Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SSC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Physical Simulation of Rocket Exhaust Aerodynamics Using Heated Ethane: Conceptual Foundations

Heated ethane (C2H6) has been proposed as an alternative to inert gases for use as a motive fluid in the experimental simulation of rocket exhaust plumes. By adjusting stagnation temperature, the isentropic exponent of ethane can be tuned to approximate those produced by common rocket propellants including hydrogen, hypergols, alcohols, and hydrocarbons. As a result, ethane can be made to follow a nozzle expansion process which is nearly identical to realistic rocket engine flow fields. Additionally, its high auto-ignition temperature and resistance to condensation enable the testing of expansion ratios much larger than conventional inertgas testing. NASA SSC has performed quasi-one-dimensional analyses using the Chemical Equilibrium with Applications (CEA) code as a preliminary means to compare flow fields produced by non-reacting ethane to those of reacting combustion products. A LO2/LH2 rocket engine operating at a chamber pressure of 5.0 MPa and a mixture ratio of 6.1 was used as an example case to demonstrate ethane’s efficacy as a simulant. Errors for key similarity parameters were compared to legacy cold-flow test methods. Additional errors induced by machining tolerances and chemical impurities were also examined. Results suggest that at a 3% geometric scale and ~500 K ethane stagnation temperature, an error of less than 2.5% throughout the flow field is realistically achievable along the dimensions of Mach number, Reynolds number, pressure ratio, and isentropic exponent. The development of an experimental test bed for validation of this configuration is currently underway.

Jones, Daniel R.↗

NASA Platform for Autonomous Systems (NPAS)

Autonomous operations are critical for the success, safety and crew survival of NASA deep space missions beyond low Earth orbit, including Gateway. For the past 10 years, Stennis Space Center (SSC) has been developing, and has demonstrated an innovative software platform, along with expertise and processes for implementation of autonomous operations.

Integrated Power Avionics and Software↗

NASA's Space Launch System Begins Moving To The Launch Site

NASA is accelerating plans for a human return to the Moon. NASA was directed by the White House in 2019 to land the first woman and next man on the Moon by 2024. NASA’s backbone for future deep space exploration is the Space Launch System (SLS), as well as the Orion crew spacecraft, Gateway outpost, and Human Landing System as part of the Artemis program. While the SLS upper stage, the Interim Cryogenic Propulsion Stage (ICPS), based on an existing commercial stage was shipped to Kennedy Space Center (KSC) in 2017, major completed components of SLS will soon begin their eastward journey that will see them at KSC in 2020 to be integrated for their history-making launch back to the Moon. Core Stage prime contractor Boeing completed the Artemis I core stage in 2019 at NASA’s Michoud Assembly Facility (MAF) and shipped it to NASA Stennis Space Center (SSC) for stage green run testing in 2020 and then to KSC. Northrop Grumman, prime contractor for the 5-segment solid rocket boosters, is scheduled to begin overland shipment of the Artemis I motor segments from Utah to KSC in 2020 to await integration. This paper will discuss SLS progress to date and planned 2020 milestones.

Bruce R Askins↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Space Launch System Artemis I CubeSats: SmallSat Vanguards of Exploration, Science and Technology

When NASA’s Space Launch System (SLS) rocket launches in 2021 with the Orion crew vehicle, it will lay the foundation for NASA’s goal of landing the first woman and the next man on the Moon as part of the Artemis program. This first flight—Artemis I—will also mark a milestone for smallsats. Thirteen6U CubeSats are manifested on the Artemis I flight, the first fleet of CubeSats carried as a ride share opportunity to deep space.(NASA’s first CubeSats to deep space, the twin Mars Cube One [MarCO] spacecraft, were an integral part of the InSight Mars lander mission). The Artemis I CubeSat manifest represents a diverse collection of smallsats performing an array of science missions and technology demonstrations. Payloads from NASA, international partners, academia and industry will execute a variety of experiments. Several smallsats will perform lunar-focused missions that may return data that addresses Strategic Knowledge Gaps (SKGs) in the agency’s lunar exploration program. Indeed, the Artemis I CubeSats will be in the vanguard of the agency’s 21st-century lunar program. The Artemis I missions will produce data to support space radiation awareness,crewed landings and in-situ resource utilization, helping to support a sustained human lunar presence. Several of the Artemis I CubeSats are demonstrating new technologies, including propulsion capabilities. Among the Artemis I CubeSats are three selected through NASA’s Cube Quest Challenge, part of the Centennial Challenges program. These three missions will compete for prize money while meeting specific technical development goals. Payloads from the Japanese and Italian space agencies provide an early opportunity for international involvement in the Artemis program. Student involvement in almost half of the payloads allow STEM engagement with NASA’s Artemis program. The SLS Block 1 vehicle for the Artemis I flight is manufactured with several elements delivered to Kennedy Space Center (KSC) and being prepared for stacking and integration. The new-development of the program, the 212-footcore stage with its four RS-25 engines installed is currently at Stennis Space Center (SSC) for “green run” testing. Following the green run test campaign, the stage will ship to KSC, where it will be integrated with the rest of the vehicle, including the upper stage adapter, where the Artemis I smallsats will be housed.

