Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Interface Tracking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Experimenting Galileo on Board the International Space Station

The SCaN Testbed is an advanced integrated communications system and laboratory facility installed on the International Space Station (ISS) in 2012. The testbed incorporates a set of new generation of Software Defined Radio (SDR) technologies intended to allow researchers to develop, test, and demonstrate new communications, networking, and navigation capabilities in the actual environment of space. Qascom, in cooperation with ESA and NASA, is designing a Software Defined Radio GalileoGPS Receiver capable to provide accurate positioning and timing to be installed on the ISS SCaN Testbed. The GalileoGPS waveform will be operated in the JPL SDR that is constituted by several hardware components that can be used for experimentations in L-Band and S-Band. The JPL SDR includes an L-Band Dorne Margolin antenna mounted onto a choke ring. The antenna is connected to a radio front end capable to provide one bit samples for the three GNSS frequencies (L1, L2 and L5) at 38 MHz, exploiting the subharmonic sampling. The baseband processing is then performed by an ATMEL AT697 processor (100 MIPS) and two Virtex 2 FPGAs. The JPL SDR supports the STRS (Space Telecommunications Radio System) that provides common waveform software interfaces, methods of instantiation, operation, and testing among different compliant hardware and software products. The standard foresees the development of applications that are modular, portable, reconfigurable, and reusable. The developed waveform uses the STRS infrastructure-provided application program interfaces (APIs) and services to load, verify, execute, change parameters, terminate, or unload an application. The project is divided in three main phases. 1)Design and Development of the GalileoGPS waveform for the SCaN Testbed starting from Qascom existing GNSS SDR receiver. The baseline design is limited to the implementation of the single frequency Galileo and GPS L1E1 receiver even if as part of the activity it will be to assess the feasibility of a dual frequency implementation (L1E1+L5E5a) in the same SDR platform.2)Qualification and test the GalileoGPS waveform using ground systems available at the NASA Glenn Research Center. Experimenters can have access to two SCaN Testbed ground based systems for development and verification: the Experimenter Development System (EDS) that is intended to provide initial opportunity for software testing and basic functional validation and the Ground Integration Unit (GIU) that is a high fidelity version of the SCaN Testbed flight system and is therefore used for more controlled final development testing and verification testing.3)Perform in-orbit validation and experimentation: The experimentation phase will consists on the collection of raw measurements (pseudorange, Carrier phase, CN0) in space, assessment on the quality of the measurements and the receiver performances in terms of signal acquisition, tracking, etc. Finally computation of positioning in space (Position, Velocity and time) and assessment of its performance.(Complete abstract in attached document).

GPS↗

Experimenting Galileo on Board the International Space Station

The SCaN Testbed is an advanced integrated communications system and laboratory facility installed on the International Space Station (ISS) in 2012. The testbed incorporates a set of new generation of Software Defined Radio (SDR) technologies intended to allow researchers to develop, test, and demonstrate new communications, networking, and navigation capabilities in the actual environment of space. Qascom, in cooperation with ESA and NASA, is designing a Software Defined Radio GalileoGPS Receiver capable to provide accurate positioning and timing to be installed on the ISS SCaN Testbed. The GalileoGPS waveform will be operated in the JPL SDR that is constituted by several hardware components that can be used for experimentations in L-Band and S-Band. The JPL SDR includes an L-Band Dorne Margolin antenna mounted onto a choke ring. The antenna is connected to a radio front end capable to provide one bit samples for the three GNSS frequencies (L1, L2 and L5) at 38 MHz, exploiting the subharmonic sampling. The baseband processing is then performed by an ATMEL AT697 processor (100 MIPS) and two Virtex 2 FPGAs. The JPL SDR supports the STRS (Space Telecommunications Radio System) that provides common waveform software interfaces, methods of instantiation, operation, and testing among different compliant hardware and software products. The standard foresees the development of applications that are modular, portable, reconfigurable, and reusable. The developed waveform uses the STRS infrastructure-provided application program interfaces (APIs) and services to load, verify, execute, change parameters, terminate, or unload an application. The project is divided in three main phases. 1)Design and Development of the GalileoGPS waveform for the SCaN Testbed starting from Qascom existing GNSS SDR receiver. The baseline design is limited to the implementation of the single frequency Galileo and GPS L1E1 receiver even if as part of the activity it will be to assess the feasibility of a dual frequency implementation (L1E1+L5E5a) in the same SDR platform.2)Qualification and test the GalileoGPS waveform using ground systems available at the NASA Glenn Research Center. Experimenters can have access to two SCaN Testbed ground based systems for development and verification: the Experimenter Development System (EDS) that is intended to provide initial opportunity for software testing and basic functional validation and the Ground Integration Unit (GIU) that is a high fidelity version of the SCaN Testbed flight system and is therefore used for more controlled final development testing and verification testing.3)Perform in-orbit validation and experimentation: The experimentation phase will consists on the collection of raw measurements (pseudorange, Carrier phase, CN0) in space, assessment on the quality of the measurements and the receiver performances in terms of signal acquisition, tracking, etc. Finally computation of positioning in space (Position, Velocity and time) and assessment of its performance.(Complete abstract in attached document).

