Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Water Impact Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

PREDICTIONS OF ION PRODUCTION RATES AND ION NUMBER DENSITIES WITHIN THE DIAMAGNETIC CAVITY OF COMET 67P/CHURYUMOV-GERASIMENKO AT PERIHELION

We present a one-dimensional ion chemistry model of the diamagnetic cavity of comet 67P/Churyumov-Gerasimenko, the target comet for the ESA Rosetta mission. We solve the continuity equations for ionospheric species and predict number densities of electrons and selected ions considering only gas-phase reactions. We apply the model to the subsolar direction and consider conditions expected to be encountered by Rosetta at perihelion (1.29 AU) in 2015 August. Our default simulation predicts a maximum electron number density of {approx}8 Multiplication-Sign 10{sup 4} cm{sup -3} near the surface of the comet, while the electron number densities for cometocentric distances r > 10 km are approximately proportional to 1/r {sup 1.23} assuming that the electron temperature is equal to the neutral temperature. We show that even a small mixing ratio ({approx}0.3%-1%) of molecules having higher proton affinity than water is sufficient for the proton transfer from H{sub 3}O{sup +} to occur so readily that other ions than H{sub 3}O{sup +}, such as NH{sub 4} {sup +} or CH{sub 3}OH{sub 2} {sup +}, become dominant in terms of volume mixing ratio in part of, if not throughout, the diamagnetic cavity. Finally, we test how the predicted electron and ion densities are influenced by changes of model input parameters, including the neutral background, the impinging EUV solar spectrum, the solar zenith angle, the cross sections for photo- and electron-impact processes, the electron temperature profile, and the temperature dependence of ion-neutral reactions.

79 ASTRONOMY AND ASTROPHYSICS↗

An Acid-Free, Temperature-Based Cation Contamination Removal Strategy for PEM Water Electrolysis

It is widely understood that the durability and reliability of polymer electrolyte membrane (PEM) water electrolyzers are heavily dependent on feedwater purity, with cation contaminants that originate from incomplete water purification and balance of plant materials significantly harming electrolyzer performance. However, contamination remains a challenge and a common cause of failure at the stack level, indicating the need for strategies to recover the performance of contaminated cells. In this study, we investigate the effects of temperature on the uptake, electrochemical impacts, and removal of contaminant calcium and iron cations. Lower operating temperatures increase the sensitivity of the cell performance to contaminant cations, while also decreasing cation uptake and promoting contaminant removal. Computational charge transfer modelling shows that lower temperature increases the concentration of contaminant at the cathode and facilitates their removal from the cell. By testing single cells under scenarios designed to mimic stack temperature dynamics, we investigate low-temperature operation as an approach to stack-relevant contaminant recovery. Together, these results demonstrate that the low-temperature recovery approach is a promising approach for acid-free contamination recovery for PEM water electrolysis to promote stack reliability and durability.

08 HYDROGEN↗

2013 Groundwater Monitoring Report, Central Nevada Test Area Subsurface Corrective Action Unit 443

The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was monitoring with institutional controls. Annual sampling and hydraulic head monitoring of the well network are conducted as part of the subsurface corrective action strategy for the site. The monitoring well network was enhanced in 2013 with the installation of a new well MV-6. The site is currently in the fifth year of the 5-year proof-of-concept monitoring period. Analytical results from the 2013 monitoring are consistent with those of previous years indicating no tritium or 14 C concentrations above the required detection limits. Water level data from new wells MV-4 and MV-5 and recompleted well HTH-1RC indicate that hydraulic heads are still recovering from installation and testing. Data from wells MV-4 and MV-5 also indicate that head levels have not yet recovered from the 2011 sampling event during which several thousand gallons of water were purged. Low-flow bladder pumps were installed during the November 2013 sampling event to reduce the well purge volumes and the impact purging has on the water levels during sampling. The new bladder pumps allow the collection of groundwater samples using the low-flow sampling method and will allow head levels to recover to steadystate conditions. Despite the lack of steady-state groundwater conditions, hydraulic head data collected from site continue to support the conceptual model that the southeast-bounding graben fault acts as a barrier to groundwater flow at the site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Active sample acquisition system for micro-penetrators