Kimberly F Robinson↗

Lagrange-Based Options for Relay Satellites to Eliminate Earth-Mars Communications Outages During Solar Superior Conjunctions

Recent conjunction class Mars human mission plans have generally assumed that there will inevitably be periods of communications outages between Earth and Mars. This has significant cost and risk implications for not only Mars missions, but also precursor missions in the lunar environment. But are there ways to avoid these outages? The potential exists for communications to be interrupted by Solar Superior Conjunctions (SSCs). Depending on the communications system, used, there can be communications outages up to as many as 78 days. The higher bandwidth systems experience the greatest outage. If these communications channels are interrupted due to an SSC, there are of course resulting challenges to mission operations. An outage of a few days to a few weeks could allow minor disturbances to become major concerns or even trigger subsystems failures. An inability to consult with the ground at the wrong time could result in loss of mission, loss of an element, or loss of life. Each planet in the solar system has a set of five Lagrange points associated with it and the Sun. At any given point in time, a planet or either its L4 or L5 point is visible to any other planet in the solar system, regardless of the position of the sun relative to the two. Thus, L4 and L5 have high value as relay systems to prevent communications outages. There are four sets of solar Lagrange points that may be of potential use in this study: Mars-Sun L4 and L5 points, Earth-Sun L4 and L5, Venus-Sun L4 and L5, and Mercury-Sun L4 and L5. A candidate relay satellite system will be identified, with consideration of both new technology developments and existing telecommunications satellites. This system may have implications for not only the Mars human mission architectures, but also Gateway and human lunar surface architectures as these other studies are tasked with paving the way to human Mars missions. If Mars communications outages can be eliminated, then the degree of autonomy necessary in Mars and precursor systems may be reduced.

Relay Satellite↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

The SIRTF Science Operations System

This paper describes the role and function of the SSC, the architecture of the SOS, and discusses the major SOS subsystems. Examples of products generated by the SOS are included.

science↗

NASA Space Launch System Completes Green Run Testing, Begins Assembly

NASA’s Space Launch System (SLS) Program is poised in 2021 to shift its focus to the launch site with the completion of its last major integrated hardware and software test. SLS is NASA’s evolvable super heavy-lift launch vehicle for deep space exploration. Using proven propulsion technologies, SLS will be the most powerful launch vehicle in the world. That capability translates not only into more mass and volume to destinations but also simplified payload design and mission operations and greater opportunity for mission success. These capabilities will be important for the Artemis program, NASA’s plan to return humans to the Moon to stay in a sustainable way in order to develop and test technologies and operations needed for human missions to Mars and other destinations. SLS will anchor the transportation leg of an innovative, sustainable program of lunar exploration with commercial and international partners as the first step of human exploration of deep space. While all major hardware and software efforts made significant progress in 2020 and 2021, the most visible was the Green Run test series of the Artemis I core stage conducted at NASA’s Stennis Space Center (SSC) on the B-2 test stand. The series validated core stage design, performance, workmanship, and readiness for shipment to NASA Kennedy Space Center (KSC) for final processing, integration and launch. The core stage provides the backbone for SLS’ main propulsion system, consisting of two five-segment solid rocket boosters and four RS-25 liquid hydrogen (LH2)/liquid oxygen (LOX) engines. SLS also includes an Interim Cryogenic Propulsion Stage (ICPS) that will insert the Orion crew spacecraft into a lunar trajectory.

