Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Work function”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Cardiovascular responses to exercise as functions of absolute and relative work load

The roles of absolute and relative oxygen uptake (VO2 and percent of muscle group specific VO2-max) as determinants of the cardiovascular and ventilatory responses to exercise over a wide range of active muscle mass are investigated. Experiments were conducted using four types of dynamic exercise: one-arm curl, one-arm cranking, and one and two-leg cycling at four different relative work loads (25, 50, 75, and 100 percent of VO2-max) for the corresponding muscle group. Results show that VO2 during maximal one-arm curl, one-arm cranking, and one-leg cycling averaged 20, 50, and 75 percent, respectively, of that for maximal two-leg cycling. Cardiac output was determined to be linearly related to VO2 with a similar slope and intercept for each type of exercise, and the heart rate at a given percent VO2-max was higher with larger active muscle mass. It is concluded that the cardiovascular responses to exercise was determined to a large extent by the active muscle mass and the absolute oxygen uptake, with the principal feature appearing to be the tight linkage between systematic oxygen transport and utilization.

Lewis, S. F.↗

The preloadable vector sensitive latch for orbital docking/berthing

The workings and function of the Preloader Vector Sensitive Latch are described. A discussion of docking systems used in the U.S. manned space flight programs is included to show how docking systems have evolved, and to highlight the potential advantages of a preloadable vector sensitive latch in such systems.

Acres, William R.↗

National facilities study. Volume 5: Space research and development facilities task group

With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R&D facilities planning for the U.S., and these are discussed in Section 4 of this volume.

Source record↗

SCOSII: ESA's new generation of mission control systems: The user's perspective

In 1974 ESOC decided to develop a reusable Mission Control System infrastructure for ESA's missions operated under its responsibility. This triggered a long and successful product development line, which started with the Multi Mission Support System (MSSS) which entered in service in 1977 and is still being used today by the MARECS and ECS missions; it was followed in 1989 by a second generation of systems known as SCOS-I, which was/is used by the Hipparcos, ERS-1 and EURECA missions and will continue to support all future ESCO controlled missions until approximately 1995. In the meantime the increasing complexity of future missions together with the emergence of new hardware and software technologies have led ESOC to go for the development of a third generation of control systems, SCOSII, which will support their future missions up to at least the middle of the next decade. The objective of the paper is to present the characteristics of the SCOSII system from the perspective of the mission control team; i.e. it will concentrate on the improvements and advances in the performance, functionality and work efficiency of the system.

Kaufeler, P.↗

Re-engineering NASA's space communications to remain viable in a constrained fiscal environment

Along with the Red and Blue Teams commissioned by the NASA Administrator in 1992, NASA's Associate Administrator for Space Communications commissioned a Blue Team to review the Office of Space Communications (Code O) Core Program and determine how the program could be conducted faster, better, and cheaper. Since there was no corresponding Red Team for the Code O Blue Team, the Blue Team assumed a Red Team independent attitude and challenged the status quo, including current work processes, functional distinctions, interfaces, and information flow, as well as traditional management and system development practices. The Blue Team's unconstrained, non-parochial, and imaginative look at NASA's space communications program produced a simplified representation of the space communications infrastructure that transcends organizational and functional boundaries, in addition to existing systems and facilities. Further, the Blue Team adapted the 'faster, better, cheaper' charter to be relevant to the multi-mission, continuous nature of the space communications program and to serve as a gauge for improving customer services concurrent with achieving more efficient operations and infrastructure life cycle economies. This simplified representation, together with the adapted metrics, offers a future view and process model for reengineering NASA's space communications to remain viable in a constrained fiscal environment. Code O remains firm in its commitment to improve productivity, effectiveness, and efficiency. In October 1992, the Associate Administrator reconstituted the Blue Team as the Code O Success Team (COST) to serve as a catalyst for change. In this paper, the COST presents the chronicle and significance of the simplified representation and adapted metrics, and their application during the FY 1993-1994 activities.

