Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste Isolation Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Annual Transuranic Waste Inventory Report - 2009 (Rev. 0)

This inventory report serves to update TRU waste inventory information last reported in the ATWIR-2008 (DOE 2008a). The information contained in the CID that supports this report is the best estimate of TRU waste inventory information as of December 31, 2008, and includes waste that is emplaced in the WIPP as reported from the WWIS. The information presented in this report includes qualified rollup reports generated from the CID, as well as TRU waste characterization data obtained from the sites and reported in the WWIS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deinococcus radiodurans UWO298 Dependence on Background Radiation for Optimal Growth

Ionizing radiation is a major environmental variable for cells on Earth, and so organisms have adapted to either prevent or to repair damages caused by it, primarily from the appearance and accumulation of reactive oxygen species (ROS). In this study, we measured the differential gene expression in Deinococcus radiodurans UWO298 cultures deprived of background ionizing radiation (IR) while growing 605 m underground at the Waste Isolation Pilot Plant (WIPP), reducing the dose rate from 72.1 to 0.9 nGy h –1 from control to treatment, respectively. This reduction in IR dose rate delayed the entry into the exponential phase of the IR-shielded cultures, resulting in a lower biomass accumulation for the duration of the experiment. The RNASeq-based transcriptome analysis showed the differential expression of 0.2 and 2.7% of the D. radiodurans genome after 24 and 34 h of growth in liquid culture, respectively. Gene expression regulation after 34 h was characterized by the downregulation of genes involved in folding newly synthesized and denatured/misfolded proteins, in the assimilation of nitrogen for amino acid synthesis and in the control of copper transport and homeostasis to prevent oxidative stress. We also observed the upregulation of genes coding for proteins with transport and cell wall assembly roles. These results show that D. radiodurans is sensitive to the absence of background levels of ionizing radiation and suggest that its transcriptional response is insufficient to maintain optimal growth.

59 BASIC BIOLOGICAL SCIENCES↗

DOE Office of Environmental Management, 2016 Year in Review

2016 accomplishments and primary areas of focus for the Department of Energy's (DOE's) Office of Environmental Management and EM sites are presented. For DOE EM, these include Focusing on the Field, Teaming with Cleanup Partners, Developing New Technology, and Maximizing Cleanup Dollars. Major 2016 achievements are highlighted for EM, Richland Operations Office, Office of River Protection, Savannah River Site, Oak Ridge, Idaho, Waste Isolation Pilot Plant, Los Alamos, Portsmouth, Paducah, West Valley Demonstration Project, and the Nevada National Security Site,

54 ENVIRONMENTAL SCIENCES↗

Characterization Techniques Investigated for Characterization of Anomalous Materials in Plutonium Oxide – 25666

The DOE has adopted a Dilute and Dispose approach for processing surplus plutonium which consists of blending plutonium oxide with adulterants and packaging it in a form which is acceptable for disposal at the Waste Isolation Pilot Plant. The feed material for the downblend process is intended to be pure plutonium oxide powder, however other objects are occasionally encountered within the oxide, particularly with legacy material. Potential technologies which could assist in the resolution of incidents where such anomalies are encountered have been investigated. Resolution of these incidents requires characterization of the anomalous object so that plutonium oxide processing can resume and so that a disposition pathway can be determined for the anomalous material. Technologies including gamma ray spectroscopy, alpha-gamma coincidence, LiDAR volumetric measurements, and surface conductivity measurements were investigated for this purpose, with a focus on systems which can be easily introduced into the processing environment when an anomaly is encountered, then removed from the environment after resolution to avoid impeding normal processing activities. This places an emphasis on small and portable measurement systems and systems that can operate in a high-background, oxide-processing environment. Gamma ray systems investigated include the GR1™a CZT detector and the MicroGe™a germanium detector, with a focus on detecting characteristic gamma rays from Pu-239 and other actinides. A gamma ray and alpha particle coincidence method was investigated with the goal of identifying actinides in the presence of a gamma ray background produced by adjacent plutonium oxide material. Leica™b BLK360 G1 and Keyence™c LJ-X8300 LiDAR systems were investigated for use in conjunction with mass measurements to gain accurate material density values, and a Foerster Sigmatest™d 2.070 was tested to determine surface conductivity. The combination of these properties would allow improved identification and characterization of a wide variety of potential anomalous material.

