Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Preparing for Human Missions to Mars: The role of ISS and Artemis as Analogs for Research and Technology Testing

The hazards of spaceflight to the human system are present in in varying degrees on different spaceflight platforms: altered gravity, isolation and confinement, distance from Earth, radiation, and hostile closed environments. A strategic view of the fidelity of hazards experienced on different platforms can shape the testing plans for human research and technology demonstration related to crew health and performance. Working across the international partnership, the International Space Station (ISS) is planning periods of modified operations to improve the fidelity of Mars simulations. To understand transit durations as an independent variable, a series of 1-year, 6-month and 30-45 day missions are being planned on ISS. Standard measurements across ISS missions of different durations, lunar missions and ground analogs offers the opportunity to distinguish different hazards and their effects in the context of the relevance to future mission concepts. The ISS partnership is planning for additional test cases that are aligned with Mars mission plans. (1) Evaluating crew performance capabilities when transitioning to gravity after long durations in microgravity representative of a Mars transit. (2) Simulating crew medical care under Mars-like autonomous operations. (3) Identification and testing of operations under communications delay and autonomy expected for Mars missions and the linked effects on behavioral health and performance of the crew. Artemis missions serve as a valuable analogs for Mars surface operations, with partial gravity and deep space radiation hazards, but with crewmembers that are probably more physically capable than their counterparts would be after a Mars transit. Getting unobtrusive data from early Artemis missions, and knowledge gained from operational experience as Artemis operations develop can improve engineering design, medical requirements and countermeasures, and ultimately ensure mission success on Mars. Linking Mars architectures with the plans and capabilities for ISS and Artemis allows us to plan to most operationally relevant tests of crew health and performance on current spaceflight missions to inform planning for future missions to Mars. By using human spaceflight platforms as well as ground simulation in an integrated way, the international community can improve exploration readiness, develop countermeasures and reduce risks of future human space missions.

International Space Station↗

Compatibility Tests Between the Mars Vehicle System Test Bed and RIMFAX Radar Antenna Prototype for the Mars 2020 Mission

NASA's Mars 2020 rover will carry a wideband (150 megahertz to 1200 megahertz) ground penetrating radar—RIMFAX (Radar Imager for Mars’ subsurFace eXperiment ), contributed by FFI (Forsvarets forskningsinstitutt) of Norway—to survey the subsurface geology of Mars. RIMFAX will take radar soundings while the rover drives across the Martian terrain, which presents possible compatibility issues between rover and radar operations. In order to study this risk, a prototype RIMFAX antenna was attached to the flight-analogous rover Vehicle System Test Bed (VSTB) in a mechanically representative location. The prototype antenna collected spectral and time-domain data across a variety of driving operations in order to assess the radar sensitivity to rover-generated noise. Conversely, the prototype antenna was driven while an engineering-model UHF (Ultra High Frequency) antenna used for rover telecom measured received in-band power to ensure that the rover hardware was not at risk of damage. Evaluation of the data by the instrument science team showed that while rover noise was apparent to the receiver, data post-processing would yield greater than 40 decibels margin to the science requirements. Similarly, power levels received by the UHF antenna were well below damage thresholds.

Gonzales, Edward↗

Social Tagging of Mission Data

Mars missions will generate a large amount of data in various forms, such as daily plans, images, and scientific information. Often, there is a semantic linkage between images that cannot be captured automatically. Software is needed that will provide a method for creating arbitrary tags for this mission data so that items with a similar tag can be related to each other. The tags should be visible and searchable for all users. A new routine was written to offer a new and more flexible search option over previous applications. This software allows users of the MSLICE program to apply any number of arbitrary tags to a piece of mission data through a MSLICE search interface. The application of tags creates relationships between data that did not previously exist. These tags can be easily removed and changed, and contain enough flexibility to be specifically configured for any mission. This gives users the ability to quickly recall or draw attention to particular pieces of mission data, for example: Give a semantic and meaningful description to mission data; for example, tag all images with a rock in them with the tag "rock." Rapidly recall specific and useful pieces of data; for example, tag a plan as"driving template." Call specific data to a user s attention; for example, tag a plan as "for:User." This software is part of the MSLICE release, which was written in Java. It will run on any current Windows, Macintosh, or Linux system.

