Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Completion Report for Well ER-4-1 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 0

Well ER-4-1 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled and completed from March 23 to April 13, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Yucca Flat/Climax Mine Corrective Action Unit (CAU) 97. The primary purpose of the well was to collect hydrogeologic data to assist in validating concepts of the groundwater flow system within the Yucca Flat/Climax Mine CAU, and to test for potential radionuclides in groundwater from the STRAIT (U4a) underground test. The completed well includes one piezometer (p1), to a depth of 663.16 meters (m) (2,175.71 feet [ft]) below ground surface (bgs) and open from the Alluvial aquifer (AA3) to the Oak Spring Butte confining unit (OSBCU) hydrostratigraphic units; and a main completion (m1), which includes 6.625-inch (in.) casing with slotted interval (m1) installed to 906.80 m (2,975.05 ft) bgs in the Lower carbonate aquifer (LCA). A 13.375-in. diameter surface casing was installed from the surface to a depth of 809.00 m (2,654.21 ft) bgs. Well ER-4-1 experienced a number of technical issues during drilling, including borehole instability and sloughing conditions. An intermediate, 10.75-in./9.625-in. casing string was installed to 856.94 m (2,811.48 ft) bgs to control these issues. Borehole stability and erosion problems appear to be associated with the Tunnel Formation (Tn) and the Older tunnel beds (Ton). Overall efforts to stabilize the borehole were successful. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), a partial suite of geophysical logs to a maximum depth of 766.57 m (2,515 ft) bgs, water-quality measurements (including tritium), water-level measurements, and two depth-discrete bailer samples collected at 538.89 m and 646.18 m (1,768 ft and 2,120 ft) bgs respectively. The well penetrated 187.45 m (615 ft) of Quaternary/Tertiary alluvium (QTa), 671.47 m (2,203 ft) of Tertiary Volcanic rocks (Tv), and 66.20 m (217.19 ft) of Paleozoic rocks (|). The stratigraphy and lithology were generally as expected with some exceptions. The top of Paleozoic rocks (|) was predicted to occur at 822.35 m (2,698 ft) bgs and was intercepted at 858.93 m (2,818 ft), a difference of 36.58 m (120 ft). As expected, the Paleozoic rocks (|) are the principal water producing formation in Well ER-4-1. Depth to water was measured after drilling as follows: In the piezometers: p1 at 320.39 m (1,051.16 ft) bgs, (measured January 4, 2017); and in the main production casing interval: m1 at 539.17 m (1,768.92 ft) bgs, (measured December 12, 2016) Geophysical logs and depth-discrete bailer sample analytical results suggest likely zones of prompt injection (underground-test-related) fission products from 472.44 to 481.48 m (1,550 to 1,580 ft) bgs and at approximately 539.50 m (1,770 ft) bgs. Subsequent work at Well ER-4-1 will be included in future reports. Field measurements for tritium were mostly below the Safe Drinking Water Act limit (20,000 picocuries per liter) with the exception of two zones showing elevated tritium concentrations. The first zone is located at approximately 365.76 to 390.14 m (1,200 to 1,280 ft) bgs and a second zone at approximately 542.54 to 566.93 m (1,780 to 1,860 ft) bgs. All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

The effect of linear regression modeling approaches on determining facility wide energy savings

Holistic energy management system business practices, such as the framework detailed in ISO 50001 – Energy management system, requirements and guidance for use , are centrally based upon the concept of energy performance improvement. For the purposes of ISO 50001, energy performance improvement can be determined for boundaries and following a process that is best suited for the implementing organization. Many organization and government ISO 50001 based programs, including the United States Department of Energy Superior Energy Performance (SEP) program, find value in demonstrating organizational energy performance improvement as the difference in energy consumption between two time periods within physically defined facility-boundaries. To make the difference in energy consumption for the two time periods meaningful, the amount of energy consumed must be adjusted to account for relevant variables. Relevant variables, such as metrics of production and weather conditions, affect directly the amount of energy consumed but are independent of the facility’s energy performance. Therefore, it is crucial to adjust the observed energy consumption by the relevant variables identified by the facility, so that the energy savings resulted from the energy performance improvement actions can be isolated and determined, which is the purpose of this program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Extent-of-Condition Review of Electrical Events Fiscal Year 2019

