Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Compositional Solution Space Quantification for Probabilistic Software Analysis

Probabilistic software analysis aims at quantifying how likely a target event is to occur during program execution. Current approaches rely on symbolic execution to identify the conditions to reach the target event and try to quantify the fraction of the input domain satisfying these conditions. Precise quantification is usually limited to linear constraints, while only approximate solutions can be provided in general through statistical approaches. However, statistical approaches may fail to converge to an acceptable accuracy within a reasonable time. We present a compositional statistical approach for the efficient quantification of solution spaces for arbitrarily complex constraints over bounded floating-point domains. The approach leverages interval constraint propagation to improve the accuracy of the estimation by focusing the sampling on the regions of the input domain containing the sought solutions. Preliminary experiments show significant improvement on previous approaches both in results accuracy and analysis time.

Monte Carlo Methods↗

Methods for Probabilistic Uncertainty Analysis and Bayesian Analysis with Examples of Statistically Analyzing Data to Revise MMOD Risk Estimates and Compare Models

Probabilistic methods are presented for characterizing and quantifying uncertainties in models and model predictions. Techniques are given for constructing specific uncertainty distributions based on available information. Alternative techniques are given for propagating uncertainties in model inputs to obtain the uncertainty in the model result or prediction. Bayesian techniques are also described for utilizing data and information to update and revise model results and predictions. The focus is on applications with numerous specific examples given. The use of data to revise Micrometeoroid and Orbital Debris (MMOD) risk prediction models are among the examples given.

Risk↗

Probabilistic Modeling of Heavy Machinery Using Machine Learning

NASA Glenn Research Center’s facility operations seeks to leverage its extensive instrumentation and historical data with machine learning to increase system efficiencies. The ultimate goal of this effort is to probabilistically model the behavior of Glenn’s central air service compressors for optimal decision making and planning. This project is a first step in that direction. We propose a multimodel approach that uses high-dimensional models to ask simple questions about complex dependent structures, and low-dimensional models to ask complex questions about simple dependent structures. While the low-dimensional models make strong assumptions, they can be visualized and they can be insightful. We show good fits for univariate models of compressor sensors, and preliminary work on high-dimensional multivariate models.

Machine learning↗

Reduced Complexity Model Intercomparison Project Phase 2: Synthesizing Earth System Knowledge for Probabilistic Climate Projections

Over the last decades, climate science has evolved rapidly across multiple expert domains. Our best tools to capture state-of-the-art knowledge in an internally self-consistent modelling framework are the increasingly complex fully coupled Earth System Models (ESMs). However, computational limitations and the structural rigidity of ESMs mean that the full range of uncertainties across multiple domains are difficult to capture with ESMs alone. The tools of choice are instead more computationally efficient reduced complexity models (RCMs), which are structurally flexible and can span the response dynamics across a range of domain-specific models and ESM experiments. Here we present Phase 2 of the Reduced Complexity Model Intercomparison Project (RCMIP Phase 2), the first comprehensive intercomparison of RCMs that are probabilistically calibrated with key benchmark ranges from specialized research communities. Unsurprisingly, but crucially, we find that models which have been constrained to reflect the key benchmarks better reflect the key benchmarks. Under the low-emissions SSP1-1.9 scenario, across the RCMs, median peak warming projections range from 1.3 to 1.7°C (relative to 1850-1900, using an observationally-based historical warming estimate of 0.8°C between 1850-1900 and 1995-2014). Further developing methodologies to constrain these projection uncertainties seems paramount given the international community's goal to contain warming to below 1.5°C above pre-industrial in the long-term. Our findings suggest that users of RCMs should carefully evaluate their RCM, specifically its skill against key benchmarks and consider the need to include projections benchmarks either from ESM results or other assessments to reduce divergence in future projections.

Climate↗

Probabilistic Risk Assessment of a Sustained Lunar Presence

The Artemis Base Camp will be our first sustainable foothold on the lunar frontier. The base camp includes a lunar surface habitat, power systems, and infrastructure needed to develop capabilities on future missions to Mars. NASA Probabilistic Risk Assessment (PRA) methodologies tend to focus on in-flight Loss of Crew (LOC) or Loss of Vehicle (LOV) risk estimates for short mission durations. However, lunar habit support systems and power generation systems will need to continuously operate. Existing risk methodologies will need to adapt to understand risk drivers in new environments under different operating conditions, such as lunar dust and increased micro-meteoroid exposure. Insights from the nuclear and oil industries can provide guidance to NASA risk practitioners to tackle this new challenge.

risk assessment↗

Automated Probabilistic Finite Element Model Calibration Tool Based on Uncertainty Quantification and Machine Learning

Qualification and certification of safety critical parts is a hurdle to the adoption of metallic additively manufactured components for aerospace vehicle applications. Challenges include variability in part properties due to inconsistent defect distribution and microstructure. Understanding of the process through finite element modeling (FEM), and process control through in-situ monitoring, may result in significant improvements; however, solutions useful to manufacturers will require large volumes of data and automated data utilization. Toward this end, a generalizable automated FEM calibration paradigm is developed. This paradigm leverages existing and novel tools from machine learning and uncertainty quantification to enable the automatic calibration of FEMs without requiring prior knowledge of the model performance across input parameter space, including meshing and solver settings, which can require time consuming manual model probing or cause noisy and inconsistent predictions. The result is a probabilistic distribution of calibrated and validated FEM input parameters targeting measured data.

