Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Single-Stage, 3.4:1-Pressure-Ratio Aspirated Fan Developed and Demonstrated

Researchers are constantly pursuing technologies that will increase the performance of gas turbine engines. The aspirated compressor concept discussed here would allow the compression system to perform its task with about one-half of the compressor blades. To accomplish this, the researchers applied boundary layer control to the blades, casing, and hub. This method of boundary layer control consisted of removing small amounts of air from the main flow path at critical areas of the compressor. This bleed air could be used by other systems such as engine cooling or could be re-injected into lower pressure areas that require air for enhanced performance. This effort was initiated by the Massachusetts Institute of Technology (MIT) in response to a solicitation from the Defense Advanced Research Projects Agency (DARPA) who sought to advance research in flow control technology. The NASA Glenn Research Center partnered with MIT (principal investigator), Honeywell Aircraft Engines (cycle analysis, structural analysis, and mechanical design), and Pratt & Whitney (cycle analysis and aero-analysis) to conceptualize, design, analyze, build, and test the aspirated fan stage. The aero-design and aero-analysis of this fan stage were jointly executed by MIT and Glenn to minimize the amount of bleed flow needed and to maintain the highest efficiency possible (ref. 1). Mechanical design issues were complicated by the need to have a shrouded rotor with hollow blades, with rotor stress levels beyond the capabilities of titanium. The high stress issues were addressed by designing a shroud that was filament wound with a carbon fiber/epoxy matrix, resulting in an assembly that was strong enough to handle the high stresses. Both the rotor (preceding photographs) and stator (following photograph) were fabricated in two halves and then bolted together at the hub and tip, permitting the bleed passages to be machined into each half before assembly.

Braunscheidel, Edward P.↗

An Overview of the Mars Reconnaissance Orbiter (MRO) Science Mission

The Mars Reconnaissance Orbiter (MRO) is the latest addition to the suite of missions on or orbiting Mars as part of the NASA Mars Exploration Program. Launched on 12 August 2005, the orbiter successfully entered Mars orbit on 10 March 2006 and finished aerobraking on 30 August 2006. Now in its near-polar, near-circular, low-altitude (approximately 300 km), 3 p.m. orbit, the spacecraft is operating its payload of six scientific instruments throughout a one-Mars-year Primary Science Phase (PSP) of global mapping, regional survey, and targeted observations. Eight scientific investigations were chosen for MRO, two of which use either the spacecraft accelerometers or tracking of the spacecraft telecom signal to acquire data needed for analysis. Six instruments, including three imaging systems, a visible-near infrared spectrometer, a shallow-probing subsurface radar, and a thermal-infrared profiler, were selected to complement and extend the capabilities of current working spacecraft at Mars. Whether observing the atmosphere, surface, or subsurface, the MRO instruments are designed to achieve significantly higher resolution while maintaining coverage comparable to the current best observations. The requirements to return higher-resolution data, to target routinely from a low-altitude orbit, and to operate a complex suite of instruments were major challenges successfully met in the design and build of the spacecraft, as well as by the mission design. Calibration activities during the seven-month cruise to Mars and limited payload operations during a three-day checkout prior to the start of aerobraking demonstrated, where possible, that the spacecraft and payload still had the functions critical to the science mission. Two critical events, the deployment of the SHARAD radar antenna and the opening of the CRISM telescope cover, were successfully accomplished in September 2006. Normal data collection began 7 November 2006 after solar conjunction. As part of its science mission, MRO will also aid identification and characterization of the most promising sites for future landed missions, both in terms of safety and in terms of the scientific potential for future discovery. Ultimately, MRO data will advance our understanding of how Mars has evolved and by which processes that change occurs, all within a framework of identifying the presence, extent, and role of water in shaping the planet s climate over time.

astronomical instruments↗

Structural Design Exploration of an Electric Powered Multi-Propulsor Wing Configuration

