Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Electrifying Transit: A Guidebook for Implementing Battery Electric Buses

This guidebook is organized to give transit decision-makers and relevant stakeholders an overview of BEB facts, data, and considerations important for planning their implementation in a variety of jurisdictions. First, the benefits and barriers for BEB are identified. Second, BEB basics in terms of the major components, including a) the bus, b) the battery, and c) the numerous charging options. BEB introduces new, high demand loads as the buses are charging and thus have a number of interactions with the electricity grid and the utility, which are explored third. Operation and maintenance of BEBs are considered fourth as BEBs should not be operated and maintained in the same approach as diesel buses. Fifth, the costs of BEB prices are summarized – and the choices of bus and battery are explored in how they impact BEB prices. Funding and financing options that support BEBs and their charging stations are also explored. Safety is a key consideration for BEBs and the guidebook touches upon codes and standards, hazards, and emergencies. The final section examines project execution, bringing together information from all the other sections so that long-term planning, route analysis, and fleet and infrastructure planning can be considered in the preparation of BEB deployment, and then deployment can be evaluated on a regular basis. A final conclusion revisits the information covered in the guidebook.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Science in a Team Environment (AKA, How to Play Nicely with Others)

So you want to do NASA funded research in a spaceflight analog? There are several things about participating in an HRP managed analog that may be different from the way you normally do work in your laboratory. The purpose of this presentation is to highlight those differences and explain some of the unique aspects of doing this research. Participation in an HRP funded analog study complement, even if initially selected for funding, is not automatic and involves numerous actions from ISSMP, HRP, and the PI. There are steps that have to be taken and processes to follow before approval and ISSMP-FA integration. After the proposal and acceptance process the Investigator works closely with the Flight Analog team to ensure full integration of their study requirements into a compliment. A complement is comprised of a group of studies requiring a common platform and/or scenario that are able to be integrated on a non-interference basis for implementation. Full integration into the analog platform can be broken down into three phases: integration, preparation, and implementation. These phases occur in order with some overlap in the integration and preparation phase. The ISSMP-FA team integrates, plans and implements analog study complements. Properly defining your research requirements and getting them documented is one of the most critical components to ensure successful integration and implementation of your study, but is also one of the most likely to be neglected by PIs. Requirements that are not documented, or that are documented poorly are unlikely to get done, no matter how much you push. The process to document requirements is two-fold, consisting of an initial individual requirements integration and then a compliment requirements integration. Understanding the requirements in detail and early ensures that the science is not compromised by outside influences. This step is vital to the integration, preparation, and implementation phases. The individual requirements integration is the first step in ensuring that the research fits into an available analog platform or allows for the Flight Analog team to provide information on structural study changes for participation in the analog. At this early point investigators need to understand exactly what their requirements are to produce relevant data and convey their must have needs to the Flight Analog team. The fluid nature of analog platforms allow for minor alterations to the operational structure. Participation in analog research requires flexibility from the investigator to ensure implementation of their research into a flight like analog platform. The compliment integration requires plasticity; investigators are asked to work closely with one another and the Flight Analog team to combine research studies into a single study plan. This study plan's ultimate goal is to facilitate multiple study participation with minimal scientific impact to each individual study. The Flight Analogs team works to find the best compromise for all parties while protecting the flight like atmosphere of a particular analog. Additional restrictions, limitations and constraints may be required by the analog in order to make all of the science work. Many studies need to be combined into each complement and there are a limited number of hours available for data collection. Through data/sample sharing, we can reduce the burden on the test subject, while usually avoiding significant science impacts. Restrictions on food, exercise, medications and sleep cycle are important to consider for your research.

Platts, S. H.↗

Lunar Dust Mitigation Technology Development

NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.

Hyatt, Mark J.↗

Improving the effectiveness of planning EIA (PEIA) in China: Integrating planning and assessment during the preparation of Shenzhen's Master Urban Plan

The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully and rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: {center_dot}as a tool and process for achieving more sustainable and strategic planning; {center_dot}to determine the level of integration of SEA within the planning system; and, {center_dot}its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.

