Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “baseline program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

A Rocket Powered Single-Stage-to-Orbit Launch Vehicle With U.S. and Soviet Engineers

A single-stage-to-orbit launch vehicle is used to assess the applicability of Soviet Energia high-pressure-hydrocarbon engine to advanced U.S. manned space transportation systems. Two of the Soviet engines are used with three Space Shuttle Main Engines. When applied to a baseline vehicle that utilized advanced hydrocarbon engines, the higher weight of the Soviet engines resulted in a 20 percent loss of payload capability and necessitated a change in the crew compartment size and location from mid-body to forebody in order to balance the vehicle. Various combinations of Soviet and Shuttle engines were evaluated for comparison purposes, including an all hydrogen system using all Space Shuttle Main Engines. Operational aspects of the baseline vehicle are also discussed. A new mass properties program entitles Weights and Moments of Inertia (WAMI) is used in the study.

MacConochie, Ian O.↗

Evaluation of Silicon Nitride for Brayton Turbine Wheel Application

Silicon nitride (Si3N4) is being evaluated as a risk-reduction alternative for a Jupiter Icy Moons Orbiter Brayton turbine wheel in the event that the Prometheus program design requirements exceed the creep strength of the baseline metallic superalloys. Five Si3N4 ceramics, each processed by a different method, were screened based on the Weibull distribution of bend strength at 1700 F (927 C). Three of the Si3N4 ceramics, Honeywell AS800, Kyocera SN282, and Saint-Gobain NT154, had bend strengths in excess of 87 ksi (600 MPa) at 1700 F (927 C). These were chosen for further assessment and consideration for future subcomponent and component fabrication and testing.

Freedman, Marc R.↗

Lightning Imaging Sensor (LIS) for the International Space Station (ISS): Mission Description and Science Goals

In recent years, NASA Marshall Space Flight Center, the University of Alabama in Huntsville, and their partners have developed and demonstrated space-based lightning observations as an effective remote sensing tool for Earth science research and applications. The Lightning Imaging Sensor (LIS) on the Tropical Rainfall Measuring Mission (TRMM) continues to provide global observations of total lightning after 17 years on-orbit. In April 2013, a space-qualified LIS built as the flight spare for TRMM, was selected for flight as a science mission on the International Space Station. The ISS LIS (or I-LIS as Hugh Christian prefers) will be flown as a hosted payload on the Department of Defense Space Test Program (STP) H5 mission, which has a January 2016 baseline launch date aboard a SpaceX launch vehicle for a 2-4 year or longer mission. The LIS measures the amount, rate, and radiant energy of global lightning. More specifically, it measures lightning during both day and night, with storm scale resolution, millisecond timing, and high, uniform detection efficiency, without any land-ocean bias. Lightning is a direct and most impressive response to intense atmospheric convection. It has been found that the characteristics of lightning that LIS measures can be quantitatively coupled to both thunderstorm and other geophysical processes. Therefore, the ISS LIS lightning observations will provide important gap-filling inputs to pressing Earth system science issues across a broad range of disciplines, including weather, climate, atmospheric chemistry, and lightning physics. A unique contribution from the ISS platform will be the availability of real-time lightning, especially valuable for operational applications over data sparse regions such as the oceans. The ISS platform will also uniquely enable LIS to provide simultaneous and complementary observations with other payloads such as the European Space Agency's Atmosphere-Space Interaction Monitor (ASIM) that will be exploring the connection between thunderstorms and lightning with terrestrial gamma-ray flashes (TGFs). Another important function of the ISS LIS will be to provide cross-sensor calibration/validation with a number of other payloads, including the TRMM LIS and the next generation geostationary lightning mappers (e.g., GOES-R Geostationary Lightning Mapper and Meteosat Third Generation Lightning Imager). This inter-calibration will improve the long term climate monitoring provided by all these systems. Finally, the ISS LIS will extend the time-series climate record of LIS lightning observations and expand the latitudinal coverage of LIS lightning to the climate significant upper middle-latitudes.

