Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Poor Baseline Pulmonary Function May Not Increase the Risk of Radiation-Induced Lung Toxicity

Purpose: Poor pulmonary function (PF) is often considered a contraindication to definitive radiation therapy for lung cancer. This study investigated whether baseline PF was associated with radiation-induced lung toxicity (RILT) in patients with non-small cell lung cancer (NSCLC) receiving conformal radiation therapy (CRT). Methods and Materials: NSCLC patients treated with CRT and tested for PF at baseline were eligible. Baseline predicted values of forced expiratory volume in 1 sec (FEV1), forced vital capacity (FVC), and diffusion capacity of lung for carbon monoxide (DLCO) were analyzed. Additional factors included age, gender, smoking status, Karnofsky performance status, coexisting chronic obstructive pulmonary disease (COPD), tumor location, histology, concurrent chemotherapy, radiation dose, and mean lung dose (MLD) were evaluated for RILT. The primary endpoint was symptomatic RILT (SRILT), including grade ≥2 radiation pneumonitis and fibrosis. Results: There was a total of 260 patients, and SRILT occurred in 58 (22.3%) of them. Mean FEV1 values for SRILT and non-SRILT patients were 71.7% and 65.9% (P=.077). Under univariate analysis, risk of SRILT increased with MLD (P=.008), the absence of COPD (P=.047), and FEV1 (P=.077). Age (65 split) and MLD were significantly associated with SRILT in multivariate analysis. The addition of FEV1 and age with the MLD-based model slightly improved the predictability of SRILT (area under curve from 0.63-0.70, P=.088). Conclusions: Poor baseline PF does not increase the risk of SRILT, and combining FEV1, age, and MLD may improve the predictive ability.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Bowtie Analysis of the Effects of Unmanned Aircraft on Air Traffic Control

Within the aviation domain, there is a growing industry demand to develop and integrate remotely piloted operations into the National Airspace System. However, it is not yet well understood how the integration of unmanned aircraft with impact air traffic control, and specifically, the air traffic controllers who are at the sharp end of this safety critical system. This research presented in this paper aimed to begin to address this gap in understanding by identifying and exploring potential hazards associated with introducing Unmanned Aircraft into the national airspace system, and identify possible mitigations to reduce identified risks. A bowtie risk analysis methodology was used to identify and analyze hazards. A focus-group format discussion was conducted with nine subject matter experts as participants. Findings identified five areas of potential risk, each associated with multiple hazards. Mitigations for each hazard are reported. Findings have essential implications for the safe and efficient integration of unmanned aircraft into the national airspace.

unmanned aerial vehicles↗

Risk-Informed Decision Making: Application to Technology Development Alternative Selection

NASA NPR 8000.4A, Agency Risk Management Procedural Requirements, defines risk management in terms of two complementary processes: Risk-informed Decision Making (RIDM) and Continuous Risk Management (CRM). The RIDM process is used to inform decision making by emphasizing proper use of risk analysis to make decisions that impact all mission execution domains (e.g., safety, technical, cost, and schedule) for program/projects and mission support organizations. The RIDM process supports the selection of an alternative prior to program commitment. The CRM process is used to manage risk associated with the implementation of the selected alternative. The two processes work together to foster proactive risk management at NASA. The Office of Safety and Mission Assurance at NASA Headquarters has developed a technical handbook to provide guidance for implementing the RIDM process in the context of NASA risk management and systems engineering. This paper summarizes the key concepts and procedures of the RIDM process as presented in the handbook, and also illustrates how the RIDM process can be applied to the selection of technology investments as NASA's new technology development programs are initiated.