Norris, Jeffrey S.↗

The Mars Pathfinder Mission and Science Results

Mars Pathfinder, the first low-cost, quick Discovery class mission to be completed, successfully landed on the surface of Mars on July 4, 1997, deployed and navigated a small rover, and collected data from 3 science instruments and 10 technology experiments. The mission operated on Mars for 3 months and returned 2.3 Gbits of new data, including over 16,500 lander and 550 rover images, 16 chemical analyses of rocks and soil, and 8.5 million individual temperature, pressure and wind measurements. The rover traversed 100 m clockwise around the lander, exploring about 200 square meters of the surface. The mission captured the imagination of the public, and garnered front page headlines during the first week. A total of about 566 million internet "hits" were registered during the first month of the mission, with 47 million "hits" on July 8th alone, making the Pathfinder landing by far the largest internet event in history at the time. Pathfinder was the first mission to deploy a rover on Mars. It carried a chemical analysis instrument, to characterize the rocks and soils in a landing area over hundreds of square meters on Mars, which provided a calibration point or "ground truth" for orbital remote sensing observations. The combination of spectral imaging of the landing area by the lander camera, chemical analyses aboard the rover, and close-up imaging of colors, textures and fabrics with the rover cameras offered the potential of identifying rocks (petrology and mineralogy). With this payload, a landing site in Ares Vallis was selected because it appeared acceptably safe and offered the prospect of analyzing a variety of rock types expected to be deposited by catastrophic floods, which enabled addressing first-order scientific questions such as differentiation of the crust, the development of weathering products, and the nature of the early Martian environment and its subsequent evolution. The 3 instruments and rover allowed seven areas of scientific investigation: the geology and geomorphology of the surface, mineralogy and geochemistry of rocks and soils, physical properties of surface materials, magnetic properties of airborne dust, atmospheric science including aerosols, and rotational and orbital dynamics of Mars. Scientists were assembled into 7 Science Operations Groups that were responsible for requesting measurements by the 3 instruments, rover and engineering subsystems for carrying out their scientific investigations and for analyzing the data and reporting on their findings. The spacecraft was launched on December 4, 1996 and had a 7 month cruise to Mars, with four trajectory correction maneuvers. The vehicle entered the atmosphere directly following cruise stage separation. Parachute deployment, heatshield and lander separation, radar ground acquisition, airbag inflation and rocket ignition all occurred before landing at 2:58 AM true local solar time (9:56:55 AM PDT). The lander bounced at least 15 times up to 12 in high without airbag rupture, demonstrating the robustness of this landing system. Reconstruction of the final landing sequence indicates that the parachute/backshel1/1ander was tilted due to a northwest directed wind and wind shear, which resulted in the lander bouncing about I km to the northwest and initially downhill about 20 m from where the solid rockets fired. Two anomalously bright spots located in the lander scene are likely the heatshield, which continued in a ballistic trajectory about 2 km downrange (west southwest), and the backshell/parachute, which stayed nearer to where the rockets fired. Unconnected disturbed soil patches in the scene indicate that the final few bounces of the lander were from the east-southeast and were followed by a gentle roll to the west before coming to rest on the base petal. The location of the lander away from where the solid rockets fired and considerations of the exhaust products used to inflate the airbags and their fate, indicate that the Pathfinder landing system is one of the cleanest designed leaving the local area essentially contaminant free. The radio signal from the low-=gain antenna was received at 11:34 AM PDT indicating a successful landing.

Golombek, M. P.↗

Recent Concept Study for Cryogenic Fluid Management to Support Opposition Class Crewed Missions to Mars