Blakeslee, R. J.↗

Lightning Imaging Sensor (LIS) for the International Space Station (ISS): Mission Description and Science Goals

In recent years, NASA Marshall Space Flight Center, the University of Alabama in Huntsville, and their partners have developed and demonstrated space-based lightning observations as an effective remote sensing tool for Earth science research and applications. The Lightning Imaging Sensor (LIS) on the Tropical Rainfall Measuring Mission (TRMM) continues to provide global observations of total lightning after 17 years on-orbit. In April 2013, a space-qualified LIS built as the flight spare for TRMM, was selected for flight as a science mission on the International Space Station. The ISS LIS (or I-LIS as Hugh Christian prefers) will be flown as a hosted payload on the Department of Defense Space Test Program (STP) H5 mission, which has a January 2016 baseline launch date aboard a SpaceX launch vehicle for a 2-4 year or longer mission. The LIS measures the amount, rate, and radiant energy of global lightning. More specifically, it measures lightning during both day and night, with storm scale resolution, millisecond timing, and high, uniform detection efficiency, without any land-ocean bias. Lightning is a direct and most impressive response to intense atmospheric convection. It has been found that the characteristics of lightning that LIS measures can be quantitatively coupled to both thunderstorm and other geophysical processes. Therefore, the ISS LIS lightning observations will provide important gap-filling inputs to pressing Earth system science issues across a broad range of disciplines, including weather, climate, atmospheric chemistry, and lightning physics. A unique contribution from the ISS platform will be the availability of real-time lightning, especially valuable for operational applications over data sparse regions such as the oceans. The ISS platform will also uniquely enable LIS to provide simultaneous and complementary observations with other payloads such as the European Space Agency's Atmosphere-Space Interaction Monitor (ASIM) that will be exploring the connection between thunderstorms and lightning with terrestrial gamma-ray flashes (TGFs). Another important function of the ISS LIS will be to provide cross-sensor calibration/validation with a number of other payloads, including the TRMM LIS and the next generation geostationary lightning mappers (e.g., GOES-R Geostationary Lightning Mapper and Meteosat Third Generation Lightning Imager). This inter-calibration will improve the long term climate monitoring provided by all these systems. Finally, the ISS LIS will extend the time-series climate record of LIS lightning observations and expand the latitudinal coverage of LIS lightning to the climate significant upper middle-latitudes.

Blakeslee, R. J.↗

Lightning Imaging Sensor (LIS) for the International Space Station (ISS): Mission Description and Science Goals

In recent years, the NASA Marshall Space Flight Center, the University of Alabama in Huntsville, and their partners have developed and demonstrated space-based lightning observations as an effective remote sensing tool for Earth science research and applications. The Lightning Imaging Sensor (LIS) on the Tropical Rainfall Measuring Mission (TRMM) continues to acquire global observations of total (i.e., intracloud and cloud-to-ground) lightning after 17 years on-orbit. However, TRMM is now low on fuel, so this mission will soon be completed. As a follow on to this mission, a space-qualified LIS built as the flight spare for TRMM has been selected for flight as a science mission on the International Space Station (ISS). The ISS LIS will be flown as a hosted payload on the Department of Defense Space Test Program (STP) H5 mission, which has a January 2016 baseline launch date aboard a SpaceX launch vehicle for a 2-4 year or longer mission. The LIS measures the amount, rate, and radiant energy of total lightning over the Earth. More specifically, it measures lightning during both day and night, with storm scale resolution (approx. 4 km), millisecond timing, and high, uniform detection efficiency, without any land-ocean bias. Lightning is a direct and most impressive response to intense atmospheric convection. It has been found that lightning measured by LIS can be quantitatively related to thunderstorm and other geophysical processes. Therefore, the ISS LIS lightning observations will continue to provide important gap-filling inputs to pressing Earth system science issues across a broad range of disciplines, including weather, climate, atmospheric chemistry, and lightning physics. A unique contribution from the ISS platform will be the availability of real-time lightning data, especially valuable for operational applications over data sparse regions such as the oceans. The ISS platform will also uniquely enable LIS to provide simultaneous and complementary observations with other ISS payloads such as the European Space Agency's Atmosphere-Space Interaction Monitor (ASIM) that will be exploring the connection between thunderstorms and lightning with terrestrial gamma-ray flashes (TGFs) and the Japan Aerospace Exploration Agency's Global LIghtning and Sprites MeasurementS (GLIMS) with its focus on global lightning and sprite connections. Another important function of the ISS LIS will be to provide cross-sensor calibration/validation with a number of other payloads, including the TRMM LIS and the next generation geostationary lightning mappers such as the GOES-R Geostationary Lightning Mapper (GLM) and Meteosat Third Generation Lightning Imager (MTG LI), as well as with ground-based lightning detection systems. These inter-calibrations will improve the long term climate monitoring record provided by all these systems. Finally, the ISS LIS will extend the time-series climate record of LIS lightning observations and expand the latitudinal coverage of LIS lightning to the climate significant upper middle-latitudes.

