Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Wind Farm”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Preparing an Incompressible-Flow Fluid Dynamics Code for Exascale-Class Wind Energy Simulations: Preprint

The US Department of Energy has identified Exascale-Class wind farm simulation tools as critical to wind energy scientific discovery. A primary objective of the Exawind project is to build high-performance, predictive Computational Fluid Dynamics tools that satisfy these modeling needs. GPU accelerators will serve as the computational thoroughbreds of next generation, Exascale-Class, platforms. Here, we report on our efforts for preparing the Exawind unstructured mesh solver, Nalu-Wind, for Exascale-Class machines. For computing at this scale, a simple port of the incompressible-flow algorithms to GPUs is not sufficient. One needs novel algorithms that are application aware, memory efficient, and optimized for latest generation GPU devices to get high-performance. The result of our efforts are unstructured mesh simulations of wind turbines that use 1/6 the compute resources of Summit supercomputer at Oak Ridge National Lab. In particular, we demonstrate a first-of-its-kind, simulation using Algebraic Multigrid solvers on over 4000 GPUs.

algebraic multigrid↗

Frequency-domain modeling of floating wind arrays with shared mooring lines

A frequency-domain model for floating wind turbine dynamics has been extended to model floating wind farms with couplings from shared mooring systems. The model, called RAFT, could previously calculate the mean offsets and wave-induced response spectra for single floating wind turbines. Now, the model supports multiple floating wind turbines, each with their own properties and responses, along with mooring lines that run directly between floating wind turbines in the array, meaning that shared mooring lines or fully suspended dynamic power cables can be included. This capability is achieved by setting up an array-level solution of the system mean offsets and assembling the full system matrices for solving the dynamic response. The quasi-static mooring model MoorPy is used to linearize the mooring system properties. To compute the floating wind turbine relative motions, phase offsets are applied to each turbine's response as a function of wave frequency based on the wavelength and relative positions in the array. These differential motions are then applied to mooring system tension Jacobians to compute the tension loads in the shared mooring lines. Overall, the capability provides a frequency-domain analog to the modeling capabilities of the floating support structure in FAST.Farm. Mean offsets and power spectral density plots of responses are compared between RAFT and FAST.Farm to verify the implementation. The results indicate good agreement within the expectations of a frequency-domain modeling approach and suggest correct implementation of the shared mooring aspects. Additionally, a unique comb-like frequency response in the shared mooring line tensions has been observed. This phenomenon has a clear physical basis and may be an important design consideration for future shared mooring systems.

17 WIND ENERGY↗

Distributed Wind Deployment: Dairy Farm

This is case study on distributed wind. Located on the plains in rural Colorado, this family farm uses a distributed wind system to offset electricity used by energy-intensive dairy farming. Their site is ideal for distributed wind development because there are minimal obstacles to block the prevailing winds coming from the west. (Buildings shown are to the east and south, not the dominant wind direction.) The turbines were interconnected on long distribution lines and grid infrastructure upgrades were completed as part of the project.

distributed↗

Application of global weather and climate model output to the design and operation of wind-energy systems

This project addressed the challenge of providing weather and climate information to support the operation, management and planning for wind-energy systems. The need for forecast information is extending to longer projection windows with increasing penetration of wind power into the grid and also with diminishing reserve margins to meet peak loads during significant weather events. Maintenance planning and natural gas trading is being influenced increasingly by anticipation of wind generation on timescales of weeks to months. Future scenarios on decadal time scales are needed to support assessment of wind farm siting, government planning, long-term wind purchase agreements and the regulatory environment. The challenge of making wind forecasts on these longer time scales is associated with a wide range of uncertainties in general circulation and regional climate models that make them unsuitable for direct use in the design and planning of wind-energy systems. To address this challenge, CFAN has developed a hybrid statistical/dynamical forecasting scheme for delivering probabilistic forecasts on time scales from one day to seven months using what is arguably the best forecasting system in the world (European Centre for Medium Range Weather Forecasting, ECMWF). The project also provided a framework to assess future wind power through developing scenarios of interannual to decadal climate variability and change. The Phase II research has successfully developed an operational wind power forecasting system for the U.S., which is being extended to Europe and possibly Asia.