Additive manufacturing model calibration finite el↗

Expectation vs. Reality: The Sunrise Problem Applied to Probabilistic Risk Assessment

The Sunrise Problem is succinctly stated as a question: “what is the probability that the sun will rise tomorrow?” Attempts to answer this seemingly simple question reveal unexpected incongruities between statistical/probabilistic estimates and “real-world” expectations. Rather than being a purely philosophical problem, similar incongruities can be found in reliability and probabilistic risk assessment (PRA) analyses. These differences between statistical predictions and demonstrated reliability can result in analysis shortcomings that should be addressed and resolved. This presentation will begin by discussing the nature of the Sunrise Problem and how it applies to PRA and reliability. Examples of the Sunrise Problem in a PRA estimate will also be included, along with tips to identify and resolve the shortcomings that result from these anomalous situations.

Sunrise Problem↗

It Depends - An Overview of Probabilistic Risk Analysis Concepts

How do you understand the data and assumptions in your probabilistic analysis? The PRA analyst needs to understand the data and input assumptions to effectively communicate the system/mission's risks. The decision maker also needs to understand conservatisms and how to interpret uncertainty in the PRA results. Properties such as assumptions on the distributions, uncertainty, use of test data, and common cause modeling can be the subject of much discussion, but often are the leading drivers of a risk profile.

risk assessment↗

Multi-State Physics Models of Aging Passive Components in Probabilistic Risk Assessment

Multi-state Markov modeling has proved to be a promising approach to estimating the reliability of passive components - particularly metallic pipe components - in the context of probabilistic risk assessment (PRA). These models consider the progressive degradation of a component through a series of observable discrete states, such as detectable flaw, leak and rupture. Service data then generally provides the basis for estimating the state transition rates. Research in materials science is producing a growing understanding of the physical phenomena that govern the aging degradation of passive pipe components. As a result, there is an emerging opportunity to incorporate these insights into PRA. This paper describes research conducted under the Risk-Informed Safety Margin Characterization Pathway of the Department of Energy’s Light Water Reactor Sustainability Program. A state transition model is described that addresses aging behavior associated with stress corrosion cracking in ASME Class 1 dissimilar metal welds – a component type relevant to LOCA analysis. The state transition rate estimates are based on physics models of weld degradation rather than service data. The resultant model is found to be non-Markov in that the transition rates are time-inhomogeneous and stochastic. Numerical solutions to the model provide insight into the effect of aging on component reliability.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Development of Simplified Probabilistic Risk Assessment Model for Seismic Initiating Event

ABSTRACT This paper discusses a simplified method to evaluate seismic risk using a methodology built on dividing the seismic intensity spectrum into multiple discrete bins. The seismic probabilistic risk assessment model uses Nuclear Regulatory Commission’s (NRC’s) full power Standardized Plant Analysis Risk (SPAR) model as the starting point for development. The seismic PRA models are integrated with their respective internal events at-power SPAR model. This is accomplished by combining the modified system fault trees from the full power SPAR model with seismic event tree logic. The peak ground acceleration is divided into five bins. The g-value for each bin is estimated using the geometric mean of lower and upper values of that particular bin and the associated frequency for each bin is estimated by taking the difference between upper and lower values of that bin. The component’s fragilities are calculated for each bin using the plant data, if available, or generic values of median peak ground acceleration and uncertainty values for the components. For human reliability analysis (HRA), the SPAR HRA (SPAR-H) method is used which requires the analysts to complete relatively straight forward worksheets that include the performance shaping factors (PSFs). The results are then used to estimate human error probabilities (HEPs) of interest. This work is expected to improve the NRC’s ability to include seismic hazards in risk assessments for operational events in support of the reactor oversight program (e.g., significance determination process).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Rapid Damage eXplorer (RDX): A Probabilistic Framework for Learning Changes From Bitemporal Images

Recent decade has witnessed major changes on the Earth, for example, deforestation, varying cropping and human settlement patterns, and crippling damages due to disasters. Accurate damage assessment caused by major natural and anthropogenic disasters is becoming critical due to increases in human and economic loss. This increase in loss of life and severe damages can be attributed to the growing population, as well as human migration to the disaster prone regions of the world. Rapid assessment of these changes and dissemination of accurate information is critical for creating an effective emergency response. Change detection using high-resolution satellite images is a primary tool in assessing damages, monitoring biomass and critical infrastructures, and identifying new settlements. In this demo, we present a novel supervised probabilistic framework for identifying changes using very high-resolution multispectral, and bitemporal remote sensing images. Our demo shows that the rapid damage explorer (RDX) system is resilient to registration errors and differing sensor characteristics.