54 ENVIRONMENTAL SCIENCES↗

SU-F-T-128: Dose-Volume Constraints for Particle Therapy Treatment Planning

Purpose: Determine equivalent Organ at Risk (OAR) tolerance dose (TD) constraints for MV x-rays and particle therapy. Methods: Equivalent TD estimates for MV x-rays are determined from an isoeffect, regression-analysis of published and in-house constraints for various fractionation schedules (n fractions). The analysis yields an estimate of (α/β) for an OAR. To determine equivalent particle therapy constraints, the MV x-ray TD(n) values are divided by the RBE for DSB induction (RBE{sub DSB}) or cell survival (RBE{sub S}). Estimates of (RBE{sub DSB}) are computed using the Monte Carlo Damage Simulation, and estimates of RBES are computed using the Repair-Misrepair-Fixation (RMF) model. A research build of the RayStation™ treatment planning system implementing the above model is used to estimate (RBE{sub DSB}) for OARs of interest in 16 proton therapy patient plans (head and neck, thorax, prostate and brain). Results: The analysis gives an (α/β) estimate of about 20 Gy for the trachea and heart and 2–4 Gy for the esophagus, spine, and brachial plexus. Extrapolation of MV x-ray constraints (n = 1) to fast neutrons using RBE{sub DSB} = 2.7 are in excellent agreement with clinical experience (n = 10 to 20). When conventional (n > 30) x-ray treatments are used as the reference radiation, fast neutron RBE increased to a maximum of 6. For comparison to a constant RBE of 1.1, the RayStation™ analysis gave estimates of proton RBE{sub DSB} from 1.03 to 1.33 for OARs of interest. Conclusion: The presented system of models is a convenient formalism to synthesize from multiple sources of information a set of self-consistent plan constraints for MV x-ray and hadron therapy treatments. Estimates of RBE{sub DSB} from the RayStation™ analysis differ substantially from 1.1 and vary among patients and treatment sites. A treatment planning system that incorporates patient and anatomy-specific corrections in proton RBE would create opportunities to increase the therapeutic ratio. The research build of the RayStation used in the study was made available to the University of Washington free of charge. RaySearch Laboratories did not provide any monetary support for the reported studies.

60 APPLIED LIFE SCIENCES↗

Next Steps in Planetary Protection for Human Spaceflight

Planetary protection is defined as: a) the prevention of contamination of extraterrestrial bodies by terrestrial microorganisms, and b) biohazard containment of returned samples from bodies in the Solar System that could harbor life.1 While the majority of interplanetary missions to date have involved robotic exploration, future missions will include human explorers. Current planetary protection requirements do not address the unique challenges associated with human exploration. The purpose of this abstract is to review planetary protection efforts for crewed missions and provide a forward plan for implementing them at the systems level. Article IX of the UN Outer Space Treaty of 1967 provides the definition of planetary protection, outlined above.1 COSPAR holds the international standard in line with this treaty2, while NASA's Planetary Protection Policy (NPD 8020.7G) outlines the U.S. implementation of the COSPAR standard. 3;4 NPI 8020.7 groups future human spaceflight planetary protection studies as follows: 1) microbial monitoring, 2) contamination mitigation and control, and 3) environmental effects. Additionally, a NPI 8020.7 outlines a five-step plan for forward work: 1) a literature review, 2) community inputs, 3) completion of recommended studies, 4) developing a draft NPR, and 5) implementation with NASA teams. The literature review was published in 2016.5 Inputs from the community were gathered at the Planetary Protection Knowledge Gaps for Human Extraterrestrial Missions, held in 2015.6 Johnson and Race (2016) outlined notional requirements and prioritized studies needed before final requirements can be produced. This prior work sets the stage for completing the necessary studies and finalizing planetary protection requirements for human spaceflight. We propose a continuation of the systems engineering approach adopted thus far. The challenges associated with the implementation of notional requirements will be quantified in detailed discussions with internal stakeholders. The status and results of high-priority studies that have been completed since 2016 or are ongoing will be incorporated into discussions with stakeholders. In this way, we plan to bridge the gap between the science behind planetary protection and the engineering development that will implement it, allowing finalized planetary protection requirements to be developed for future human space missions.