Advancements in aircraft electric propulsion may enable an expanded operational envelope for electrically powered vehicles compared to their internal combustion engine counterparts. High aspect ratio wings provide additional lift and drag reduction for a proposed multi-propulsor design, however, the challenge is to reduce the weight of wing structures while maintaining adequate structural and aeroelastic margins. Design exploration using a conventional design-and-build philosophy coupled with a finite element method (FEM)-based design of experiments (DOE) strategy are presented to examine high aspect ratio wing structures that have spanwise distributed electric motors. Multiple leading-edge-mounted engine masses presented a challenge to design a wing within acceptable limits for dynamic and aeroelastic stability. Because the first four primary bending eigenmodes of the proposed wing structure are very sensitive to outboard motor placement, safety-of-flight requirements drove the need for multiple spars, rib attachments, and outboard structural reinforcements in the design. Global aeroelasticity became an increasingly important design constraint during the on-going design process, with outboard motor pod flutter ultimately becoming a primary design constraint. Designers successively generated models to examine stress, dynamics, and aeroelasticity concurrently. This research specifically addressed satisfying multi-disciplinary design criteria to generate fluid-structure interaction solution sets, and produced high aspect ratio primary structure designs for the NASA Scalable Convergent Electric Propulsion Technology and Operations Research (SCEPTOR) project in the Aeronautic Research Mission Directorate at NASA. In this paper, a dynamics-driven, quasi-inverse design methodology is presented to address aerodynamic performance goals and structural challenges encountered for the SCEPTOR demonstrator vehicle. These results are compared with a traditional computer aided design based approach.

Moore, James B.↗

Earthquake-induced impact of base-isolated buildings: theory, numerical modeling, and design solutions

Earthquake shaking more intense than that used to size the horizontal clearance between a base–isolated building and near–rigid perimeter moat wall will result in hard impact, producing high–frequency, high–amplitude acceleration response in the structure and supported equipment. Herein this paper provides a design solution for the damaging effects of hard impact by installing a compliant engineered element in the load path between the base–isolated building and the moat wall, resulting in soft impact and a much smaller acceleration response. The engineered element assumed herein is a commercial–off–the–shelf marine fender with mechanical properties determined by physical testing. The attachment of a flexible engineered element, with well–defined stiffness and damping, to a near–rigid moat wall, simplifies the numerical modeling of the building–moat wall system and eliminates the need to bound the lateral stiffness of the wall for impact calculations. The simple model of the engineered element can be implemented in commercial finite element codes. Theory is developed for two–sided impact of a single–degree–of–freedom oscillator. Analytical solutions are derived for the shifted first–mode frequency of the impacted oscillator and for its free–vibration response. The shifted first–mode frequency is a function of the composite lateral stiffness of the isolator–engineered element assembly and its earthquake–induced displacement. Local peaks in the spectral response of the impacted oscillator form at odd integer multiples of the shifted first–mode frequency. The analytical solutions can be used to verify, in part, the numerical model used for impact analysis.

42 ENGINEERING↗

Using Space Weather Variability in Evaluation the Radiation Environment Specifications for NASA's Constellation Program

Hardware design environments for NASA's Constellation Program-the Vision for Space Exploration program to design and build new vehicles for servicing low Earth orbit and the Moon and beyond-have been developed that are necessarily conservative in nature to assure robust hardware design and development required to build space systems which will meet operational goals in a wide range of space environments, This presentation will describe the rationale used to establish the space radiation and plasma design environments specified for a variety of applications including total ionizing radiation dose, dose rate effects, and spacecraft charging and will compare the design environments with "space weather" variability to evaluate the applicability of the design environments and potential vulnerabilities of the system to extreme space weather events.