Hornstein, Rhoda Shaller↗

Mission Simulation Facility: Simulation Support for Autonomy Development

The Mission Simulation Facility (MSF) supports research in autonomy technology for planetary exploration vehicles. Using HLA (High Level Architecture) across distributed computers, the MSF connects users autonomy algorithms with provided or third-party simulations of robotic vehicles and planetary surface environments, including onboard components and scientific instruments. Simulation fidelity is variable to meet changing needs as autonomy technology advances in Technical Readiness Level (TRL). A virtual robot operating in a virtual environment offers numerous advantages over actual hardware, including availability, simplicity, and risk mitigation. The MSF is in use by researchers at NASA Ames Research Center (ARC) and has demonstrated basic functionality. Continuing work will support the needs of a broader user base.

Pisanich, Greg↗

Development and Evaluation of an Airborne Separation Assurance System for Autonomous Aircraft Operations

NASA Langley Research Center is developing an Autonomous Operations Planner (AOP) that functions as an Airborne Separation Assurance System for autonomous flight operations. This development effort supports NASA s Distributed Air-Ground Traffic Management (DAG-TM) operational concept, designed to significantly increase capacity of the national airspace system, while maintaining safety. Autonomous aircraft pilots use the AOP to maintain traffic separation from other autonomous aircraft and managed aircraft flying under today's Instrument Flight Rules, while maintaining traffic flow management constraints assigned by Air Traffic Service Providers. AOP is designed to facilitate eventual implementation through careful modeling of its operational environment, interfaces with other aircraft systems and data links, and conformance with established flight deck conventions and human factors guidelines. AOP uses currently available or anticipated data exchanged over modeled Arinc 429 data buses and an Automatic Dependent Surveillance Broadcast 1090 MHz link. It provides pilots with conflict detection, prevention, and resolution functions and works with the Flight Management System to maintain assigned traffic flow management constraints. The AOP design has been enhanced over the course of several experiments conducted at NASA Langley and is being prepared for an upcoming Joint Air/Ground Simulation with NASA Ames Research Center.

Barhydt, Richard↗

Breadboard Facility

In the sixties, Chrysler was NASA's prime contractor for the Saturn I and IB test launch vehicles. The company installed and operated at Huntsville what was known as the Saturn I/IB Development Breadboard Facility. "Breadboard," means an array of electrical and electronic equipment for performing a variety of development and test functions. This work gave Chrysler a broad capability in computerized testing to assure quality control in development of solid-state electronic systems. Today that division is manufacturing many products not destined for NASA, most of them being associated with the company's automotive line. A major project is production and quality-control testing of the "lean-burn" engine, one that has a built-in Computer to control emission timing, and allow the engine to run on a leaner mixture of fuel and air. Other environment-related products include vehicle emission analyzers. The newest of the line is an accurate, portable solid state instrument for testing auto exhaust gases. The exhaust analyzers, now being produced for company dealers and for service

Source record↗

Developing a Habitat for Long Duration, Deep Space Missions

One possible next leap in human space exploration is a mission to a near Earth asteroid (NEA). In order to achieve such an ambitious goal, a space habitat will need to be designed to accommodate a crew of four for the 380-day round trip. The Human Spaceflight Architecture Team (HAT) developed a conceptual design for such a habitat. The team identified activities that would be performed inside a long-duration, deep space habitat, and the capabilities needed to support such a mission. A list of seven functional activities/capabilities was developed: individual and group crew care, spacecraft and mission operations, subsystem equipment, logistics and resupply, and contingency operations. The volume for each activity was determined using NASA STD-3001 and the companion Human Integration Design Handbook (HIDH). Although, the sum of these volumes produced an over-sized spacecraft, the team evaluated activity frequency and duration to identify functions that could share a common volume without conflict, reducing the total volume by 24%. After adding 10% for growth, the resulting functional pressurized volume was calculated to be 268 m3 distributed over the functions. The work was validated through comparison with the International Space Station (ISS), Bigelow Aerospace s proposed habitat module, and NASA s Trans-Hab concepts. In the end, the team developed an internal layout that (a) minimized the transit time between related crew stations, (b) accommodated expected levels of activity at each station, (c) isolated stations when necessary for health, safety, performance, and privacy, and (d) provided a safe, efficient, and comfortable work and living environment.

