Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Secure by Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Low Yield Nuclear Monitoring Physics Experiment 1 – Integrated Data Acquisition System Design and Initial Observations

The report documents the design of the Integrated Data AcQuisition (IDAQ) system and observations recorded during the first in a series of underground chemical explosions conducted on the Nevada National Security Site (NNSS) in southern Nevada. Experiments are funded as part of Low Yield Nuclear Monitoring (LYNM) research and development within the United States National Nuclear Security Administration NA-22 nuclear non-proliferation program. The series is part of the broader Physical Experiment 1 (PE1) being conducted in and around the P-tunnel facility on the NNSS. Each explosive experiment utilizes several tons of comp-B to generate signals recorded by a broad suite of instrumentation. The IDAQ serves as the backbone for all subsurface instrumentation providing precise time synchronization, remote control, data exfiltration and backup, along with recording several sensing modalities throughout the underground complex that includes ground motion, environmental conditions, and electromagnetic signals.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

eMosaic: Electrification Mosaic Platform for Grid Informed Smart Charging Management (Final Scientific/Technical Report)

ABB (Prime Contractor), in collaboration with its partners at the Utah State University (USU), Idaho National Laboratory, Rocky Mountain Power (RMP), and Electric Power Engineers (EPE), have performed research, development, and wide scale demonstration of a scalable and resilient Electrification Mosaic (eMosaic) platform for Smart Charge Management (SCM) for Electric Vehicle Infrastructure. Work was completed under DE EE0009194, titled “eMosaic Electrification Mosaic Platform for Grid Informed Smart Charging Management”, funded by the US Department of Energy. The project members developed algorithms that provide localized and bulk grid services and that reduce and stabilize costs all the way down the supply chain to the PEV owner through SCM. This platform aggregates telemetry from multiple data sources as pieces of the larger picture including personal, private fleet or transportation EVs, fast chargers and other supply equipment, weather service information, and geographically distributed charging sites such as public lots, garage and retail, and private or shared usage depots. ABB and the project team designed, tested, and improved a charging management system at local/edge and cloud levels. The ultimate objective of the project was to convincingly demonstrate that the developed secure eMosaic plat-form can be readily and favorably adopted by diverse utilities and site owners at scale. This was achieved through a demonstration plan with field deployment at several physical sites across 4 states and additional scalable simulation from high fidelity charging models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Need for a Maximum Intensity Accident in ANS 8-Series Standards

The Y-12 National Security Complex has installed one Criticality Accident Alarm System (CAAS) under the ANS 8.3 framework as a safety significant system, and is in the process of designing, installing, and qualifying another. As a safety significant system, the Y-12 CAAS is required to demonstrate that it is able to perform its function and actuate an alarm when exposed to the radiation from both a Minimum Accident of Concern and a maximum intensity accident. The ANS 8-series standards do not present a maximum accident to be considered, nor do they specify radiation tolerance requirements for the CAAS equipment, leading CAAS vendors to potentially use other standards that provide inadequate criteria. In this paper, the historical basis and need for a maximum intensity accident in the ANS standards is discussed, the fission rate of a maximum intensity accident is proposed, and the effects of this accident on CAAS analysis and the vendor’s equipment qualification are discussed.

61 RADIATION PROTECTION AND DOSIMETRY↗

Cyber-Informed Engineering Principles: What’s in it for me?

CIE is an emerging method to integrate cybersecurity considerations into the conception, design, development, and operation of any physical system that has digital connectivity, monitoring, or control. CIE complements—but does not replace—the application of cybersecurity standards or practices currently in place within an organization. Rather, it expands cybersecurity decisions into the engineering space, not by asking engineers to become cyber experts, but by calling on engineers to apply engineering tools and make engineering decisions that improve cybersecurity outcomes. CIE examines the engineering consequences that a sophisticated cyber attacker could achieve, and drives engineering changes that may provide deterministic mitigations to limit or eliminate those consequences. Engineers and technicians that design critical energy infrastructure installations can integrate the 12 principles of CIE into each phase of the engineering lifecycle, from concept to retirement. These principles are aimed at system or design engineers, operators, and technicians, rather than software engineers or operational cybersecurity practitioners, because the engineers who design, build, operate, and maintain the physical infrastructure are best positioned to leverage a system’s engineering design to diminish the severity of cyber attacks or digital technology failures. This approach creates new opportunities for engineering teams—and not just cybersecurity teams—to secure the system using the physics and mechanics of engineering controls—not just digital monitoring and controls.