Sandia National Laboratories has experienced a number of electrical events in recent years. A careful examination of data shows that for the third year in a row, two of the three most frequently categorized Occurrence Reporting and Processing System (ORPS)-reportable event types were unexpected or unintended personal contact with a hazardous energy source and a failure to follow a prescribed hazardous energy control process, as defined in the occurrence reporting criteria of DOE Order 232.2A, Occurrence Reporting and Processing of Operations Information, 2D(1) and 2D(2). Sandia policy CA001.2, Identify and Manage Issues, requires an extent-of-condition review for any high-level reportable occurrence, and the analysts were tasked to perform this EOC in light of high-level reportable occurrence NA-SS-SNL-1000-2019- 0007, Contact with Electrical Energy During Marx Capacitor Troubleshooting. This extent of condition not only evaluated the 10 reportable electrical occurrences for Fiscal Year 2019, but also looked at 11 other related events: those involving control of hazardous energy and electrical events associated with less than hazardous energy.1 This Extent-of-Condition report makes several observations, conclusions, and recommendations for improvement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NTS-SS-SNL-NMSITE-2017-0004 "Contamination Monitor Left in Service After Inadequate Calibration" Causes Not Fully Addressed (Causal Analysis Report)

On June 5th, 2020 Sandia National Laboratories signed and recommended for closure the evidence package for the Noncompliance Tracking System NTS—SS-SNL-NMSITE-2017-0004, Contamination Monitor Left in Service After Inadequate Calibration. On July 16th, 2020 the Sandia Field Office sent a follow-up question list to the Radiation Protection Instrumentation Program Lead to clarify some points while reviewing the evidence package. The follow-up questions readily identified deficiencies with all three calibrations of the iPCM12 systems. On July 30th, 2020 Radiation Protection hosted a meeting to better understand the exact nature of the concerns, determine if the iPCM12 machines were out of calibration and therefore would have to be taken out of service. One result of this meeting was to determine if SNL could withdraw the evidence package. SNL transmitted a letter on August 26th, 2020 recalling the evidence package and committed to performing a thorough causal analysis and invoke the required issues management processes to ensure that corrective actions are sustained.

54 ENVIRONMENTAL SCIENCES↗

IDEAS-Watersheds FY21 Annual Report for July 1, 2020-June 30, 2021

Watersheds play a critical role in our water supply infrastructure and require sustainable management in a changing environment. Sustainable management of watershed systems and their interaction with the built environment rely on understanding the hydrologic and biogeochemical processes that control watershed system dynamics and water availability and quality. The overarching objective of the U.S. Department of Energy’s (DOE’s) Environmental System Science (ESS) program is to advance a robust, predictive understanding of how watersheds function and respond to perturbations as integrated hydrobiogeochemical systems. ESS supports a network of watershed testbeds within the United States where national laboratories and university partners work in interdisciplinary teams to advance watershed system science for energy.

54 ENVIRONMENTAL SCIENCES↗

CRADA Number NFE1706843 with SkyNano LLC (CRADA Final Report)

Cooperative Research and Development Agreement (CRADA) NFE-17-06843 between Oak Ridge National Laboratory (ORNL) and SkyNano LLC focused on studying and developing a better fundamental understanding of SkyNano’s technology to capture and convert CO 2 into solid carbon nanostructures, including carbon nanotubes (CNTs), using electrochemistry at elevated temperatures in molten salts. The project focused on developing a fundamental scientific understanding of how electrochemistry influences the dynamic catalytic processes that drive the formation of CNTs on electrodes, while developing synthesis and processing technology relevant to implementation of the technology – including chemical engineering to aid in recapturing the lithium carbonate electrolyte essential to the process, and the modeling and testing of systems with the required thermal management at practical scales.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Operational Uncrewed Aircraft Systems Development for Meteorology and Atmospheric Physics Field Campaign Report

