Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Advanced District Energy Controls for Improved Efficiency and Resilience

District energy (DE) systems have efficiently provided heat and cooling to buildings in the US for over a century by leveraging economies of scale through shared generation assets. However, optimizing DE boiler and chiller plants is complex due to the intricate mix of equipment and multiple operating flows. Sophisticated controls are necessary to achieve highest efficiencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

OPAD 1991

The Optical Plume Anomaly Detection Program, an experimental study in the attempt to create a rocket engine health monitor based on detection and possible quantification of anomalous atomic and molecular species in the exhaust plume, has been in existence for several years. The instruments developed to monitor the exhaust plumes are presented. Two optical instruments are employed: the polychromator and the spectrometer. The polychromator is a 16 channel spectroradiometer having independent channels individually adjustable for center wavelength and pass bandwidth. Those values may be mechanically reset, with the aid of certain lab equipment. The spectrometer is a multichannel spectral analyzer having two 2048 element linear photodiode arrays at the exit plane of the dispersing instrument, which, like the 16 channel device, is a 1/2 meter grating spectrograph. These instruments are equipped with ultraviolet grade multifiber optical input cables, allowing the instruments to be placed in a benign environment. Telescopes mounted on the test stand observe the plume keeping the shock structure in view. The data acquisition and control system consist of four 80386-33 MHz computers: two at the test stand for instrument control and data preconditioning, and two in the test support building providing data archiving, display, and system control. Further descriptions of the instrumentation are provided.

Powers, W. T.↗

Upwind Buildings Effects on Test Section Performance of the NFAC 80- by 120-Foot Wind Tunnel

In 2013, a new development began that would put multi-story buildings within the exclusion zone of the 80- by 120- Foot Wind Tunnel (80x120) inlet that exceeded the then existing building height restriction. This raised questions concerning whether the tunnel could operate within the acceptable turbulence limits of ≤ 0.5% in the axial direction over 75% area in the wind tunnel test section. The goal of this testing was to determine the validity of this hypothesis. Testing was performed using the 1/50th-scale model of the 80- by 120-FootWind Tunnel within the full-scale facility test section to characterize the model’s test section turbulence levels as a function of wind direction with the presence of the upwind buildings that are currently being constructed. This paper reports the first testing performed to date on the 80x120 inlet as-built under controlled test conditions for wind magnitude and wind onset direction for a variety of buildings in the inlet external flow field, including no buildings (the control case). This testing determined that, at rated operational conditions the upwind blockages caused no increase in turbulence intensity levels measured in the test section and, in some limited cases, caused the turbulence levels to decrease. Lastly, looking at generic rectangular blockages showed that, to have a discernible effect on test section turbulence levels, scaled 100-ft tall blockages need to be within 600 ft of the existing inlet.

Upwind Buildings Effects↗

Re-Envisioning RCx: Achieving Max Potential HVAC Controls Retrofits through Modernized BAS Hardware and Software

Most existing buildings have sub-optimal heating, ventilation, and air conditioning (HVAC) controls, resulting in wasted energy and occupant discomfort. Retro-commissioning (RCx) addresses many of these issues, but it is a lengthy and highly customized process. Limited capabilities of existing building automation system hardware restricts the scope of most RCx projects. Incentive programs consider building automation system (BAS) hardware retrofits to be high-capital investments and do not allow them in typical RCx programs. This paper describes work that the authors are leading to facilitate technical and market innovation in the BAS industry to unlock large savings in existing commercial buildings through deep retrofits of BAS hardware and software. California and New York research projects are demonstrating BAS retrofits leveraging the American Society of Heating, Refrigeration, and Air Conditioning Engineers’ (ASHRAE) new Guideline 36 high performance sequences of operation to achieve greater than 20 percent whole building energy savings, while saving costs and reducing risk through streamlined processes and standardization across BAS manufacturer product lines and across implementation practices. This paper describes market barriers that impede achieving deep savings from BAS retrofits in custom incentive and traditional RCx programs and presents a new maximum potential BAS retrofit model that addresses these barriers. The new model leverages the authors’ efforts in market enablement through open standards, BAS industry partnerships, and tools for cost-effective scaling that includes tools for project screening, savings calculations, and measurement and verification (M&V). This approach is widely applicable and will be ready for at-scale implementation within two years.