John Honeycutt↗

Propellant Delivery via VDC Driven Pump

The SMART (Scalable Mobile Autonomous Rocket engine Test) testbed system initiative at SSC was conceived to attempt to address many of the principal cost drivers in developing and maintaining a rocket engine test facility. The system (optimized to test engines and components generating up to 10K lbf nominal thrust) is serving as a testbed for innovative technologies and processes to provide lower cost test services with a rapid test cadence and expedient turnaround times. The system can also potentially be used as a testbed to test other related technologies relevant to surface situations (e.g., moon, Mars associated with crogenic fluid management, engine/component testing, autonomous operations, etc.). This FY20 CIF project, being conducted as part of the SMART testbed system, is developing and testing a propellant delivery system via electrically driven centrifugal pumps (obviating dependence upon Multi-Layer Pressure Vessels) with configuration and operation by a minimal number of personnel. During FY20 the team identified the requirements and worked with P3 and Masten Space Systems to develop the long lead (9 months after receipt of order) items, the 400 VDC pumps, for delivery in mid FY21. Since control of the 400 VDC pump motor is not well developed the team has established heuristics to control flows in LN2 at off nominal shaft speeds to allow deep throttling of the pump in flow test scenarios. Various test scenarios including nominal i.e. high flow high pressure, high flow low pressure, low flow high pressure, low flow low pressure, minimum throttle step change, and low inlet pressure cavitation testing were developed ahead of the anticipated hardware delivery and test. FY20 COVID Stage 3 conditions restricted access to the center and hindered lab work, so efforts focused on the system design and testing plans along with the project procurement paperwork for the hardware... now with its anticipated delivery in spring FY21. Some limited access to the center is expected by spring/summer FY21 for the continuing second year (FY21) CIF project effort meant to be focused upon system integration and initial testing.

Aaron Head↗

Instrumentation for Exploring Mars with High Science Return Small Payload Missions

The Mars Exploration Directorate at the JPL is sponsoring a study to examine technical feasibility of developing small spacecraft missions (SSc) capable of low-cost compelling science. Low cost small spacecraft missions can enable unique mission concepts with higher than normal mission risk. This increase in risk can create opportunities for low-cost, compelling science missions in regions that may be otherwise unexplored, provide opportunities for constellations, networks scouts, and fundamentally new measurements. Potential science instruments for MEPAG high-priority investigations suited to small spacecraft mass, volume, power, and cost constraints include compact versions of a camera (MSL EECam), Meteorology (MEDA-ATS or FMI wind, barometry, T, and P), Seismometer (INSIGHT SEIS), Atmosphere and trace Gases (MSL Tunable Laser Spectrometer), Dust (ExoMars MicroMED) analyzers, and fluxgate magnetometers (INSIGHT Mag). Two examples of low cost mission concepts are LOKI (Localizing Organic Key Ingredients), an areostationary SmallSat orbital constellation designed to measure trace gases, and TH2OR, a time-domain EM sound capable of water detection to a depth of many kilometers which would be landed via a small high impact energy device (SHIELD).

Anderson, R.↗

Orbital Communications Adapter

What is OCA? The OCA system provides the capability to transfer data (documents, imagery, video, data) between a ground PC network in MCC-H and the onboard SSC and JSL systems via Ku band.

Michelle Lee Nowling↗

Analytic Nonlinear Methods for Beam Optics

In recent years there have been major advances in the computation and use of high-order maps for the design, optimization and operation of beamlines. We will describe five practical examples for both linear and circular colliders. From least to most complex these examples will be: use of similarity transformations (FFTB design, SLC diagnosis); statistical maps (SSC smear and tune-shift); aberrations (SLC upgrade); resonance basis and nPB tracking (PEP-II design); and kick factorization (possibly LHC).

43 PARTICLE ACCELERATORS↗

Aluminum Stabilized NbTi Conductor Test Coil Design, Fabrication, and Test Results

A new generation of precision muon conversion experiments is planned at both Fermilab and KEK. These experiments will depend upon a complex set of solenoid magnets for the production, momentum selection and transport of a muon beam to a stopping target, and for tracking detector momentum analysis of candidate conversion electrons from the target. Baseline designs for the production and detector solenoids use NbTi cable that is heavily stabilized by an extruded high RRR aluminum jacket. A U.S.-Japan research collaboration has begun whose goal is to advance the development of optimized Al-NbTi conductors, gain experience with the technology of winding coils from this material, and test the conductor performance as modest length samples become available. For this purpose, a 'conductor test' solenoid with three coils was designed and built at Fermilab. A sample of the RIKEN Al-NbTi conductor from KEK was wound into a 'test' coil; this was sandwiched between two 'field' coils wound from doubled SSC cable, to increase the peak field on the RIKEN test coil. All three solenoid coils were epoxy impregnated, and utilized aluminum outer bandage rings to apply preload to the coils when cold. The design and fabrication details, and results of the magnet quench performance tests are presented and discussed.

