Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Development of a Pioneer Venus expert scheduling system

An Expert System has been developed to perform a substantial part of the science planning for NASA's Pioneer Venus spacecraft. The program performs functions that have been traditionally performed by operations personnel ('orbit builders'), and attempts to directly duplicate their methods and techniques. Output from the program is formatted to correspond to the previously hand-generated worksheets, in order to ease program validation as well as operator acceptance. Pioneer Venus mission operations are described in detail followed by a description of the expert system implementation.

Rosenthal, Donald A.↗

Conceptual design of the MHD Engineering Test Facility

The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.

Bents, D. J.↗

Planning in time - Windows and durations for activities and goals

The present general purpose automated planner/scheduler generates parallel plans aimed at the achievement of goals having imposed time constraints, with both durations and start time windows being specifiable for sets of goal conditions. Deterministic durations of such parallel plan activities as actions, events triggered by circumstances, inferences, and scheduled events entirely outside the actor's control, are explicitly modeled and may be any computable function of the activity variables. The final plan network resembles a PERT chart. Examples are given from the traditional 'blocksworld', and from a realistic 'Spaceworld' in which an autonomous spacecraft photographs objects in deep space and transmits the information to earth.

Vere, S. A.↗

Conflict-free trajectory planning for air traffic control automation

As the traffic demand continues to grow within the National Airspace System (NAS), the need for long-range planning (30 minutes plus) of arrival traffic increases greatly. Research into air traffic control (ATC) automation at ARC has led to the development of the Center-TRACON Automation System (CTAS). CTAS determines optimum landing schedules for arrival traffic and assists controllers in meeting those schedules safely and efficiently. One crucial element in the development of CTAS is the capability to perform long-range (20 minutes) and short-range (5 minutes) conflict prediction and resolution once landing schedules are determined. The determination of conflict-free trajectories within the Center airspace is particularly difficult because of large variations in speed and altitude. The paper describes the current design and implementation of the conflict prediction and resolution tools used to generate CTAS advisories in Center airspace. Conflict criteria (separation requirements) are defined and the process of separation prediction is described. The major portion of the paper will describe the current implementation of CTAS conflict resolution algorithms in terms of the degrees of freedom for resolutions as well as resolution search techniques. The tools described in this paper have been implemented in a research system designed to rapidly develop and evaluate prototype concepts and will form the basis for an operational ATC automation system.

Slattery, Rhonda↗

Toward a Real-Time Measurement-Based System for Estimation of Helicopter Engine Degradation Due to Compressor Erosion

This paper presents a preliminary demonstration of an automated health assessment tool, capable of real-time on-board operation using existing engine control hardware. The tool allows operators to discern how rapidly individual turboshaft engines are degrading. As the compressor erodes, performance is lost, and with it the ability to generate power. Thus, such a tool would provide an instant assessment of the engine s fitness to perform a mission, and would help to pinpoint any abnormal wear or performance anomalies before they became serious, thereby decreasing uncertainty and enabling improved maintenance scheduling. The research described in the paper utilized test stand data from a T700-GE-401 turboshaft engine that underwent sand-ingestion testing to scale a model-based compressor efficiency degradation estimation algorithm. This algorithm was then applied to real-time Health Usage and Monitoring System (HUMS) data from a T700-GE-701C to track compressor efficiency on-line. The approach uses an optimal estimator called a Kalman filter. The filter is designed to estimate the compressor efficiency using only data from the engine s sensors as input.

Litt, Jonathan S.↗

Full-Scaled Advanced Systems Testbed: Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