Dezfuli, Homayoon↗

Evaluation of a proposed expert system development methodology: Two case studies

Two expert system development projects were studied to evaluate a proposed Expert Systems Development Methodology (ESDM). The ESDM was developed to provide guidance to managers and technical personnel and serve as a standard in the development of expert systems. It was agreed that the proposed ESDM must be evaluated before it could be adopted; therefore a study was planned for its evaluation. This detailed study is now underway. Before the study began, however, two ongoing projects were selected for a retrospective evaluation. They were the Ranging Equipment Diagnostic Expert System (REDEX) and the Backup Control Mode Analysis and Utility System (BCAUS). Both projects were approximately 1 year into development. Interviews of project personnel were conducted, and the resulting data was used to prepare the retrospective evaluation. Decision models of the two projects were constructed and used to evaluate the completeness and accuracy of key provisions of ESDM. A major conclusion reached from these case studies is that suitability and risk analysis should be required for all AI projects, large and small. Further, the objectives of each stage of development during a project should be selected to reduce the next largest area of risk or uncertainty on the project.

Gilstrap, Lewey↗

Risk and Cost Analysis of Utilizing FLEX Equipment for O&M Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plant (NPP) operators in USA have announced to close their plants despite there are remaining years on their operating licenses. The cause of these closures is because the plant operators suffer financial losses. Approximately 80% of USA NPPs would have undergone financial losses if they were situated in a deregulated electricity market. In a deregulated market, electricity generators are independent entities separate from the transmission companies and Independent System Operator (ISO) which manages the market. NPPs in this market are termed merchant NPPs, and their profitability is determined solely from electricity generation revenues. Meanwhile, regulated and public power nuclear units’ profitability is determined by the regulatory process in place for each unit. Due to the complexity of differentiating each regulated and public power NPP’s regulations 36 NPPs are at an immediate risk of retiring early to stop losses, while 27 units will likely to follow in the long run. Today, cost is well-recognized and important factor in NPP decision-making that cannot be ignored. Therefore, it is essential to consider risk and cost together in decision-making to strengthen the position of the nuclear industry in an economically challenging energy market. With operational and maintenance (O&M) cost at 70% of the total operating expenditure of an NPP and some plants closing prematurely despite excellent safety record, there is an urgent need to address the high O&M cost. One of the novel entities that provide additional safety resulting in reduced risk of nuclear power plants is Flex equipment. Flex strategies were postulated by the US NRC in the wake of Fukushima Dai-chi accident to address beyond design-basis accidents and improve plant flexibility. Flex strategy comprise both onsite and off-site component storage for the provision of additional materials and equipment. This work explored innovative ways of utilizing the onsite Flex equipment during regular plant operation, for purposes in addition to the intended use of beyond design basis accidents. This report describes the risk and cost analysis of using Flex equipment during regular or unplanned maintenance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Delayed Complications in Patients Surviving at Least 3 Years After Stereotactic Radiosurgery for Brain Metastases

Purpose: Little is known about delayed complications after stereotactic radiosurgery in long-surviving patients with brain metastases. We studied the actual incidence and predictors of delayed complications. Patients and Methods: This was an institutional review board-approved, retrospective cohort study that used our database. Among our consecutive series of 2000 patients with brain metastases who underwent Gamma Knife radiosurgery (GKRS) from 1991-2008, 167 patients (8.4%, 89 women, 78 men, mean age 62 years [range, 19-88 years]) who survived at least 3 years after GKRS were studied. Results: Among the 167 patients, 17 (10.2%, 18 lesions) experienced delayed complications (mass lesions with or without cyst in 8, cyst alone in 8, edema in 2) occurring 24.0-121.0 months (median, 57.5 months) after GKRS. The actuarial incidences of delayed complications estimated by competing risk analysis were 4.2% and 21.2% at the 60th month and 120th month, respectively, after GKRS. Among various pre-GKRS clinical factors, univariate analysis demonstrated tumor volume-related factors: largest tumor volume (hazard ratio [HR], 1.091; 95% confidence interval [CI], 1.018-1.154; P=.0174) and tumor volume {<=}10 cc vs >10 cc (HR, 4.343; 95% CI, 1.444-12.14; P=.0108) to be the only significant predictors of delayed complications. Univariate analysis revealed no correlations between delayed complications and radiosurgical parameters (ie, radiosurgical doses, conformity and gradient indexes, and brain volumes receiving >5 Gy and >12 Gy). After GKRS, an area of prolonged enhancement at the irradiated lesion was shown to be a possible risk factor for the development of delayed complications (HR, 8.751; 95% CI, 1.785-157.9; P=.0037). Neurosurgical interventions were performed in 13 patients (14 lesions) and mass removal for 6 lesions and Ommaya reservoir placement for the other 8. The results were favorable. Conclusions: Long-term follow-up is crucial for patients with brain metastases treated with GKRS because the risk of complications long after treatment is not insignificant. However, even when delayed complications occur, favorable outcomes can be expected with timely neurosurgical intervention.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Bowtie Analysis of the Effects of Unmanned Aircraft on Air Traffic Control