Galileo↗

VERDEX: A virtual environment demonstrator for remote driving applications

One of the key areas of the National Advanced Robotics Centre's enabling technologies research program is that of the human system interface, phase 1 of which started in July 1989 and is currently addressing the potential of virtual environments to permit intuitive and natural interactions between a human operator and a remote robotic vehicle. The aim of the first 12 months of this program (to September, 1990) is to develop a virtual human-interface demonstrator for use later as a test bed for human factors experimentation. This presentation will describe the current state of development of the test bed, and will outline some human factors issues and problems for more general discussion. In brief, the virtual telepresence system for remote driving has been designed to take the following form. The human operator will be provided with a helmet-mounted stereo display assembly, facilities for speech recognition and synthesis (using the Marconi Macrospeak system), and a VPL DataGlove Model 2 unit. The vehicle to be used for the purposes of remote driving is a Cybermotion Navmaster K2A system, which will be equipped with a stereo camera and microphone pair, mounted on a motorized high-speed pan-and-tilt head incorporating a closed-loop laser ranging sensor for camera convergence control (currently under contractual development). It will be possible to relay information to and from the vehicle and sensory system via an umbilical or RF link. The aim is to develop an interactive audio-visual display system capable of presenting combined stereo TV pictures and virtual graphics windows, the latter featuring control representations appropriate for vehicle driving and interaction using a graphical 'hand,' slaved to the flex and tracking sensors of the DataGlove and an additional helmet-mounted Polhemus IsoTrack sensor. Developments planned for the virtual environment test bed include transfer of operator control between remote driving and remote manipulation, dexterous end effector integration, virtual force and tactile sensing (also the focus of a current ARRL contract, initially employing a 14-pneumatic bladder glove attachment), and sensor-driven world modeling for total virtual environment generation and operator-assistance in remote scene interrogation.

Stone, Robert J.↗

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003(dagger), and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) - 2 days were +/-0.12(deg) (3(sigma)) for Spirit and +/-0.14(deg) (3(sigma)) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary avigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was +/-0.028(deg) (3(sigma) ) for Spirit and +/-0.035(deg) (3(sigma)) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)↗

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003, and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) -2 days were +/-0.12 deg(3 sigma) for Spirit and +/-0.14 deg(3 sigma) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary navigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was 0.028 deg(3 sigma) for Spirit and 0.035 deg(3 sigma) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control demonstration of intelligent procedures to automatically initialize a rack onboard the International Space Station (ISS) with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures provide a step-by-step messaging paradigm and a high level status upon termination. This messaging and high level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high level execution status was transmitted to ground, for WebPD consumption.