NASA recently completed a mission concept study to evaluate the feasibility and propulsion technology development requirements for reduced travel duration crewed missions to Mars. A high-level goal of the study was to minimize the health impact on the crew caused by the space environment. This was implemented in the study by limiting the crew to a total of approximately-two years of in-space operations and travel time. For the initial mission, the crew would stay about 30 days on the Martian surface. The propulsive demands of such a mission are immense, and the study identified two advanced propulsion options with the potential to meet the mission requirements—both options rely on nuclear fission to provide efficient propulsive energy. One propulsion option was a nuclear electric propulsion (NEP)/Chem Hybrid, with a reactor and energy conversion system powering xenon propellant ion thrusters to provide an efficient, but lower-thrust, push for most of the mission duration. This concept also relied on a liquid oxygen/liquid methane (LO2/LCH4) chemical propulsion stage to provide high thrust for maneuvers while near the Earth and Mars. The second propulsion option was nuclear thermal propulsion (NTP), in which the reactor heats liquid hydrogen (LH2) propellant to expand through a nozzle for thrust at about twice the efficiency of the best chemical propulsion systems. Both vehicle concepts rely on storing large amounts of cryogenic propellant (either LO2/LCH4 or LH2) for multiple years in space without loss, far exceeding state-of-the-art capability. To enable this new capability, the team assumed the use of several advanced cryogenic fluid management (CFM) technologies and analyzed the integrated system performance. This included considering the vehicle-level effects of the size, mass, and power requirements of these CFM elements. Further, the team evaluated the development required to enable such a mission in the mid-2030 s and determined that it was feasible. The paper elaborates on the assumed CFM technologies, provides key analysis results, and illustrates the feasibility of technology development for the proposed solutions to the CFM challenges for each propulsion concept.

cryogenic propellant↗

The Mojave Desert: A Martian Analog Site for Future Astrobiology Themed Missions

Astrobiological interest in Mars is highlighted by evidence that Mars was once warm enough to have liquid water present on its surface long enough to create geologic formations that could only exist in the presense of extended fluvial periods. These periods existed at the same time life on Earth arose. If life began on Mars as well during this period, it is reasonable to assume it may have adapted to the subsurface as environments at the surface changed into the inhospitable state we find today. If the next series of Mars missions (Mars Science Laboratory, the ExoMars Trace Gas Orbiter proposed for launch in 2016, and potential near surface sample return) fail to discover either extinct or extant life on Mars, a subsurface mission would be necessary to attempt to "close the book" on the existence of martian life. Mars is much colder and drier than Earth, with a very low pressure CO2 environment and no obvious habitats. Terrestrial regions with limited precipitation, and hence reduced active biota, are some of the best martian low to mid latitude analogs to be found on Earth, be they the Antarctic dry valleys, the Atacama or Mojave Deserts. The Mojave Desert/Death Valley region is considered a Mars analog site by the Terrestrial Analogs Panel of the NSF-sponsored decadal survey; a field guide was even developed and a workshop was held on its applicability as a Mars analog. This region has received a great deal of attention due to its accessibility and the variety of landforms and processes observed relevant to martian studies.

Mars analog sites↗

A High Efficiency System for Science Instrument Commanding for the Mars Global Surveyor Mission

The Mars Global Surveyor (MGS) mission will return to Mars to re- cover most of the science lost when the ill fated Mars Observer space- craft suffered a catastrophic anomaly in its propulsion system and did not go into orbit. Described in detail are the methods employed by the MGS Sequence Team to accelerate science command processing by using standard command generation process and standard UNIX control scripts.

mars global surveyor mission science instrument co↗

Mars landing mission: A structural approach

A Mars landing mission in 2000 presents a structural challenge. Earlier studies have indicated that a Mars landing was then feasible using current structural techniques. Since these earlier studies, technology advances were made to enhance the capability. Lighter and stronger materials, large structures programs, and supercomputers now exist and even greater advances are expected. The feasibility of a Mars landing does not depend on the structure. If the space travelers can withstand the trip, the necessary structures can be provided to deliver them. If artificial gravity is required the structure can also provide for it. The structural challenge is to provide structural designs that are lightweight with high reliability. In order to do this advanced technology must be utilized to the fullest on all structural elements.

Fuller, Stan↗

Entry, Descent, and Landing Communications for the Mars 2020 Lander Mission

The Mars 2020 mission was launched on July 30, 2020 and successfully landed in Jezero Crater on February 18, 2021. The challenging Entry, Descent, and Landing (EDL) sequence was observed by ground stations on Earth and by orbiters at Mars. This paper discusses the design of the launch and arrival period to ensure maximum Earth visibility, the details of phasing the orbiting assets, and the development of the entry relay targets needed to ensure robust spacecraft telecommunications during EDL.