54 ENVIRONMENTAL SCIENCES↗

Renewable Energy Contingencies in Power Systems: Concept and Case Study

This paper introduces the concept of renewable energy contingencies that represent long-term/extended variability of variable renewable energy (VRE) resources, namely, significant periods (e.g., days/weeks) of low wind/solar availability. These contingencies have not received much attention to date but are likely to emerge as a major issue in some countries such as India as the share of VRE increases. Using 38 years of climate model reanalysis data for wind over India, we demonstrate that low periods of wind contingency below long-term (Indian) national average of 5 m/s can extend for more than 100 days in several zones some of which are deploying large wind farms. Even in some of the best wind resource areas in India with long term average wind speed close to 7 m/s, low wind days (e.g., 5 m/s which is substantially below average) can extend up to 60 days. We propose a four-step methodology around a co-optimization based energy-ancillary services dispatch model to assess the impact of renewable contingency and implemented it for the state of Tamil Nadu, the most wind-rich state of India. We have estimated that annual renewable contingency cost impact of 5 GW additional wind in Tamil Nadu to be in the range of US$27-76 million pa. Planning analysis should embrace the concept of renewable contingency to recognize these costs and put in place necessary spinning reserve and back-up generation resources.

Mohar Chattopadhyay↗

ExaWind: Exascale Predictive Wind Plant Flow Physics Modeling

The scientific goal of the ExaWind project is to advance our fundamental understanding of the flow physics governing whole wind plant performance, including wake formation, complex terrain impacts, and turbine-turbine-interaction effects. The primary application codes in the ExaWind environment are Nalu-Wind, an unstructured-grid computational fluid dynamics (CFD) code, AMR-Wind, a structured-grid CFD code, and OpenFAST, a whole-turbine simulation code. In this poster we present our progress towards simulating the ExaWind challenge problem, which is a predictive simulation of a wind farm with tens of megawatt-scale wind turbines dispersed over an area of 50 square kilometers.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

U.S. Department of Energy Collegiate Wind Competition 2025 Rules - Phase 1

The U.S. Department of Energy (DOE) Wind Energy Technologies Office's (WETO) Collegiate Wind Competition (CWC, also referred to as the "Competition" in this rules document) invites interdisciplinary teams of undergraduate students from a variety of academic programs to solve complex wind energy challenges. Through the competition, WETO intends to offer students direct industry experience, valuable exposure to wind energy career pathways, and greater knowledge of wind energy's potential to contribute to a clean energy future. The competition will select up to 35 teams to start, making them eligible to compete for a cash prize pool of up to $280,000 . Each year, the competition identifies a new challenge and set of activities that address real-world research questions, thus demonstrating skills that students will need to work in the wind or wider renewable energy industries. The Collegiate Wind Competition 2025 challenge requires participants to compete simultaneously in four contests: 1) Turbine Prototype Contest: Design, build, and present a unique, wind-driven power system based on market research; 2) Turbine Testing Contest: Test the wind turbine in a competition wind tunnel at the final event; 3) Project Development Contest: Research wind resource data, transmission infrastructure, and environmental factors to create a site plan and financial analysis for a hypothetical wind farm; and Connection Creation Contest: Partner with wind industry professionals, raise awareness of wind energy in your local community, and work with local media to promote your team's accomplishments. The competition does not prescribe a power system market or wind regime. It is expected that each team will participate in all four contests.

collegiate wind competition↗

U.S. Department of Energy Collegiate Wind Competition 2025: Rules - Phases 2 and 3

The U.S. Department of Energy (DOE) Wind Energy Technologies Office's (WETO) Collegiate Wind Competition (CWC, also referred to as the "competition" in this rules document) invites interdisciplinary teams of undergraduate students from a variety of academic programs to solve complex wind energy challenges. Through the competition, WETO intends to offer students direct industry experience, valuable exposure to wind energy career pathways, and greater knowledge of wind energy's potential to contribute to a clean energy future. The competition will select up to 35 teams to start, making them eligible to compete for a cash prize pool of up to $280,000. Each year, the competition identifies a new challenge and set of activities that address real-world research questions, thus demonstrating skills that students will need to work in the wind or wider renewable energy industries. The Collegiate Wind Competition 2025 challenge requires participants to compete simultaneously in four contests: 1) Turbine Design Contest: Design, build, and present a unique, wind-driven power system. 2) Turbine Testing Contest: Test the wind turbine in a competition wind tunnel at the final event. 3) Project Development Contest: Research wind resource data, transmission infrastructure, and environmental factors to create a site plan and financial analysis for a hypothetical wind farm. 4) Connection Creation Contest: Partner with wind industry professionals, raise awareness of wind energy in your local community, and work with local media to promote your team's accomplishments. The competition does not prescribe a power system market or wind regime. It is expected that each team will participate in all four contests.

