Workshop on Biosecurity Curriculum Development in Yemen - Day 3: Implement and Evaluate for Biosecurity Curriculum: Action Plan.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Purpose: Thyroid {sup 131}I effective half-life (T{sub eff}) is an essential parameter in patient therapy when accurate radiation dose is desirable for producing an intended therapeutic outcome. Multiple {sup 131}I uptake measurements and resources from patients themselves and from nuclear medicine facilities are requisites for determining T{sub eff}, these being limiting factors when implementing the treatment planning of Graves' disease (GD) in radionuclide therapy. With the aim of optimizing this process, this study presents a practical, propitious, and accurate method of determining T{sub eff} for dosimetric purposes. Methods: A total of 50 patients with GD were included in this prospective study. Thyroidal {sup 131}I uptake was measured at 2-h, 6-h, 24-h, 48-h, 96-h, and 220-h postradioiodine administration. T{sub eff} was calculated by considering sets of two measured points (24-48-h, 24-96-h, and 24-220-h), sets of three (24-48-96-h, 24-48-220-h, and 24-96-220-h), and sets of four (24-48-96-220-h). Results: When considering all the measured points, the representative T{sub eff} for all the patients was 6.95 ({+-}0.81) days, whereas when using such sets of points as (24-220-h), (24-96-220-h), and (24-48-220-h), this was 6.85 ({+-}0.81), 6.90 ({+-}0.81), and 6.95 ({+-}0.81) days, respectively. According to the mean deviations 2.2 ({+-}2.4)%, 2.1 ({+-}2.0)%, and 0.04 ({+-}0.09)% found in T{sub eff}, calculated based on all the measured points in time, and with methods using the (24-220-h), (24-48-220-h), and (24-96-220-h) sets, respectively, no meaningful statistical difference was noted among the three methods (p > 0.500, t test). Conclusions: T{sub eff} obtained from only two thyroid {sup 131}I uptakes measured at 24-h and 220-h, besides proving to be sufficient, accurate enough, and easily applicable, attributes additional major cost-benefits for patients, and facilitates the application of the method for dosimetric purposes in the treatment planning of Graves' disease.
Dosimetry results from 1 January 2008 through 31 December 2017 were reviewed to demonstrate that radiation protection methods used at Sandia National Laboratories are compliant with regulatory limits and consistent with the philosophy to keep exposures to radiation As Low As is Reasonably Achievable (ALARA). Personnel dosimetry (external and internal) and environmental thermoluminescent dosimeter results were reviewed for the Sandia National Laboratories in New Mexico, California, and Nevada. ALARA is a philosophical approach to radiation protection by managing and controlling radiation exposures (individual and collective) to the work force and to the public to levels that are As Low As is Reasonably Achievable taking social, technical, economic, practical, and public policy considerations into account. ALARA is not a dose limit but a planning tool with the objective to keep doses below applicable dose limits As Low As is Reasonably Achievable. In the case of Sandia National Laboratories, formal ALARA goals are not needed since Collective and individual doses are well below applicable limits through operational ALARA practices implemented during Work Planning and Control activities.
Purpose: A small-scale implementation of Failure Modes and Effects Analysis (FMEA) for treatment planning system QA by utilizing methodology of AAPM TG-100 report. Methods: FMEA requires numerical values for severity (S), occurrence (O) and detectability (D) of each mode of failure. The product of these three values gives a risk priority number (RPN). We have implemented FMEA for the treatment planning system (TPS) QA for two clinics which use Pinnacle and Eclipse TPS. Quantitative monthly QA data dating back to 4 years for Pinnacle and 1 year for Eclipse have been used to determine values for severity (deviations from predetermined doses at points or volumes), and occurrence of such deviations. The TPS QA protocol includes a phantom containing solid water and lung- and bone-equivalent heterogeneities. Photon and electron plans have been evaluated in both systems. The dose values at multiple distinct points of interest (POI) within the solid water, lung, and bone-equivalent slabs, as well as mean doses to several volumes of interest (VOI), have been re-calculated monthly using the available algorithms. Results: The computed doses vary slightly month-over-month. There have been more significant deviations following software upgrades, especially if the upgrade involved re-modeling of the beams. TG-100 guidance and the data presented here suggest an occurrence (O) of 2 depending on the frequency of re-commissioning the beams, severity (S) of 3, and detectability (D) of 2, giving an RPN of 12. Conclusion: Computerized treatment planning systems could pose a risk due to dosimetric errors and suboptimal treatment plans. The FMEA analysis presented here suggests that TPS QA should immediately follow software upgrades, but does not need to be performed every month.