Blakeslee, R. J.↗

Module Architecture for in Situ Space Laboratories

The paper analyzes internal outfitting architectures for space exploration laboratory modules. ISS laboratory architecture is examined as a baseline for comparison; applicable insights are derived. Laboratory functional programs are defined for seven planet-surface knowledge domains. Necessary and value-added departures from the ISS architecture standard are defined, and three sectional interior architecture options are assessed for practicality and potential performance. Contemporary guidelines for terrestrial analytical laboratory design are found to be applicable to the in-space functional program. Densepacked racks of system equipment, and high module volume packing ratios, should not be assumed as the default solution for exploration laboratories whose primary activities include un-scriptable investigations and experimentation on the system equipment itself.

planetary↗

Development of Level 2 Calibration and Validation Plans for GOES-R; What is a RIMP?

Calibration and Validation (CalVal) plans for Geostationary Operational Environmental Satellite version R (GOES-R) Level 2 (L2) products were documented via Resource, Implementation, and Management Plans (RIMPs) for all of the official L2 products required from the GOES-R Advanced Baseline Imager (ABI). In 2015 the GOES-R program decided to replace the typical CalVal plans with RIMPs that covered, for a given L2 product, what was required from that product, how it would be validated, and what tools would be used to do so. Similar to Level 1b products, the intent was to cover the full spectrum of planning required for the CalVal of L2 ABI products. Instead of focusing on step-by-step procedures, the RIMPs concentrated on the criteria for each stage of the validation process (Beta, Provisional, and Full Validation) and the many elements required to prove when each stage was reached.

Validation↗

Development of Level 2 Calibration and Validation Plans for GOES-R; What is a RIMP?

Calibration and Validation (CalVal) plans for Geostationary Operational Environmental Satellite version R (GOES-R) Level 2 (L2) products were documented via Resource, Implementation, and Management Plans (RIMPs) for all of the official L2 products required from the GOES-R Advanced Baseline Imager (ABI). In 2015 the GOES-R program decided to replace the typical CalVal plans with RIMPs that covered, for a given L2 product, what was required from that product, how it would be validated, and what tools would be used to do so. Similar to Level 1b products, the intent was to cover the full spectrum of planning required for the CalVal of L2 ABI products. Instead of focusing on step-by-step procedures, the RIMPs concentrated on the criteria for each stage of the validation process (Beta, Provisional, and Full Validation) and the many elements required to prove when each stage was reached.

Validation↗

Snowmass Neutrino Frontier: Neutrino Interaction Cross Sections (NF06) Topical Group Report

A thorough understanding of neutrino cross sections in a wide range of energies is crucial for the successful execution of the entire neutrino physics program. In order to extract neutrino properties, long-baseline experiments need an accurate determination of neutrino cross sections within their detector(s). Since very few of the needed neutrino cross sections across the energy spectrum are directly measured, we emphasize the need for theoretical input and indirect measurements such as electron scattering, which would complement direct measurements. In this report we briefly summarize the current status of our knowledge of the neutrino cross sections and articulate needs of the experiments, ongoing and planned, at energies ranging from CEvNS and supernova neutrino energies to the DUNE and atmospheric neutrino energies.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Component Repair Times Obtained from MSPI Data

