7.10, demonstrates that the Y-12 National Security Complex (Y-12) ES-3100 package with bulk HEU contents meets the established NRC regulations for packaging, preparation for shipment, and transportation of radioactive materials given in Title 10, Part 71, of the Code of Federal Regulations (CFR) [10 CFR 71] as well as U.S. Department of Transportation (DOT) regulations for packaging and shipment of hazardous materials given in Title 49 CFR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical analysis of filter testing at the U.S. Department of Energy Filter Test Facility

The U.S. Department of Energy (DOE) technical standard DOE-STD-3020-2015 requires verification testing at the Filter Test Facility (FTF) of high-efficiency particulate air (HEPA) filters to be installed in nuclear facility (Hazard Category 1, 2, 3, and radiological facilities) confinement ventilation systems, or to be installed in habitability systems (e.g., filters for protection of workers required to act for the control and mitigation of emergency situations). Filters in these applications perform a safety function in accident situations, are designated as important to safety, or are necessary for habitability systems. Different FTFs have operated for decades, and results of tests are available to examine the need for and benefits of continued execution of 100 percent QA verification testing. The objective of this study and resulting report was to assess the need for 100 percent QA testing at the current FTF in Maryland, based on an examination of a database of test results from 2013 to August 2020. Filters that require independent testing per DOE-STD-3020-2015 to be installed in nuclear facilities are sent to the FTF before being shipped to the facilities. The FTF examines the documentation (e.g., certificates of compliance, results of particle penetration and airflow resistance testing by the manufacturers, labels affixed to filters and packages, and other requirements specified in purchase orders by the nuclear facility operators), implements visual inspections of the physical state of the filters, and checks the dimensions of frames. Filters that meet the documentation and visual inspection requirements are subjected to particle penetration and airflow resistance testing. In case of rejections, the filters are shipped back to the manufacturers, at the cost of the manufacturers, for replacement. Filters that pass all tests are shipped to the nuclear facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

TA-60-2 Warehouse Asset Tree and Supporting Information

The purpose of the document is to show an example of a Multi-Sector General Permit environmental compliance program inspection structure to new software provider (new provider is under contract w/ LANL) to begin setting up new database.

54 ENVIRONMENTAL SCIENCES↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Low-Temperature Chlorination of Zirconium

Recovery of Zr from nuclear fuel is of high interest because the Zr cladding material comprises up to 50% of the high-level radioactive waste (HLW) that requires disposition. An ideal Zr-recovery process would not only recover the bulk Zr from the fuel or cladding but would also provide decontamination from the components that give rise to the HLW designation. A simplified decontamination pathway providing recovered Zr in compliance with low-level radioactive waste acceptance criteria could significantly reduce the burden of HLW requiring geologic disposition. A newly developed advanced low-temperature chlorination process presents an opportunity to recover a ZrCl4 product that is effectively decontaminated from the elements of concern. This advanced low-temperature chlorination process uses a mixture of the sulfur-containing chlorination compounds sulfur monochloride (S 2 Cl 2 ) and thionyl chloride (SOCl 2 ).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Report Series: Evaluation, Finding of Effect, and Mitigation Documentation for the Main Gate (23-GS100), Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to replace the existing guard shack at the Main Gate (23-GS100, Nevada State Historic Preservation Office [SHPO] Resource No. S1758) to the Nevada National Security Site (NNSS) in Nye County, Nevada. The purpose of the project is to improve security. The project is considered an undertaking subject to review under Title 54 of United States Code (USC) § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 USC § 300101, et seq., and its implementing regulations, Title 36 of the Code of Federal Regulations (36 CFR) Part 800. In 2018, Desert Research Institute (DRI) completed an architectural survey of the town of Mercury. This effort resulted in the identification, recordation, and evaluation of the Mercury Historic District (MHD, SHPO Resource No. D230), including the identification of its contributing elements (Reno et al. 2018). The MHD was recommended eligible for listing in the National Register of Historic Places (NRHP, National Register) under the Secretary of the Interior’s (SOI) Significance Criteria A and C, as defined in 36 CFR Part 60.4, as a significant concentration of buildings and structures with a direct and important association with Cold War-era nuclear testing from 1951 through 1992. It has not been evaluated under Criteria B and D to date. As part of a larger modernization program for Mercury, the NNSA/NFO and the SHPO executed the 2018 Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada (Mercury PA). The Mercury PA includes streamlined Section 106 procedures for undertakings in the MHD based on contributing element categories. The Main Gate is identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of Section 106 compliance and subject to the stipulations of the Mercury PA. Per Stipulation VI of the Mercury PA, when the Area of Potential Effect (APE) for an undertaking includes Category I elements, the NNSA/NFO must evaluate the Category I elements for individual NRHP eligibility under all of the SOI Significance Criteria, prior to initiating any activity that may affect the elements. Thus, the purpose of this report is to evaluate the Main Gate as a potential individually eligible historic property in fulfillment of Stipulation VI of the Mercury PA. The evaluation detailed herein concludes that the Main Gate is individually eligible for listing in the NRHP under SOI Significance Criterion A at the national level of significance for its direct, important association with Cold War-era nuclear testing from 1965 (the date the current Main Gate was constructed) through 1992 (when critical nuclear testing on the NNSS ceased).