Collegiate Wind Competition↗

A use-case-driven approach for demonstrating the added value of digitalisation in wind energy

Digitalisation is one of the key drivers for reducing the costs and risks of wind energy. When considering whether to embark on a digitalisation initiative, two key questions arise. The first is what business or operational opportunities might feasibly be addressed and the second is which of the many potential aspects of digitalisation are relevant to those opportunities. In this work, we show how these questions can be answered with a use-case-driven approach, based around a survey aiming to collect and collate the main "pain points" (or everyday challenges) of people in the wind energy sector. Although the relatively low number of participants of the survey (46) means that the results should only be used indicatively, it is still possible to make some general recommendations for priorities for digitalisation efforts in the wind energy sector. Firstly, digitalisation efforts should focus both on supporting people carrying out cross-lifecycle tasks, in particular sharing data, managing data, undertaking general data analyses and accessing data. Tools to do this should deal with varying data formats and naming conventions, make metadata more accessible, define data and metadata standards, make more data publicly available and improve the quality of data. Secondly, efforts should also focus on supporting people in the wind farm operational phase, in particular with failure detection, fault diagnosis, failure rate modelling and predictive maintenance. Solutions to do this should focus on accessible and validated tools for fault detection, cloud or other data pipeline solutions for SCADA data and tools for exhaustive data documentation. Finally, digitalisation efforts should focus on better communicating and helping people become aware of existing solutions and tools, as well as on helping people to exert a stronger influence on possible solutions.

17 WIND ENERGY↗

Development and Verification of an Improved Wake-Added Turbulence Model in FAST.Farm

We introduce a generalized wake-added turbulence (WAT) model in the multiphysics, multiturbine simulation tool FAST.Farm. The WAT model introduces additional small-scale turbulence that represents the breakdown of vortical structures and shear layers in the wake. The article describes the development, implementation, calibration, and verification of the model. The novelties of the model include support for wake asymmetry, buildup of WAT across the wind farm, and secondary effects of wake-induced turbulence (e.g., wake meandering) driven by smaller-scale turbulence structures that arise from wake breakdown. Large-eddy simulations were run to support the calibration of the WAT parameters and verification of the model. Previous studies hypothesized that the lack of WAT modeling was the source of underprediction of fatigue loads, in particular for cases at low turbulence intensities and/or stable atmospheric boundary layers. This study confirms that the newly implemented WAT model enhances the loads predictions in these cases.

17 WIND ENERGY↗

Wind power forecasting : state-of-the-art 2009.