Information concerning times to repair or restore equipment to service given a failure is valuable to probabilistic risk assessments (PRAs). Examples of such uses in modern PRAs include estimation of the probability of failing to restore a failed component within a specified time period (typically tied to recovering a mitigating system before core damage occurs at nuclear power plants) and the determination of mission times for support system initiating event (SSIE) fault tree models. Information on equipment repair or restoration times applicable to PRA modeling is limited and dated for U.S. commercial nuclear power plants. However, the Mitigating Systems Performance Index (MSPI) program covering all U.S. commercial nuclear power plants provides up-to-date information on restoration times for a limited set of component types. This paper describes the MSPI program data available and analyzes the data to obtain median and mean component restoration times as well as non-restoration cumulative probability curves. The MSPI program provides guidance for monitoring both planned and unplanned outages of trains of selected mitigating systems deemed important to safety. For systems included within the MSPI program, plants monitor both train UA and component unreliability (UR) against baseline values. If the combined system UA and UR increases sufficiently above established baseline results (converted to an estimated change in core damage frequency or CDF), a “white” (or worse) indicator is generated for that system. That in turn results in increased oversight by the US Nuclear Regulatory Commission (NRC) and can impact a plant’s insurance rating. Therefore, there is pressure to return MSPI program components to service as soon as possible after a failure occurs. Three sets of unplanned outages might be used to determine the component repair durations desired in this article: all unplanned outages for the train type that includes the component of interest, only unplanned outages associated with failures of the component of interest, and only unplanned outages associated with PRA failures of the component of interest. The paper will describe how component repair times can be generated from each set and which approach is most applicable. Repair time information will be summarized for MSPI pumps and diesel generators using data over 2003 – 2007. Also, trend information over 2003 – 2012 will be presented to indicate whether the 2003 – 2007 repair time information is still considered applicable. For certain types of pumps, mean repair times are significantly higher than the typically assumed 24 h duration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Hydrogen Turbine Development

Under the sponsorship of the U.S. Department of Energy (DOE) National Energy Technology Laboratories, Siemens has completed the Advanced Hydrogen Turbine Development Program to develop an advanced gas turbine for incorporation into future coal-based Integrated Gasification Combined Cycle (IGCC) plants. All the scheduled DOE Milestones were completed and significant technical progress was made in the development of new technologies and concepts. Advanced computer simulations and modeling, as well as subscale, full scale laboratory, rig and engine testing were utilized to evaluate and select concepts for further development. Program Requirements of: A 3 to 5 percentage point improvement in overall plant combined cycle efficiency when compared to the reference baseline plant; 20 to 30 percent reduction in overall plant capital cost when compared to the reference baseline plant; and NOx emissions of 2 PPM out of the stack. were all met. The program was completed on schedule and within the allotted budget

42 ENGINEERING↗

Performance Analysis of Apollo Navigational Starter Routine

The focus of this project is to recreate and analyze the effectiveness of the original Apollo Starter Routine (ASR) which was used to generate the state vector of the Apollo spacecraft based on a series of radiometric observations. The original Apollo navigation software is unavailable in a modern programming language and the original coding has not been preserved. This necessitates its recreation using the original software documentation. Space Shuttle navigation software does not typically use the ASR or an algorithm like it since the Shuttle s state vector is easily deduced from GPS information or other sources. However, this tactic will be ineffective when trying to determine the state vector of a craft approaching, departing or in orbit around the Moon since the GPS network faces the surface of the Earth, not outer space. The recreation of the ASR from the original documentation is therefore vital as a simulation baseline for the navigation software under development for the Constellation program. The algorithms that make up the ASR will be extracted from the original documentation and adapted for and then implemented in a modern programming language; the majority of it will be coded in Matlab. The ASR s effectiveness will then be tested using simulated tracking data. The ability of the ASR to handle realistically noisy data and the accuracy with which it generates state vectors were analyzed. The ASR proved to be robust enough to process data with range and angle noise as large as 10,000 meters and 10(exp -6) radians together and 300,000 meters and 5x10(exp -4) radians separately at Lunar distances. The ASR was able to handle marginally more noise at distances closer to the Earth where the angle noise was less significant. The ASR is capable of effectively processing 40-80 data points gathered at a rate of one per 20 seconds at close Earth orbit and up to 28-40 data points gathered at a rate of one per minute at distant Earth orbit and Lunar orbit.