Within the aviation domain, there is a growing industry demand to develop and integrate remotely piloted operations into the National Airspace System. However, it is not yet well understood how the integration of unmanned aircraft with impact air traffic control, and specifically, the air traffic controllers who are at the sharp end of this safety critical system. This research presented in this paper aimed to begin to address this gap in understanding by identifying and exploring potential hazards associated with introducing Unmanned Aircraft into the national airspace system, and identify possible mitigations to reduce identified risks. A bowtie risk analysis methodology was used to identify and analyze hazards. A focus-group format discussion was conducted with nine subject matter experts as participants. Findings identified five areas of potential risk, each associated with multiple hazards. Mitigations for each hazard are reported. Findings have essential implications for the safe and efficient integration of unmanned aircraft into the national airspace.

Tamsyn Edwards↗

The role of risk management in the design of diagnostics for fusion reactors

A project-oriented approach is beneficial for the selection and design of viable diagnostics for fusion reactors because of the associated complex physical and organizational environment. The project-oriented approach includes rigorous risk management. The nature and impact of risks related to technical, organizational and commercial aspects in relation to the development of ITER diagnostics under EU responsibility are analyzed. The majority of risks are related to organizational aspects and technical feasibility issues. The experience with ITER is extrapolated to DEMO and beyond. It should not be taken for granted that technical solutions will be found, while a risk analysis of various diagnostic techniques with quantitative assessments undertaken early in the design of DEMO would be beneficial.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Volume Averaged Height Integrated Radar Reflectivity (VAHIRR) Cost-Benefit Analysis

Lightning Launch Commit Criteria (LLCC) are designed to prevent space launch vehicles from flight through environments conducive to natural or triggered lightning and are used for all U.S. government and commercial launches at government and civilian ranges. They are maintained by a committee known as the NASA/USAF Lightning Advisory Panel (LAP). The previous LLCC for anvil cloud, meant to avoid triggered lightning, have been shown to be overly restrictive. Some of these rules have had such high safety margins that they prohibited flight under conditions that are now thought to be safe 90% of the time, leading to costly launch delays and scrubs. The LLCC for anvil clouds was upgraded in the summer of 2005 to incorporate results from the Airborne Field Mill (ABFM) experiment at the Eastern Range (ER). Numerous combinations of parameters were considered to develop the best correlation of operational weather observations to in-cloud electric fields capable of rocket triggered lightning in anvil clouds. The Volume Averaged Height Integrated Radar Reflectivity (VAHIRR) was the best metric found. Dr. Harry Koons of Aerospace Corporation conducted a risk analysis of the VAHIRR product. The results indicated that the LLCC based on the VAHIRR product would pose a negligible risk of flying through hazardous electric fields. Based on these findings, the Kennedy Space Center Weather Office is considering seeking funding for development of an automated VAHIRR algorithm for the new ER 45th Weather Squadron (45 WS) RadTec 431250 weather radar and Weather Surveillance Radar-1988 Doppler (WSR-88D) radars. Before developing an automated algorithm, the Applied Meteorology Unit (AMU) was tasked to determine the frequency with which VAHIRR would have allowed a launch to safely proceed during weather conditions otherwise deemed "red" by the Launch Weather Officer. To do this, the AMU manually calculated VAHIRR values based on candidate cases from past launches with known anvil cloud LLCC violations. An automated algorithm may be developed if the analyses from past launches show VAHIRR would have provided a significant cost benefit by allowing a launch to proceed. The 45 WS at the ER and 30th Weather Squadron (30 WS) at the Western Range provided the AMU with launch weather summaries from past launches that were impacted by LLCC. The 45 WS provided summaries from 14 launch attempts and the 30 WS fkom 5. The launch attempts occurred between December 2001 and June 2007. These summaries helped the AMU determine when the LLCC were "red" due to anvil cloud. The AMU collected WSR-88D radar reflectivity, cloud-to-ground lightning strikes, soundings and satellite imagery. The AMU used step-by-step instructions for calculating VAHIRR manually as provided by the 45 WS. These instructions were used for all of the candidate cases when anvil cloud caused an LLCC violation identified in the launch weather summaries. The AMU evaluated several software programs capable of visualizing radar data so that VAHIRR could be calculated and chose GR2Analyst from Gibson Ridge Software, LLC. Data availability and lack of detail from some launch weather summaries permitted analysis of six launch attempts from the ER and none from the WR. The AMU did not take into account whether or not other weather LCC violations were occurring at the same time as the anvil cloud LLCC since the goal of this task was to determine how often VAHIRR provided relief to the anvil cloud LLCC at any time during several previous launch attempts. Therefore, in the statistics presented in this report, it is possible that even though VAHIRR provided relief to the anvil cloud LLCC, other weather LCC could have been violated not permitting the launch to proceed. The results of this cost-benefit analysis indicated VAHIRR provided relief from the anvil cloud LLCC between about 15% and 18% of the time for varying 5-minute time periods based on summaries fkom six launch attempts and would have allowed launch to proceed that were otherwise "NO GO" due to the anvil cloud LLCC if the T-0 time occurred during the anvil cloud LLCC violations.