The overarching goal of the project is to develop integrated small, unmanned aircraft systems (SUAS) capabilities for enhanced atmospheric physics measurements. This team included atmospheric scientists, meteorologists, engineers, computer scientists, geographers, and chemists necessary to evaluate the needs and develop the advanced sensing and imaging, robust autonomous navigation, enhanced data communication, and data management capabilities required to use SUAS in atmospheric physics. The flight campaigns at the Southern Great Plains (SGP) U.S. Department of Energy Atmospheric Radiation Measurement (ARM) observatory were an integrated evaluation of the systems in coordinated field tests. This enabled sensor testing, and validation of SUAS technology and integration of unmanned aircraft into the airspace. The set of experiments enabled evaluation and progression of remote UAS deployment operations with observing atmospheric sensors. Each flight test endeavor was notable for the significant lessons learned during every deployment event. Team size and roles, equipment use, aircraft instruments, meteorological instruments, and deployment logistics, were all evaluated and improved at every flight-testing day. The details of these are further discussed in the Results section.

54 ENVIRONMENTAL SCIENCES↗

County Land-Use Regulations for Solar Energy Development in Colorado

We present a survey of county-level policies on ground-mounted solar development across Colorado, including both solar-specific ordinances as well as general land-use code that might be applicable in counties without solar-specific policies. This report provides an accessible reference for stakeholders interested in identifying counties with particular regulations or in analyzing the diversity of regulations across Colorado. We defined a set of search criteria to find information on solar definitions and classifications, permitting processes, and use-specific requirements in each of Colorado's 64 counties. With those criteria, we reviewed relevant ordinances, land-use code, and comprehensive and master plans. If any uncertainties were identified, we contacted county officials for clarification. The findings are categorized and mapped to illustrate the distribution of key policies adopted across Colorado's counties on the following topics: solar definitions, solar siting policy documentation, categorization of PV systems for permitting, 1041 permitting, solar on agricultural land, panel height restrictions, fencing requirements, vegetation management, visual impacts, decommissioning plans, and financial assurance for decommissioning. Additionally, we identify and discuss policies that might impact the deployment of agrivoltaics, a dual land use combining both agriculture and solar on the same land, which might not fit neatly in existing zoning definitions and solar-specific regulations.

14 SOLAR ENERGY↗

CRiSPPy: An advanced hydropower scheduling tool for the Colorado River Storage Project

The Western Area Power Administration (WAPA) plays a vital role in delivering reliable and cost-effective hydroelectric power to millions of customers across the western United States. The Colorado River Storage Project (CRSP) carries out WAPA’s mission in Arizona, Utah, Colorado, New Mexico, Nevada, Wyoming and Texas. Achieving this mission requires effective management of the Colorado River system, and depends on the use of advanced analytical tools and modeling methodologies. For many years, CRSP has relied on the Generation and Transmission Maximization Superlite (GTMax SL) model for its mid-term and long-term hydroscheduling needs. However, the evolving energy market, power system operations, environmental rules, and hydrology conditions, coupled with advancements in computational capabilities, have necessitated the development of a more modern and robust solution. This report introduces the Colorado River Storage Project Python-based (CRiSPPy) model, a new, advanced hydropower scheduling tool developed to address CRSP ever-evolving challenges. CRiSPPy represents a significant leap forward in our ability to model and optimize the operation of the Colorado River system. It incorporates state-of-the-art optimization algorithms, enhanced data management capabilities, and an advanced graphical user interface, providing WAPA CRSP personnel with unprecedented insights and decision-making support. This document details the development, capabilities, and implementation of CRiSPPy. It is intended to serve as a comprehensive resource for WAPA staff, stakeholders, and anyone interested in the future of hydropower scheduling in the Colorado River Basin. We are confident that CRiSPPy will enhance WAPA's mission while adapting to the challenges of a dynamic and increasingly complex environment. The version of CRiSPPy described in this report is the version 2.3. New versions of CRiSPPy will be developed as the tool keeps evolving to address CRSP challenges.