Rucker, Michelle A.↗

Developing a Habitat for Long Duration, Deep Space Missions

One possible next leap in human space exploration for the National Aeronautics and Space Administration (NASA) is a mission to a near Earth asteroid (NEA). In order to achieve such an ambitious goal, a space habitat will need to accommodate a crew of four for the 380-day round trip. The Human Spaceflight Architecture Team (HAT) developed a conceptual design for such a habitat. The team identified activities that would be performed inside a long-duration, deep space habitat, and the capabilities needed to support such a mission. A list of seven functional activities/capabilities was developed: individual and group crew care, spacecraft and mission operations, subsystem equipment, logistics and resupply, and contingency operations. The volume for each activity was determined using NASA STD-3001 and the companion Human Integration Design Handbook (HIDH). Although, the sum of these volumes produced an over-sized spacecraft, the team evaluated activity frequency and duration to identify functions that could share a common volume without conflict, reducing the total volume by 24%. After adding 10% for growth, the resulting functional pressurized volume was calculated to be a minimum of 268 cu m (9,464 cu ft) distributed over the functions. The work was validated through comparison to Mir, Skylab, the International Space Station (ISS), Bigelow Aerospace s proposed habitat module, and NASA s Trans-Hab concept. Using HIDH guidelines, the team developed an internal layout that (a) minimized the transit time between related crew stations, (b) accommodated expected levels of activity at each station, (c) isolated stations when necessary for health, safety, performance, and privacy, and (d) provided a safe, efficient, and comfortable work and living environment.

Rucker, Michelle A.↗

Factors Impacting Habitable Volume Requirements for Long Duration Missions

One possible next leap in human space exploration for the National Aeronautics and Space Administration (NASA) is a mission to a near Earth asteroid (NEA). In order to achieve such an ambitious goal, a space habitat will need to accommodate a crew of four for the 380-day round trip. The Human Spaceflight Architecture Team (HAT) developed a conceptual design for such a habitat. The team identified activities that would be performed inside a long-duration, deep space habitat, and the capabilities needed to support such a mission. A list of seven functional activities/capabilities was developed: individual and group crew care, spacecraft and mission operations, subsystem equipment, logistics and resupply, and contingency operations. The volume for each activity was determined using NASA STD-3001 and the companion Human Integration Design Handbook (HIDH). Although, the sum of these volumes produced an over-sized spacecraft, the team evaluated activity frequency and duration to identify functions that could share a common volume without conflict, reducing the total volume by 24%. After adding 10% for growth, the resulting functional pressurized volume was calculated to be a minimum of 268 m3 (9,464 ft3) distributed over the functions. The work was validated through comparison to Mir, Skylab, the International Space Station (ISS), Bigelow Aerospace s proposed habitat module, and NASA s Trans-Hab concept. Using HIDH guidelines, the team developed an internal layout that (a) minimized the transit time between related crew stations, (b) accommodated expected levels of activity at each station, (c) isolated stations when necessary for health, safety, performance, and privacy, and (d) provided a safe, efficient, and comfortable work and living environment.

Simon, Matthew↗

Simulation of Stochastic Mud-Crack Damage Formation in an Environmental Barrier Coating

The integrated Finite Element Analysis–Micromechanics Analysis Code/Ceramics Analysis and Reliability Evaluation of Structures (FEAMAC/CARES) program was used to simulate the formation of mudflat-cracks from thermomechanical loading on a multi-layered Environmental Barrier Coating (EBC) system deposited on a ceramic substrate. FEAMAC/CARES combines MAC/GMC multiscale composite micromechanics code with CARES/Life probabilistic multiaxial failure criteria code and Abaqusfinite element analysis. In this work, step function elastic modulus reduction of randomly damaged finite elements was used to represent discrete cracking events. The use of many small-sized low-aspect-ratio finite elements enabled the depiction of crack boundaries and formation of mudflat patterned damage. Demonstrated examples include finite element models of button–sized disk–shaped 3-D specimen, and a 2-D model of through-the-thickness cross-section. All models were subjected to a progressive cool down from 1300oC to room temperature. Mudflat crack damage in the coating system resulted from the buildup of residual tensile stresses between the individual material constituents from thermal expansion mismatch. A 2-parameter Weibull distribution characterized the coating layer stochastic strength response and the effect of the Weibull modulus on the formation of damage was studied here.

