Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Field support activity aerospace manpower transfer to small business enterprises

This report reiterates the major findings of the original study on the utilization of unemployed aerospace professionals in small businesses, and also provides a definition of three programs which, as a result of this study and other research into this problem, offer great potential in providing for better utilization of the nation's technically trained personal and technology resources. Details of these three programs are provided along with a recommended plan of action for their implementation.

Green, M. K.↗

Space-based solar power conversion and delivery systems study. Volume 1: Executive summary

The technical and economic aspects of satellite solar power systems are presented with a focus on the current configuration 5000 MW system. The technical studies include analyses of the orbital system structures, control and stationkeeping, and the formulation of program plans and costs for input to the economic analyses. The economic analyses centered about the development and use of a risk analysis model for a system cost assessment, identification of critical issues and technologies, and to provide information for programmatic decision making. A preliminary economic examination of some utility interface issues is included. Under the present state-of-knowledge, it is possible to formulate a program plan for the development of a satellite solar power system that can be economically justified. The key area of technological uncertainty is man's ability to fabricate and assemble large structures in space.

Hazelrigg, G. A., Jr.↗

Summary of the NASA/MSFC FY-79 Severe Storm and Local Weather research review

Significant acomplishments, current focus of work, plans for FY-80, and recommendations for new research are outlined for 36 research projects proposed for technical monitoring by the Atmospheric Sciences Division at Marshall Space Flight Center. Topics of the investigations, which were reviewed at a two-day meeting, relate to cloud physics, atmospheric electricity, and mesoscale/storm dynamics.

Source record↗

Case study: Lockheed-Georgia Company integrated design process

A case study of the development of an Integrated Design Process is presented. The approach taken in preparing for the development of an integrated design process includes some of the IPAD approaches such as developing a Design Process Model, cataloging Technical Program Elements (TPE's), and examining data characteristics and interfaces between contiguous TPE's. The implementation plan is based on an incremental development of capabilities over a period of time with each step directed toward, and consistent with, the final architecture of a total integrated system. Because of time schedules and different computer hardware, this system will not be the same as the final IPAD release; however, many IPAD concepts will no doubt prove applicable as the best approach. Full advantage will be taken of the IPAD development experience. A scenario that could be typical for many companies, even outside the aerospace industry, in developing an integrated design process for an IPAD-type environment is represented.

Waldrop, C. T.↗

NASA evolution of exploration architectures

A series of charts and diagrams is used to provide a detailed overview of the evolution of NASA space exploration architectures. The pre-Apollo programs including the Werner von Braun feasibility study are discussed and the evolution of the Apollo program itself is treated in detail. The post-Apollo era is reviewed and attention is given to the resurgence of strategic planning exemplified by both ad hoc and formal efforts at planning. Results of NASA's study of the main elements of the Space Exploration Initiative which examined technical scenarios, science opportunities, required technologies, international considerations, institutional strengths and needs, and resource estimates are presented. The 90-day study concludes that, among other things, major investments in challenging technologies are required, the scientific opportunities provided by the program are considerable, current launch capabilities are inadequate, and Space Station Freedom is essential.

Roberts, Barney B.↗

High-speed civil transport issues and technology program

A strawman program plan is presented, consisting of technology developments and demonstrations required to support the construction of a high-speed civil transport. The plan includes a compilation of technology issues related to the development of a transport. The issues represent technical areas in which research and development are required to allow airframe manufacturers to pursue an HSCT development. The vast majority of technical issues presented require flight demonstrated and validated solutions before a transport development will be undertaken by the industry. The author believes that NASA is the agency best suited to address flight demonstration issues in a concentrated effort. The new Integrated Test Facility at NASA Dryden Flight Research Facility is considered ideally suited to the task of supporting ground validations of proof-of-concept and prototype system demonstrations before night demonstrations. An elaborate ground hardware-in-the-loop (iron bird) simulation supported in this facility provides a viable alternative to developing an expensive fill-scale prototype transport technology demonstrator. Drygen's SR-71 assets, modified appropriately, are a suitable test-bed for supporting flight demonstrations and validations of certain transport technology solutions. A subscale, manned or unmanned flight demonstrator is suitable for flight validation of transport technology solutions, if appropriate structural similarity relationships can be established. The author contends that developing a full-scale prototype transport technology demonstrator is the best alternative to ensuring that a positive decision to develop a transport is reached by the United States aerospace industry.

Hewett, Marle D.↗

A 32-GHz solid-state power amplifier for deep space communications

A 1.5-W solid-state power amplifier (SSPA) has been demonstrated as part of an effort to develop and evaluate state-of-the-art transmitter and receiver components at 32 and 35 GHz for future deep space missions. Output power and efficiency measurements for a monolithic millimeter-wave integrated circuit (MMIC)-based SSPA are reported. Technical design details for the various modules and a thermal analysis are discussed, as well as future plans.

Wamhof, P. D.↗

Overviews of the Apollo Program and Its Management

This special bibliography includes items individually selected by scientific and technical information professionals that provide an overview of the history, events, and results of the Apollo missions. Planning, scheduling, and management are also included.