Preplanning scope for the Hanford tank transuranic (TRU) waste project was authorized in 2013 by the Department of Energy (DOE) Office of River Protection (ORP) after a project standby period of eight years. Significant changes in DOE orders, Hanford contracts, and requirements at the Waste Isolation Pilot Plant (WIPP) have occurred during this time period, in addition to newly implemented regulatory permitting, re-evaluated waste management strategies, and new commercial applications. Preplanning has identified the following key approaches for reactivating the project: qualification of tank inventory designations and completion of all environmental regulatory permitting; identifying program options to accelerate retrieval of key leaking tank T-111; planning fully compliant implementation of DOE Order 413.3B, and DOE Standard 1189 for potential on-site treatment; and re-evaluation of commercial retrieval and treatment technologies for better strategic bundling of permanent waste disposal options.
The U. S. Department of Energy (DOE), National Association of State Energy Officials (NASEO), and Association of State Energy Research and Technology Transfer Institutions (ASERTTI) signed an intergovernmental agreement on November 14, 2002, that allowed states and territories and the Federal Government to better collaborate on energy research, development, demonstration and deployment (RDD&D) projects. The agreement established the State Technologies Advancement Collaborative (STAC) which allowed the states and DOE to move RDD&D forward using an innovative competitive project selection and funding process. A cooperative agreement between DOE and NASEO served as the contracting instrument for this innovative federal-state partnership obligating funds from DOE's Office of Energy Efficiency and Renewable Energy and Office of Fossil Energy to plan, fund, and implement RDD&D projects that were consistent with the common priorities of the states and DOE. DOE's Golden Field Office provided Federal oversight and guidance for the STAC cooperative agreement. The STAC program was built on the foundation of prior Federal-State efforts to collaborate on and engage in joint planning for RDD&D. Although STAC builds on existing, successful programs, it is important to note that it was not intended to replace other successful joint DOE/State initiatives such as the State Energy Program or EERE Special Projects. Overall the STAC process was used to fund, through three competitive solicitations, 35 successful multi-state research, development, deployment, and demonstration projects with an overall average non-federal cost share of 43%. Twenty-two states were awarded at least one prime contract, and organizations in all 50 states and some territories were involved as subcontractors in at least one STAC project. Projects were funded in seven program areas: (1) Building Technologies, (2) Industrial Technologies, (3) Transportation Technologies, (4) Distributed Energy Resources, (5) Hydrogen Technology Learning Centers, (6) Fossil Energy, and (7) Rebuild America.
Extensive efforts to adaptively manage nutrient pollution rely on Chesapeake Bay Program’s (Phase 6) Watershed Model, called Chesapeake Assessment Scenario Tool (CAST), which helps decision-makers plan and track implementation of Best Management Practices (BMPs). We describe mathematical characteristics of CAST and develop a constrained nonlinear BMP-subset model, software, and visualization framework. This represents the first publicly available optimization framework for exploring least-cost strategies of pollutant load control for the United States’ largest estuary. The optimization identifies implementation options for a BMP subset modeled with load reduction effectiveness factors, and the web interface facilitates interactive exploration of >30,000 solutions organized by objective, nutrient control level, and for ~200 counties. We assess framework performance and demonstrate modeled cost improvements when comparing optimization-suggested proposals with proposals inspired by jurisdiction plans. Stakeholder feedback highlights the framework’s current utility for investigating cost-effective tradeoffs and its usefulness as a foundation for future analysis of restoration strategies.