Munson, Justin M.↗

Selection of Russian Plutonium Beryllium Sources for Inclusion in the Nuclear Mateirals Information Program Archive

Throughout the 1960s and 1970s, the former Soviet Union produced and exported Plutonium-Beryllium (PuBe) neutron sources to various Eastern European countries. The Russian sources consist of an intermetallic compound of plutonium and beryllium encapsulated in an inner welded, sealed capsule and consisting of a body and one or more covers. The amount of plutonium in the sources ranges from 0.002 g up to 15 g. A portion of the sources was originally exported to East Germany. A portion of these sources were acquired by Los Alamos National Laboratory (LANL) in the late 1990s for destruction in the Offsite Source Recovery Program. When the OSRP was canceled, the remaining 88 PuBe neutron sources were packaged and stored in a 55-gal drum at T A-55. This storage configuration is no longer acceptable for PuBe sources, and the sources must either be repackaged or disposed of. Repackaging would place the sources into Hagan container, and depending on the dose rates, some sources may be packaged individually increasing the footprint and cost of storage. In addition, each source will be subject to leak-checking every six months. Leaks have already been detected in some of the sources, and due to the age of these sources, it is likely that additional leaks may be detected over time, which will increase the overall complexity of handling and storage. Therefore, it was decided that the sources would be disposed of at the Waste Isolation Pilot Plant (WIPP) due to the cost and labor associated with continued storage at TA-55. However, the plutonium in the sources is of Russian origin and needs to be preserved for research purposes. Therefore, it is important that a representative sample of the sources retained and archived for future studies. This report describes the criteria used to obtain a representative sample of the sources. Nine Russian PuBe neutron sources have been selected out of a collection of 77 sources for inclusion in the NMIP archive. Selection criteria were developed so that the largest sources that are representative of the collection are included. One representative source was chosen for every 20 sources in the collection, and effort was made to preserve sources unique to the collection. In total, four representative sources and five unique sources were selected for the archive. The archive samples contain 40 grams of plutonium with an isotopic composition similar to that of weapon grade material and three grams of plutonium with an isotopic composition similar to that of reactor grade plutonium.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Experimental determination of lead carbonate solubility at high ionic strengths: A Pitzer model description

In this article, solubility measurements of lead carbonate, PbCO 3 (cr), cerussite, as a function of total ionic strengths are conducted in the mixtures of NaCl and NaHCO 3 up to I = 1.2 mol•kg –1 and in the mixtures of NaHCO 3 and Na 2 CO 3 up to I = 5.2 mol•kg –1 , at room temperature (22.5 ± 0.5 °C). The solubility constant (log K sp ) for cerussite, PbCO 3 (cr) = Pb 2+ + CO 3 2- was determined as –13.76 ± 0.15 (2σ) with a set of Pitzer parameters describing the specific interactions of PbCO 3 (aq), Pb(CO 3 ) 2 2- , and Pb(CO 3 )Cl – with the bulk-supporting electrolytes, based on the Pitzer model. The model developed in this work can reproduce the experimental results including model-independent solubility values from the literature over a wide range of ionic strengths with satisfactory accuracy. The model is expected to find applications in numerous fields, including the accurate description of chemical behavior of lead in geological repositories, the modeling of formation of oxidized Pb–Zn ore deposits, and the environmental remediation of lead contamination.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

CH Packaging Operations Manual

This procedure provides instructions forassembling the following CH packaging payload: Drum payload assembly Standard Waste Box (SWB) assembly Ten-Drum Overpack (TDOP)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 3)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Cask Waste Shipping Package (hereinafter referred to as "72-B cask"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before 72-B cask loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the 72-B cask can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the 72-B cask: a spread axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the 72-B cask into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 4)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 5)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 6)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Maintenance Manual (Rev. 0)

This document provides instructions for performing (1) Inner containment vessel (IV) and outer containment vessel (OC) maintenance leakage rate test on packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test; (2) IV and OC periodic leakage rate test using nondestructive He leak test; and (3) IV and OC structural pressure tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CNS 10-160B RH Cask Program Guidance (Rev. 2)

The purpose of this document is to provide guidelines and to define responsibilities for use, operation, inspection, and maintenance of the 10-160B cask and directly related components used for shipments of DOE controlled TRU waste. This document complies with the minimum requirements specified in the Safety Analysis Report (SAR) for Model 10-160B Type B Radwaste Shipping Cask and U.S. Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9204. In the event of a conflict between this document and the SAR or C of C, the C of C shall govern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