43 PARTICLE ACCELERATORS↗

Essay: In Memory of Robert Siemann

Bob Siemann came to SLAC from Cornell in 1991. With the support from Burton Richter, then Director of SLAC, he took on a leadership role to formulate an academic program in accelerator physics at SLAC and the development of its accelerator faculty. Throughout his career he championed accelerator physics as an independent academic discipline, a vision that he fought so hard for and never retreated from. He convinced Stanford University and SLAC to create a line of tenured accelerator physics faculty and over the years he also regularly taught classes at Stanford and the U.S. Particle Accelerator School. After the shutdown of the SSC Laboratory, I returned to SLAC in 1993 to join the accelerator faculty he was forming. He had always visualized a need to have a professional academic journal for the accelerator field, and played a pivotal role in creating the journal Physical Review Special Topics - Accelerators and Beams, now the community standard for accelerator physics after nine years of his editorship. Today, Bob's legacy of accelerator physics as an independent academic discipline continues at SLAC as well as in the community, from which we all benefit. Bob was a great experimentalist. He specialized in experimental techniques and instrumentation, but what he wanted to learn is physics. If he had to learn theory - heaven forbid - to reach that goal, he would not hesitate one second to do so. In fact, he had written several theoretical papers as results of these efforts. Now this is what I call a true experimentalist! Ultimately, however, I think it was experimental instruments that he loved most. His eyes widened when he talked about his instruments. Prompted by a question, he would proceed to a nearby blackboard, with a satisfying grin, and draw his experimental device in a careful thinking manner, then describe his experiment and educate the questioner with some insightful physics. These moments were most enjoyable, to him and the questioner alike. When I think of Bob today, it is these moments that first come to mind, and it is these moments I will miss the most. I should like to mention another curious thing about Bob, namely he had a special talent of finding persuasive arguments that went his way. It was difficult to argue with Bob because it was so difficult to win. Generally quiet otherwise, he was too good and too methodical a debater. I had never seen him losing a debate on a policy issue or in a committee setting. However, when it comes to physics, his soft spot, he occasionally let go some weakness. When so doing, he would lose the debate, but his grin revealed that the loss was more than compensated by the physics he gained together with his debater. It is hard to believe that the office around the corner is now empty. The dear colleague we have come to know, to talk to, and to seek advice from, together with the feet-on-the-desk posture and the familiar grin, are no longer there. I wonder, who will now occupy that office next? And who will continue to carry on Bob Siemann's legacy? Many of us are waiting.

43 PARTICLE ACCELERATORS↗

Nuclear Power Plant Concrete Structures

A nuclear power plant (NPP) involves complex engineering structures that are significant items of the structures, systems and components (SSC) important to the safe and reliable operation of the NPP. Concrete is the commonly used civil engineering construction material in the nuclear industry because of a number of advantageous properties. The NPP concrete structures underwent a great degree of evolution, since the commissioning of first NPP in early 1960. The increasing concern with time related to safety of the public and environment, and degradation of concrete structures due to ageing related phenomena are the driving forces for such evolution. The concrete technology underwent rapid development with the advent of chemical admixtures of plasticizer/super plasticizer category as well as viscosity modifiers and mineral admixtures like fly ash and silica fume. Application of high performance concrete (HPC) developed with chemical and mineral admixtures has been witnessed in the construction of NPP structures. Along with the beneficial effect, the use of admixtures in concrete has posed a number of challenges as well in design and construction. This along with the prospect of continuing operation beyond design life, especially after 60 years, the impact of extreme natural events ( as in the case of Fukushima NPP accident) and human induced events (e.g. commercial aircraft crash like the event of September 11th 2001) has led to further development in the area of NPP concrete structures. The present paper aims at providing an account of evolution of NPP concrete structures in last two decades by summarizing the development in the areas of concrete technology, design methodology and construction techniques, maintenance and ageing management of concrete structures.

aging management↗

Methodology for the Incorporation of Passive Component Aging Modeling into the RAVEN/ RELAP-7 Environment