Stetson, Howard K.↗

The Deep Space Network in the Common Platform Era: A Prototype Implementation at DSS-13

To enhance NASA's Deep Space Network (DSN), an effort is underway to improve network performance and simplify its operation and maintenance. This endeavor, known as the "Common Platform," has both short- and long-term objectives. The long-term work has not begun yet; however, the activity to realize the short-term goals has started. There are three goals for the long-term objective: 1. Convert the DSN into a digital network where signals are digitized at the output of the down converters at the antennas and are distributed via a digital IF switch to the processing platforms. 2. Employ a set of common hardware for signal processing applications, e.g., telemetry, tracking, radio science and Very Long Baseline Interferometry (VLBI). 3. Minimize in-house developments in favor of purchasing commercial off-the-shelf (COTS) equipment. The short-term goal is to develop a prototype of the above at NASA's experimental station known as DSS-13. This station consists of a 34m beam waveguide antenna with cryogenically cooled amplifiers capable of handling deep space research frequencies at S-, X-, and Ka-bands. Without the effort at DSS-13, the implementation of the long-term goal can potentially be risky because embarking on the modification of an operational network without prior preparations can, among other things, result in unwanted service interruptions. Not only are there technical challenges to address, full network implementation of the Common Platform concept includes significant cost uncertainties. Therefore, a limited implementation at DSS-13 will contribute to risk reduction. The benefits of employing common platforms for the DSN are lower cost and improved operations resulting from ease of maintenance and reduced number of spare parts. Increased flexibility for the user is another potential benefit. This paper will present the plans for DSS-13 implementation. It will discuss key issues such as the Common Platform architecture, choice of COTS equipment, and the standard for radio frequency (RF) to digital interface.

Space Communications and Navigation (SCaN)↗

High-performance mass storage system for workstations

Reduced Instruction Set Computer (RISC) workstations and Personnel Computers (PC) are very popular tools for office automation, command and control, scientific analysis, database management, and many other applications. However, when using Input/Output (I/O) intensive applications, the RISC workstations and PC's are often overburdened with the tasks of collecting, staging, storing, and distributing data. Also, by using standard high-performance peripherals and storage devices, the I/O function can still be a common bottleneck process. Therefore, the high-performance mass storage system, developed by Loral AeroSys' Independent Research and Development (IR&D) engineers, can offload a RISC workstation of I/O related functions and provide high-performance I/O functions and external interfaces. The high-performance mass storage system has the capabilities to ingest high-speed real-time data, perform signal or image processing, and stage, archive, and distribute the data. This mass storage system uses a hierarchical storage structure, thus reducing the total data storage cost, while maintaining high-I/O performance. The high-performance mass storage system is a network of low-cost parallel processors and storage devices. The nodes in the network have special I/O functions such as: SCSI controller, Ethernet controller, gateway controller, RS232 controller, IEEE488 controller, and digital/analog converter. The nodes are interconnected through high-speed direct memory access links to form a network. The topology of the network is easily reconfigurable to maximize system throughput for various applications. This high-performance mass storage system takes advantage of a 'busless' architecture for maximum expandability. The mass storage system consists of magnetic disks, a WORM optical disk jukebox, and an 8mm helical scan tape to form a hierarchical storage structure. Commonly used files are kept in the magnetic disk for fast retrieval. The optical disks are used as archive media, and the tapes are used as backup media. The storage system is managed by the IEEE mass storage reference model-based UniTree software package. UniTree software will keep track of all files in the system, will automatically migrate the lesser used files to archive media, and will stage the files when needed by the system. The user can access the files without knowledge of their physical location. The high-performance mass storage system developed by Loral AeroSys will significantly boost the system I/O performance and reduce the overall data storage cost. This storage system provides a highly flexible and cost-effective architecture for a variety of applications (e.g., realtime data acquisition with a signal and image processing requirement, long-term data archiving and distribution, and image analysis and enhancement).