Bauman, William H., III↗

External Events P-204

Familiarize students with terminology and methodology to understand external event risk analysis. Enable students to understand external event analysis submittals from licensees History and progression of external events analysis. Overview of how external events are incorporated into SAPHIRE Level 1 model

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Prognostic Launch Vehicle Probability of Failure Assessment Methodology for Conceptual Systems Predicated on Human Causal Factors

Create an improved method to calculate reliability of a conceptual launch vehicle system prior to fabrication by using historic data of actual root causes of failures. While failures have unique "proximate causes", there are typically a finite amount of common "root causes". Heretofore launch vehicle reliability evaluation typically hardware-centric statistical analyses, while most root causes of failures are been shown to be human-centric. A method based on human-centric root causes can be used to quantify reliability assessments and focus proposed actions to mitigate problems. Existing methods have been optimistic in their projections of launch vehicle reliability compared to actuals. Hypothesis: reliability of a conceptual launch vehicle can be more accurately evaluated based on a rational, probabilistic approach using past failure assessment teams' findings predicated on human-centric causes."Human Reliability Analysis Methods Selection Guidance for NASA"Chandler F.T., et al., NASA HQ/OSMA study group, July 2006. Outside HRA experts from academia, other federal labs, and the private sector. 50 system reliability methods considered, fourteen selected for further study, four finally selected as best suited for human spaceflight. Probabilistic Risk Analysis (PRA) + Human Reliability Analysis (HRA) enabled incorporating effects and probabilities of human errors. While four down-selected methods deemed appropriate for failure assessment, it did not appear that these methods could be concisely applied to perform major system-wide assessment of probability of failure of a conceptual design without becoming unwieldy."Engineering a Safer World", Detailed, comprehensive study external to NASA Leveson N. G., MIT, 2011.Systems-Theoretic Accident Model and Processes (STAMP). All-encompassing accident model based on systems theory analyzed accidents after they occurred and created approaches to prevent occurrence in developing systems not focused on failure prevention per se, but rather reducing hazards by influencing human behavior through use of constraints, hierarchical control structures, and process models to improve system safetySystem Theoretic Process Analysis (STPA) addresses predictive part of problem (a "hazard analysis"). Includes all causal factors identified in STAMP: "...design errors, software flaws, component interaction accidents, cognitively complex human decision-making errors, and social organizational and management factors contributing to accidents" can guide design process rather than require it to exist before-hand did not appear capable of concise application for system-wide assessment of probability of failure of a conceptual design without becoming unwieldy.