The Molten Chloride Reactor Experiment (MCRE) will be the first reactor featuring a fast-spectrum molten chloride circulating nuclear fuel system in the world. Planning for equipment removal and disposal (ERD) of MCRE has identified several technology gaps due to the unique environment of this nuclear experiment. Some of the gaps arise from the application of existing disassembly and/or sizing methods to novel material forms or in novel configurations. Others arise from unknown material behavior. This paper summarizes proposed test plans for ERD validation experiments to address these complicated or unknown equipment removal procedures. At the Waste Management Symposia in 2024, the Idaho National Laboratory (INL) MCRE ERD team presented the challenges associated with hosting multiple nuclear experiments in series with only brief transition periods between systems. Such difficulties include higher dose rates, the presence of radioisotopes infrequently encountered in reactor decommissioning and radioactive waste management, lack of intrinsic remote-operations infrastructure in the test bed, space constraints in the test bed, and contamination minimization requirements. To address these challenges, remote or semi-remote technologies are planned to be implemented in a non-hot cell environment with limited space availability. The team also discussed how a systems engineering approach is being used for conceptual development and design of equipment removal systems to address these challenges. For example, to reduce constraints for the removal of more difficult components, non-activated, noncontaminated elements are planned to be taken out first where possible. Still, there are complexities associated with the remaining components. In this work, the operational framework for MCRE ERD was reviewed for technical gaps and open questions, and test plans were drafted to address these areas. The tests plans were written for the following categories: vision systems, pipe cutting, drill/grout/filler, flush salt, and miscellaneous, with the miscellaneous group consisting of tests like techniques for removing bearings and reflector bricks. The test plans explore material, infrastructure, and staffing requirements needed for test execution. The test plans additionally focus on the evaluation of success. Determining the outcome of a test is imperative - as these explorative actions have the potential to rearrange or re-scope planned ERD activities. Success criteria identified thus far include required tool output, required area(s), debris production and mitigation, and repeatability. Test plans are an essential aspect of the systems engineering approach to MCRE ERD. They are used as the beginning steps in defining use cases for the ERD system. Performance of the validation tests is expected to begin in the summer of 2025 and will take approximately 9 to 12 months to complete. Execution of these plans will be expedited by specifying test needs ahead of time, facilitating efficient interactions with any subcontractors tasked with running the requested tests. Evaluating the outcomes of these tests will inform MCRE ERD procedures and timing and will also identify additional technical constraints for the MCRE ERD System. This upfront process optimization effort will help the project save time and resources at the end of the experiment.
Magnox Ltd. (Operated by the Cavendish Fluor Partnership) has initiated decommissioning of spent fuel pools/ponds utilizing divers. This decommissioning technique is being employed to disassemble and size reduce underwater equipment and furniture, as well as the collection of sludge and debris prior to draining of the pool. This technique has proven to be highly effective at reducing the radiological exposure to the workforce over previously implemented methods and is expected to significantly reduce overall decommissioning durations and costs. The decommissioning of the UK Nuclear Decommissioning Authority's (NDA) Dungeness A power station spent fuel ponds was initiated in 2015 to eliminate the mobile hazards and prepare the facilities for entry into a Care and Maintenance period. This dual reactor