23-GS100↗

Incentivizing Adoption of Software Quality Practices

Although many software teams across the laboratories comply with yearly software quality engineering (SQE) assessments, the practice of introducing quality into each phase of the software lifecycle, or the team processes, may vary substantially. Even with the support of a quality engineer, many teams struggle to adapt and right-size software engineering best practices in quality to fit their context, and these activities aren’t framed in a way that motivates teams to take action. In short, software quality is often a “check the box for compliance” activity instead of a cultural practice that both values software quality and knows how to achieve it. In this report, we present the results of our 6600 VISTA Innovation Tournament project, "Incentivizing and Motivating High Confidence and Research Software Teams to Adopt the Practice of Quality." We present our findings and roadmap for future work based on 1) a rapid review of relevant literature, 2) lessons learned from an internal design thinking workshop, and 3) an external Collegeville 2021 workshop. These activities provided an opportunity for team ideation and community engagement/feedback. Based on our findings, we believe a coordinated effort (e.g. strategic communication campaign) aimed at diffusing the innovation of the practice of quality across Sandia National Laboratories could over time effect meaningful organizational change. As such, our roadmap addresses strategies for motivating and incentivizing individuals ranging from early career to seasoned software developers/scientists.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗

Cost Impacts of Risk-Based Methods for Defining AoR and PISC Duration of a CO 2 Storage Project Using NRAP Tools and FE/NETL CO 2 Saline Storage Cost Model

The purpose of this analysis is to assess the fiscal impact of using risk-based methods to define the area of review (AoR) and post-injection site care (PISC) duration for a geologic carbon dioxide (CO 2 ) storage project. The Office of Fossil Energy (FE)/National Energy Technology Laboratory (NETL) CO 2 Saline Storage Cost Model (“cost model”) was utilized to evaluate CO 2 storage economics in this study. The cost model is a widely used tool for evaluating CO 2 storage costs in geologic settings. It estimates costs for storage operations conducted under compliance to the United States Environmental Protection Agency (EPA) Underground Injection Control (UIC) Class VI regulations. This analysis evaluates and compares the costs of storage (on a first-year break-even dollar per tonne [2018$] basis) at the proposed FutureGen 2.0 site as a case study storage location by implementing different approaches to determine AoR and PISC given the prevailing geologic conditions and injection volume and duration considerations. The approaches include the use of 1) risk-based methods to define AoR and PISC duration, 2) an EPA-approved AoR and PISC documented in the FutureGen 2.0 UIC Class VI permit applications, and 3) cost model default settings that utilize uncertainty multipliers to estimate CO 2 plume and pressure front extent as part of AoR determination, as well as a 50-year PISC default. From all three sources, the AoR and PISC specified in the Class VI permit applications for FutureGen 2.0 were the largest and longest relative to the other two sources.