Williams, Craig H.↗

Quality Assurance With Plan Veto: Reincarnation of a Record and Verify System and Its Potential Value

Purpose: To quantify the potential impact of the Integrating the Healthcare Enterprise–Radiation Oncology Quality Assurance with Plan Veto (QAPV) on patient safety of external beam radiation therapy (RT) operations. Methods and Materials: An institutional database of events (errors and near-misses) was used to evaluate the ability of QAPV to prevent clinically observed events. We analyzed reported events that were related to Digital Imaging and Communications in Medicine RT plan parameter inconsistencies between the intended treatment (on the treatment planning system) and the delivered treatment (on the treatment machine). Critical Digital Imaging and Communications in Medicine RT plan parameters were identified. Each event was scored for importance using the Failure Mode and Effects Analysis methodology. Potential error occurrence (frequency) was derived according to the collected event data, along with the potential event severity, and the probability of detection with and without the theoretical implementation of the QAPV plan comparison check. Failure Mode and Effects Analysis Risk Priority Numbers (RPNs) with and without QAPV were compared to quantify the potential benefit of clinical implementation of QAPV. Results: The implementation of QAPV could reduce the RPN values for 15 of 22 (71%) of evaluated parameters, with an overall average reduction in RPN of 68 (range, 0-216). For the 6 high-risk parameters (>200), the average reduction in RPN value was 163 (range, 108-216). The RPN value reduction for the intermediate-risk (200 > RPN > 100) parameters was (0-140). With QAPV, the largest RPN value for “Beam Meterset” was reduced from 324 to 108. The maximum reduction in RPN value was for Beam Meterset (216, 66.7%), whereas the maximum percentage reduction was for Cumulative Meterset Weight (80, 88.9%). Conclusion: This analysis quantifies the value of the Integrating the Healthcare Enterprise–Radiation Oncology QAPV implementation in clinical workflow. We demonstrate that although QAPV does not provide a comprehensive solution for error prevention in RT, it can have a significant impact on a subset of the most severe clinically observed events.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Decision Aid for Conjunction Risk Mitigation by Differential Drag