13 HYDRO ENERGY↗

FERC order 2222 & DER policy and implementation report - January 2026

The January 2026 FERC 2222 Tracker Report provides an overview of the progress and challenges in the implementation of FERC Order 2222, emphasizing the critical need for state-level action to address gaps in DERA/EDC communication protocols. The report highlights the importance of reliable communication between electric distribution companies (EDCs) and DER aggregators (DERAs) for seamless market operations, noting the absence of specific directives from FERC and RTO/ISO compliance filings. Key discussions include the operational coordination required to manage DER operations within aggregated markets, the potential use of tools like DER Registries for efficient data exchange, and the implications of non-performance due to communication issues. While steps are being taken at the state level, such as ongoing policy development and bi-monthly webinars for stakeholder education, no states have fully developed coordination frameworks as of early 2026. The report underscores the growing role of states and local regulators in defining these protocols and ensuring effective coordination amidst the complex dynamics of distributed energy resources (DERs) integration into wholesale markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Numerical Investigation of Butterfly Valve Performance in Variable Valve Sizes, Positions and Flow Regimes

Reliability and efficiency of valves are necessary for precise control and sufficient heat-flow to heat application plants for the integrated energy systems of nuclear power plants (NPPs). Strategic Management Analysis Requirement and Technology (SMART) valves’ ability to control flow and assess environmental parameters stands out for these requirements. Their ability to sustain the downstream flow rate, prevent reverse flow, and maintain pressure in the heat transport loop is much more efficient with the integration of sensors and intelligent algorithms. For assessing valve performance and monitoring, mechanical design and operating conditions are two important parameters. In this study, the butterfly valves of three different sizes are simulated with water and steam using STAR-CCM+ in various flow regimes and positions to analyze performance parameters to strategize an automated control system for efficiently balancing the heat–transport network. Also, flow behavior is studied using velocity and pressure fields for valve–body geometry optimization. It can be observed, through performance parameters, that the valves are suitable for operation between 30° and 90° positions with significantly low loss coefficients and high flow coefficients, and the performance parameters follow a certain pattern in both water and steam flow in each scenario.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Overview of the Instrumentation for the Dark Energy Spectroscopic Instrument

Abstract The Dark Energy Spectroscopic Instrument (DESI) embarked on an ambitious 5 yr survey in 2021 May to explore the nature of dark energy with spectroscopic measurements of 40 million galaxies and quasars. DESI will determine precise redshifts and employ the baryon acoustic oscillation method to measure distances from the nearby universe to beyond redshift z > 3.5, and employ redshift space distortions to measure the growth of structure and probe potential modifications to general relativity. We describe the significant instrumentation we developed to conduct the DESI survey. This includes: a wide-field, 3.°2 diameter prime-focus corrector; a focal plane system with 5020 fiber positioners on the 0.812 m diameter, aspheric focal surface; 10 continuous, high-efficiency fiber cable bundles that connect the focal plane to the spectrographs; and 10 identical spectrographs. Each spectrograph employs a pair of dichroics to split the light into three channels that together record the light from 360–980 nm with a spectral resolution that ranges from 2000–5000. We describe the science requirements, their connection to the technical requirements, the management of the project, and interfaces between subsystems. DESI was installed at the 4 m Mayall Telescope at Kitt Peak National Observatory and has achieved all of its performance goals. Some performance highlights include an rms positioner accuracy of better than 0.″1 and a median signal-to-noise ratio of 7 of the [O ii ] doublet at 8 × 10 −17 erg s −1 cm −2 in 1000 s for galaxies at z = 1.4–1.6. We conclude with additional highlights from the on-sky validation and commissioning, key successes, and lessons learned.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fixed-Base Simulator Studies of the Ability of the Human Pilot to Provide Energy Management Along Abort and Deep-Space Entry Trajectories