Chiang, T.↗

Software for Simulating Air Traffic

Future Air Traffic Management Concepts Evaluation Tool (FACET) is a system of software for performing computational simulations for evaluating advanced concepts of advanced air-traffic management. FACET includes a program that generates a graphical user interface plus programs and databases that implement computational models of weather, airspace, airports, navigation aids, aircraft performance, and aircraft trajectories. Examples of concepts studied by use of FACET include aircraft self-separation for free flight; prediction of air-traffic-controller workload; decision support for direct routing; integration of spacecraft-launch operations into the U.S. national airspace system; and traffic- flow-management using rerouting, metering, and ground delays. Aircraft can be modeled as flying along either flight-plan routes or great-circle routes as they climb, cruise, and descend according to their individual performance models. The FACET software is modular and is written in the Java and C programming languages. The architecture of FACET strikes a balance between flexibility and fidelity; as a consequence, FACET can be used to model systemwide airspace operations over the contiguous U.S., involving as many as 10,000 aircraft, all on a single desktop or laptop computer running any of a variety of operating systems. Two notable applications of FACET include: (1) reroute conformance monitoring algorithms that have been implemented in one of the Federal Aviation Administration s nationally deployed, real-time, operational systems; and (2) the licensing and integration of FACET with the commercially available Flight Explorer, which is an Internet- based, real-time flight-tracking system.

Sridhar, Banavar↗

Adaptive-Sweep Algorithm for Spacecraft Carrier Acquisition and Tracking: System Analysis and Implementation

This paper presents an adaptive-sweep algorithm that can be used in conjunction with a Phased-Lock Loop to acquire and track the carrier of a Binary Phase-shift Keying signal with residual carrier. This algorithm is useful in proximity links where no Doppler pre-compensation is available at the transmitter, and allows the receiver to acquire the incoming carrier even if the experienced Doppler shift is several orders of magnitude larger than the PLL bandwidth. Other applications for this algorithm include Multiple Uplink per Antenna at the Deep Space Network, and generation of observables (Doppler shift, Doppler rate, range rate) for in-situ navigation purposes. This paper enhances a previously presented adaptive-sweep algorithm and its performance analysis in two fronts. First, the algorithm now uses the direction function to automatically estimate the required frequency jump to achieve PLL lock. This enables a fully adaptive-sweep scheme in which system implementer does not need to manually select thresholds. On the other hand, we study the system performance in the presence of Additive White Gaussian Noise and derive necessary conditions for the system to operate at low signal-to-noise conditions. This allows us to create design rules that specify all parameters of the algorithm given a set of system-level requirements. To test the performance of the proposed algorithm, we implement it in GNU Radio, an open-source Software-Defined Radio that interfaces with several commercial radio peripherals. We use this implementation to demonstrate carrier lock and quantify system performance under different noise conditions. We also test the algorithm using open-loop recordings of two downlinks between the Lunar Reconnaissance Orbiter and the Deep Space Network. We show that even after large frequency jumps (tens of kHz), the proposed system is able to rapidly reacquire the carrier and continue operation.