Passive system, structure and components (SSCs) will degrade over their operation life and this degradation may cause to reduction in the safety margins of a nuclear power plant. In traditional probabilistic risk assessment (PRA) using the event-tree/fault-tree methodology, passive SSC failure rates are generally based on generic plant failure data and the true state of a specific plant is not reflected realistically. To address aging effects of passive SSCs in the traditional PRA methodology [1] does consider physics based models that account for the operating conditions in the plant, however, [1] does not include effects of surveillance/inspection. This paper represents an overall methodology for the incorporation of aging modeling of passive components into the RAVEN/RELAP-7 environment which provides a framework for performing dynamic PRA. Dynamic PRA allows consideration of both epistemic and aleatory uncertainties (including those associated with maintenance activities) in a consistent phenomenological and probabilistic framework and is often needed when there is complex process/hardware/software/firmware/ human interaction [2]. Dynamic PRA has gained attention recently due to difficulties in the traditional PRA modeling of aging effects of passive components using physics based models and also in the modeling of digital instrumentation and control systems. RAVEN (Reactor Analysis and Virtual control Environment) [3] is a software package under development at the Idaho National Laboratory (INL) as an online control logic driver and post-processing tool. It is coupled to the plant transient code RELAP-7 (Reactor Excursion and Leak Analysis Program) also currently under development at INL [3], as well as RELAP 5 [4]. The overall methodology aims to: • Address multiple aging mechanisms involving large number of components in a computational feasible manner where sequencing of events is conditioned on the physical conditions predicted in a simulation environment such as RELAP-7. • Identify the risk-significant passive components, their failure modes and anticipated rates of degradation • Incorporate surveillance and maintenance activities and their effects into the plant state and into component aging progress. • Asses aging affects in a dynamic simulation environment 1. C. L. SMITH, V. N. SHAH, T. KAO, G. APOSTOLAKIS, “Incorporating Ageing Effects into Probabilistic Risk Assessment –A Feasibility Study Utilizing Reliability Physics Models,” NUREG/CR-5632, USNRC, (2001). 2. T. ALDEMIR, “A Survey of Dynamic Methodologies for Probabilistic Safety Assessment of Nuclear Power Plants, Annals of Nuclear Energy, 52, 113-124, (2013). 3. C. RABITI, A. ALFONSI, J. COGLIATI, D. MANDELLI and R. KINOSHITA “Reactor Analysis and Virtual Control Environment (RAVEN) FY12 Report,” INL/EXT-12-27351, (2012). 4. D. ANDERS et.al, "RELAP-7 Level 2 Milestone Report: Demonstration of a Steady State Single Phase PWR Simulation with RELAP-7," INL/EXT-12-25924, (2012).

97 MATHEMATICS AND COMPUTING↗

Impact of Passive Safety on FHR Instrumentation Systems Design and Classification

Fluoride salt-cooled high-temperature reactors (FHRs) will rely more extensively on passive safety than earlier reactor classes. 10CFR50 Appendix A, General Design Criteria for Nuclear Power Plants, establishes minimum design requirements to provide reasonable assurance of adequate safety. 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, provides guidance on how the safety significance of systems, structures, and components (SSCs) should be reflected in their regulatory treatment. The Nuclear Energy Institute (NEI) has provided 10 CFR 50.69 SSC Categorization Guideline (NEI-00-04) that factors in probabilistic risk assessment (PRA) model insights, as well as deterministic insights, through an integrated decision-making panel. Employing the PRA to inform deterministic requirements enables an appropriately balanced, technically sound categorization to be established. No FHR currently has an adequate PRA or set of design basis accidents to enable establishing the safety classification of its SSCs. While all SSCs used to comply with the general design criteria (GDCs) will be safety related, the intent is to limit the instrumentation risk significance through effective design and reliance on inherent passive safety characteristics. For example, FHRs have no safety-significant temperature threshold phenomena, thus enabling the primary and reserve reactivity control systems required by GDC 26 to be passively, thermally triggered at temperatures well below those for which core or primary coolant boundary damage would occur. Moreover, the passive thermal triggering of the primary and reserve shutdown systems may relegate the control rod drive motors to the control system, substantially decreasing the amount of safety-significant wiring needed. Similarly, FHR decay heat removal systems are intended to be running continuously to minimize the amount of safety-significant instrumentation needed to initiate operation of systems and components important to safety as required in GDC 20. This paper provides an overview of the design process employed to develop a pre-conceptual FHR instrumentation architecture intended to lower plant capital and operational costs by minimizing reliance on expensive, safety related, safety-significant instrumentation through the use of inherent passive features of FHRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