Abilleira, Fernando↗

MAPGEN : mixed initiative planning and scheduling for the Mars '03 MER mission

The Mars Exploration Rovers Mars '03 mission is one of NASA's most ambitious science missions to date. The rovers will be launched in the summer of 2003 with each rover carrying instruments to conduct remote and in-situ observation to elucidate the planet's past climate, water activity, and habitability. Science is the primary driver of MER and, as a consequence, making best use of the scientific instruments, within the available resources, is a crucial aspect of the mission. To address this critically, the MER project has selected MAPGEN (Mixed-Initiative Activity Plan GENerator) as an activity planning tool. MAPGEN combines two exiting systems, each with a strong heritage: APGEN the Activity Planning tool from the Jet Propulsion Laboratory and the Europs Planning/Scheduling system from NASA Ames Research Center. This paper discusses the issues arising from combining these tools in the context of this mission.

planning and scheduling↗

Interplanetary trajectory optimization of Mars aerobraking missions with constrained atmospheric entry velocities

Many current manned Mars mission studies are using low lift-to-drag ratio (L/D) vehicles to aerobrake at both Mars and earth. The use of these low L/D vehicles imposes constraints on the allowable velocity at the atmospheric interface. This paper will demonstrate that if these entry velocity constraints are incorporated into the interplanetary analysis, more opportunities can be achieved for a small increase in initial LEO mass. These additional opportunities result from varying the initial launch date, the encounter dates, and possibly using a powered Venus swingby on either the inbound or outbound transfer. This paper presents results for three atmospheric entry velocity ranges at Mars arrival and one velocity limitation upon Earth return. The results indicate that by carefully selecting the interplanetary trajectory, an optimum initial LEO mass mission can be found for even highly restrictive entry velocity missions in practically all of the 15 years studied.

Striepe, Scott A.↗

Pioneer Mars 1979 mission options

A preliminary investigation of lower cost Mars missions which perform useful exploration objectives after the Viking/75 mission was conducted. As a study guideline, it was assumed that significant cost savings would be realized by utilizing Pioneer hardware currently being developed for a pair of 1978 Venus missions. This in turn led to the additional constraint of a 1979 launch with the Atlas/Centaur launch vehicle which has been designated for the Pioneer Venus missions. Two concepts, using an orbiter bus platform, were identified which have both good science potential and mission simplicity indicative of lower cost. These are: (1) an aeronomy/geology orbiter, and (2) a remote sensing orbiter with a number of deployable surface penetrometers.

Friedlander, A. L.↗

Mission design for the Mars Exploration Rover mission

The Mars Exploration Rover (MER) project, will conduct fundamentally new observations of Mars geology, including the first micro-scale study of rock samples, as well as a detailed study of surface environments for the purpose of calibrating and validating orbital remote sensing data.

Mars Exploration Rover mission design↗

Final Mission and Navigation Design for the 2016 Mars InSight Mission

NASA’s Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) mission was scheduled to launch the next lander to Mars in March 2016 arriving to the Red Planet in the fall. Derived from the Phoenix mission which successfully landed on Mars in May 2008, the InSight Entry, Descent, and Landing system will place a lander in the Elysium Planitia region. This paper specifies the mission and navigation requirements set by the Project and how the final mission and navigation design satisfies those requirements. Background information affecting navigation including spacecraft modeling and the physical environment which influences the spacecraft motion are included. (Note from the author: The InSight launch in 2016 was suspended due to critical issues with the Seismic Experiment for Interior Structure (SEIS) instrument that could not be fixed prior to the planned launch period. This paper represents the state of the design for the 2016 mission. No attempt has been made to reflect the latest developments).

Abilleira, Fernando↗

Interplanetary mission design handbook. Volume 1, part 2: Earth to Mars ballistic mission opportunities, 1990-2005

Graphical data necessary for the preliminary design of ballistic missions to Mars are provided. Contours of launch energy requirements, as well as many other launch and Mars arrival parameters, are presented in launch date/arrival date space for all launch opportunities from 1990 through 2005. In addition, an extensive text is included which explains mission design methods, from launch window development to Mars probe and orbiter arrival design, utilizing the graphical data as well as numerous equations relating various parameters.

Sergeyevsky, A. B.↗