This paper summarizes the design and development of a sub-surface sample acquisition system for use in micro-penetrators. The system was developed for flight use under NASA's New Millennium Program, Deep Space 2 project. The system goal is to acquire approximately 100 mg of Martian sub-surface soil and return it to the inside of the micro-penetrator for analysis to determine the presence of water. Various passive and active sampling techniques that were tested during the development cycle are described. After significant testing, a side bore drill mechanism was chosen to be developed for use in the flight penetrators. The design, development, and testing of mechanism element are outlined, with particular emphasis placed on actuator development, drill stem design, impact testing, and mechanism testing in various soil types. The other system elements, a pyrotechnically actuated door mechanism to seal the sample and an impact restraint mechanism, are also described.

Voorhees, Chris↗

Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) Aeroshell Performance

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) reentry vehicle (RV)as a secondary payload mounted inside the launch vehicle (LV) adaptor on an Atlas V 401 out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun-synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere, the top of the payload adaptor was ejected to expose the LOFTID RV. Next, the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated without issue. The Centaur pointed the LOFTID RV to the desired attitude to enter the atmosphere, spun the assembly to three rpm, separated the LOFTID RV, and finally performed a divert maneuver to prevent the Centaur from re-contacting the LOFTID RV after atmospheric entry. The LOFTID RV maintained the design attitude and spin rate from separation to atmospheric entry, a duration of roughly 30 minutes, demonstrating the aeroshell did not experience any energy damping from inflatable structure flexibility. The LOFTID RV entered the atmosphere over Alaska at >8km/sec and decelerated as designed, demonstrating aerodynamically stable flight from hypersonic entry through subsonic parachute deployment. On-board visible-spectrum cameras captured the physical response of the heatshield through all phases of flight. Co-located infrared cameras captured the temperature distribution of the aftside of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. This paper will document aeroshell’s response to the atmospheric entry. The visible-spectrum cameras captured mechanical response of the deployable aeroshell to the loads encountered in the different phases of entry. Events seen on the visible-spectrum cameras correlate with the measurements of the load cell pins on webbing elements that attach the aeroshell to the centerbody structure. Thermocouple data captured verifies the aerothermal response of the aeroshell was in-kind with pre-flight analysis predictions although somewhat lower in most locations. This data will enable enhancement of HIAD predictive capability. Post-flight inspection of the aeroshell after splashdown and ocean recovery shows that all the aeroshell materials and manufacturing techniques developed over the past two decades of HIAD technology development performed as expected at large scale, a scale which cannot be replicated in ground test facilities. The LOFTID RV remained high in the water after touching down under parachute, and maintained buoyancy and integrity for the hour it took to position the recovery vessel near the vehicle after splashdown. There was no indication the HIAD would have experienced an issue maintaining buoyancy for many more hours after water impact as the component maintained adequate inflation pressure more than 24 hours after water extraction with no additional inflation gas in tanks, as the inflation gas remaining in the tank was purposely vented prior to splashdown.

HIAD↗

Engineering Surface Architectures for Improved Durability in III–V Photocathodes

GaInP2 has shown promise as the wide bandgap top junction in tandem absorber photoelectrochemical (PEC) water splitting devices. Among previously reported dual-junction PEC devices with a GaInP 2 top cell, those with the highest performance incorporate an AlInP 2 window layer (WL) to reduce surface recombination and a thin GaInP2 capping layer (CL) to protect the WL from corrosion in electrolytes. However, the stability of these III-V systems is limited, and durability continues to be a major challenge broadly in the field of PEC water splitting. This work provides a systematic investigation into the durability of GaInP 2 systems, examining the impacts of the window layer and capping layer among single junction pn-GaInP 2 photocathodes coated with an MoS 2 catalytic and protective layer. The photocathode with both a CL and WL demonstrates the highest PEC performance and longest lifetime, producing a significant current for >125 h. In situ optical imaging and post-test characterization illustrate the progression of macroscopic degradation and chemical state. The surface architecture combining an MoS 2 catalyst, CL, and WL can be translated to dual-junction PEC devices with GaInP 2 or other III-V top junctions to enable more efficient and stable PEC systems.