Divsalar, Dariush↗

CATS-based Air Traffic Controller Agents

This report describes intelligent agents that function as air traffic controllers. Each agent controls traffic in a single sector in real time; agents controlling traffic in adjoining sectors can coordinate to manage an arrival flow across a given meter fix. The purpose of this research is threefold. First, it seeks to study the design of agents for controlling complex systems. In particular, it investigates agent planning and reactive control functionality in a dynamic environment in which a variety perceptual and decision making skills play a central role. It examines how heuristic rules can be applied to model planning and decision making skills, rather than attempting to apply optimization methods. Thus, the research attempts to develop intelligent agents that provide an approximation of human air traffic controller behavior that, while not based on an explicit cognitive model, does produce task performance consistent with the way human air traffic controllers operate. Second, this research sought to extend previous research on using the Crew Activity Tracking System (CATS) as the basis for intelligent agents. The agents use a high-level model of air traffic controller activities to structure the control task. To execute an activity in the CATS model, according to the current task context, the agents reference a 'skill library' and 'control rules' that in turn execute the pattern recognition, planning, and decision-making required to perform the activity. Applying the skills enables the agents to modify their representation of the current control situation (i.e., the 'flick' or 'picture'). The updated representation supports the next activity in a cycle of action that, taken as a whole, simulates air traffic controller behavior. A third, practical motivation for this research is to use intelligent agents to support evaluation of new air traffic control (ATC) methods to support new Air Traffic Management (ATM) concepts. Current approaches that use large, human-in-the-loop simulations are unquestionably valuable for this purpose, but pose considerable logistical, fiscal, and experimental control problems. First, data analysis is extremely complicated, owing simply to the large number of participants and data sources in such simulations. In addition, experienced human air traffic controllers working adjacent sectors tend to flexibly adapt to the evolving control problem - potentially shifting to other strategies than those under investigation. In addition, their performance is tightly coupled to the control interface, which in the development phase may support some concepts and supporting strategies better than others. A simple shift in strategy by one controller can change the character of a particular traffic scenario dramatically, which makes experimental comparison of ATC performance under different traffic scenarios difficult. Training a given team of controllers on operations under a new ATM concept for a sufficient period of time could avert such difficulties, but instituting an adequate training program is expensive and logistically difficult.

Callantine, Todd J.↗

Automation-induced monitoring inefficiency: role of display location

Operators can be poor monitors of automation if they are engaged concurrently in other tasks. However, in previous studies of this phenomenon the automated task was always presented in the periphery, away from the primary manual tasks that were centrally displayed. In this study we examined whether centrally locating an automated task would boost monitoring performance during a flight-simulation task consisting of system monitoring, tracking and fuel resource management sub-tasks. Twelve nonpilot subjects were required to perform the tracking and fuel management tasks manually while watching the automated system monitoring task for occasional failures. The automation reliability was constant at 87.5% for six subjects and variable (alternating between 87.5% and 56.25%) for the other six subjects. Each subject completed four 30 min sessions over a period of 2 days. In each automation reliability condition the automation routine was disabled for the last 20 min of the fourth session in order to simulate catastrophic automation failure (0 % reliability). Monitoring for automation failure was inefficient when automation reliability was constant but not when it varied over time, replicating previous results. Furthermore, there was no evidence of resource or speed accuracy trade-off between tasks. Thus, automation-induced failures of monitoring cannot be prevented by centrally locating the automated task.

Automation↗

Integrated Network Architecture for NASA's Orion Missions

NASA is planning a series of short and long duration human and robotic missions to explore the Moon and then Mars. The series of missions will begin with a new crew exploration vehicle (called Orion) that will initially provide crew exchange and cargo supply support to the International Space Station (ISS) and then become a human conveyance for travel to the Moon. The Orion vehicle will be mounted atop the Ares I launch vehicle for a series of pre-launch tests and then launched and inserted into low Earth orbit (LEO) for crew exchange missions to the ISS. The Orion and Ares I comprise the initial vehicles in the Constellation system of systems that later includes Ares V, Earth departure stage, lunar lander, and other lunar surface systems for the lunar exploration missions. These key systems will enable the lunar surface exploration missions to be initiated in 2018. The complexity of the Constellation system of systems and missions will require a communication and navigation infrastructure to provide low and high rate forward and return communication services, tracking services, and ground network services. The infrastructure must provide robust, reliable, safe, sustainable, and autonomous operations at minimum cost while maximizing the exploration capabilities and science return. The infrastructure will be based on a network of networks architecture that will integrate NASA legacy communication, modified elements, and navigation systems. New networks will be added to extend communication, navigation, and timing services for the Moon missions. Internet protocol (IP) and network management systems within the networks will enable interoperability throughout the Constellation system of systems. An integrated network architecture has developed based on the emerging Constellation requirements for Orion missions. The architecture, as presented in this paper, addresses the early Orion missions to the ISS with communication, navigation, and network services over five phases of a mission: pre-launch, launch from T0 to T+6.5 min, launch from T+6.5 min to 12 min, in LEO for rendezvous and docking with ISS, and return to Earth. The network of networks that supports the mission during each of these phases and the concepts of operations during those phases are developed as a high level operational concepts graphic called OV-1, an architecture diagram type described in the Department of Defense Architecture Framework (DoDAF). Additional operational views on organizational relationships (OV-4), operational activities (OV-5), and operational node connectivity (OV-2) are also discussed. The system interfaces view (SV-1) that provides the communication and navigation services to Orion is also included and described. The challenges of architecting integrated network architecture for the NASA Orion missions are highlighted.