54 ENVIRONMENTAL SCIENCES↗

Guide to the Distributed Energy Resource Risk Management Framework

The emergence of distributed energy resources (DERs) has transformed the electric power sector and will likely have even more profound impacts on the future evolution of the United States energy sector as it modernizes and becomes more reliant upon complex informatics programming and systems to ensure that our power grid remains safe from malicious interference. To mitigate risks associated with the increased and diversified use of DERs, the Distributed Energy Resource Cybersecurity Framework (DER-CF) was developed in 2019. The National Renewable Energy Laboratory extended the scope of the DER-CF to include the RMF. To address the challenges faced by federal energy managers and energy system stakeholders in applying the RMF to DER systems, the Distributed Energy Resource Risk Manager (DER-RM) is a six-step process to proactively manage cybersecurity risk in a methodical manner. The DER-RM is independent of the DER-CF's existing assessment, allowing users to focus specifically on the RMF steps. The tools are targeted to different processes - DER-CF enables organizations to perform self-assessments to improve their cybersecurity posture, while DER-RM assists organizations in achieving compliance with specific requirements. This document provides an overview of the DER-RM. The RMF process outlined in this report serves as a guide to diagnose information and operational system threats, gather required materials to comply with industry standards, and document plans for achieving Authority to Operate. Using the DER-RM, federal agencies and other organizations can easily and intuitively follow the RMF process, manage the risks to their grid-edge infrastructure through the integration of their on-site DERs, and comply with appropriate requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Core Design of the Holos-Quad Microreactor

The Holos-Quad micro-reactor concept, developed by HolosGen LLC, is equipped with a 22 MWt (Mega-Watt thermal) core and an integral power conversion system converting the core thermal energy into approximately 10 MWe (Mega-Watt electric). This design can be configured to support a wide range of applications. It is a very innovative high-temperature gas-cooled reactor concept using TRI-structural ISOtropic particle fuel (TRISO) distributed in graphite hexagonal blocks, cooled with helium in a direct Brayton cycle independently executed by four Subcritical Power Modules (SPMs) fitted into a hardened 40-foot container whose dimensions are in compliance with ISO shipping containers requirements. In FY2019 HolosGen LLC was awarded by the Department of Energy Advanced Research Project Agency-Energy (DOE ARPA-E) under the MEITNER funding program. As part of the MEITNER award, the Argonne National Laboratory (ANL) contributed expertise through two specialized teams: The “Design Team” and the “Resource Team”. The Design Team was dedicated to validate feasibility of the Holos-Quad core and to optimize its core design through neutronics analyses. The Resource Team was dedicated to feasibility verification via high-fidelity codes of Holos-Quad thermal-hydraulic, heat transfer, shielding, and structural aspects. This report summarizes the activities conducted by ANL Design Team. A rigorous design approach based on multi-criteria optimization and code-to-code comparison involving stochastic and high-fidelity deterministic solutions was developed and employed at several evolutionary stages of the Holos-Quad design. Several generations of the Holos-Quad core were designed within this project before converging to the current full-scale Gen 2+ design that is detailed in this report. Figure EA-1 illustrates a cross-sectional view of Gen 2+ Holos-Quad core configuration, and Figure EA-2 provides a simplified perspective view of 1-of-4 SPMs. The Holos-Quad uses four thermal-hydraulically independent SPMs locked into stationary positions during power operation, surrounded by BeO reflector and structural component fully comprised within the dimensional constraints represented by traditional ISO containers. One of the benefits of this approach is to enable transportation of each SPM promptly after irradiation in shielded containers. The core is designed to operate for approximately 8 full-power years while the reactivity controls and power conversion system enable load-following operations. The reactivity controls are represented by independent, diversified, and redundant reactivity control systems based on control drums and redundant sets of shutdown rods. The high-fidelity simulation tools were used to assess detailed power and flux distributions of the three-dimensional full-core or quarter-core of the Gen 2+ configuration. Single-physics and multi-physics simulations of the neutronics code PROTEUS and the thermal-hydraulic code System Analysis Module (SAM) were performed to analyze the Holos design configurations with detailed high-fidelity solutions. The design work performed confirmed feasibility of the Holos-Quad concept, provided realistic design description for detailed design of the operational system, and identified several core design improvements to be further considered for future reactor development activities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Los Alamos National Laboratory Wetland Assessment for the Replacement Water Lines from Technical Area 48 to Technical Area 55 Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take action at Los Alamos National Laboratory (LANL) near a wetland at Technical Area (TA) 48 and under a wetland at TA-55. The project proposes to install two 12-inch water lines along an alignment from TA-48 to Pecos Road on the east side of TA-55 (Figure 1). The proposed water lines will replace aging cast iron pipes that provide water for fire suppression to buildings within TA-55, and potable water to other areas in the Pajarito Corridor. NNSA has prepared this wetland assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Wetland and Wetland Environmental Review Requirements (10 CFR Part 1022) (CFR 2003) which was promulgated to implement DOE requirements under Executive Order 11988 Wetland Management (EO 1977). A wetland is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base wetland as “the 100-year wetland, that is, a wetland with a 1.0 percent chance of flooding in any given year (CFR 2003).” This wetland assessment evaluates potential impacts to wetland values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

Naval Reactors Facility Environmental Monitoring Report (CY2020)

This report presents the results of the radiological and non-radiological environmental monitoring programs for 2020 at the Naval Reactors Facility (NRF). Current operations at NRF are in compliance with applicable regulations governing use, emission, and disposal of solid, liquid, and gaseous materials. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF did not have any adverse effect on human health or the environment. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the maximum potential dose received by any member of the public was well below the most restrictive dose limits prescribed by the US Environmental Protection Agency (EPA), the US Department of Energy (DOE), and the Nuclear Regulatory Commission.