site has two spent fuel ponds each containing 1000 m{sup 3} of water, with the fuel removed since April 2012, which will utilize divers to remove solid wastes from the ponds prior to drain down. This technique has overcome many challenges to implementation including regulatory approval and high airborne contamination. The use of divers for decommissioning was a new technique for the Magnox Sites and required early engagement with the UK Office for Nuclear Regulation (ONR) and the Health and Safety Executive (HSE). The use of plasma arc cutting underwater required the pond area to be classified as an airborne contamination area. The implementation of local ventilation has controlled this hazard. The initial demonstration dives at Dungeness A were completed in April 2016 and the decommissioning dives are expected to be completed in March 2017. This is a substantial improvement to the project schedule and will allow the project completion 5 1/2 years ahead of the Licence Condition milestone. This technique is planned to be implemented at two further NDA Magnox power stations over the next three years. This paper provides the accomplishments and lessons learned to date. (authors)
Supercritical CO 2 (S-CO 2 ) power plants offer the potential for better economics because of their small size, use of standard materials, and improved electrical power conversion efficiency at modest temperature (400–750°C). Sandia National Laboratories (SNL or Sandia) and the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) are operating a supercritical CO 2 Brayton cycle power system—the Generation IV (Gen IV) split-flow S-CO 2 compressor test loop—currently located in Arvada Colorado, at Barber Nichols, Inc., under contract to Sandia. A photograph of the upgraded loop is shown in Figure E-1. This system is one of the first S-CO 2 power-producing Brayton cycles operating in the world. This report provides a summary of the newly installed hardware and briefly describes some of the test results that were performed in the upgraded split-flow Brayton loop during June and July of 2011. The Gen IV S-CO 2 split-flow Brayton loop was reconfigured to operate as a simple heated recuperated Brayton loop for the testing in this report period. The test loop had just concluded a phase of construction that substantially increased the capability of the loop by adding heaters, a high-temperature (HT) recuperator, more waste heat removal capability, high-power load banks, larger diameter piping with more bends to reduce thermal stress, and more capable scavenging pumps to reduce windage and friction within the turbomachinery and provide greater cooling capabilities. With these additions, the loop greatly increased its capacity for electrical power generation (30–80 kWe per generator, depending on the loop configuration) and its ability to reach high temperatures (up to 810 K [1000°F]). In recent weeks of testing, the test facility began to realize this potential by achieving new records in turbine inlet temperature (615 K [650°F]), shaft speed (52,000 rpm), pressure ratio (1.65), flow rate (2.7 kg/s), and electrical power generated (20 kWe). These operating conditions still remain short of design conditions for each turbine—an inlet temperature of 810 K (1000°F), a pressure ratio of 1.8, a shaft speed of 75,000 rpm, a flow rate of 3.5 kg/s, and a maximum generator power of 125 kWe—but they are beginning to be approached. Not all planned upgrades were implemented due to the limited funding profile of FY2010. Only 520 kW of heater power were installed—not the total 780 kW. Furthermore, because one of the heater controllers was not functioning, only 390 kW of heater power were available. Similarly, the 3-in. piping was installed only in the high-pressure leg of the loop, not in the low-pressure leg, as was originally planned. We also had to rely on the new load bank capability for rapid shutdown situations, and were not able to install a dedicated shutdown resistor. Nevertheless, in spite of these limitations, we operated the loop at record operating conditions and were largely limited only by the facility and support equipment—not the turbomachinery.