08 HYDROGEN↗

Thermal Hydraulic Effect of Fuel Plate Surface Roughness

This study presents surface roughness measurements characteristic of the pre-film layer applied to a typical Advanced Test Reactor (ATR) fuel plate. This data is used to estimate the friction factor for thermal hydraulic flow calculations of a Gas Test Loop (GTL) system proposed for incorporation into ATR to provide a fast neutron flux environment for the testing of nuclear fuels and materials. To attain the required neutron flux, the design includes booster fuel plates clad with the same aluminum alloy as the ATR driver fuel and cooled with water supplied by the ATR primary coolant pumps. The objectives of this study are to: (1) determine the surface roughness of the protective boehmite layer applied to the ATR driver fuel prior to reactor operations in order to specify the machining tolerances for the surface finish on simulated booster fuel plates in a GTL hydraulic flow test model, and (2) assess the consequent thermal hydraulic impact due to surface roughness on the coolability of the booster fuel with a similar pre-film layer applied. While the maximum roughness of this coating is specified to be 1.6 µm (63 microinches), no precise data on the actual roughness were available. A representative sample coupon autoclaved with the ATR driver fuel to produce the pre-film coating was analyzed using optical profilometry. Measurements yielded a mean surface roughness of 0.53 µm (21 microinches). Results from a sensitivity study show that a ±15% deviation from the mean measured surface finish would have a minimal effect on coolant temperature, coolant flow rate, and fuel temperature. However, frictional losses from roughnesses greater than 1.5 µm (~60 microinches) produce a marked decrease in flow rate, causing fuel and coolant temperatures to rise sharply.

36 MATERIALS SCIENCE↗

Mimicking Geologic Depositional Fabrics for Multiphase Flow Experiments

A novel laboratory technique is presented for generating two-dimensional beadpacks with reproducible natural geologic sedimentary bedforms. The heterogeneous beadpacks are deposited in a 0.6 m × 0.6 m × 0.02 m glass slab chamber using a programmable two-axis linear actuator. The method takes advantage of natural mechanical sorting processes, along with the ability to program the motion of the arm, to efficiently build cross-beds and ripple laminae similar to those seen in natural water-lain clastic deposits. By using a mixture of grain sizes (200 to 800 μm diameter), depositional fabrics with multiscale heterogeneity (mm to dm) are generated. Reproducibility tests show very high correlation among multiple fabric realizations produced with similar inputs. After introducing this first-of-a-kind capability to produce depositionally realistic fabrics at scales larger than that of rock cores, a demonstrative study is presented that illustrates gravity unstable multiphase flow which is relevant in the context of CO 2 sequestration. Preliminary results highlight the dramatic impact small scale capillary heterogeneities have on multiphase immiscible displacement and can help bridge understanding between core scale experiments and reservoir scale observations.