Coffey, Victoria N.↗

Challenges and Lessons Learned from an Analysis of Three Zero Energy Buildings

Zero energy buildings, or zero energy ready buildings, which are designed and operated by public or private commercial property owners can play an important role in reducing carbon emissions. This paper discusses lessons learned and key takeaways from an in-depth analysis of three zero energy buildings that took an integrated design and construction approach to significantly reduce energy use. Two of these projects are new construction and one is a retrofit to zero energy. Findings are based on project literature review, data analysis, and in-depth interviews with the building design teams and staff who were involved during the design, construction, and operation of the buildings. The paper addresses value proposition and cost data in such a way that other building owners can replicate the strategies and technology solutions in response to regulatory mandates or organizational goals. It also provides details on operational improvements taken at each zero energy building to enhance energy performance and increase the potential for load flexibility, and discusses challenges and lessons gleaned from design teams and building staff. The findings serve as a reference for building owners, designers, engineers, contractors, or others interested in, or involved with, the design, construction, or use of new or existing buildings. The paper also includes recommended pathways for widespread adoption of zero energy strategies that can be applied in various locations.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

Response Surface Model Building and Multidisciplinary Optimization Using D-Optimal Designs

This paper discusses response surface methods for approximation model building and multidisciplinary design optimization. The response surface methods discussed are central composite designs, Bayesian methods and D-optimal designs. An over-determined D-optimal design is applied to a configuration design and optimization study of a wing-body, launch vehicle. Results suggest that over determined D-optimal designs may provide an efficient approach for approximation model building and for multidisciplinary design optimization.

Unal, Resit↗

Design and manufacture of solid ZrO2 electrolyte

The following project assignment was given to the students: 'design and build a suitable YSZ solid electrolyte cell. Describe advantages of the design and fabrication method. Finally, to the limits of available resources, fabricate the design. Explain why it would be superior to other designs.' Clemson University students definitely benefitted from this experience with USRA/NASA. The challenge that this project gave the students was both exciting and attention-getting. Students spent far more time per credit hour on this project than on their other course. This project advanced the art of making efficient oxygen generators as well. Clemson students are now well on the way to designing a solid electrolyte with a large active surface area and comparatively small volume. Previous devices have had to endure the limitation of using only simple shapes such as tubes. The results of this project have demonstrated that better configurations are not only possible but practical.

Source record↗

Building the Next Generation Through 20 Years of Solar Decathlon: From Collegiate Prize to Multifaceted Clean Energy Workforce Program: Preprint

The U.S. Department of Energy Solar Decathlon, initiated in 2002 as a collegiate competition that challenges student teams to design and build high-performance, low-carbon buildings powered by renewables, has always been about developing students to be the next generation of buildings professionals. As we celebrate the 20th anniversary of the Solar Decathlon in 2022, this paper highlights its evolution from a singular prize to a multi-faceted platform preparing the broader buildings workforce to address the challenges of climate change. The original program challenged students to design and construct a residence. To improve the accessibility of the competition, the Design Challenge -- a 1-2 semester design-only competition-- was added to the Solar Decathlon platform. The Solar Decathlon has also scaled globally with events in Europe, the Middle East, China, Latin America and the Caribbean, Africa, and India. In 2021, the Solar Decathlon broadened its reach once again by introducing Solar Decathlon Pro, a zero-energy design practicum for professional architects and engineers. This paper utilizes participation data, surveys, alumni profiles, project submissions, and more to understand how changes to the program have expanded program reach to minority-serving institutions, environmental justice communities, and impacted the building industry's capacity to construct high performance and zero energy buildings. As one of the oldest federal government prizes, the Solar Decathlon offers a roadmap for dramatically increasing prize impact and demonstrates that it continues to push boundaries to tackle decarbonization and environmental justice.