54 ENVIRONMENTAL SCIENCES↗

Naval Reactors Facility Environmental Monitoring Report (CY2019)

This report presents the results of the radiological and non-radiological environmental monitoring programs for 2019 at the Naval Reactors Facility (NRF). Current operations at NRF are in compliance with applicable regulations governing use, emission, and disposal of solid, liquid, and gaseous materials. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF did not have any adverse effect on human health or the environment. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the maximum potential dose received by any member of the public was well below the most restrictive dose limits prescribed by the US Department of Energy (DOE) and the Nuclear Regulatory Commission.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2021)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment, CAU 91, Area 3 U-3fi Injection Well, CAU 92, Area 6 Decon Pond Facility, CAU 110, Area 3 WMD U-3ax/bl Crater, CAU 111, Area 5 WMD Retired Mixed Waste Pits, and CAU 112, Area 23 Hazardous Waste Trenches. This report covers calendar year 2021. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Characterization Results for the March 2022 Tank Farm 3H Evaporator Overhead Sample

On an annual basis, Savannah River Mission Completion (SRMC) provides 2H and 3H evaporator overhead samples to Savannah River National Lab (SRNL) to be analyzed per Section 5.2 of the Effluent Treatment Project (ETP) Waste Compliance Plan (WCP) and the Waste Acceptance Criteria (WAC). This report presents characterization results for the March 2022 3H evaporator overhead sample. The sample was clear and colorless with no visible solids. The results provide measurements for cesium-137 ( 137 Cs), strontium-90 ( 90 Sr), and iodine-129 ( 129 I) with the radionuclide concentration limits specified by the WAC. These analyses were performed on a single sample replicate. A summary of the analytical results for the 3H evaporator overhead sample includes the following. The measured cesium-137 activity in the 3H evaporator overhead sample is 4.59E+02 dpm/mL which is above the ETP WAC limit of 3.28E+02 dpm/mL. The strontium-90 activity in the 3H evaporator overhead sample is <2.95E+01 dpm/mL. This is below the ETP WAC limit of 1.76E+02 dpm/mL. The iodine-129 activity in the 3H evaporator overhead sample is <1.92E-02 dpm/mL. This is below the ETP WAC limit of 1.00E+00 dpm/mL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Security Enhancements for Distributed Energy Resource Systems Interconnected with Distribution Networks: Final Technical Report

The revised IEEE 1547 Standard defines new complex communication-adjustable voltage and frequency regulation and ride-through characteristics, while maintaining the general antiislanding requirement for unintentional islanding situations. Unintentional islanding is prohibited while intentional islanding is specifically allowed, thus effectively enabling microgrid operation mode. Further, IEEE 1547-2018 Standard introduces new requirements in terms of interoperability so that the DER plant/circuit segments may be seamlessly integrated with the utility networks but at the same time become vulnerable to a cyber-attack. Traditional cybersecurity measures including encryption, authentication and role-based access control may not be fully implementable to all communication protocols specified in the IEEE 1547 Standard. Therefore, in this project we have identified, researched, implemented and tested several cyberphysical approaches that rely mostly on the behavior of the DER circuit and may help with validating the incoming command and control action potentially coming through an insecure communications channel. Additionally, we have built semantic models and communications profiles for DER facilities and have implemented lightweight IEC 61850 based publisher-subscriber GOOSE messaging mechanism, with security extensions in terms of authentication and encryption. The project proposed information models for integration into UCA OpenFMB 2.0 profiles focusing on grid code compliance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ALDWP NET- TA-55 Waste Management Item #53780 [Slides]

Waste is a Product. It must be manufactured in complete compliance with the customers’ (WIPP, various LLW sites) specification. Programmatic, facility, and maintenance personnel originate the waste. NPI-6 is the waste generator (key legal term). Our customers are the waste originators.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