Mitchell, Julie↗

The role of large scale demonstration experiments in supporting the implementation of a high level waste programme

Large scale demonstration experiments in underground research laboratories (both onsite and off-site) are currently undertaken by most high level radioactive waste management organisations. The decision to plan and implement prototype experiments, which might have a life of several decades, has both important strategic and budgetary consequences for the organisation. Careful definition of experimental objectives based on the design and safety requirements is critical. The implementation requires the involvement of many parties and needs flexible but consequent management as, for example, additional goals for the experiments, identified in the course of the implementation, might jeopardise initial primary goals. The outcomes of an international workshop in which European and Japanese implementers (SKB, Posiva, Andra, ONDRAF, NUMO and Nagra) but also certain research organisations (JAEA, RWMC) participated identified which experiments are likely to be needed depending on the progress in implementing a disposal programme. Already earlier in a programme, large scale demonstrations are generally performed aiming at reducing uncertainties identified during the safety case development such as thermo-hydraulic-mechanical process validation in the engineered barrier system and target host rock. Also feasibility testing of underground construction in a potential host rock at relevant depth might be required. Later in a programme, i.e., closer to the license application, large scale experiments aim largely at demonstrating engineering feasibility and performance confirmation of complete repository components. Ultimately, before licensing repository operation, 1:1 scale commissioning testing will be required. Factors contributing to the successful completion of large scale demonstration experiments in terms of planning, defining the objectives, optimising results and main lessons learned over the last 30 years are being discussed. The need for international coordination in defining the objectives of new large scale demonstration experiments is addressed. The paper is expected to provide guidance to implementing organisations (especially those in their early stages of the programme), considering participating in and/or or conducting on their own large scale experiments in the near future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated energy-water-land nexus planning to guide national policy: an example from Uruguay

Despite broad consensus on the benefits of a nexus approach to multi-sector planning, actual implementation in government and other decision-making institutions is still rare. This study presents an approach to conducting integrated energy-water-land (EWL) planning, using Uruguay as an example. This stakeholder-driven study focuses on assessing the EWL nexus implications of actual planned policies aimed at strengthening three of Uruguay's key exports (beef, soy, and rice), which account for more than 40% of total national export revenue. Five scenarios are analyzed in the study: a reference scenario, a climate impacts scenario, and three policy scenarios. The three policy scenarios include measures such as increasing the intensity of beef production while simultaneously decreasing emissions, increasing irrigated soybean production, and improving rice yields. This study supplements previous sector-specific planning efforts in Uruguay by conducting the first stakeholder-driven integrated multi-sector assessment of planned policies in Uruguay using a suite of integrated modeling tools. Key insights from the study are: as compared to a reference scenario, improving beef productivity could lead to cropland expansion (+30%) and significant indirect increases in water requirements (+20%); improving rice yields could lead to increases in total emissions (+3%), which may partially offset emissions reductions from other policies; expanding irrigated soy could have the least EWL impacts amongst the policies studied; and climate-driven changes could have significantly less impact on EWL systems as compared to human actions. The generalizable insights derived from this analysis are readily applicable to other countries facing similar multi-sector planning challenges. In particular, the study's results reinforce the fact that policies often have multi-sector consequences, and thus policies can impact one another's efficacy. Thus, policy design and implementation can benefit from coordination across sectors and decision-making institutions.

54 ENVIRONMENTAL SCIENCES↗

Online Magnetic Resonance Image Guided Adaptive Radiation Therapy: First Clinical Applications