Source record↗

Expedition Memory: Towards Agent-based Web Services for Creating and Using Mars Exploration Data.

Explorers ranging over kilometers of rugged, sometimes "feature-less" terrain for over a year could be overwhelmed by tracking and sharing what they have done and learned. An automated system based on the existing Mobile Agents design [ I ] and Mars Exploration Rover experience [2], could serve as an "expedition memory" that would be indexed by voice as wel1 as a web interface, linking people, places, activities, records (voice notes, photographs, samples). and a descriptive scientific ontology. This database would be accessible during EVAs by astronauts, annotated by the remote science team, linked to EVA plans, and allow cross indexing between sites and expeditions. We consider the basic problem, our philosophical approach, technical methods, and uses of the expedition memory for facilitating long-term collaboration between Mars crews and Earth support teams. We emphasize that a "memory" does not mean a database per se, but an interactive service that combines different resources, and ultimately could be like a helpful librarian.

Clancey, William J.↗

Deep Space Habitat Team: HEFT Phase 2 Effects

HEFT was a NASA-wide team that performed analyses of architectures for human exploration beyond LEO, evaluating technical, programmatic, and budgetary issues to support decisions at the highest level of the agency in HSF planning. HEFT Phase I (April - September, 2010) and Phase II (September - December, 2010) examined a broad set of Human Exploration of Near Earth Objects (NEOs) Design Reference Missions (DRMs), evaluating such factors as elements, performance, technologies, schedule, and cost. At end of HEFT Phase 1, an architecture concept known as DRM 4a represented the best available option for a full capability NEO mission. Within DRM4a, the habitation system was provided by Deep Space Habitat (DSH), Multi-Mission Space Exploration Vehicle (MMSEV), and Crew Transfer Vehicle (CTV) pressurized elements. HEFT Phase 2 extended DRM4a, resulting in DRM4b. Scrubbed element-level functionality assumptions and mission Concepts of Operations. Habitation Team developed more detailed concepts of the DSH and the DSH/MMSEV/CTV Conops, including functionality and accommodations, mass & volume estimates, technology requirements, and DDT&E costs. DRM 5 represented an effort to reduce cost by scaling back on technologies and eliminating the need for the development of an MMSEV.

Toups, Larry D.↗

NASA's UAS Integration into the NAS: A Report on the Human Systems Integration Phase 1 Simulation Activities

In 2011 the National Aeronautics and Space Administration (NASA) began a five-year Project to address the technical barriers related to routine access of Unmanned Aerial Systems (UAS) in the National Airspace System (NAS). Planned in two phases, the goal of the first phase was to lay the foundations for the Project by identifying those barriers and key issues to be addressed to achieve integration. Phase 1 activities were completed two years into the five-year Project. The purpose of this paper is to review activities within the Human Systems Integration (HSI) subproject in Phase 1 toward its two objectives: 1) develop GCS guidelines for routine UAS access to the NAS, and 2) develop a prototype display suite within an existing Ground Control Station (GCS). The first objective directly addresses a critical barrier for UAS integration into the NAS - a lack of GCS design standards or requirements. First, the paper describes the initial development of a prototype GCS display suite and supporting simulation software capabilities. Then, three simulation experiments utilizing this simulation architecture are summarized. The first experiment sought to determine a baseline performance of UAS pilots operating in civil airspace under current instrument flight rules for manned aircraft. The second experiment examined the effect of currently employed UAS contingency procedures on Air Traffic Control (ATC) participants. The third experiment compared three GCS command and control interfaces on UAS pilot response times in compliance with ATC clearances. The authors discuss how the results of these and future simulation and flight-testing activities contribute to the development of GCS guidelines to support the safe integration of UAS into the NAS. Finally, the planned activities for Phase 2, including an integrated human-in-the-loop simulation and two flight tests are briefly described.

National Airspace System↗

Prospective Architectures for Onboard vs Cloud-Based Decision Making for Unmanned Aerial Systems

This paper investigates propsective architectures for decision-making in unmanned aerial systems. When these unmanned vehicles operate in urban environments, there are several sources of uncertainty that affect their behavior, and decision-making algorithms need to be robust to account for these different sources of uncertainty. It is important to account for several risk-factors that affect the flight of these unmanned systems, and facilitate decision-making by taking into consideration these various risk-factors. In addition, there are several technical challenges related to autonomous flight of unmanned aerial systems; these challenges include sensing, obstacle detection, path planning and navigation, trajectory generation and selection, etc. Many of these activities require significant computational power and in many situations, all of these activities need to be performed in real-time. In order to efficiently integrate these activities, it is important to develop a systematic architecture that can facilitate real-time decision-making. Four prospective architectures are discussed in this paper; on one end of the spectrum, the first architecture considers all activities/computations being performed onboard the vehicle whereas on the other end of the spectrum, the fourth and final architecture considers all activities/computations being performed in the cloud, using a new service known as Prognostics as a Service that is being developed at NASA Ames Research Center. The four different architectures are compared, their advantages and disadvantages are explained and conclusions are presented.