In the previous five years, the rate of conjunctions that the NASA Conjunction Assessment Risk Analysis (CARA) team processed and analyzed has more than tripled. (NASA CARA, 2024) New missions in the early development phases are now required to plan for dealing with conjunctions under the present space environment, and also projecting forward into a future likely with even further increased utilization of the space environment. Some missions are investigating the possibility of using differential drag to remediate conjunctions without expending limited fuel or for missions without propulsive capabilities. The NASA CARA team studied the historical record of conjunctions to evaluate the circumstances under which differential drag may be successfully applied and have developed a series of tables to use as a decision aid for missions considering differential drag. Currently, if a CARA-protected mission with maneuvering capabilities is predicted to have a conjunction with probability of collision (Pc) greater than 7E-5 (the default value of the ‘yellow threshold’, which may have some other value agreed by CARA and the mission during the Orbital Collison Avoidance Planning (OCAP) process), CARA will use its Maneuver Trade Space (MTS) tool to evaluate and recommend options for the timing and magnitude of a risk mitigation maneuver (RMM), based on the mission’s capabilities. If the conjunction’s Pc is greater than 1E-4, the ‘red threshold’, then an RMM must be executed per NASA Procedural Requirements (NPR) 8079.1 (NASA, 2023), although missions may execute an RMM even if the Pc is lower. The magnitude of the maneuver is typically a few cm/s, and CARA estimates how many will be required for the mission’s nominal lifetime – typically a few per year – during the OCAP process, to inform the mission’s delta-V requirement. For traditional satellites, this is usually smaller than other requirements for orbit insertion, maintenance, and disposal, but for CubeSats or other small satellite missions, a propulsion system may not provide much more than a few cm/s of delta-V or may not fit at all within the available budget of money, time, size, weight, and/or power (SWaP). Conversely, CubeSats often have deployable solar panels, which offer the capacity to have much higher areas facing some directions than others. Such a mission can instead use ‘differential drag’ to remediate a conjunction -- in other words, change its drag area (usually increasing) to deviate from the predicted collision course. This is how Planet’s Dove spacecraft maintain their formations and remediate conjunction risks without having on-board propulsion (Foster, et al., 2017) (Griffith, et al., 2021). CARA has been developing improvements to MTS to support differential-drag for NASA's missions -- where it is effective. CARA records all conjunctions of their protected payloads, with historical records starting in 2005 (with significant conjunction events starting to occur on or after 2013). From this record, approximately 7,300 had a Pc greater than 1E-4 at 3 days prior to the time of closest approach, the time analyzed for differential drag efficacy. Of those, approximately 4,300 had fully-defined covariance matrices stored for both the primary and secondary objects; this set of conjunctions is the basis for the analysis of this work. CARA’s MTS tool was used to propagate the primary satellite forward from that decision point with varying degrees of increase to ballistic coefficient (BC). Because these conjunctions came from multiple missions, the nondimensional ‘delta-BC’ factor was used to quantify and normalize the increase in ballistic coefficient, defined as follows: Delta-BC = BC_new / BC_old - 1 Positive delta-BC factors represent an increase in drag compared to the nominal attitude, while negative delta-BC factors (to a minimum of -1) represent a decrease in drag. At the conclusion of the differential-drag ‘maneuver’, the Pc was recalculated to evaluate whether or not the conjunction was mitigated (Pc < 3E-6). These results were then binned and sorted along several axes, including altitude, amount of delta-BC, and (pre-maneuver) rate of energy dissipation (EDR), to identify underlying patterns. The altitude plot is shown in Figure 1. To validate this analysis, we consulted the record of a NASA mission which uses differential drag to maintain its orbit and remediate conjunction risk. CARA’s empirical record of the mission’s orbit history suggests it achieves a delta-BC of 2.2. Of the twenty-one RMM plans that were submitted by this mission, eighteen were matched with conjunctions in the historical record; of those, twelve were successfully remediated (final measured Pc < 3E-6), and six were not. This is consistent with the expected efficacy for missions orbiting at that altitude. We are presently simulating this mission’s RMMs with MTS; this work is ongoing, but so far, the MTS results are qualitatively in agreement with the empirical results -- correctly predicting that a maneuver would or would not remediate a conjunction, if not exactly matching the final post-remediation Pc value. We found that differential drag was most successful for satellites with perigees below 560 km, and which could adopt an average delta-BC of 2 or greater (that is, increasing their ballistic coefficient by a factor of 3). However, this is a difficult threshold for a mission to clear; very few spacecraft are capable of adopting a high-drag configuration for 72 hours continuously. Planet’s Dove spacecraft use differential drag to remediate conjunctions (Griffith, et al., 2021), and they have a maximum delta-BC factor of 9, but in practice (with mission and charging constraints) they achieve a time-averaged delta-BC that is closer to 2 (Foster, et al., 2017). A mission’s differential drag utility strongly depends on the operational constraints that has the capacity to limit the time-averaged delta-BC. A mission with a high maximum delta-BC of 5 or more can have an effective delta-BC of less than 1 due to operational constraints such as instrument and solar panel pointing, especially if this constraint results in holding an intermediate drag value for most of its orbit. CARA has developed tables that can be used as decision aids to advise missions-in-development about the best way to utilize their differential drag capabilities. For missions below 560 km with the operational flexibility to devote multiple days to holding a high-drag configuration (or a sufficiently high drag ratio to compensate for limitations on that time), they are -- more likely than not -- able to successfully remediate high-risk conjunctions. Conversely, missions that do not meet these exacting criteria -- most missions -- can instead be advised to use on-board propulsion systems to perform RMMs, or to turn their minimum-area face towards the approach vector, thereby reducing Pc at the moment of conjunction due to the decreased Hard-Body Radius (HBR), that is a strongly correlated variable in the Pc calculations. (NASA, 2023)