Purpose: To demonstrate the feasibility of online adaptive magnetic resonance (MR) image guided radiation therapy (MR-IGRT) through reporting of our initial clinical experience and workflow considerations. Methods and Materials: The first clinically deployed online adaptive MR-IGRT system consisted of a split 0.35T MR scanner straddling a ring gantry with 3 multileaf collimator-equipped {sup 60}Co heads. The unit is supported by a Monte Carlo–based treatment planning system that allows real-time adaptive planning with the patient on the table. All patients undergo computed tomography and MR imaging (MRI) simulation for initial treatment planning. A volumetric MRI scan is acquired for each patient at the daily treatment setup. Deformable registration is performed using the planning computed tomography data set, which allows for the transfer of the initial contours and the electron density map to the daily MRI scan. The deformed electron density map is then used to recalculate the original plan on the daily MRI scan for physician evaluation. Recontouring and plan reoptimization are performed when required, and patient-specific quality assurance (QA) is performed using an independent in-house software system. Results: The first online adaptive MR-IGRT treatments consisted of 5 patients with abdominopelvic malignancies. The clinical setting included neoadjuvant colorectal (n=3), unresectable gastric (n=1), and unresectable pheochromocytoma (n=1). Recontouring and reoptimization were deemed necessary for 3 of 5 patients, and the initial plan was deemed sufficient for 2 of the 5 patients. The reasons for plan adaptation included tumor progression or regression and a change in small bowel anatomy. In a subsequently expanded cohort of 170 fractions (20 patients), 52 fractions (30.6%) were reoptimized online, and 92 fractions (54.1%) were treated with an online-adapted or previously adapted plan. The median time for recontouring, reoptimization, and QA was 26 minutes. Conclusion: Online adaptive MR-IGRT has been successfully implemented with planning and QA workflow suitable for routine clinical application. Clinical trials are in development to formally evaluate adaptive treatments for a variety of disease sites.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

99 GENERAL AND MISCELLANEOUS↗

Space station power system

It is pointed out that space station planning at NASA began when NASA was created in 1958. However, the initiation of the program for a lunar landing delayed the implementation of plans for a space station. The utility of a space station was finally demonstrated with Skylab, which was launched in 1972. In May 1982, the Space Station Task Force was established to provide focus and direction for space station planning activities. The present paper provides a description of the planning activities, giving particular attention to the power system. The initial space station will be required to supply 75 kW of continuous electrical power, 60 kW for the customer and 15 kW for space station needs. Possible alternative energy sources for the space station include solar planar or concentrator arrays of either silicon or gallium arsenide.

Forestieri, A. F.↗

FY16 Strategic Themes.

I am pleased to present this summary of the Division 1000 Science and Technology Strategic Plan. This plan was created with considerable participation from all levels of management in Division 1000, and is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. The plan is characterized by four strategic themes: Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Each theme is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16. I want to be clear that this is not a strategy to be pursued in tension with the Laboratory strategic plan. Rather, it is intended to describe “how” we intend to show up for the “what” described in Sandia’s Strategic Plan. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming year.

99 GENERAL AND MISCELLANEOUS↗

CReST-VCT System Integration Framework

In this paper, we propose a system integration framework for deploying the Coordinated Real-time Sub-Transmission Volt-var Control Tool (CReST VCT) functionality between the transmission system, the distribution system, and DERs. This represents one possible set of design choices to implement the coordinated optimization capabilities in an operating environment. The framework provides the following: An architectural reference model that describes how the CReST VCT solution maps into a broader grid architecture that accommodates and enables higher levels of DER penetration and utilization: A system integration reference model that defines a possible allocation of CReST VCT functionality within a utility’s operational environment. This includes one possible system design approach for allocation of functionality within software and protocol selections across the various interfaces; A list of potential performance and security issues that should be considered during an implementation. This framework does not represent a specific implementation of the CReST VCT algorithm or integration into a specific utility environment. It is intended to serve as a reference for those who plan to implement such a solution into their environment. The general model provided by the framework can be tailored to a specific environment based on its specific constraints and requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cassini Engineering Operations at Saturn

These presentation viewgraphs shows the engineering operations that have contributed to the unprecedented scientific success of the Cassini and Huygens missions, and how engineering operations are planned and implemented in concert with the required sequence of science observations. Frequent Orbit Trim Maneuvers (OTM) keep Cassini on the correct trajectory to complete the planned Saturn Tour. Considerable effort has been invested in detailed planning of the complete set of science observations associated with this Tour, so a robust OTM strategy is necessary to protect this investment by ensuring the spacecraft keeps to the planned trajectory.

systems engineering↗

Pastures to Prairies to Pools: An Update on Natural Resource Damages Settlement Projects at the Fernald Preserve - 13198

The DOE Office of Legacy Management oversees implementation and monitoring of two ecological restoration projects at the Fernald Preserve, Fernald, Ohio, that are funded through a CERCLA natural resource damage settlement. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Field implementation of these projects was completed in May 2012. Herbaceous cover and woody vegetation survival was determined in August and September 2012. Results show successful establishment of native vegetation. Additional monitoring will be needed to determine whether project goals have been met. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)