Irrigation water delivery infrastructure, such as canals and pipelines, are essential to agriculture in the Western U.S., yet many of these systems are reaching the end of their useful lives. Reinvestment can achieve a wide variety of benefits, from water conservation to energy savings or renewable energy generation. Modernization requires significant planning, design, and implementation funding which can be a challenge for many irrigation districts. Here, this paper introduces IrrigationViz, a web-based mapping application designed to help irrigation districts visualize and generate high-level cost and benefit estimates for infrastructure modernization projects. These estimates can help water managers identify projects that benefit from additional engineering resources and ultimately obtain funding. IrrigationViz includes map interactions, graphs, and visualization components to facilitate planning and communication to stakeholders and funders. IrrigationViz combines user-provided information about a water-delivery system with public datasets and basic engineering formulas to generate estimates of the benefits of reinvestment. Estimates include the amount of water seepage in earthen canals, potential hydropower generation associated with replacing a canal with a pressurized pipe, and pipe size recommendations. We found that hydropower generation estimates compared favorably with real world projects, but seepage loss estimates showed high variability relative to on-the-ground measurements
Purpose: To replace the paper records, we designed an electronic records function for plan checked meeting in our in-house developed radiotherapy information management system(RTIMS). Methods: Since 2007, the RTIMS has been developed on a database and web service of Apache+PHP+MySQL, and almost all computers and smartphones could access the RTIMS through IE browser, to input, search, count, and print the data. In 2012, we also established an radiation therapy case conference multi-media system(RTCCMMS) based on Windows Remote Desktop feature. Since 2013, we have carried out the treatment plan checked meeting of the physics division in every afternoon for about half an hour. In 2014, we designed an electronic records function, which includes a meeting information record and a checked plan record. And the meeting record includes the following items: meeting date, name, place, length, status, attendee, content, etc. The plan record includes the followings: meeting date, meeting name, patient ID, gender, age, patient name, course, plan, purpose, position, technique, CTsim type, plan type, primary doctor, other doctor, primary physicist, other physicist, difficulty, quality, score, opinion, status, note, etc. Results: In the past year, the electronic meeting records function has been successfully developed and implemented in the division, and it could be accessed from an smartphone. Almost all items have the corresponding pull-down menu selection, and each option would try to intelligently inherit default value from the former record or other form. According to the items, we could do big data mining to the input data. It also has both Chinese and English two versions. Conclusion: It was demonstrated to be user-friendly and was proven to significantly improve the clinical efficiency and quality of treatment plan. Since the RTIMS is an in-house developed system, more functions can be added or modified to further enhance its potentials in research and clinical practice. Project supported by the National Natural Science Foundation of China (Grant No.81101694)
When the Toledo Lucas County Port Authority (TLCPA) filed for the Department of Energy EECBG grant in late 2009, it was part of a strategic and Board backed objective to expand the organization’s economic development and financing programs into alternative energy and energy efficiency. This plan was filed with the knowledge and support of the areas key economic development agencies. The City of Toledo was also a key partner with the Mayor designating a committee to develop a Strategic Energy Policy for the City. This would later give rise to a Community Sustainability Strategic Plan for Toledo, Lucas County and the surrounding region with energy efficiency as a key pillar. When the TLCPA signed the grant documents with the DOE in June of 2010, the geographic area was severely distressed economically, in the early stages of a recovery from over a 30% drop in business activity and high unemployment. The TLCPA and its partners began identifying potential project areas well before the filing of the application, continuing to work diligently before the formal award and signing of the grant documents. Strong implementation and actions plans and business and financing models were developed and revised throughout the 3 year grant period with the long term goal of creating a sustainable program. The TLCPA and the City of Toledo demonstrated early leadership by forming the energy improvement district and evaluating buildings under their control including transportation infrastructure and logistics, government services buildings and buildings which housed several for profit and not for profit tenants while completing significant energy efficiency projects that created public awareness and confidence and solid examples of various technologies and energy savings. As was stated in the DOE Award Summary, the undertaking was focused as a commercial program delving into Alternative Energy Utility Districts; what are referred to in Ohio Statute as Energy Special Improvement Districts or ESIDs and what is nationally known as Property Assessed Clean Energy or PACE districts and PACE financing. The project methodology followed the identify, develop, implement, monitor and measure format. These districts began in Toledo and adjoining areas and are expanding to TLCPA’s 28 county financing agency geographic footprint. What began as the Toledo Ohio Advanced Energy Improvement Corporation is now doing business as the Northwest Ohio Advanced Energy Improvement District recognizing it expansion into creating and financing other districts in NW Ohio. The program has been sought out as an advisor by major communities and states in the process of developing similar legislation and programs and has become one