residual tensile stress↗

Weibull-Based Stochastic Simulation of Mud-Crack Damage Formation in an Environmental Barrier Coating

The integrated Finite Element Analysis Micromechanics Analysis Code/Ceramics Analysis and Reliability Evaluation of Structures (FEAMAC/CARES) program was used to simulate the formation of mudflat-cracks from thermomechanical loading on a multi-layered Environmental Barrier Coating (EBC) system deposited on a ceramic substrate. FEAMAC/CARES combines MAC/GMC (Micromechanics Analysis Code/Generalized Method of Cells) multiscale composite micromechanics code with CARES/Life probabilistic multiaxial failure criteria code and Abaqusfinite element analysis. In this work, step function elastic modulus reduction of randomly damaged finite elements was used to represent discrete cracking events. The use of many small-sized low-aspect-ratio finite elements enabled the depiction of crack boundaries and formation of mudflat patterned damage. Demonstrated examples include finite element models of button-sized disk-shaped 3-D specimen, and a 2-D model of through-the-thickness cross-section. All models were subjected to a progressive cool down from 1300 degrees Centigrade to room temperature. Mudflat crack damage in the coating system resulted from the buildup of residual tensile stresses between the individual material constituents from thermal expansion mismatch. A 2-parameter Weibull distribution characterized the coating layer stochastic strength response and the effect of the Weibull modulus on the formation of damage was studied here.

Residual Tensile Stress↗

Emitter Surface Temperature Measurements of a 25-A class Hollow Cathode

Measurements of the emitter surface temperature of a hollow cathode were made using an optical ratio pyrometer. These measurements were performed to provide insight into the effect of various cathode operating parameters on emitter surface peak temperature and temperature distribution

Hollow Cathode↗

ECS Artemis II Upgrades

The National Aeronautics and Space Administration (NASA) actively works to further the expectations of space exploration and research. NASA has been able to develop innovative technology and methods that has allowed for continued discovery and innovation. NASA is in the midst of work for the Artemis mission, which is to return to the moon in an effort to prepare for future Mars exploration. After the successful launch of Artemis I last November, our sights have shifted to Artemis II, which is set to launch next year and bring humans into the lunar orbit for the first time in over fifty years. Artemis II will be the first crewed mission for the program and will represent another step forward in our mission to advance our knowledge of the universe around us. From there, the Artemis program will move onto building a permanent site on the moon that will allow us to eventually reach Mars. During my time at NASA, I was able to work with the NE-XF Branch, also known as the Environmental and Life Support Systems Branch. I specifically worked with the Environmental Control Systems (ECS) team. During my time here, construction on the system in the Vehicle Assembly Building (VAB) and at Launchpad 39B have been progressing at full force. ECS is used to provide processed and purged air at specific temperatures, pressures, and humidity’s to fulfill requirements necessary to support Orion and the SLS. While the Pad has been undergoing upgrades from the original Artemis I configuration, the VAB has a completely new ECS very similar to it. While both systems have been undergoing upgrades, we have been able to transition into testing the systems as we prepare for stacking in the VAB early next year. My role has allowed me to learn about how the systems work and function through walkdowns and visits out to both the Pad and the VAB. I’ve been able to see firsthand how the system operates and have learned how the system affects the vehicle. I’ve been able to shadow my mentor, my coworkers, and COMET operators to oversee the construction efforts of the system along with the testing of the software and the system itself. I even was able to aid in testing at the console myself at Pad 39B. Additionally, I am also revising and reviewing displays for Artemis IV that will be used to remotely control parts of the system. Eventually these displays will be used to support the future of Artemis.