The National Aeronautics and Space Administration's Dryden Flight Research Center completed flight testing of adaptive controls research on the Full-Scale Advance Systems Testbed (FAST) in January of 2011. The research addressed technical challenges involved with reducing risk in an increasingly complex and dynamic national airspace. Specific challenges lie with the development of validated, multidisciplinary, integrated aircraft control design tools and techniques to enable safe flight in the presence of adverse conditions such as structural damage, control surface failures, or aerodynamic upsets. The testbed is an F-18 aircraft serving as a full-scale vehicle to test and validate adaptive flight control research and lends a significant confidence to the development, maturation, and acceptance process of incorporating adaptive control laws into follow-on research and the operational environment. The experimental systems integrated into FAST were designed to allow for flexible yet safe flight test evaluation and validation of modern adaptive control technologies and revolve around two major hardware upgrades: the modification of Production Support Flight Control Computers (PSFCC) and integration of two, fourth-generation Airborne Research Test Systems (ARTS). Post-hardware integration verification and validation provided the foundation for safe flight test of Nonlinear Dynamic Inversion and Model Reference Aircraft Control adaptive control law experiments. To ensure success of flight in terms of cost, schedule, and test results, emphasis on risk management was incorporated into early stages of design and flight test planning and continued through the execution of each flight test mission. Specific consideration was made to incorporate safety features within the hardware and software to alleviate user demands as well as into test processes and training to reduce human factor impacts to safe and successful flight test. This paper describes the research configuration, experiment functionality, overall risk mitigation, flight test approach and results, and lessons learned of adaptive controls research of the Full-Scale Advanced Systems Testbed.

Pavlock, Kate M.↗

A Novel Application of TMA to Converging Runway Operations in a Simulated NextGen Environment

In 2013, the Airspace Operations Laboratory at NASA Ames Research Center conducted a human-in-the-loop simulation that examined the feasibility of applying a number of Next Generation Air Transportation System (NextGen) solutions to complex arrival operations in and around the New York metroplex. The delivery of arrivals to Newark Liberty International Airport (EWR) was the focus of this simulation, which involved extending the Terminal Sequencing and Spacing (TSS) scheduling capability to precisely schedule arrivals to intersecting runways 22 Left and 11. An important enabler for the concept was the availability of a dependent runway scheduler that was able to coordinate arrival times between aircraft landing on intersecting runways. At the time of the study, there was no functionality within the TSS scheduler to automatically create the dependent runway schedules. Instead, a Traffic Management Coordinator (TMC) manually created a de-conflicted schedule, which allowed for the concept to be tested as well as provided valuable insight into the tool requirements for a dependent runway scheduler. Throughout the course of preparations for the simulation, the individual serving as the TMC developed a number of strategies and procedures for manually adjusting the Scheduled Time of Arrival (STA) of the EWR arrivals in order to ensure that adequate spacing was provided between runway 22L and 11 arrival pairs. This paper describes the strategies and procedures that were developed and details how they were successfully applied during the simulation. Results will also be presented that shed additional light on exactly how the schedules were manipulated and their impact on delivery performance and safety. Ideas for additional TSS enhancements and next steps, based on participant feedback, will also be presented.

Homola, Jeffrey↗

The Psyche Planning Software Subsystem: Creating a Robust Toolset for a Discovery-class Mission

Psyche is a Discovery-class mission to the small metal-rich asteroid (16) Psyche, and is slated to launch in 2022. Psyche, like many missions, requires low-cost activity planning and sequence generation that serves as the backbone to overall uplink design. Such tools must be maintainable over long periods of operations, and powerful enough to solve complex issues that deep-space one-off missions encounter. In this paper we introduce cost-effective solutions that leverage inner- and open-source principles to meet a variety of common and novel use cases.The uplink process that was designed to meet these challenges is presented, as well as the data-flow through the high-level architecture of the planning software subsystem. The user-facing planning tools are described, particularly the Science Opportunity Analyzer, the Plan Editor, Psyche’s planning automation in the Blackbird framework, and Psyche Simulation Reports. All these applications are either new or have been substantially revamped to meet Psyche’s concept of operations. In particular, ensuring the entire toolchain can correctly process epoch-relative activities is discussed. Underlying the main applications are a common set of dependencies developed and maintained by a new cross-mission association of planning developers. In this way, Psyche can inherit well-tested functionality which saves effort and ensures its developers can focus on solving domain challenges. Quality control of the applications and libraries is ensured with a code-review and unit-test based novel ‘CM lite’ process. Collaboration with international industry and academia using the open-source modules is already occurring.The planning and scheduling software is designed to maximize operator awareness of the integrated plan at every step of the process and use common interfaces and file formats to easily transfer information. Design choices plus the team’s test-driven development process enables more expansive capabilities compared to the decentralized planning and sequence generation functions typical of Discovery-class orbiters without significant development cost increases. Benefits and drawbacks of Psyche’s approach are discussed, including comparison to other missions and tools where appropriate.