Bhasin, Kul B.↗

Delay Tolerant, Radio Frequency Identification (RFID )-enabled Sensing

Radio Frequency Identification (RFID) technology offers a completely passive method to transmit fixed data sequences from an RFID tag, which typically doesn’t have its own power supply, to an interrogator. Radio frequency (RF) energy harvested from the interrogator is rectified by the tag and used to charge an integrated circuit (IC). The IC then modulates the received signal with the data stored on the tag and reflects the energy back to the interrogator. RFID has seen great proliferation in terrestrial inventory management applications, and it has recently made the jump to spaceflight applications onboard the International Space Station, augmenting an existing optical bar‐code infrastructure for tracking supplies. A number of advanced automated logistics management (ALM) concepts employing RFID are currently being developed and evaluated, including so‐called “smart” shelves, cubbies, and trash receptacles using low‐power, embeddable RFID interrogators. An infrastructure where both crew members and robotic assistants, such as autonomous free flyers, are similarly equipped with small RFID interrogators seems likely. It therefore behooves us to consider extending this infrastructure beyond ALM to applications such as low power, embedded sensing. Typically, data on an RFID tag can only be written by an RFID interrogator, using interrogator energy. In recent years, however, a few efforts have focused on using that energy to drive data acquisition from the tag IC, allowing the tag to modify its stored data sequence with sensor data before replying to an interrogator. In this way, the tag can act as a completely passive sensing device. One problem exists with this approach, however: the tag cannot gather data when an interrogator is not present. Thus, strictly passive RFID sensing tags cannot gather data at regular intervals, in the manner of a typical wireless sensor network, without careful, and impractical, planning of mobile interrogator movements. To address this shortcoming, we look to a recent advance in RFID technology which allows an external microprocessor to power the tag IC and write directly into its RFID memory using a wired serial interface. In this paradigm, data gathering is driven by a small, on‐board power supply (using batteries or harvested energy), and data transfer is provided passively through the RFID interrogation service. Since communication typically consumes the lion’s share of power in WSNs, such a technique has the potential to enable extremely long‐lived, embedded wireless sensing when used with extremely low‐current microcontrollers. Since the communication channel is only open when an interrogator is present and actively interrogating the RFID sensing tag, transport of periodically‐sampled sensor data presents itself as a delay/disruption‐tolerant networking (DTN) problem. In this paper, we present the design of a DTN‐like overlay on the common EPC Global, Class 1, Generation 2 RFID standard. This overlay allows seamless, guaranteed data transfer using the EPC Global protocol, supporting extremely low‐power, embedded sensing using an infrastructure likely to be already in place for ALM applications. We evaluate a prototype implementation of a complete end‐to‐end system using a robotic RFID interrogation agent, and we present future directions for the development of this sensing technique.