build↗

Beyond Component Optimization: Systems Level Biodesign for Lanthanide Recovery

Global demand for lanthanides (Ln) is projected to rise sharply over the next decade, while geographically concentrated supply chains and the low concentrations and matrix complexity of secondary feedstocks limit the reach of conventional hydro- and pyrometallurgical separation. Engineered biological systems offer a selective, low-energy alternative, and component-level advances in Ln-binding proteins, AI-designed selective scaffolds, and cell-surface display platforms now rival synthetic chelators in affinity and selectivity. These components, however, remain functionally isolated. Currently, there are no engineered chassis coupling recognition, intracellular trafficking, accumulation, and controlled release into an end-to-end pipeline. Here, we outline how new biodesign strategies and chassis selection must move beyond bioleaching to encompass the full recovery pathway. Achieving this requires integrating AI/ML-guided design, genome-scale build tools, high-throughput phenotyping, and biophysical transport modeling within a Design–Build–Test–Learn cycle tuned to recognition, trafficking, accumulation, and release.

Biodesign↗

Regal Beloit Final Technical Report

The original project proposal submitted from NovaTorque Inc (NovaTorque) in 2016 was to improve the existing motor with 95% efficiency by reducing the losses by 21% to achieve 96%. A few months after the proposal was submitted, NovaTorque lost funding and went out of business. The assets of NovaTorque were then acquired by Regal Beloit Corporation (“Regal Beloit” or “Regal”). When the NovaTorque proposal was selected, the project was transferred to Regal Beloit. Once we had production samples from the new Regal production line, they were tested at the Regal Beloit test lab in Wausau, WI. The original NovaTorque motor had an efficiency of 95%, but when the technology was transferred to Regal Beloit, there were multiple manufacturing improvements made, even though the basic electromagnetic design did not change. The test results in Wausau showed that the motors made at the Regal Beloit plant had an efficiency of 96%. Since the goal of the project was to reduce the losses by 21%, a new efficiency target of 96.8% became the project objective. In the first budget period, motors were tested to get the baseline performance. We then used FEA modeling with ANSYS Maxwell to model the existing motor to get correlation between the FEA simulations and the actual test results. Once the model was validated, we evaluated some changes that could be made to the stator to reduce the losses and improve efficiency without changing the rotor or stator housing, keeping the modifications easy to implement. The changes were primarily in the area of making the stator axially shorter and adding Soft Magnetic Composite (SMC) tooth tips. In the second budget period, we proceeded to design and build the new stator that was identified above and identified additional improvements in the process that included a stator machining modification and the use of rectangular wire. When we actually built the motor, the choice of rectangular wire turned out to be a problem. The wire was made by squishing round wire to get the rectangular shape, which caused work hardening, making the wire too stiff to make the desired coils. We shifted to annealed square wire which was better, but we still could not maintain the proper coil envelope. The result was that we had reduced cross section area for stator laminations. We also had to have a radial offset resulting in a radial misalignment between the stator and rotor because of the oversized coils. After the motor was completed, it was shipped to Texas A&M University for testing. With the loss of flux from these issues, the measured motor efficiency was only 96.3%. The primary focus of this motor was to make sure our FEA simulation model predicted the measured losses and overall efficiency, this we moved on to the FEA simulation. The FEA simulations of the motor “as built” with misalignments had good correlation with the test results, so the next step was to use that model to optimize the design of the motor for a final build. This time we considered changes to the stator and rotor and also minor changes to the housing diameter. In the third budget period, we did the detailed design and construction of the final prototypes. The final prototypes had a slight increase in the stator diameter to fit in a standard Regal Beloit housing. We shortened the stator and use more layers of wire in the coils. We also increased the cone angle of the rotor and stator from the original 110 degrees to 130 degrees to get some additional efficiency and optimized the stator cross section. The predicted efficiency from the FEA simulations was 96.9%. When completed, the motors were tested. We were a little short of reaching our target efficiency goal of 96.8%. We were only able to get to 96.7% efficiency. While it may be possible with additional iterations in designs and future builds to gain that additional 0.1%, we believe that we are close to the best we can achieve from a practical viewpoint, and additional iterations would be more work than the potential gains would be worth. No other motor in this class can even reach the 96% that we started with.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Factors Influencing Building Demand Flexibility