54 ENVIRONMENTAL SCIENCES↗

Thermal Removal Of Tritium From Concrete And Soil To Reduce Groundwater Impacts

Legacy heavy-water moderator operations at the Savannah River Site (SRS) have resulted in the contamination of equipment pads, building slabs, and surrounding soil with tritium. At the time of discovery the tritium had impacted the shallow (< 3-m) groundwater at the facility. While tritium was present in the groundwater, characterization efforts determined that a significant source remained in a concrete slab at the surface and within the associated vadose zone soils. To prevent continued long-term impacts to the shallow groundwater a CERCLA non-time critical removal action for these source materials was conducted to reduce the leaching of tritium from the vadose zone soils and concrete slabs. In order to minimize transportation and disposal costs, an on-site thermal treatment process was designed, tested, and implemented. The on-site treatment consisted of thermal detritiation of the concrete rubble and soil. During this process concrete rubble was heated to a temperature of 815 deg C (1,500 deg F) resulting in the dehydration and removal of water bound tritium. During heating, tritium contaminated soil was used to provide thermal insulation during which it&#x27;s temperature exceeded 100 deg C (212 deg F), causing drying and removal of tritium. The thermal treatment process volatiles the water bound tritium and releases it to the atmosphere. The released tritium was considered insignificant based upon Clean Air Act Compliance Package (CAP88) analysis and did not exceed exposure thresholds. A treatability study evaluated the effectiveness of this thermal configuration and viability as a decontamination method for tritium in concrete and soil materials. Post treatment sampling confirmed the effectiveness at reducing tritium to acceptable waste site specific levels. With American Recovery and Reinvestment Act (ARRA) funding three additional treatment cells were assembled utilizing commercial heating equipment and common construction materials. This provided a total of four units to batch treat concrete rubble and soil. Post treatment sampling verified that the activity in the treated soil and concrete met the treatment standards for each medium which allowed the treated concrete rubble and soil to be disposed of on site as backfill. During testing and operations a total of 1,261-m{sup 3} (1,650-yd{sup 3}) of contaminated concrete and soils were treated with an actual incurred cost of $3,980,000. This represents a unit treatment cost of $3,156/m{sup 3} ($2,412/yd{sup 3}). In 2011 the project was recognized with an e-Star Sustainability Award by DOE&#x27;s Office of Environmental Management.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Removal of Tritium from Concrete and Soil to Reduce Groundwater Impacts - 13197

Legacy heavy-water moderator operations at the Savannah River Site (SRS) have resulted in the contamination of equipment pads, building slabs, and surrounding soil with tritium. At the time of discovery the tritium had impacted the shallow (< 3-m) groundwater at the facility. While tritium was present in the groundwater, characterization efforts determined that a significant source remained in a concrete slab at the surface and within the associated vadose zone soils. To prevent continued long-term impacts to the shallow groundwater a CERCLA non-time critical removal action for these source materials was conducted to reduce the leaching of tritium from the vadose zone soils and concrete slabs. In order to minimize transportation and disposal costs, an on-site thermal treatment process was designed, tested, and implemented. The on-site treatment consisted of thermal detritiation of the concrete rubble and soil. During this process concrete rubble was heated to a temperature of 815 deg. C (1,500 deg. F) resulting in the dehydration and removal of water bound tritium. During heating, tritium contaminated soil was used to provide thermal insulation during which it's temperature exceeded 100 deg. C (212 deg. F), causing drying and removal of tritium. The thermal treatment process volatiles the water bound tritium and releases it to the atmosphere. The released tritium was considered insignificant based upon Clean Air Act Compliance Package (CAP88) analysis and did not exceed exposure thresholds. A treatability study evaluated the effectiveness of this thermal configuration and viability as a decontamination method for tritium in concrete and soil materials. Post treatment sampling confirmed the effectiveness at reducing tritium to acceptable waste site specific levels. With American Recovery and Reinvestment Act (ARRA) funding three additional treatment cells were assembled utilizing commercial heating equipment and common construction materials. This provided a total of four units to batch treat concrete rubble and soil. Post treatment sampling verified that the activity in the treated soil and concrete met the treatment standards for each medium which allowed the treated concrete rubble and soil to be disposed of on-site as backfill. During testing and operations a total of 1,261-m{sup 3} (1,650-yd{sup 3}) of contaminated concrete and soils were treated with an actual incurred cost of $3,980,000. This represents a unit treatment cost of $3,156/m{sup 3} ($2,412/yd{sup 3}). In 2011 the project was recognized with an e-Star Sustainability Award by DOE's Office of Environmental Management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Supplemental Immobilization of Hanford Low-Activity Waste: Cast Stone Augmented Formulation Matrix Tests