99 GENERAL AND MISCELLANEOUS↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

Cognitive Grid Optimization

This project laid the foundation to include a security constrained economic dispatch (SCED) within one of the leading simulators which is used to train system operators who keep the lights on for over 150 million people in USA. The SCED is designed to handle very high penetrations of renewable generation as well as battery storage. As a follow on the this project, a Trusted Source Model of the North American Electric Interconnections will be built from public GIS data. The various North American Markets will be emulated. This Trusted Source Model will grow the software developers for the next generation of power applications that are needed to transition to all green generation while everything is electrified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

American cities in a time of global environmental change: the case of the Baltimore Social-Environmental Collaborative

The Baltimore Social-Environmental Collaborative (BSEC) Urban Integrated Field Laboratory seeks a new paradigm for urban climate research. Motivated by deep uncertainties in urban climate and the future of urban systems, BSEC works collaboratively across institutions and stakeholder groups to co-generate the science needed to advance energy security and resilience to extreme events across the city of Baltimore, Maryland, USA, and to do so in a manner that can inform similar efforts in other cities. BSEC begins with stakeholder priorities (health, affordable energy, etc) and designs observation networks and models to deliver climate science to address them. This takes the form of an iterative collaborative cycle, in which an initial research strategy is repeatedly updated in conversation with community partners, and researchers and stakeholders learn from each other. To date, this cycle has included multiple rounds of collaborative deliberation on urban heat mitigation, in which a multicriteria decision tool has been updated with more community-relevant spatial structure and modified optimization metrics. The guiding objective of this cycle is to inform potential ‘secure and resilient pathways’ for energy and infrastructure. In doing so, BSEC addresses fundamental urban science questions in natural and social sciences. It also tests our ability to integrate this science in a manner that advances participatory decision-making for urban resilience.

climate↗

Encoding Multilayer Complexity in Anti‐Counterfeiting Heterometallic MOF‐Based Optical Tags

Abstract Optical tags provide a way to quickly and unambiguously identify valuable assets. Current tag fluorophore options lack the tunability to allow combined methods of encoding in a single material. Herein we report a design strategy to encode multilayer complexity in a family of heterometallic rare‐earth metal–organic frameworks based on highly connected nonanuclear clusters. To impart both intricacy and security, a synergistic approach was implemented resulting in both overt (visible) and covert (near‐infrared, NIR) properties, with concomitant multi‐emissive spectra and tunable luminescence lifetimes. Tag authentication is validated with a variety of orthogonal detection methodologies. Importantly, the effect induced by subtle compositional changes on intermetallic energy transfer, and thus on the resulting photophysical properties, is demonstrated. This strategy can be widely implemented to create a large library of highly complex, difficult‐to‐counterfeit optical tags.

Deneff, Jacob I.↗

Blockchain Smart Contract Reference Framework and Program Logic Architecture for Transactive Energy Systems

This paper proposes a reference framework for a transactive energy market based on blockchain. The framework was designed based on the engineering requirements of a distribution-scale market; including participant needs, expected market transactions, and the cybersecurity constructs required to support a fair, secure and efficient market operation. It leverages the existing blockchain primitives to provide clear value propositions to the transactive market, including identity management (access control), data security (integrity), resiliency (decentralization, scalability and performance). The validity of the proposed framework is demonstrated using a real-time 5-min double-auction market. The results highlight its benefits while providing strong validation of applicability to blockchain within transactive energy systems.

Gourisetti, Sri Nikhil Gupta↗

Calibration strategy of the PROSPECT-II detector with external and intrinsic sources

This paper presents an energy calibration scheme for an upgraded reactor antineutrino detector for the Precision Reactor Oscillation and Spectrum Experiment (PROSPECT). The PROSPECT collaboration is preparing an upgraded detector, PROSPECT-II (P-II), to advance capabilities for the investigation of fundamental neutrino physics, fission processes and associated reactor neutrino flux, and nuclear security applications. P-II will expand the statistical power of the original PROSPECT (P-I) dataset by at least an order of magnitude. The new design builds upon previous P-I design and focuses on improving the detector robustness and long-term stability to enable multi-year operation at one or more sites. The new design optimizes the fiducial volume by elimination of dead space previously occupied by internal calibration channels, which in turn necessitates the external deployment. In this paper, we describe a calibration strategy for P-II. Here, the expected performance of externally deployed calibration sources is evaluated using P-I data and a well-benchmarked simulation package by varying detector segmentation configurations in the analysis. The proposed external calibration scheme delivers a compatible energy scale model and achieves comparable performance with the inclusion of an additional AmBe neutron source, in comparison to the previous internal arrangement. Most importantly, the estimated uncertainty contribution from the external energy scale calibration model meets the precision requirements of the P-II experiment.

47 OTHER INSTRUMENTATION↗

Subcritical Assembly at ORNL [Slides]

This presentation discusses the US Department of Energy (DOE) Nuclear Criticality Safety Program (NCSP), specifically regarding the training and education courses. Also discussed is the AGN-201M reactor and fuel disk. Additionally, the ORSA conceptual design and design changes are presented. In conclusion, the ORSA design has moved from conceptual to implementable. ORSA hands-on experiments will remain subcritical under normal and credible abnormal conditions. The ORSA location will have minimal security and safety basis impact and is feasible for a diversity of students. The implementation of ORSA will improve upon NCSP T&E’s vision to remain adaptable and responsive.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Assessment of Technical Hydropower Potential at Non-Powered Dams in the United States