of the largest most successful PACE energy improvement and financing districts in the US. The program and the energy district focused on transforming energy use, delivery, conservation and renewable energy as “options of first choice”. The significant energy savings paid for many of the improvements and created a financially viable program well beyond the grant period. The program has become a model within the State of Ohio and Nationally on how to implement and finance projects in broad energy districts including how to evolve and integrate several financing methodologies. It is a unique utilization of revolving loan funds and energy bond pooling with revenue backing primarily from energy improvement special assessments on commercial properties along with some power purchase agreement (PPA) and loan agreement revenue. The program has also incorporated Qualified Energy Conservation Bonds, State of Ohio Energy Loans (SEP), utility rebates, solar and renewable energy certificates, renewable tax incentives and grants, and owner funded equity as additional program leverage and funding. Other keys to this success have been a continual simplification and refinement of the application and documentation process to make funding available easily and quickly to building owners when they are prepared to commit to the project as well as act as a trusted facilitator and advisor to both building owners and other stakeholders. Taking a flexible and pragmatic approach to project evaluation and implementation that matches time and expense to the complexity of the project has been another key learning. To date the program has closed 3 energy bond issues through the TLCPA sponsored and managed NW Ohio Bond Fund totaling $16.54 million (of which $3.34 million were QECB qualified). The program has turned over its $3.0 million revolving loan fund twice as construction financing in advance of bond issuance and currently has issued $1.25 million in revolving term loans. The program has $1.66 million of remaining capacity for QECB qualified bonds. The program can issue an additional $13.46 million in energy bonds continuing to utilize its DOE EECBG loan loss reserves. In addition, the program has available $3.6 million of loan loss reserves from the State of Ohio, as an eligible Port Authority, that can back the issuance of an additional $7.2 to $14.4 million of energy bonds. This does not include additional bond capacity is available from the NW Ohio Bond Fund. The program is the master escrow agent for $18 million of loan loss reserves from the State of Ohio for eligible Port Authorities that can be utilized to assist the formation of energy districts and financing programs in major metropolitan areas and regions around the State of Ohio. Other leveraged funds now total $10 million; placing the total project value completed and financed at over $30 million. In addition that program has generated an active pipeline of projects in various stages that total $25 – $30 million.
This panel focused on the progress of deep repository programs, worldwide. While efforts on a deep geological repository for SNF/UNF and HLW in the USA were terminated in 2010, several other repository programs continue to make considerable progress 10 and deserve to be recognized. Panelists from national, multi-national, and international repository programs and organizations reported on the status and future plans as well as the perceived reasons underlying the success and the failure of components of their respective repository program. This session provided a forum for interested parties to present, exchange, and take advantage of, as appropriate, repository progress, challenges, concepts/designs and other lessons learned around the world, including site characterization, site selection, research and development, licensing, construction, operation, and public acceptance and participation. Panelists with presentations: Switzerland's Geological Repository Program for Radioactive Waste (Tim Vietor); Update on NWMO's Progress in Implementing Canada's Plan (Sarah Hirschorn); Cigeo Project Progress and Next Milestones (Corinne Bauer)
This document introduces the Energy Department's new Guide to Community Shared Solar: Utility, Private, and Nonprofit Project Development. The guide is designed to help those who want to develop community shared solar projects - from community organizers and advocates to utility managers and government officials - navigate the process of developing shared systems, from early planning toimplementation.
To develop a volumetric modulated arc therapy (VMAT) treatment planning solution in the treatment of primary renal cell carcinoma and oligometastatic adrenal lesions with stereotactic body radiation therapy. Single-arc VMAT plans (n = 5) were compared with clinically delivered step-and-shoot intensity-modulated radiotherapy (IMRT) with planning target volume coverage normalized between techniques. Target volume conformity, organ-at-risk (OAR) dose, treatment time, and monitor units were compared. A VMAT planning solution, created from a combination of arc settings and optimization constraints, auto-generated treatment plans in a single optimization. The treatment planning solution was evaluated on 15 consecutive patients receiving kidney and adrenal stereotactic body radiation therapy. Treatment time was reduced from 13.0 ± 2.6 to 4.0 ± 0.9 minutes for IMRT and VMAT, respectively. The VMAT planning solution generated treatment plans with increased target homogeneity, improved 95% conformity index, and a reduced maximum point dose to nearby OARs but with increased intermediate dose to distant OARs. The conformity of the 95% isodose improved from 1.32 ± 0.39 to 1.12 ± 0.05 for IMRT and VMAT treatment plans, respectively. Evaluation of the planning solution showed clinically acceptable dose distributions for 13 of 15 cases with tight conformity of the prescription isodose to the planning target volume of 1.07 ± 0.04, delivering minimal dose to OARs. The introduction of a stereotactic body radiation therapy VMAT treatment planning solution improves the efficiency of planning and delivery time, producing treatment plans of comparable or superior quality to IMRT in the case of primary renal cell carcinoma and oligometastatic adrenal lesions.