conjunction assessment↗

Secondary Breast Cancer Risk by Radiation Volume in Women With Hodgkin Lymphoma

Purpose: To determine whether the risk of secondary breast cancer (SBC) is reduced in women with Hodgkin lymphoma (HL) treated with smaller field radiation therapy (SFRT) versus mantle field radiation therapy (MRT). Methods and Materials: We used the BC Cancer Agency (BCCA) Lymphoid Cancer Database to identify female patients treated for HL between January 1961 and December 2009. Radiation therapy volumes were categorized as MRT or SFRT, which included involved field, involved site, or involved nodal radiation therapy. SBC risk estimates were compared using competing risk analysis and Fine and Gray multivariable model: MRT ± chemotherapy, SFRT ± chemotherapy, or chemotherapy-only. Results: Of 734 eligible patients, 75% of the living patients have been followed up for more than 10 years, SBC has developed in 54, and 15 have died of breast cancer. The 20-year estimated risks (competing risk cumulative incidence) for SBC differed significantly: MRT 7.5% (95% confidence interval [CI] 4.4%-11.5%), SFRT 3.1% (95% CI 1.0%-7.7%), and chemotherapy-only 2.2% (95% CI 1.0%-4.8%) (P=.01). Using a Fine and Gray model to control for death and patients lost to follow-up, MRT was associated with a higher risk of SBC (hazard ratio [HR] = 2.9; 95% CI 1.4%-6.0%; P=.004) compared with chemotherapy-only and with SFRT (HR = 3.3; 95% CI 1.3%-8.4%; P=.01). SFRT was not associated with a greater risk of SBC compared with chemotherapy-only (HR = 0.87; 95% CI 0.28%-2.66%; P=.80). Conclusion: This study confirms that large-volume MRT is associated with a markedly increased risk of SBC; however, more modern small-volume RT is not associated with a greater risk of SBC than chemotherapy alone.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Conformal Postoperative Radiotherapy in Patients With Positive Resection Margins and/or pT3-4 Prostate Adenocarcinoma

Purpose: To evaluate outcome and toxicity of high-dose conformal radiotherapy (RT) after radical prostatectomy. Methods and Materials: Between August 1998 and December 2007, 182 consecutive patients with positive resection margins and/or pT3-4, node-negative prostate adenocarcinoma underwent postoperative conformal RT. The prescribed median dose to the prostate/seminal vesicle bed was 66.6 Gy (range 50-70). Hormone therapy (a luteinizing hormone-releasing hormone analogue and/or antiandrogen) was administered to 110/182 (60.5%) patients with high-risk features. Biochemical relapse was defined as an increase of more than 0.2 ng/mL over the lowest postoperative prostate-specific antigen (PSA) value measured on 3 occasions, each at least 2 weeks apart. Results: Median follow-up was 55.6 months (range 7.6-141.9 months). The 3- and 5-year probability of biochemical relapse-free survival were 87% and 81%, respectively. In univariate analysis, more advanced T stages, preoperative PSA values {>=}10 ng/mL, and RT doses <70 Gy were significant factors for biochemical relapse. Pre-RT PSA values >0.2 ng/mL were significant for distant metastases. In multivariate analysis, risk factors for biochemical relapse were higher preoperative and pre-RT PSA values, hormone therapy for under 402 days and RT doses of <70 Gy. Higher pre-RT PSA values were the only independent predictor of distant metastases. Acute genitourinary (GU) and gastrointestinal (GI) toxicities occurred in 72 (39.6%) and 91 (50%) patients, respectively. There were 2 cases of Grade III GI toxicity but no cases of Grade IV. Late GU and GI toxicities occurred in 28 (15.4%) and 14 (7.7%) patients, respectively: 11 cases of Grade III toxicity: 1 GI (anal stenosis) and 10 GU, all urethral strictures requiring endoscopic urethrotomy. Conclusions: Postoperative high-dose conformal RT in patients with high-risk features was associated with a low risk of biochemical relapse as well as minimal morbidity.

62 RADIOLOGY AND NUCLEAR MEDICINE↗