Software engineering↗

Designing and Building a Crew-Centric Mobile Scheduling and Planning Tool for Exploring Crew Autonomy Concepts Onboard the International Space Station

During 2015, as part of our ongoing research on crew autonomy, our team adapted and extended the plan viewing tool, Playbook, into a mobile tool for exploring crew autonomy onboard the International Space Station (ISS). This work enables crewmembers to intuitively re-plan and schedule on their own with limited input from mission control. Designed for ease of use, re-planning is composed of simple drag and drop interactions and learning the tool requires little to no training. Playbook was successfully uplinked onto ISS as a technology demonstration and completed its onboard ground and crew checkouts in August and September 2015, respectively. We will discuss and describe how Playbook was able to integrate with actual ISS operational plans and operational procedures without disrupting real mission operations. This work will also outline the design and technical constraints required to build a collaborative tool that allows multiple users to simultaneously self-schedule and synchronize during communication dropouts in the restricted networking and computing environment onboard ISS. Finally, we will explore the aspects of crew autonomy that this technology enables as well as discuss our next steps and possible extensions.

ISS↗

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and will serve as a staging point for deep space exploration. In January 2020, NASA Headquarters contacted Goddard Space Flight Center (GSFC) with a request that they provide a Heliophysics instrumentation package for Gateway. This package would later become known as the Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES). HERMES consists of four high-heritage instruments – a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), a Solar Probe Analyzer-Ions (SPAN-I), and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two magneto-inductive magnetometers. Launching HERMES with Gateway would provide an opportunity to conduct early science experiments on Gateway, but the plan to develop HERMES concurrently with Gateway and launch with the co-manifested vehicle brought numerous technical challenges for the pathfinder payload. HERMES was intended to be a low-cost, tailored Class-D mission, and maintaining that programmatic position proved difficult as the technical challenges grew. The effects of Coronavirus Disease 2019 (COVID-19) were not factored in from the beginning and also created programmatic challenges. This paper will discuss what’s being done to overcome the technical and programmatic challenges to put HERMES on track for a 2024 Launch Readiness Date (LRD).

Joe Burt↗

Mars Sample Return Mission Concept Status

This paper will provide an overview of current concepts and options for the architecture and design of a Mars Sample Return Mission, including the Sample Retrieval Lander (SRL) (developed by NASA) and the Earth Return Orbiter (ERO) (developed by ESA) . Key mission objectives and the overall campaign will be described, including the mission’s concept of operations and a notional timeline from launch to entry, through surface operations, to delivery of the samples to Mars orbit and return to Earth. The overall SRL lander vehicle concept will be described, including current options being evaluated. Key lander element options that have been studied will be discussed, including the Mars Ascent Vehicle (MAV), Sample Fetch Rover (provided by ESA), Orbiting Sample container (OS), and sample tube transfer robotics systems. For the ERO the vehicle concept will be described including key interfaces with the Capture/Containment and Return System (CCRS). Specific challenges and approaches for addressing those challenges will be discussed, including key technical margins and backward planetary protection. The information provided about possible Mars sample return architectures is for planning and discussion purposes only. NASA has made no official decision to implement Mars sample return.

Muirhead, Brian K↗

NASA Crew and Cargo Launch Vehicle Development Approach Builds on Lessons from Past and Present Missions

The United States (US) Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with new space transportation systems for missions to the Moon, Mars, and beyond. The Crew Exploration Vehicle (CEV) that the new human-rated Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station (ISS) Toward the end of the next decade, a heavy-lift Cargo Launch Vehicle (CaLV) will deliver the Earth Departure Stage (EDS) carrying the Lunar Surface Access Module (LSAM) to low-Earth orbit (LEO), where it will rendezvous with the CEV launched on the CLV and return astronauts to the Moon for the first time in over 30 years. This paper outlines how NASA is building these new space transportation systems on a foundation of legacy technical and management knowledge, using extensive experience gained from past and ongoing launch vehicle programs to maximize its design and development approach, with the objective of reducing total life cycle costs through operational efficiencies such as hardware commonality. For example, the CLV in-line configuration is composed of a 5-segment Reusable Solid Rocket Booster (RSRB), which is an upgrade of the current Space Shuttle 4- segment RSRB, and a new upper stage powered by the liquid oxygen/liquid hydrogen (LOX/LH2) J-2X engine, which is an evolution of the J-2 engine that powered the Apollo Program s Saturn V second and third stages in the 1960s and 1970s. The CaLV configuration consists of a propulsion system composed of two 5-segment RSRBs and a 33- foot core stage that will provide the LOX/LED needed for five commercially available RS-68 main engines. The J-2X also will power the EDS. The Exploration Launch Projects, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operations planning for these new space transportation systems. Utilizing a foundation of heritage hardware and management lessons learned mitigates both technical and programmatic risk. Project engineers and managers work closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch systems, leveraging a wealth of knowledge from Shuffle operations. In addition, NASA and its industry partners have tapped into valuable Apollo databases and are applying corporate wisdom conveyed firsthand by Apollo-era veterans of America s original Moon missions. Learning from its successes and failures, NASA employs rigorous systems engineering and systems management processes and principles in a disciplined, integrated fashion to further improve the probability of mission success.

Dumbacher, Daniel L.↗