More than 56 million gallons of radioactive and hazardous waste are stored in 177 underground storage tanks at the U.S. Department of Energy’s (DOE’s) Hanford Site in Washington State. The HLW will be vitrified in the HLW facility for ultimate disposal at an offsite federal repository. A portion (~35%) of the LAW will be vitrified in the LAW vitrification facility for disposal onsite at the Integrated Disposal Facility (IDF). The pretreatment and HLW vitrification facilities will have the capacity to treat and immobilize all of the wastes destined for those facilities. However, a second facility will be needed for the expected volume of LAW requiring immobilization. Cast Stone, a cementitious waste form, is being considered to provide the required additional LAW immobilization capacity. The Cast Stone waste form must be acceptable for disposal in the IDF. The Cast Stone waste form and immobilization process must be tested to demonstrate that the final Cast Stone waste form can comply with the waste acceptance criteria for the disposal facility and that the immobilization processes can be controlled to consistently provide an acceptable waste form product. A testing program was developed in fiscal year (FY) 2012 describing in detail the work needed to develop and qualify Cast Stone as a waste form for the solidification of Hanford LAW. A statistically designed test matrix was used to evaluate the effects of key parameters on the properties of the Cast Stone as it is initially prepared and after curing. For the processing properties, the water-to-dry-blend mix ratio was the most significant parameter in affecting the range of values observed for each property. The single shell tank (SST) Blend simulant also showed differences in measured properties compared to the other three simulants tested. A review of the testing matrix and results indicated that an additional set of tests would be beneficial to improve the understanding of the impacts noted in the Screening Matrix tests. A set of Cast Stone formulations were devised to augment the original screening test matrix and focus on the range of the test conditions. Fly ash and blast furnace slag were limited to either northwest or southeast and the salt solutions were narrowed to the Average and the SST Blend at the 7.8M Na concentration. To fill in the matrix, a mix ratio of 0.5 was added. In addition, two admixtures, Xypex Admix C-500 and Rheomac SF100 (silica fume), were added as an additional dry material binder in select compositions. As in the Screening Matrix, both fresh and cured properties were evaluated for the formulations. In this study, properties that were influenced by the W/DM ratio in the Screening Matrix; flow diameter, plastic viscosity, density, and compressive strength, showed consistent behavior with respect to W/DM. The leach index for highly soluble components, sodium and nitrate, were not influenced by changes in formulation or the admixtures. The leach index for both iodine and Tc-99 show an influence from the addition of the admixture, Xypex Admix C-500. Additional testing should be performed to further evaluate the influence of Xypex Admix C-500 on the leach index over a range of admixture concentrations, Cast Stone formulations, and curing and storage conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CO{sub 2}-philic oligomers as novel solvents for CO{sub 2} absorption

Desirable properties for an oligomeric CO{sub 2}-capture solvent in an integrated gasification combined cycle (IGCC) plant include high selectivity for CO{sub 2} over H{sub 2} and water, low viscosity, low vapor pressure, low cost, and minimal environmental, health, and safety impacts. The neat solvent viscosity and solubility of CO{sub 2}, measured via bubble-point loci and presented on a pressure−composition diagram (weight basis), and water miscibility in CO{sub 2}-philic solvents have been determined and compared to results obtained with Selexol, a commercial oligomeric CO{sub 2} solvent. The solvents tested include polyethyleneglycol dimethylether (PEGDME), polypropyleneglycol dimethylether (PPGDME), polypropyleneglycol diacetate (PPGDAc), polybutyleneglycol diacetate (PBGDAc), polytetramethyleneetherglycol diacetate (PTMEGDAc), glyceryl triacetate (GTA), polydimethyl siloxane (PDMS), and perfluorpolyether (PFPE) that has a perfluorinated propyleneglycol monomer unit. Overall, PDMS and PPGDME are the best oligomeric solvents tested and exhibit properties that make them very promising alternatives for the selective absorption of CO{sub 2} from a mixed gas stream, especially if the absorption of water is undesirable.