Paliaga, Gwelen↗

Build plate conduction cooling for thermal management of wire arc additive manufactured components

Wire arc additive manufacturing (WAAM) allows for quick, large component manufacturing with fast deposition rates while leveraging readily available wire feedstock that is significantly cheaper than metal powder. However, the increased deposition rate of this process requires enhanced thermal management as failures can occur due to overheating. A common strategy to mitigate overheating is to dwell, or pause, between individual layers; however, this can significantly increase build times and eliminate the advantage of additive manufacturing being able to manufacture components quickly. To help mitigate this issue, this study explores the use of active cooling to maintain process control and to decrease overall build time. In this work, conductive cooling applied to either the bottom or side of the print substrate was explored. Results from this study showed that bottom build plate active cooling can be used to decrease dwell times by up to 50% and decrease cool-down to room temperature after the building process by up to 75%. Results from this study demonstrate that the use of active cooling strategies for WAAM can be used for better thermal control over the process and should be further investigated.

36 MATERIALS SCIENCE↗

Parametric and sensitivity analysis of a PCM-integrated wall for optimal thermal load modulation in lightweight buildings

Load modulation in buildings is becoming increasingly important due to growing disparity in energy demand during peak and off-peak hours. Integrating phase change material (PCM) in building envelopes and using a controlled precooling strategy can provide substantial thermal load modulation; however, it may greatly increase the total energy use. Previous studies have employed PCM in building envelopes primarily for energy savings and, to some extent, peak load shedding and shifting. However, the load modulation capacity of a PCM-integrated envelope has not been well explored in the literature. In this study, we perform an extensive parametric and sensitivity analysis on PCM-integrated lightweight building walls and examine the combinatory effects of various PCM parameters on thermal load modulation and wall-related heat gains in buildings. Using numerical simulations, we investigate eight PCM parameters: PCM location in the wall, transition temperature, thickness, latent heat, transition range, density, specific heat, and thermal conductivity. Here, we evaluate their impact and relative importance to achieve maximum load modulation in buildings without compromising occupants’ thermal comfort or total energy use. The results show that the optimized PCM proposed in this study can completely invert the transient heat gain profile of the wall, providing up to 70% reduction of wall-related heat gain during peak hours without a major increase in the cumulative heat gain.

42 ENGINEERING↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decarbonizing all-electric communities via carbon-responsive control of behind-the-meter resources

The progression of electrification in the building and transportation sectors brings new opportunities for energy decarbonization. With higher dependence on the grid power supply, the variation of the grid carbon emission intensity can be utilized to reduce the carbon emissions from the two sectors. Existing coordinated control methods for buildings with distributed energy resources (DERs) either consider electricity price or renewable energy generation as the input signal, or adopt optimization in the decision-making, which is difficult to implement in the real-world environment. This paper aims to propose and validate an easy-to-deploy rule-based carbon responsive control framework that facilitates coordination between all-electric buildings and electric vehicles (EVs). The signals of the grid carbon emission intensity and the local photovoltaics (PV) generation are used for shifting the controllable loads. Extensive simulations were conducted using a model of an all-electric mixed-use community in a cold climate to validate the control performance with metrics such as emissions, energy consumption, peak demand, and EV end-of-day state-of-charge (SOC). Our study identifies that 4.5% to 27.1% of annual emission reduction can be achieved with limited impact on energy costs, peak demand, and thermal comfort. Additionally, up to 32.7% of EV emission reduction can be obtained if the EV owners reduce the target SOC by less than 21.2%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Controls of interaction dynamics of orbital assembly

Building structures and spacecraft in orbit will require technologies for positioning, docking/berthing, and joining orbital structures. A fundamental problem underlying the operation of docking and berthing is that of controlling the contact dynamics of mechanical structures actuated by active mechanisms such as robotic devices. Control systems must be designed to control these active mechanisms so that both the free space motions and contact motions are stable and satisfy specifications on position accuracy and bounds on contact forces. For the large orbital structures of the future, the problem of interactive dynamics and control is fundamentally different in several ways than it was for spacecraft docking in the past. First, future space structures must be treated as flexible structures - the operations of docking, berthing, and assembly will need to respect the vibrations of the structures. Second, the assembly of these structures will require multiple-point contact, rather than the essentially single-point positioning of conventional spacecraft docking. Third, some assembly operations require the subassemblies to be brought and held in contact so that successful joining can be accomplished. A preliminary study of contact stability and compliance control design has resulted in the development of an analytical method and a design method to analyze stability. The analytical method analyzes the problem of stability when an actively-controlled structure contacts a passive structure. This method makes it possible to accurately estimate the stiffness of the passive structures with which the contact motion will become unstable. The analytic results suggest that passivity is neither achievable in practice, nor necessary as a design concept. A contact control system need only be passive up to a certain frequency; beyond that frequency the system can be stabilized with sufficiently small gains. With this concept the Center developed a design methodology for achieving desired compliant contact motions. This design method is based on H-infinity norm optimization, which makes it possible to consider both driving point mechanical impedance and systems robustness to modeling uncertainty. A laboratory facility was set up to verify experimentally the analytical and design theory.