Ivanov, Stoyan I.↗

TU-F-CAMPUS-I-05: Semi-Automated, Open Source MRI Quality Assurance and Quality Control Program for Multi-Unit Institution

Purpose: Phantom measurements allow for the performance of magnetic resonance (MR) systems to be evaluated. Association of Physicists in Medicine (AAPM) Report No. 100 Acceptance Testing and Quality Assurance Procedures for MR Imaging Facilities, American College of Radiology (ACR) MR Accreditation Program MR phantom testing, and ACR MRI quality control (QC) program documents help to outline specific tests for establishing system performance baselines as well as system stability over time. Analyzing and processing tests from multiple systems can be time-consuming for medical physicists. Besides determining whether tests are within predetermined limits or criteria, monitoring longitudinal trends can also help prevent costly downtime of systems during clinical operation. In this work, a semi-automated QC program was developed to analyze and record measurements in a database that allowed for easy access to historical data. Methods: Image analysis was performed on 27 different MR systems of 1.5T and 3.0T field strengths from GE and Siemens manufacturers. Recommended measurements involved the ACR MRI Accreditation Phantom, spherical homogenous phantoms, and a phantom with an uniform hole pattern. Measurements assessed geometric accuracy and linearity, position accuracy, image uniformity, signal, noise, ghosting, transmit gain, center frequency, and magnetic field drift. The program was designed with open source tools, employing Linux, Apache, MySQL database and Python programming language for the front and backend. Results: Processing time for each image is <2 seconds. Figures are produced to show regions of interests (ROIs) for analysis. Historical data can be reviewed to compare previous year data and to inspect for trends. Conclusion: A MRI quality assurance and QC program is necessary for maintaining high quality, ACR MRI Accredited MR programs. A reviewable database of phantom measurements assists medical physicists with processing and monitoring of large datasets. Longitudinal data can reveal trends that although are within passing criteria indicate underlying system issues.

60 APPLIED LIFE SCIENCES↗

Involving the new generations in Fermilab endeavors

Since 1984 the Italian groups of the Istituto Nazionale di Fisica Nucleare (INFN) and Italian Universities, collaborating with the DOE laboratory of Fermilab (US) have been running a two-month summer training program for Italian university students. While in the first year the program involved only four physics students of the University of Pisa, in the following years it was extended to engineering students. This extension was very successful and the engineering students have been since then extremely well accepted by the Fermilab Technical, Accelerator, and Scientific Computing Division groups. Over the many years of its existence, this program has proven to be the most effective way to engage new students in Fermilab endeavors. Many students have extended their collaboration with Fermilab with their Master’s Thesis and PhD. Since 2004 the program has been supported in part by DOE in the frame of an exchange agreement with INFN. Over its almost 40 years of history, the program has grown in scope and size and has involved more than 550 Italian students from more than 20 Italian Universities, Several Institutes of Research, including ASI and INAF in Italy, and the ISSNAF Foundation in the US, have provided additional financial support. Since the program does not exclude appropriately selected non-Italian students, a handful of students from European and non-European Universities were also accepted over the years. Each intern is supervised by a Fermilab Mentor responsible for performing the training program. Training programs spanned from Tevatron, CMS, Muon (g-2), Mu2e, and Short Baseline Neutrino Experiments and DUNE design and experimental data analysis, development of particle detectors (silicon trackers, calorimeters, drift chambers, neutrino and dark matter detectors), design of electronic and accelerator components, development of infrastructures and software for exascale data handling, research on superconductive elements and on accelerating cavities, and theory of particle accelerators. Since 2010, within an extended program supported by the Italian Space Agency and the Italian National Institute of Astrophysics, a total of 30 students in physics, astrophysics, and engineering have been hosted for two months in the summer at US space science Research Institutes and laboratories. In 2015 the University of Pisa included these programs within its educational programs. Accordingly, Summer School students are enrolled at the University of Pisa for the duration of the internship and are identified and ensured as such. At the end of the internship, the students are required to write summary reports on their achievements. After positive evaluation by a University Examining Board, interns are acknowledged credits for their Diploma Supplement. The program was canceled in 2020 and 2021 due to the pandemic but restarted successfully in 2022. We believe this program can be taken as a model and easily adopted by interested institutions.