Change detection↗

Performing Probabilistic Risk Assessment Through RAVEN

The Reactor Analysis and Virtual control ENviroment (RAVEN) code is a software tool that acts as the control logic driver and post-processing engine for the newly developed Thermal-Hydraulic code RELAP-7. RAVEN is now a multi-purpose Probabilistic Risk Assessment (PRA) software framework that allows dispatching different functionalities: Derive and actuate the control logic required to simulate the plant control system and operator actions (guided procedures), allowing on-line monitoring/controlling in the Phase Space Perform both Monte-Carlo sampling of random distributed events and Dynamic Event Tree based analysis Facilitate the input/output handling through a Graphical User Interface (GUI) and a post-processing data mining module

99 GENERAL AND MISCELLANEOUS↗

Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

99 GENERAL AND MISCELLANEOUS↗

Development/Modernization of an Advanced Non-Light Water Reactor Probabilistic Risk Assessment

In 2015, GE Hitachi Nuclear Energy (GEH) teamed with Argonne National Laboratory (Argonne) to perform Research and Development (R&D) of next-generation Probabilistic Risk Assessment (PRA) methodologies for the modernization of an advanced non-Light Water Reactor (non-LWR) PRA. This effort built upon a PRA developed in the early 1990s for GEH’s Power Reactor Inherently Safe Module (PRISM) Sodium Fast Reactor (SFR). The work had four main tasks: internal events development modeling the risk from the reactor for hazards occurring at-power internal to the plant; an all hazards scoping review to analyze the risk at a high level from external hazards such as earthquakes and high winds; an all modes scoping review to understand the risk at a high level from operating modes other than at-power; and risk insights to integrate the results from each of the three phases above. To achieve these objectives, GEH and Argonne used and adapted proven PRA methodologies and techniques to build a modern non-LWR all hazards/all modes PRA. The teams also advanced non-LWR PRA methodologies, which is an important outcome from this work. This report summarizes the project outcomes in two major phases. The first phase presents the methodologies developed for non-LWR PRAs. The methodologies are grouped by scope, from Internal Events At-Power (IEAP) to hazards analysis to modes analysis. The second phase presents details of the PRISM PRA model which was developed as a validation of the non-LWR methodologies. The PRISM PRA was performed in detail for IEAP, and at a broader level for hazards and modes. In addition to contributing methodologies, this project developed risk insights applicable to non-LWR PRA, including focus-areas for future R&D, and conclusions about the PRISM design.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Probabilistic Risk Assessment of Flexible Power Operation of a Nuclear Power Plant

Nuclear power plants (NPPs) are becoming cost prohibitive to operate. This is due to historically low natural gas prices and wind and solar prices often being less than the marginal cost of operating baseload coal and NPPs, which sometimes forces NPPs to pay for the electricity they create. Thus, the feasibility of using part of the heat from an NPP to create other commodities such as hydrogen is being evaluated; operating in this way is called flexible power operation (FPO). To change the NPP design and operation, a license review must happen. Part of the review is the Probabilistic Risk Assessment (PRA) which proves the safety of the design and operation by identifying sequences of events that result in plant failure and estimating their likelihood of occurrence. A Level 1 PRA model that evaluates the risk of removing heat from the secondary side of NPP was created. The model was developed using Systems Analysis Program for Hands-On Integrated Reliability Evaluations (SAPHIRE 8) software to calculate core damage frequency (CDF). It is a fault tree that represents the possible pathways that could lead to a loss of steam inventory in the secondary loop. A loss of steam inventory can induce steam generator tube rupture or other events that activates response systems to avoid core damage. This is the main concern for the Nuclear Regulatory Commission (NRC), the group in the United States that licenses NPPs. This model will calculate a total CDF of any of these pathways occurring which will be compared to the baseline CDF in a generic NPP PRA for licensing support.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Coupling RAVEN to SAPHIRE for Performing Time Dependent Probabilistic Risk Assessment

Cost Risk Analysis Framework Tool (CRAFT) was recently developed by Idaho National Laboratory (INL) to perform economical risk analysis by combining physics, risk and cost information of components in a Nuclear Power Plant (NPP) that can be quickly deployable through the nuclear industry to evaluate the risk associated to capital projects and asset management [1]. In this framework, RAVEN is coupled with SAPHIRE to perform the time dependent risk/safety assessment of NPPs. Traditionally, the risk associated to the NPPs can be determined by classical Probabilistic Risk Assessment (PRA) tools, such as SAPHIRE, under the assumption that all failure rates are constant over time. In some circumstances, however, the assumption is rendered invalid since that the failure rate of a component may gradually change in a systematic way, for example, because of aging and degradation. In addition, recent data analysis in [2] has suggested decreasing values of failure rates for several important components of NPPs. A PRA that includes these components should employ the time-dependent failure rates in order to accurately estimate the risk at any given time. This time-dependent PRA is achieved by the coupling between RAVEN and SAPHIRE.

42 ENGINEERING↗