Su, Renjeng↗

Pore-Selective Fullerene Loading in a Porphyrin-Based Metal–Organic Framework Controls Photoinduced Charge-Transfer Dynamics

Building porous donor−acceptor networks based on host−guest interactions in metal organic frameworks (MOFs) provides unique opportunities for tuning charge separation in highly tailorable materials. Here we focus on installing electron-rich porphyrins and electron-deficient fullerene derivatives in the PCN-222 MOF using a solvent assisted ligand insertion (SALI) method. The fullerene is primarily bound in the large pore, where it is subject to distinct dielectric environments through dimethylformamide (DMF) and 1,4-dioxane solvent exchange. Following photoexcitation, sub-picosecond charge transfer involving initial exciplex population is observed, with different charge recombination pathways and lifetimes depending on solvent polarity through modulation of charge-transfer state energies. While the 1,4-dioxane environment yields charge recombination within 1 ns via local fullerene and porphyrin triplet state population, DMF results in charge recombination directly to the ground state on much longer time scales, including some lifetime components in the microsecond range. Fullerene loading influences these kinetics, and the potential for charge delocalization due to fullerene aggregation within the pores is evaluated by using molecular dynamics simulations.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Identifying Controlling Variables Related to Mercury Vapor Concentrations in Legacy Facilities: SRNL Technology Development For D&D

A suite of sensor packages has been installed in the Alpha-4 facility at Y-12 and preliminary data analysis to isolate the controlling variables has been performed after two months of data collection. In line with the conceptual model presented in Section 2.0, the preliminary analysis has demonstrated that temperature, barometric pressure, and relative humidity are the key controlling variables for mercury vapor releases within the building. The data analysis will continue to explore these controlling variables across the next several months to capture a more complete picture of the annual change in meteorological conditions at Y-12.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optical Closed-Loop Propulsion Control System Development

The overall objective of this program was to design and fabricate the components required for optical closed-loop control of a F404-400 turbofan engine, by building on the experience of the NASA Fiber Optic Control System Integration (FOCSI) program. Evaluating the performance of fiber optic technology at the component and system levels will result in helping to validate its use on aircraft engines. This report includes descriptions of three test plans. The EOI Acceptance Test is designed to demonstrate satisfactory functionality of the EOI, primarily fail-safe throughput of the F404 sensor signals in the normal mode, and validation, switching, and output of the five analog sensor signals as generated from validated optical sensor inputs, in the optical mode. The EOI System Test is designed to demonstrate acceptable F404 ECU functionality as interfaced with the EOI, making use of a production ECU test stand. The Optical Control Engine Test Request describes planned hardware installation, optical signal calibrations, data system coordination, test procedures, and data signal comparisons for an engine test demonstration of the optical closed-loop control.

Poppel, Gary L.↗

Optimizing Layered Control Strategies for Reducing Exposure to SARS-CoV-2

While there is growing understanding of the predominance of the airborne mode of transmission of the SARS-CoV-2 virus, there is a lack of guidance on how to build an effective system of controls to mitigate transmission in enclosed spaces. Such a system integrates multiple hazard-specific control measures to both eliminate or replace a hazard, and safeguard individuals against potential exposure and infection. Controls are defined by the US Occupational Safety and Health Association (OSHA) as the use of engineering methods to reduce the level of hazard inside a confined space. The Hierarchy of Controls provides a framework through which a system of controls can be examined; identifying those which directly remove or replace a hazard as the most effective, and individual behavioral measures (e.g., masking or shielding) as least effective. Use of such a framework to quantify control effectiveness might allow for the promotion of spaces as meeting a certain threshold of safety, likely adding to the confidence of space users resulting in increases in various metrics such as sales, visits, or likes.

99 GENERAL AND MISCELLANEOUS↗

Thermal diode and thermal switch for bi-directional heat transfer in building envelopes

The present disclosure relates to a directional heat transfer using thermal control devices, including a dual phase change thermal diode and an active contact-based thermal switch. The thermal diode includes a positive temperature coefficient switching material and a negative temperature coefficient switching material arranged in series. The thermal switch includes two thermally conducting surfaces which may be moved to contact (i.e., having a distance between them of substantially zero) creating minimal thermal contact resistance. Both thermal control devices may be used to control heat flow into and/or out of a building.