Historically, dams have been constructed for a variety of purposes, such as providing a more secure and reliable water supply, mitigating impacts from variations in river flow, allowing continuous navigability, and harnessing mechanical power. A relatively small portion of dams have been designed to store or regulate flows for the purpose of generating electricity (roughly 3% of nationally inventoried dams in the US and 17% of the dams included in the World Register of Dams). The remaining population of existing non-powered dams (NPDs) presents both an opportunity to generate renewable energy and a need to modernize aging infrastructure. This report describes an assessment of more than 2,600 NPDs in the US that have a collective potential of nearly 4 GW in new power capacity. Previous national-scale assessments were aimed at evaluating the theoretical maximum power potential at existing dams in the United States. These estimates were based on the best available information at the time for water availability, hydraulic head, and representative regional capacity factors. This study revisits a subset of 3,299 dams identified in the most recent theoretical resource assessment and uses more detailed and updated hydrologic data to produce estimates of technical potential. These improvements in data enable estimates that more realistically reflect what is physically possible given simple assumptions about the existing structure and constraints on flow and head (Figure 1).

13 HYDRO ENERGY↗

Cybersecurity Workforce Training for SMR Integration into Distribution Grids: A Competency Framework and Containerized Hands-On Lab for the SMR/DER/Microgrid Boundary

Small modular reactors (SMRs) and microreactors are entering the U.S. distribution grid as synchronous generation on feeders designed for loads and inverter-based distributed energy resources (DERs). No existing cybersecurity training program addresses this intersection of nuclear operations, DER management, and operational technology security. As subcontractor to Iowa State University on the CyDERMS Center, Argonne analyzed the relevant standards and training landscape, translated the resulting gaps into a twelve-objective competency framework across distribution-operator and graduate-analyst role tracks, and built a containerized training lab using a ∼400-bus composite grid model behind a realistically simulated Modbus TCP SCADA stack. The analysis isolates the balance-of-plant / energy-management-system (BOP/EMS) boundary as the critical jurisdictional seam where, as of March 2026, neither NRC nor NERC CIP cleanly claims cybersecurity responsibility for distribution-connected SMRs. The framework maps each objective across NIST CSF 2.0, ISA/IEC 62443, NIST NICE Task–Knowledge–Skill statements, and NRC RG 5.71 awareness-and-training controls. The training lab implements operator-recognition assessment scenarios spanning grid-side disturbances and telemetry-layer anomalies.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

GLIMPSE of Future Power Grid Models

Power grid is one of the critical national infrastructures with social, economics, and national security impacts. Particularly, power distribution systems represent part of the infrastructure between power distribution substations and customers such as residential, commercial, and industrial. To address various grid modernization challenges, state-of-the-art algorithms and methodologies have been developed to deploy, operate, and expand a secure and resilient power grid. At the same time, there is a need to develop capabilities to assist power grid stakeholders to quickly get insight into the design and structure of the grid. Data visualization is a key approach to comprehend and understand complex systems such as the power grid. We present GLIMPSE Grid Layout Interface for Model Preview and System Exploration), a graph-based semantic-aware application to visualize and update distribution power grid models. The GLIMPSE can be used with standard IEEE models to search and highlight power grid objects such as generators, loads, overhead lines, etc. Additionally, it supports updating attributes and model export to integrate with GridLAB-D simulations.

Cybersecurity, power grid, visualization↗

Design of Nuclear Criticality Safety Framework for Hands-on Construction of Fast Systems Over Ranges of Multiplication

Since 1945, Los Alamos National Laboratory (LANL) has performed critical experiments, primarily at the Los Alamos Critical Experiments Facility (LACEF) at Technical Area 18 (TA-18). Since 2011, these experiments have been conducted by the National Criticality Experiments Research Center (NCERC), operated by LANL, at the Device Assembly Facility (DAF) in the Nevada National Security Site (NNSS). These experiments utilize various types of Special Nuclear Material (SNM). Some of these experiments utilize what is referred to as the Rocky Flat Shells, which are called such as they came from the Rocky Flats Plant. These concentric hemi-shells are made of Highly Enriched Uranium (HEU), which is 93 w/o 235U. Fig. 1. Subset of the Rocky Flat Shells LANL is designing a new subcritical hands-on experiment with the goal of achieving a neutron multiplication in the range of 50 to 200, which correlates to Keff values of 0.98 to 0.995. ANSI/ANS-1 is the standard for Conduct of Critical Experiments which governs critical operations at NCERC. Section 3.9 of ANSI/ANS-1 states that when manipulating a critical assembly by hand, the predicted k eff of a known configuration should not exceed 0.95 (a neutron multiplication of 20). This presents a challenge, as this system would have a higher multiplication than 20 and the assembly would have to remain subcritical in normal and credible accident scenarios. To ensure the safety of such an assembly, the different normal and abnormal conditions that could alter the criticality 1 MCNP® and Monte Carlo N-Particle® are registered trademarks owned by Triad National Security, LLC, manager and operator of Los Alamos National Laboratory. Any third party use of such registered marks should be properly of the system must be considered and analyzed. If such a condition is deemed to be credible, it will be further investigated using the Monte Carlo N-Particle (MCNP) transport code. If the results of these simulations show that a k eff larger than one could be possible, modifications to the assembly will be made until such an event is deemed no longer possible.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