Ramanathan, Keshav↗

From Paper to Production: An Update on NASA's Upper Stage Engine for Exploration

The NASA/industry team responsible for developing the J-2X Upper Stage Engine for the Constellation Program's Ares I and Ares V launch vehicles has made significant progress toward moving the design from paper to production during the past year. The J-2X exemplifies the Constellation goal of using proven technology and experience from more than 50 years of United States spaceflight experience and seeking where possible to employ common hardware in the Ares I crew launch vehicle and the Ares V cargo launch vehicle. The J-2X will power the Ares I upper stage to place the Orion crew vehicle in orbit. For the Ares V, the J-2X will place the Earth departure stage (EDS) and lunar lander in orbit and later re-start to send the Orion and lander to the Moon. Pratt & Whitney Rocketdyne (PWR) is under contract to develop and produce the engine, leveraging its flight-proven LH2/LOX, gas generator cycle J-2 and RS-68 engine capabilities, recent experience with the X-33 aerospike XRS-2200 engine, and development knowledge of the J-2S tap-off cycle engine. The J-2X employs a gas generator operating cycle designed to produce 294,000 pounds of thrust in primary operating mode for the Ares I and Ares V ascent phases. It also has a secondary mode, during which it operates at 80 percent thrust by altering its mixture ratio to perform the TLI burn for the Ares V lunar sortie and lunar cargo missions. The J-2X development philosophy is based on proven hardware, an aggressive development schedule, and early risk reduction. NASA Marshall Space Flight Center (MSFC) and PWR began development of the J-2X in June 2006. The government/industry team of more than 600 people within NASA and PWR successfully completed the Critical Design Review (CDR) in November 2008, following extensive risk mitigation testing. The team is working toward a first flight of the J-2X on the Orion 1 mission in 2014. This paper will discuss the J-2X development background and provide top-level information on design and testing to date. Details will be provided on overcoming challenges such as gas generator instability, turbine blade life, and nozzle extension selection and materials.

Kynard, Mike↗

Estimating Controller Intervention Probabilities for Optimized Profile Descent Arrivals

Simulations of arrival traffic at Dallas/Fort-Worth and Denver airports were conducted to evaluate incorporating scheduling and separation constraints into advisories that define continuous descent approaches. The goal was to reduce the number of controller interventions required to ensure flights maintain minimum separation distances of 5 nmi horizontally and 1000 ft vertically. It was shown that simply incorporating arrival meter fix crossing-time constraints into the advisory generation could eliminate over half of the all predicted separation violations and more than 80% of the predicted violations between two arrival flights. Predicted separation violations between arrivals and non-arrivals were 32% of all predicted separation violations at Denver and 41% at Dallas/Fort-Worth. A probabilistic analysis of meter fix crossing-time errors is included which shows that some controller interventions will still be required even when the predicted crossing-times of the advisories are set to add a 1 or 2 nmi buffer above the minimum in-trail separation of 5 nmi. The 2 nmi buffer was shown to increase average flight delays by up to 30 sec when compared to the 1 nmi buffer, but it only resulted in a maximum decrease in average arrival throughput of one flight per hour.

continous descent arrivals↗

Space shuttle main engine controller assembly, phase C-D

System design and system analysis and simulation are slightly behind schedule, while design verification testing has improved. Input/output circuit design has improved, but digital computer unit (DCU) and mechanical design continue to lag. Part procurement was impacted by delays in printed circuit board, assembly drawing releases. These are the result of problems in generating suitable printed circuit artwork for the very complex and high density multilayer boards.

Source record↗

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

Extravehicular activity welding experiment

The In-Space Technology Experiments Program (INSTEP) provides an opportunity to explore the many critical questions which can only be answered by experimentation in space. The objective of the Extravehicular Activity Welding Experiment definition project was to define the requirements for a spaceflight experiment to evaluate the feasibility of performing manual welding tasks during EVA. Consideration was given to experiment design, work station design, welding hardware design, payload integration requirements, and human factors (including safety). The results of this effort are presented. Included are the specific objectives of the flight test, details of the tasks which will generate the required data, and a description of the equipment which will be needed to support the tasks. Work station requirements are addressed as are human factors, STS integration procedures and, most importantly, safety considerations. A preliminary estimate of the cost and the schedule for completion of the experiment through flight and postflight analysis are given.