Kishore, Ravi Anant↗

On the role of exchange of power and information signals in control and stability of the human-robot interaction

A human's ability to perform physical tasks is limited, not only by his intelligence, but by his physical strength. If, in an appropriate environment, a machine's mechanical power is closely integrated with a human arm's mechanical power under the control of the human intellect, the resulting system will be superior to a loosely integrated combination of a human and a fully automated robot. Therefore, we must develop a fundamental solution to the problem of 'extending' human mechanical power. The work presented here defines 'extenders' as a class of robot manipulators worn by humans to increase human mechanical strength, while the wearer's intellect remains the central control system for manipulating the extender. The human, in physical contact with the extender, exchanges power and information signals with the extender. The aim is to determine the fundamental building blocks of an intelligent controller, a controller which allows interaction between humans and a broad class of computer-controlled machines via simultaneous exchange of both power and information signals. The prevalent trend in automation has been to physically separate the human from the machine so the human must always send information signals via an intermediary device (e.g., joystick, pushbutton, light switch). Extenders, however are perfect examples of self-powered machines that are built and controlled for the optimal exchange of power and information signals with humans. The human wearing the extender is in physical contact with the machine, so power transfer is unavoidable and information signals from the human help to control the machine. Commands are transferred to the extender via the contact forces and the EMG signals between the wearer and the extender. The extender augments human motor ability without accepting any explicit commands: it accepts the EMG signals and the contact force between the person's arm and the extender, and the extender 'translates' them into a desired position. In this unique configuration, mechanical power transfer between the human and the extender occurs because the human is pushing against the extender. The extender transfers to the human's hand, in feedback fashion, a scaled-down version of the actual external load which the extender is manipulating. This natural feedback force on the human's hand allows him to 'feel' a modified version of the external forces on the extender. The information signals from the human (e.g., EMG signals) to the computer reflect human cognitive ability, and the power transfer between the human and the machine (e.g., physical interaction) reflects human physical ability. Thus the information transfer to the machine augments cognitive ability, and the power transfer augments motor ability. These two actions are coupled through the human cognitive/motor dynamic behavior. The goal is to derive the control rules for a class of computer-controlled machines that augment human physical and cognitive abilities in certain manipulative tasks.

Kazerooni, H.↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility Operations

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic . Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Urban Air Mobility↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic. Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55 operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Advanced Air Mobility↗

Modernizing the Legacy Fission Wire Measurement System for the Advanced Test Reactor-Critical Facility

Operational lifetime extensions of existing research reactors have emphasized the need for refurbishment, replacements, and upgrades to supporting equipment and instrumentation. The Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), which entered service in 1967, has recently completed the sixth core internals change-out and has scheduled operations until at least 2040. Reactor maintenance and operational risk management is critically important in the research reactor community, however supporting measurement systems sometimes get overlooked when maintenance is planned. The Fission Wire Measurement System (FWMS) is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical (ATR-C) facility. The ATR-C is an open-pool, low-power test reactor that was purpose driven to resemble ATR and is used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in ATR. A power distribution measurement in ATR-C uses uranium-aluminum wires that are distributed throughout the ATR-C core to validate simulation and modeling results. These measurements require 340 to 1500 wires to be irradiated and measured within a 12-hour window. The activity of the wires is measured in the required time with the FWMS, which was put into service in 1965 at the Radiation Measurements Laboratory (RML). The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. This legacy system is crucial to the continued operations of ATR and has undergone some minor hardware upgrades since 1965, however the system presently relies on custom control boards, custom gas ion chambers, analog amplifiers/discriminators, and a user interface (UI) for the system written in outdated code. Much of the equipment and software is custom with no commercial replacements or support and limited documentation. The existing control software requires an operating system that is no longer supported, creating more vulnerabilities to continued operations. A project is underway with a third-party vendor to design, build, and document a new control and data acquisition system (CDAS) for the FWMS. The new upgrade will replace the control system, computer, UI, sample changer motors, and main power supply while maintaining the interface with existing detector hardware. The upgraded system will be operated in parallel with the current hardware and software to conduct validation testing. This equipment upgrade demonstrates the commitment at ATR to ensuring successful operations and potential future research reactors at INL.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