Many countries and regions are introducing policies aimed at reducing the environmental footprint from the energy sector and increasing the use of renewable energy. In the United States, a number of initiatives have been taken at the state level, from renewable portfolio standards (RPSs) and renewable energy certificates (RECs), to regional greenhouse gas emission control schemes. Within the U.S. Federal government, new energy and environmental policies and goals are also being crafted, and these are likely to increase the use of renewable energy substantially. The European Union is pursuing implementation of its ambitious 20/20/20 targets, which aim (by 2020) to reduce greenhouse gas emissions by 20% (as compared to 1990), increase the amount of renewable energy to 20% of the energy supply, and reduce the overall energy consumption by 20% through energy efficiency. With the current focus on energy and the environment, efficient integration of renewable energy into the electric power system is becoming increasingly important. In a recent report, the U.S. Department of Energy (DOE) describes a model-based scenario, in which wind energy provides 20% of the U.S. electricity demand in 2030. The report discusses a set of technical and economic challenges that have to be overcome for this scenario to unfold. In Europe, several countries already have a high penetration of wind power (i.e., in the range of 7 to 20% of electricity consumption in countries such as Germany, Spain, Portugal, and Denmark). The rapid growth in installed wind power capacity is expected to continue in the United States as well as in Europe. A large-scale introduction of wind power causes a number of challenges for electricity market and power system operators who will have to deal with the variability and uncertainty in wind power generation when making their scheduling and dispatch decisions. Wind power forecasting (WPF) is frequently identified as an important tool to address the variability and uncertainty in wind power and to more efficiently operate power systems with large wind power penetrations. Moreover, in a market environment, the wind power contribution to the generation portofolio becomes important in determining the daily and hourly prices, as variations in the estimated wind power will influence the clearing prices for both energy and operating reserves. With the increasing penetration of wind power, WPF is quickly becoming an important topic for the electric power industry. System operators (SOs), generating companies (GENCOs), and regulators all support efforts to develop better, more reliable and accurate forecasting models. Wind farm owners and operators also benefit from better wind power prediction to support competitive participation in electricity markets against more stable and dispatchable energy sources. In general, WPF can be used for a number of purposes, such as: generation and transmission maintenance planning, determination of operating reserve requirements, unit commitment, economic dispatch, energy storage optimization (e.g., pumped hydro storage), and energy trading. The objective of this report is to review and analyze state-of-the-art WPF models and their application to power systems operations. We first give a detailed description of the methodologies underlying state-of-the-art WPF models. We then look at how WPF can be integrated into power system operations, with specific focus on the unit commitment problem.

17 WIND ENERGY↗

Generating wind power scenarios for probabilistic ramp event prediction using multivariate statistical post-processing

Wind power forecasting is gaining international significance as more regions promote policies to increase the use of renewable energy. Wind ramps, large variations in wind power production during a period of minutes to hours, challenge utilities and electrical balancing authorities. A sudden decrease in wind-energy production must be balanced by other power generators to meet energy demands, while a sharp increase in unexpected production results in excess power that may not be used in the power grid, leading to a loss of potential profits. In this study, we compare different methods to generate probabilistic ramp forecasts from the High Resolution Rapid Refresh (HRRR) numerical weather prediction model with up to 12h of lead time at two tall-tower locations in the United States. We validate model performance using 21 months of 80m wind speed observations from towers in Boulder, Colorado, and near the Columbia River gorge in eastern Oregon. We employ four statistical post-processing methods, three of which are not currently used in the literature for wind forecasting. These procedures correct biases in the model and generate short-term wind speed scenarios which are then converted to power scenarios. This probabilistic enhancement of HRRR point forecasts provides valuable uncertainty information of ramp events and improves the skill of predicting ramp events over the raw forecasts. We compute Brier skill scores for each method with regard to predicting up- and down-ramps to determine which method provides the best prediction. We find that the Standard Schaake shuffle method yields the highest skill at predicting ramp events for these datasets, especially for up-ramp events at the Oregon site. Increased skill for ramp prediction is limited at the Boulder, CO, site using any of the multivariate methods because of the poor initial forecasts in this area of complex terrain. These statistical methods can be implemented by wind farm operators to generate a range of possible wind speed and power scenarios to aid and optimize decisions before ramp events occur.

17 WIND ENERGY↗

Northern Power Systems ACCROSS (Final Report)

Northern Power Systems, Inc. has developed advanced Permanent Magnet Direct Drive (PMDD) technology that when fully commercialized will be able to expand the market for both Distributed Scale and Utility Scale wind power across the U.S. However, if Northern Power is to successfully commercialize this technology it will need to develop advanced manufacturing processes that will enable a jump from batch production to continuous flow manufacturing and to ensure that it fields a quality and reliable product for end users that reflects a necessary maturation of wind industry manufacturing in the U.S. The objective of the proposed Advanced Manufacturing and Supply Chain Automation Project is to create and implement a continuous manufacturing, supply chain and field support automated system that will initially be centered on commercialization of the NPS™ 100 turbine for Distributed Wind applications. As a result of implementing this system, Northern Power will publicize its findings and lessons learned to the broader U.S. wind industry as well as apply the system and methodology as part of development and commercialization of the NPS 2.3 turbine for utility scale wind farms.

17 WIND ENERGY↗

Variability of Load and Net Load in Case of Large Scale Distributed Wind Power

Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates), number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the net load variability. Wind power will also change the timing of daily ramps.

17 WIND ENERGY↗