The U.S. Department of Energy’s National Roadmap for Grid-interactive Efficient Buildings (GEB) acknowledged that building demand flexibility (DF) is both an important strategy to decarbonizing the buildings sector and an important resource for meeting the changing needs of the electrical grid such as improving grid reliability. However, understanding the complexity and uncertainties in real building field performance of DF strategies is a large gap hindering stakeholders on both grid and buildings side to make investments on deploying such strategies. The research work in this report intended to advance understanding of the variability and influential factors in building demand flexibility. Adding such knowledge based on lab testing results and measured performance data from real buildings is an important contribution. The report uses standardized metrics and methods to quantify DF performance from field-measured DF datasets of two significant building groups of big-box retail and medium office buildings to present the challenge of building DF variability in multiple dimensions. The report presents findings related to how several key factors influence building demand flexibility from implementing a common, cost-effective DF control strategy (i.e., adjusting zone temperatures). The findings are supported by full-scale lab testing, field data analysis and simulation research. The authors also provided application-oriented recommendations to stakeholders such as building aggregators, utility program design professionals, sophisticated building portfolio owners, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Gaining the Competitive Edge: Design for Manufacturing

The successful design of a commercial aircraft which is intended to be in direct competition with existing aircraft requires a market analysis to establish design requirements, the development of a concept to achieve those goals. and the ability to economically manufacture the aircraft. It is often the case that an engineer designs system components with only the perspective of a particular discipline. The relationship of that component to the entire system is often a minor consideration. In an effort to highlight the interaction that is necessary during the design process, the students were organized into design/build teams and required to integrate aspects of market analysis, engineering design, production and economics into their concepts. In order to facilitate this process a hypothetical "Aeroworld" was established. Having been furnished relevant demographic and economic data for "Aeroworld". students were given the task of designing and building an aircraft for a specific market while achieving an economically competitive design. Involvement of the team in the evolution of the design from market definition to technical development to manufacturing allowed the students to identify critical issues in the design process and to encounter many of the conflicting requirements which arise in an aerospace systems design.

Batill, Stephen M.↗

Review and Performance Testing of the Optical Power Monitor (PMON)

The LISA mission requires a high precision optical power monitoring and control system that combines high reliability and measurement accuracy with extremely low disturbance to the core interferometric detection system. NASA is working with Avo Photonics to design and build this optical power monitor, known as PMON. The high-level design requirements take into account detector redundancy, mechanical rigidity, stability against temperature and input alignment changes, parasitic scatter and reflection artifacts, as well as low magnetic field. Gamma and Proton radiation tests have been performed on the photodiodes from a few vendors to verify radiation tolerance. Engineering development units of the PMON have been fabricated, delivered and evaluated at NASA.

Hua Jiao↗

Medium and Heavy Duty Vehicle Powertrain Electrification and Fleet Demonstration

The Contract Award Grant # EE0007513 dated 2 June, 2016 is for the design, development and demonstration of medium duty package delivery vehicles that will result in a 100% increase in fuel economy as measured in miles per gallon. The project was proposed in 3 phases over two budget periods. The Phases were: 1. Modeling and Simulation – This phase was completed and formed the basis of the specifications for the design and build of the physical systems. The modeling and simulation was conducted by AVL and used real world package delivery routes that AVL mapped. The motors, battery pack, range extender and balance of plant support systems were modeled and iterated until a system with the desired fuel economy improvement was realized. Early design of the major subsystems using the actual vehicle space constraints was also completed. This phase was successfully completed in May of 2017. 2. 1st Build and FE Confirmation - This phase was completed and resulted in the final design, release, procurement and build of all major vehicle systems for commissioning into the first vehicle. The work was a partnered effort between McLaren and AVL. McLaren built the eAxle system while AVL built the range extender and integrated the range extender, battery and balance of plant sub-systems into the first vehicle with a control system to make it operate. Prior to the end of this phase a real world HIL system test gave evidence that the fuel economy improvement would be achieved in the real world. This phase was exited with a 7 month delay due mostly to procurement and supply base issues and ended in May, 2018. 3. Final Build and Demonstration - This phase included the final build and commissioning of the four program vehicles and the operation of a demonstration on a set of routes near San Diego California. During this phase, a multitude of issues arose in different systems in the vehicle. These issue resolution exercises were quite complex and caused repeated delays but were all successfully completed. It should also be noted that an early commercialization analysis resulted in the conclusion that the complexity of the system would not make it cost effective, leading to the start of a follow-on design that used newly available component technologies to specify a more cost effective system. This design will be repurposed and put into demonstration on a separately (non-DOE) funded program. It was decided and agreed with DOE that this phase should be considered completed. The knowledge and know-how gained on this program has been incorporated into and transferred to the new program. This phase and the entire program was considered closed on June 1, 2021.