Monique Toon↗

DOE CESER 6 GHz Interference Study

DOE CESER has sponsored Idaho National Laboratory (INL) to conduct an objective and independent study of potential 6 GHz interference from outdoor operation of unlicensed devices in the 6 GHz band on fixed service (FS) microwave communication links operated by electrical sector incumbents in that band. INL is collaborating with University of Notre Dame (UND), Electric Power Research Institute (EPRI), Lockard & White, Southern Company, and AT&T, to gather data with real-world 6 GHz interference experiments and identify (1) the potential for interference from unlicensed devices and (2) the interference necessary to cause harm to the incumbents. In addition to the functional assessment, a security assessment of the FCC mandated Automatic Frequency Coordination (AFC) System to regulate use of unlicensed 6 GHz standard power devices is also being conducted. A major objective is to create a science-based and defensible methodology used to produce the necessary data and to derive objective conclusions. This proven methodology can then be used to produce objective data and conclusions for other spectrum bands with similar incumbent uses including 4.4 – 4.9 GHz and 7.125 – 7.4 GHz, identified in the reconciliation bill that was adopted on July 4, 2025, as well as the National Spectrum Strategy discussions that are ongoing. This report contains 6 GHz field experiments and findings in the following real-world scenarios with commercial unlicensed standard power (SP) 6 GHz devices regulated by Automated Frequency Coordination (AFC): • University of Notre Dame (UND) Stadium with a capacity of 80,000 spectators, where Wi-Fi operating in 6 GHz has been deployed recently • Southern Company 6 GHz FS microwave link between Columbus and Fortson, Georgia Following are the following key findings from this study. 1. The AFC is under-protective of FS when line-of-sight exists along the path centerline. Data collected at Southern’s 6 GHz fixed link site shows significant erosion of as much as 21.4-24.4 dB of under-protection that can lead to potential service degradation under typical operating conditions. This first key finding is most likely the result of erroneous use of the RF propagation model. INL will collaborate with EPRI and the AFC Functional Requirements Working Group to submit a change request to the WinnForum TS-1014 standard towards correct use of the propagation model by the AFC. 2. There is additive interference effect of about 3 dB from nearly equal power interferers measured from simultaneous operation of two SP AP's operating co-channel with the FS receive from different locations along the path. This second key finding should be used to add the impact of additive interference of operation of multiple APs in the same geographical area, to the next generation of AFCs. INL will collaborate with FCC on the need for the AFC to consider additive interference. We also recommend that additional experiments are conducted on 6 GHz spectrum interference to further improve the AFC operation as the number of outdoor Wi-Fi devices continues to increase. These proposed steps and recommendations will make the co-existence of the incumbents and the 6 GHz outdoor Wi-Fi providers possible without any impact on the incumbents with a win-win outcome for all.

6 GHz↗

Liquid alkali metals - Equation of state and reduced-pressure, bulk-modulus, sound-velocity, and specific-heat functions

The previous work of Schlosser and Ferrante (1988) on universality in solids is extended to the study of liquid metals. As in the case of solids, to a good approximation, in the absence of phase transitions, plots of the logarithm of the reduced-pressure function H, of the reduced-isothermal-bulk-modulus function b, and of the reduced-sound-velocity function v are all linear in 1-X. Finally, it is demonstrated that ln(Cp/C/v) is also linear in 1-X, where X = (V/V/0/)exp 1/3), and V(0) is the volume at zero pressure.

Schlosser, Herbert↗

Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix A: EOS program WBS dictionary. Appendix B: EOS mission functional analysis

The work breakdown structure (WBS) dictionary for the Earth Observatory Satellite (EOS) is defined. The various elements of the EOS program are examined to include the aggregate of hardware, computer software, services, and data required to develop, produce, test, support, and operate the space vehicle and the companion ground data management system. A functional analysis of the EOS mission is developed. The operations for three typical EOS missions, Delta, Titan, and Shuttle launched are considered. The functions were determined for the top program elements, and the mission operations, function 2.0, was expanded to level one functions. Selection of ten level one functions for further analysis to level two and three functions were based on concern for the EOS operations and associated interfaces.

Source record↗