54 ENVIRONMENTAL SCIENCES↗

A Mars/phobos Transportation System

A transportation system will be necessary to support construction and operation of bases on Phobos and Mars beginning in the year 2020 or later. An approach to defining a network of vehicles and the types of vehicles which may be used in the system are presented. The network will provide a convenient, integrated means for transporting robotically constructed bases to Phobos and Mars. All the technology needed for the current plan is expected to be available for use at the projected date of cargo departure from the Earth system. The modular design of the transportation system provides easily implemented contingency plans, so that difficulties with any one vehicle will have a minimal effect on the progress of the total mission. The transportation network proposed consists of orbital vehicles and atmospheric entry vehicles. Initially, only orbital vehicles will participate in the robotic construction phase of the Phobos base. The Interplanetary Transfer Vehicle (ITV) will carry the base and construction equipment to Phobos where the Orbital Maneuvering Vehicles (OMV's) will participate in the initial construction of the base. When the Mars base is ready to be sent, one or more ITV's will be used to transport the atmospheric entry vehicles from Earth. These atmospheric vehicles are the One Way Landers (OWL's) and the Ascent/Descent Vehicles (ADV's). They will be used to carry the base components and/or construction equipment. The OMV's and the Orbital Transfer Vehicles (OTV's) will assist in carrying the atmospheric entry vehicles to low Martian orbit where the OWL's or ADV's will descent to the planet surface. The ADV's were proposed to accommodate expansion of the system. Additionally, a smaller version of the ADV class is capable of transporting personnel between Mars and Phobos.

Source record↗

CARETS: A prototype regional environmental information system. Volume 7: Land use information and air quality planning

The pilot national land use information system developed by the U.S. Geological Survey in the Central Atlantic Regional Ecological Test Site project has provided an improved technique for estimating emissions, diffusion, and impact patterns of sulfur dioxide (S0 2 ) and particulate matter. Implementation of plans to control air quality requires land use information, which, until this time, has been inadequate. The pilot system, however, provided data for updating information on the sources of point and area emissions of S0 2 and particulate matter affecting the Norfolk--Portsmouth area of Virginia for the 1971-72 winter (Dec.-Jan.-Feb.) and the annual 1972 period, and for a future annual period--1985. This emission information is used as input to the Air Quality Display Model of the Environmental Protection Agency to obtain diffusion and impact patterns for the three periods previously mentioned. The results are: (1) During the 1971-72 winter, estimated SO 2 amounts over an area with a SW-NE-axis in the central section of Norfolk exceeded both primary and secondary levels; (2) future annual levels of SO 2 , estimated by anticipated residential development and point-source changes, are not expected to cause serious deterioration of the region's present air quality; and (3) for the 1971-72 winter and annual 1972 period the diffusion results showed that both primary and secondary standards for particulate matter are regularly exceeded in central Norfolk and Portsmouth. In additions on the bas is of current control programs, the 1985 levels of particulate matter are expected to exceed the presently established secondary air quality standards throughout central Norfolk and Portsmouth and in certain areas of Virginia Beach. The land use information can be used to estimate emissions for inputs to diffusion models and to interpret the implications of diffusion patterns for: (1) Implementing various control strategies (2) selecting sites of air sampling stations, and (3) predicting the effects that proposed changes in land use might have on emission patterns and air quality.

Remote sensing↗

Earth science information: Planning for the integration and use of global change information

Activities and accomplishments of the first six months of the Consortium for International Earth Science Information Network (CIESIN's) 1992 technical program have focused on four main missions: (1) the development and implementation of plans for initiation of the Socioeconomic Data and Applications Center (SEDAC) as part of the EOSDIS Program; (2) the pursuit and development of a broad-based global change information cooperative by providing systems analysis and integration between natural science and social science data bases held by numerous federal agencies and other sources; (3) the fostering of scientific research into the human dimensions of global change and providing integration between natural science and social science data and information; and (4) the serving of CIESIN as a gateway for global change data and information distribution through development of the Global Change Research Information Office and other comprehensive knowledge sharing systems.

Lousma, Jack R.↗