10 SYNTHETIC FUELS↗

The Impact of Operational Strategies and Load Fluctuations on Anion Exchange Membrane Water Electrolyzer Degradation

This study reports on the durability of anion exchange membrane water electrolyzers (AEMWEs) at the cell level in a supporting electrolyte (1 M) and the impact of operational profiles on cell degradation. While constant load shows significant voltage loss, including a current hold at 1 A cm −2 and a potential hold at 2 V, it generally occurs in the first 70 h of testing. These losses are likely due to passivation altering site reactivity and cell kinetics, and are largely recoverable upon load cycling and diagnostics at the end of test. Furthermore, square and triangular-wave cycling do not show cell degradation and indicate that AEMWEs are not vulnerable to load cycling. When operating outside of this potential window (1.45–2 V), cell voltage decay rates markedly increase and the losses are not recoverable. This includes a current density hold at 4.0 A cm −2 with high cell voltages (>2.4 V for test duration) and cycling between 0 and 2 V to simulate start–stop, where more than a 50% loss in current density occurs over 50 h. The findings presented here demonstrate the high durability of AEMWEs, particularly when operating with load fluctuations, and may allow for durability advantages compared to iridium and proton exchange membrane systems.

08 HYDROGEN↗

The controlled ecological life support system Antarctic analog project: Analysis of wastewater from the South Pole Station, Antarctica, volume 1

The Controlled Ecological Life Support system (CELSS) Antarctic Analog Project (CAAP) is a joint National Science Foundation (NSF) and NASA project for the development, deployment and operation of CELSS technologies at the Amundsen-Scott South Pole Station. NASA goals are operational testing of CELSS technologies and the conduct of scientific studies to facilitate technology selection and system design. The NSF goals are that the food production, water purification, and waste treatment capabilities which will be provided by CAAP will improve the quality of life for the South Pole inhabitants, reduce logistics dependence, and minimize environmental impacts associated with human presence on the polar plateau. This report presents an analysis of wastewater samples taken from the Amundsen-Scott South Pole Station, Antarctica. The purpose of the work is to develop a quantitative understanding of the characteristics of domestic sewage streams at the South Pole Station. This information will contribute to the design of a proposed plant growth/waste treatment system which is part of the CELSS Antarctic Analog Project (CAAP).

Flynn, Michael T.↗

Inducer Hydrodynamic Forces in a Cavitating Environment

Marshall Space Flight Center has developed and demonstrated a measurement device for sensing and resolving the hydrodynamic loads on fluid machinery. The device - a derivative of the six-component wind tunnel balance - senses the forces and moments on the rotating device through a weakened shaft section instrumented with a series of strain gauges. This rotating balance was designed to directly measure the steady and unsteady hydrodynamic loads on an inducer, thereby defining the amplitude and frequency content associated with operating in various cavitation modes. The rotating balance was calibrated statically using a dead-weight load system in order to generate the 6 x 12 calibration matrix later used to convert measured voltages to engineering units. Structural modeling suggested that the rotating assembly first bending mode would be significantly reduced with the balance s inclusion. This reduction in structural stiffness was later confirmed experimentally with a hammer-impact test. This effect, coupled with the relatively large damping associated with the rotating balance waterproofing material, limited the device s bandwidth to approximately 50 Hertz Other pre-test validations included sensing the test article rotating assembly built-in imbalance for two configurations and directly measuring the assembly mass and buoyancy while submerged under water. Both tests matched predictions and confirmed the device s sensitivity while stationary and rotating. The rotating balance was then demonstrated in a water test of a full-scale Space Shuttle Main Engine high-pressure liquid oxygen pump inducer. Experimental data was collected a scaled operating conditions at three flow coefficients across a range of cavitation numbers for the single inducer geometry and radial clearance. Two distinct cavitation modes were observed symmetric tip vortex cavitation and alternate-blade cavitation. Although previous experimental tests on the same inducer demonstrated two additional cavitation modes at lower inlet pressures, these conditions proved unreachable with the rotating balance installed due to the intense dynamic environment. The sensed radial load was less influenced by flow coefficient than by cavitation number or cavitation mode although the flow coefficient range was relatively narrow. Transition from symmetric tip vortex to alternate-blade cavitation corresponded to changes in both radial load magnitude and radial load orientation relative to the inducer. Sensed moments indicated that the effective load center moved downstream during this change in cavitation mode. An occurrence of "higher+rdex cavitation" was also detected in both the stationary pressures and the rotating balance data although the frequency of the phenomena was well above the reliable bandwidth of the rotating balance. In summary the experimental tests proved both the concept and device s capability despite the limitations and confirmed that hydrodynamically-induced forces and moments develop in response to the unbalanced pressure field, which is, in turn, a product of the cavitation environment.