A simulation study has been made to determine a pilot's ability to control a low L/D vehicle to a desired point on the earth with initial conditions ranging from parabolic orbits to abort conditions along the boost phase of a deep-space mission. The program was conducted to develop procedures which would allow the pilot to perform the energy management functions required while avoiding the high deceleration or skipout region and to determine the information display required to aid the pilot in flying these procedures. The abort conditions studied extend from a region of relatively high flight-path angles at suborbital velocities while leaving the atmosphere to a region between orbital and near-escape velocity outside the atmosphere. The conditions studied included guidance from suborbital and superorbital aborts as well as guidance following return from a deepspace mission. In this paper, the role of the human pilot?s ability to combine safe return abort procedures with guidance procedures has been investigated. The range capability from various abort and entry conditions is also presented.

PILOT↗

Proceedings of the Second Workshop on Voltage Breakdown in Electronic Equipment at Low Air Pressure

The Second Workshop on Voltage Breakdown in Electronic Equipment at Low Air Pressure was sponsored by the Jet Propulsion Laboratory, Pasadena, California. It has been three and one-half years since the convening of the first workshop on voltage breakdown. In this interval, gains are evidenced in the progress and sophistication in solving voltage breakdown problems affecting electronic equip­ment operating at high altitudes or other low air pressure environments. Although space applications predominate the area of concern, other projects such as the SST are becoming increasingly involved with voltage breakdown. High-voltage breakdown in spacecraft continues; however, the incidences of occurrence appear to have decreased in spite of an increase in the number of missions flown. This, it is felt, is due to many project managers now requiring all equipment with voltage in excess of 270-V peak to be designed to operate in the critical pressure region without damage, even though its normal functional environment is sea level pressure and the hard vacuum of space. In addition, designers are becoming more aware of the principle of good high-voltage design by selecting void-free components, proper spacing of conductors, isolating high-­voltage circuitry from lower voltage areas, etc. The consensus seems to be that the slight increase in cost to achieve a provable corona-free design is more than offset by the increase in confidence that the equipment will survive accidental loss of vacuum during high-vacuum tests, inadvertent turn on while passing through the critical air-pressure region of earth after launch or outgassing in flight pressurizing the enclosure into the critical pressure region.

E. R. Bunker, Jr.↗

Shuttle mission simulator. Volume 2: Requirement report, volume 2, revision C

The requirements for space shuttle simulation which are discussed include: general requirements, program management, system engineering, design and development, crew stations, on-board computers, and systems integration. For Vol. 1, revision A see N73-22203, for Vol 2, revision A see N73-22204.

Burke, J. F.↗

Systems approach to low cost payload design and operations

It is argued that the numerous factors governing the development and use of low-cost payload systems must be analyzed from a total systems viewpoint covering design, standardization, reuse, and refurbishment operations both in orbit and on the ground. Standardization of payloads for use with different transportation systems is shown to require extensive management studies involving cooperation between users and the technical community. Problems and potential solutions are identified in areas of orbital and ground-based refurbishment, and candidate vehicle systems are discussed for delivery, repair, replacement, and resupply of systems in orbit.

Moore, W. F.↗

Skylab experiments processing at KSC

The Skylab was basically a scientific program, and had the physical capacity for a large number of experiments. The number, weight, complexity, and size of these experiments far exceeded that of those on any previous manned space flight. The Apollo Telescope Mount was the most sophisticated and complex device ever to perform intensive studies of the sun above the restrictions imposed by earth's atmosphere. The demands these experiments made on Kennedy Space Center resources were varied and difficult, since each was virtually unique and imposed its own requirements. A management system to handle these responsibilities was devised and implemented, based on KSC experience with the Apollo and other prior programs.

Barnett, U. R.↗