99 GENERAL AND MISCELLANEOUS↗

Composite Overwrapped Pressure Vessels: Database Extension Task 3.0 and Impact Damage Effects Control Task 8.0

This document represents efforts accomplished at the NASA Johnson Space Center White Sands Test Facility (WSTF) in support of the Enhanced Technology for Composite Overwrapped Pressure Vessels (COPV) Program, a joint research and technology effort among the U.S. Air Force, NASA, and the Aerospace Corporation. WSTF performed testing for several facets of the program. Testing that contributed to the Task 3.0 COPV database extension objective included baseline structural strength, failure mode and safe-life, impact damage tolerance, sustained load/impact effect, and materials compatibility. WSTF was also responsible for establishing impact protection and control requirements under Task 8.0 of the program. This included developing a methodology for establishing an impact control plan. Seven test reports detail the work done at WSTF. As such, this document contributes to the database of information regarding COPV behavior that will ensure performance benefits and safety are maintained throughout vessel service life.

Beeson, Harold D.↗

Development of improved ablative materials for ASRM

A program to improve ablative materials for the Advanced Solid Rocket Motor (ASRM) is briefly discussed. The main concerns with the baseline material are summarized along with the measures being undertaken to obtain improvements. The materials involved in the program, all of which have been manufactured and are now being evaluated, are mentioned.

Canfield, A.↗

Development and verification testing of automation and robotics for assembly of space structures

A program was initiated within the past several years to develop operational procedures for automated assembly of truss structures suitable for large-aperture antennas. The assembly operations require the use of a robotic manipulator and are based on the principle of supervised autonomy to minimize crew resources. A hardware testbed was established to support development and evaluation testing. A brute-force automation approach was used to develop the baseline assembly hardware and software techniques. As the system matured and an operation was proven, upgrades were incorprated and assessed against the baseline test results. This paper summarizes the developmental phases of the program, the results of several assembly tests, the current status, and a series of proposed developments for additional hardware and software control capability. No problems that would preclude automated in-space assembly of truss structures have been encountered. The current system was developed at a breadboard level and continued development at an enhanced level is warranted.

Rhodes, Marvin D.↗

Simulated impact of the renewable fuels standard on US Conservation Reserve Program enrollment and conversion

Abstract A socioeconomic model is used to estimate the land‐use implications on the U.S. Conservation Reserve Program from potential increases in second‐generation biofuel production. A baseline scenario with no second‐generation biofuel production is compared to a scenario where the Renewable Fuels Standard ( RFS 2) volumes are met by 2022. We allow for the possibility of converting expiring CRP lands to alternative uses such as conventional crops, dedicated second‐generation biofuel crops, or harvesting existing CRP grasses for biomass. Results indicate that RFS 2 volumes ( RFS 2‐v) can be met primarily with crop residues (78% of feedstock demand) and woody residues (19% of feedstock demand) compared with dedicated biomass (3% of feedstock demand), with only minimal conversion of cropland (0.27 million hectares, <1% of total cropland), pastureland (0.28 million hectares of pastureland, <1% of total pastureland), and CRP lands (0.29 million hectares of CRP lands, 3% of existing CRP lands) to biomass production. Meeting RFS 2 volumes would reduce CRP re‐enrollment by 0.19 million hectares, or 4%, below the baseline scenario where RFS 2 is not met. Yet under RFS 2‐v scenario, expiring CRP lands are more likely to be converted to or maintain perennial cover, with 1.78 million hectares of CRP lands converting to hay production, and 0.29 million hectares being harvested for existing grasses. A small amount of CRP is harvested for existing biomass, but no conversion of CRP to dedicated biomass crops, such as switchgrass, are projected to occur. Although less land is enrolled in CRP under RFS 2‐v scenario, total land in perennial cover increases by 0.15 million hectares, or 2%, under RFS 2‐v. Sensitivity to yield, payment and residue retention assumptions are evaluated.

09 BIOMASS FUELS↗