33 ADVANCED PROPULSION SYSTEMS↗

Architectural development of an ST fusion device

A recent U.S. National Academy study recommended the development of a next step Sustained High Power Density (SHPD) facility within the U.S. as an intermediate step in designing and building a Pilot Plant device. Several papers have been written describing the physics, design and engineering scoping analysis performed in developing this machine design. This paper places emphasis on the continued evolution of the architectural development of past activities to meet the requirements of an ST fusion pilot plant and power plant. The current effort centers on meeting basic physics and component requirements in a machine design that improves the chance of achieving fission level availability (95%) within an arrangement that promotes design simplicity, offsite construction with on-site modular assembly. As a prelude to both the SHPD and Pilot Plant, a scoping design of a 500MWe Spherical Tokamak Advanced Reactor (STAR) has been defined to investigate design options and physics scenarios that can successfully meet physics performance, engineering requirements and economic conditions of an ST power plant. Following a successful physics/engineering assessment, the STAR Power Plant design will be downsized to meet the specifications established in the design of a near term ST Pilot Plant

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of deployable structures for large space platform systems. Volume 1: Executive summary

The preponderance of study effort was devoted toward the deployable platform systems study which culminated in the detailed design of a ground test article for future development testing. This design is representative of a prototype square-truss, single-fold building-block design that can construct deployable platform structures. This prototype design was selected through a comprehensive and traceable selection process applied to eight competitive designs. The selection process compared the competitive designs according to seven major selection criteria, i.e., design versatility, cost, thermal stability, meteoroid impact significance, reliability, performance predictability, and orbiter integration suitability. In support of the foregoing, a materials data base, and platform systems technology development needs were established. An erectable design of an OTV hangar was selected and recommended for further design development. This design was selected from five study-developed competitive single-fold and double-fold designs including hard-shell and inflatable designs. Also, two deployable manned module configurations, i.e., a hard-shell and an inflatable design were each developed to the same requirements as the composite of two Space station baseline habitat modules.

Greenberg, H. S.↗

The unique challenge of managing an undergraduate Get-Away-Special experiment

A group of Bringham Young University (BYU) undergraduate students has undertaken an experiment to design and build a normal incidence soft x ray robotics telescope for solar observations. The design phase of this, GOLDHELOX project, has now been completed and final construction and modifications are in progress. The design and manufacture of the payload is under the direction of team leaders and a system's integrator. A goal of this project is educating and furnishing experiences in space engineering and physics for undergraduate students. Our main source of funding is NASA and the BYU Colleges of Physical and Mathematical Sciences and Engineering and Technology. This project is possible because of the NASA Get-Away Special (GAS) program. The only feasible alternative is using an expensive sounding rocket. We estimate the sun tracking and guidance package alone would cost upwards of a million dollars -- at least ten times our entire budget. Because of the GAS program, we simplified the construction, operation, and programming of the instruments with resulting savings in weight, cost, and time spent.

Roming, Peter W. A.↗