Raymond S. Wagner↗

Assessing Dual Sensor Enhanced Flight Vision Systems to Enable Equivalent Visual Operations

Flight deck-based vision system technologies, such as Synthetic Vision (SV) and Enhanced Flight Vision Systems (EFVS), may serve as a revolutionary crew/vehicle interface enabling technologies to meet the challenges of the Next Generation Air Transportation System Equivalent Visual Operations (EVO) concept - that is, the ability to achieve the safety of current-day Visual Flight Rules (VFR) operations and maintain the operational tempos of VFR irrespective of the weather and visibility conditions. One significant challenge lies in the definition of required equipage on the aircraft and on the airport to enable the EVO concept objective. A motion-base simulator experiment was conducted to evaluate the operational feasibility, pilot workload and pilot acceptability of conducting straight-in instrument approaches with published vertical guidance to landing, touchdown, and rollout to a safe taxi speed in visibility as low as 300 ft runway visual range by use of onboard vision system technologies on a Head-Up Display (HUD) without need or reliance on natural vision. Twelve crews evaluated two methods of combining dual sensor (millimeter wave radar and forward looking infrared) EFVS imagery on pilot-flying and pilot-monitoring HUDs as they made approaches to runways with and without touchdown zone and centerline lights. In addition, the impact of adding SV to the dual sensor EFVS imagery on crew flight performance, workload, and situation awareness during extremely low visibility approach and landing operations was assessed. Results indicate that all EFVS concepts flown resulted in excellent approach path tracking and touchdown performance without any workload penalty. Adding SV imagery to EFVS concepts provided situation awareness improvements but no discernible improvements in flight path maintenance.

Kramer, Lynda J.↗

Adding a Second Ku-Band Antenna to the International Space Station

The International Space Station, as originally developed, used the Ku-Band Tracking and Data Relay Satellite System communications link to transmit non-critical data to the ground. Since becoming operational, the use for the link evolved to include additional services that, although also not critical, were deemed to be necessary for the crew. The external Ku-Band Antennas were designed for transport to the ISS in the shuttle cargo bay and thus are not suitable for manifesting on any current cargo vehicle. The original intent was to stow two spare antennas on orbit in a protective container until such time as they were needed to replace a failing unit which is a long and complicated process due to the complexity of the removal and replacement procedure. The Boeing Company proposed manifesting one of those spare antennas in an operable configuration eliminating the need for an Extravehicular Activity (EVA) to correct the first failure and as such minimizing the time to hours rather than weeks required to restore the Ku-Band communications link after failures. After the first failure, an EVA would be scheduled to replace the failed antenna with the stowed spare antenna. Because the hot spare is activated internal to the ISS, the replacement of the failed unit can be done when convenient rather than in haste. This paper describes the methodology used to locate a suitable site to add a new antenna mast to the ISS as well the process followed to fabricate, deliver and install the new interface hardware. Because this was not planned when the ISS was originally designed, structural, power, data and Intermediate Frequency signal connections had to be found for use. With the movement of the P6 solar array element from the initial location in the center zenith location of the ISS to the end of the port side of the truss and concurrent relocation of one string of S-Band communications assets, there were candidate power, data and structural connections available on the Z1 Truss. The engineering team evaluated these residual interfaces for use and designed cabling and structural elements for the candidate interfaces. The antenna was recently installed on ULF-4 and has completed a preliminary checkout. Included in this check out were evaluation of the power level received from the TDRS and evaluation of the gimbal position feedback for consideration in the static bias pointing matrix. This process demonstrates the ability to modify and upgrade manned space vehicles as either need or technology requires.