Skelley, Stephen E.↗

Hard and Soft Safety Verifications

The purpose of this paper is to examine the differences between and the effects of hard and soft safety verifications. Initially, the terminology should be defined and clarified. A hard safety verification is datum which demonstrates how a safety control is enacted. An example of this is relief valve testing. A soft safety verification is something which is usually described as nice to have but it is not necessary to prove safe operation. An example of a soft verification is the loss of the Solid Rocket Booster (SRB) casings from Shuttle flight, STS-4. When the main parachutes failed, the casings impacted the water and sank. In the nose cap of the SRBs, video cameras recorded the release of the parachutes to determine safe operation and to provide information for potential anomaly resolution. Generally, examination of the casings and nozzles contributed to understanding of the newly developed boosters and their operation. Safety verification of SRB operation was demonstrated by examination for erosion or wear of the casings and nozzle. Loss of the SRBs and associated data did not delay the launch of the next Shuttle flight.

Wetherholt, Jon↗

Capture Efficiency of Cooking-Related Fine and Ultrafine Particles by Residential Exhaust Hoods

Effective exhaust hoods can mitigate the indoor air quality impacts of pollutant emissions from residential cooking. This study reports capture efficiencies (CE) measured for cooking generated particles for scripted cooking procedures in a 121-m3 chamber with kitchenette. CEs also were measured for burner produced CO2 during cooking and separately for pots and pans containing water. The study used four exhaust hoods previously tested by Delp and Singer (Environ. Sci. Technol., 2012, 46, 6167-6173). For pan-frying a hamburger over medium heat on the back burner, CEs for particles were similar to those for burner produced CO2 and mostly above 80percent. For stir-frying green beans in a wok (high heat, front burner), CEs for burner CO2 during cooking varied by hood and airflow: CEs were 34-38percent for low (51?68 L s-1) and 54?72percent for high (109?138 L s-1) settings. CEs for 0.3?2.0 ?m particles during front burner stir-frying were 3?11percent on low and 16?70percent on high settings. Results indicate that CEs measured for burner CO2 are not predictive of CEs of cooking-generated particles under all conditions, but they may be suitable to identify devices with CEs above 80percent both for burner combustion products and for cooking-related particles.

54 ENVIRONMENTAL SCIENCES↗

Development and Implementation of an Optimization Model for Hydropower and Total Dissolved Gas in the Mid-Columbia River System

Managing energy, water, and environmental priorities and constraints within a cascade hydropower system is a challenging multiobjective optimization effort that requires advanced modeling and forecasting tools. Within the mid-Columbia River system, there is currently a lack of specific solutions for predicting how coordinated operational decisions can mitigate the impacts of total dissolved gas (TDG) supersaturation while satisfying multiple additional policy and hydropower generation objectives. In this study, a reduced-order TDG uptake equation is developed that predicts tailrace TDG at seven hydropower facilities on the mid-Columbia River. The equation is incorporated into a general multiobjective river, reservoir, and hydropower optimization tool as a prioritized operating goal within a broader set of system-level objectives and constraints. A test case is presented to assess the response of TDG and hydropower generation when TDG supersaturation is optimized to remain under state water-quality standards. Satisfaction of TDG as an operating goal is highly dependent on whether constraints that limit TDG uptake are implemented at a higher priority than generation requests. According to the model, an opportunity exists to reduce TDG supersaturation and meet hydropower generation requirements by shifting spillway flows to different time periods. In conclusion, a coordinated effort between all project owners is required to implement systemwide optimized solutions that satisfy the operating policies of all stakeholders.

13 HYDRO ENERGY↗