Purpose: This study provides an overview of the design and commissioning of the Monte Carlo (MC) model of the spot-scanning proton therapy nozzle and its implementation for the patient plan simulation. Methods: The Hitachi PROBEAT V scanning nozzle was simulated based on vendor specifications using the TOPAS extension of Geant4 code. FLUKA MC simulation was also utilized to provide supporting data for the main simulation. Validation of the MC model was performed using vendor provided data and measurements collected during acceptance/commissioning of the proton therapy machine. Actual patient plans using CT based treatment geometry were simulated and compared to the dose distributions produced by the treatment planning system (Varian Eclipse 13.6), and patient quality assurance measurements. In-house MATLAB scripts are used for converting DICOM data into TOPAS input files. Results: Comparison analysis of integrated depth doses (IDDs), therapeutic ranges (R90), and spot shape/sizes at different distances from the isocenter, indicate good agreement between MC and measurements. R90 agreement is within 0.15 mm across all energy tunes. IDDs and spot shapes/sizes differences are within statistical error of simulation (less than 1.5%). The MC simulated data, validated with physical measurements, were used for the commissioning of the treatment planning system. Patient geometry simulations were conducted based on the Eclipse produced DICOM plans. Conclusion: The treatment nozzle and standard option beam model were implemented in the TOPAS framework to simulate a highly conformal discrete spot-scanning proton beam system.
Purpose: To quantify the potential impact of the Integrating the Healthcare Enterprise–Radiation Oncology Quality Assurance with Plan Veto (QAPV) on patient safety of external beam radiation therapy (RT) operations. Methods and Materials: An institutional database of events (errors and near-misses) was used to evaluate the ability of QAPV to prevent clinically observed events. We analyzed reported events that were related to Digital Imaging and Communications in Medicine RT plan parameter inconsistencies between the intended treatment (on the treatment planning system) and the delivered treatment (on the treatment machine). Critical Digital Imaging and Communications in Medicine RT plan parameters were identified. Each event was scored for importance using the Failure Mode and Effects Analysis methodology. Potential error occurrence (frequency) was derived according to the collected event data, along with the potential event severity, and the probability of detection with and without the theoretical implementation of the QAPV plan comparison check. Failure Mode and Effects Analysis Risk Priority Numbers (RPNs) with and without QAPV were compared to quantify the potential benefit of clinical implementation of QAPV. Results: The implementation of QAPV could reduce the RPN values for 15 of 22 (71%) of evaluated parameters, with an overall average reduction in RPN of 68 (range, 0-216). For the 6 high-risk parameters (>200), the average reduction in RPN value was 163 (range, 108-216). The RPN value reduction for the intermediate-risk (200 > RPN > 100) parameters was (0-140). With QAPV, the largest RPN value for “Beam Meterset” was reduced from 324 to 108. The maximum reduction in RPN value was for Beam Meterset (216, 66.7%), whereas the maximum percentage reduction was for Cumulative Meterset Weight (80, 88.9%). Conclusion: This analysis quantifies the value of the Integrating the Healthcare Enterprise–Radiation Oncology QAPV implementation in clinical workflow. We demonstrate that although QAPV does not provide a comprehensive solution for error prevention in RT, it can have a significant impact on a subset of the most severe clinically observed events.