DuSold, Chuck↗

Automating Surface Attitude Positioning and Pointing Operations for Mars 2020

The Surface Attitude Positioning and Pointing (SAPP) subsystem of the Mars Perseverance rover keeps track of the rover’s position and attitude on the surface of Mars. The SAPP Downlink Engineering Operations team members receive data from the rover on a daily basis. They must interpret the data to make sure the rover is staying safe and to support uplink planning. The SAPP team keeps track of the error growth in the rover’s attitude estimate due to noise in the Rover Inertial Measurement Unit’s (RIMU) gyroscopes used to propagate that attitude estimate whenever the rover is moving. Whenever this error grows to a particular threshold, SAPP is responsible for updating the onboard attitude knowledge using the RIMU’s accelerometers to estimate rover roll and pitch and sun imaging to estimate rover yaw, thereby reducing this attitude estimation error. Accurate attitude estimation is required so that the rover can successfully point its High Gain Antenna (HGA) to receive information from Earth and as a backup to the Mars orbiters used for sending data from the rover to Earth, point instruments on its Remote Sensing Mast (RSM), and support safe movement and placement of instruments by the rover’s ARM relative to the Martian surface. The Mars 2020 Engineering Operations team has been working to increase the operational efficiency of the mission and eventually move to a five-hour timeline for daily operations. In pursuit of this goal, the SAPP Engineering Operations team has automated their downlink process by developing a centralized Jupyter notebook to analyze the data received daily from the rover. The SAPP downlink Jupyter notebook automatically collects the data relevant to the SAPP subsystem and visualizes this information in plots and tables that can be easily read by downlink operators to aid them in assessing the status of the subsystem. Various Application Programming Interfaces (APIs) have been incorporated into the downlink daily notebook to automate the collection and posting of data, such as gathering and posting data products to the cloud. The SAPP team has also developed a SAPP downlink software library that includes functions to aid the notebook in processing data. In addition to assessing the SAPP subsystem on a daily basis, operators need to assess the long-term trending behavior of the subsystem over time. An automated trending process has been developed to collect information from the daily notebooks in order to plot and analyze that data in a centralized place. These daily and trending processes have expedited the SAPP downlink assessment and laid the groundwork to completely automate the SAPP downlink process so that SAPP operators are unnecessary unless something unexpected occurs. This paper will provide an overview of the functions that the SAPP subsystem carries out on a daily basis, and will then dive into the automations that have been developed for daily and trending downlink assessment. An assessment of the downlink efficiency will be provided, along with a summary of lessons learned and work to go. Finally, the authors will discuss how these types of automated spacecraft health assessments could be more broadly used within mission operations.

Zarifian, Anais↗

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for the Lunar Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and serve as a staging point for deep space exploration. In January of 2020 NASA headquarters contacted Goddard Space Flight Center to request that they develop a Heliophysics instrumentation package for Gateway. This package would later become known as HERMES-Heliophysics Environmental & Radiation Measurement Experiment Suite. HERMES consists of a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), Solar Probe Analyzers (SPAN)-A-ions, and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two Magneto-Inductive Magnetometers. From the beginning the HERMES mission faced a number of Challenges. It was constrained to fit in a small, half meter, cube and it was required to weigh no more than 25kg. A new boom design for the magnetometer would be required and for safety reasons it must be able to retract autonomously with power removed. To complicate matters the location of the SORI-Small ORU- (Orbital Replacement Unit) Robotics Interface, the primary interface for the HERMES platform to the Gateway elements, was undetermined. Also, the mechanical, thermal and electrical interfaces are not fully defined. The Canadian Space Agency is still in process of designing the version of the SORI that will be flown on the Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO) elements, each of which are being developed by different contractors. At the time of initiating the HERMES project, neither of the Gateway module providers were under contract. Additionally, we would later learn the ISS heritage SORI modules were not originally designed for launching on the Gateway elements with a payload directly attached but rather were intended to be brought up on a separate carrier outfitted with launch locks and specialized launch structures from which the robotic arm on Gateway would then be used to detach the payload and install it on the SORI adapters while on orbit. Launching the integrated Payload/SORI on the PPE and HALO elements complicates the stiffness requirements and coupled loads analysis. Adding to this are serious constraints on Field-Of-View (FOV) for solar viewing and severe radiation exposure considerations brought on by slowly raising the orbit through the Van Allen Belts. Just to make things a little more challenging the budget for the entire project was intended to be a low-cost tailored Class-D mission approach. Plus, the effects of Corona VIrus Disease 2019 (COVID-19) were not factored in from the beginning. This paper will discuss what’s being done to overcome these challenges and put HERMES on track for a 2024 Launch Readiness Date (LRD).

Irving Joseph Burt↗