Watson, J. Kevin↗

Piloted simulation of a ground-based time-control concept for air traffic control

A concept for aiding air traffic controllers in efficiently spacing traffic and meeting scheduled arrival times at a metering fix was developed and tested in a real time simulation. The automation aid, referred to as the ground based 4-D descent advisor (DA), is based on accurate models of aircraft performance and weather conditions. The DA generates suggested clearances, including both top-of-descent-point and speed-profile data, for one or more aircraft in order to achieve specific time or distance separation objectives. The DA algorithm is used by the air traffic controller to resolve conflicts and issue advisories to arrival aircraft. A joint simulation was conducted using a piloted simulator and an advanced concept air traffic control simulation to study the acceptability and accuracy of the DA automation aid from both the pilot's and the air traffic controller's perspectives. The results of the piloted simulation are examined. In the piloted simulation, airline crews executed controller issued descent advisories along standard curved path arrival routes, and were able to achieve an arrival time precision of + or - 20 sec at the metering fix. An analysis of errors generated in turns resulted in further enhancements of the algorithm to improve the predictive accuracy. Evaluations by pilots indicate general support for the concept and provide specific recommendations for improvement.

Davis, Thomas J.↗

A Post-Flight Comparison Between GPS Signal Generator and On-Orbit Testing Results from the STS-101 and STS-106 SOAR Shuttle Flight Experiment

The use of a GPS Signal Generator (GPSSG) prior to launch for verification of a GPS subsystem and GN&C system on a spacecraft is becoming a very common practice. The level of confidence in the verification created by running a receiver with a GPSSG can greatly impact both schedule and cost of spacecraft development. This paper addresses the comparison of the Space Shuttle STS-101 and STS-106 Space Integrated GPS/INS (SIGI) Orbital Attitude Readiness (SOAR) flight experiments on-orbit performance with the performance from the same receiver on a Global Simulation Systems (GSS) GPSSG. The SOAR flight experiment was designed to demonstrate on-orbit performance of the International Space Station Force-19 GPS receiver. This paper discusses the process involved in getting the post-flight Best Estimate of Trajectory and Best Estimate of Attitude into the GPSSG such that the Force-19 receiver will experience the same trajectory and environmental conditions as observed during the SOAR flight experiment. Results of the comparison conclude with recommendations of how better to construct and interpret results from receiver tests using a GSS GPSSG.

Simpson, James↗

A Low-Cost Clustered Archive Approach for Storing Remote Sensing Data

As part of NASA's Earth Observing System (EOS) Data and Information System (EOSDIS), the Moderate Resolution Imaging Spectrometer (MODIS) Data Processing System (MODAPS) is now processing data from two instruments on the EOS flag ship spacecraft Terra and Aqua. Between the two, MODAPS is generating over 1 Terrabyte of data per day and has surpassed 3 Petabytes of total data. The bulk of the data is stored near-line in StorageTek Powerhorn tape jukeboxes. Accessing data that has been moved to tape involves submitting an order, scheduling the tape, and waiting for the data to become available. I am developing a low cost clustered archive that could enable storing a very large amount of data such as the MODIS data described above in an organized fashion on a cluster of commodity hardware using low cost SATA hard drives such that the files are directly available online. The system takes full advantage of Open Source software, using the GNULinux operating system, PostgreSQL relational database and the Apache HTTP Server. This poster session will depict my approach, the interface to the archive, a brief discussion of the internals of the system and some performance numbers from my prototyping. I will also describe various costs and benefits of this approach versus the traditional large tape jukebox approach currently in use in the EOSDIS.

Tilmes, Curt↗

MPST Software: MoonKommand

This software automatically processes Sally Ride Science (SRS) delivered MoonKAM camera control files (ccf) into uplink products for the GRAIL-A and GRAIL-B spacecraft as part of an education and public outreach (EPO) extension to the Grail Mission. Once properly validated and deemed safe for execution onboard the spacecraft, MoonKommand generates the command products via the Automated Sequence Processor (ASP) and generates uplink (.scmf) files for radiation to the Grail-A and/or Grail-B spacecraft. Any errors detected along the way are reported back to SRS via email. With Moon Kommand, SRS can control their EPO instrument as part of a fully automated process. Inputs are received from SRS as either image capture files (.ccficd) for new image requests, or downlink/delete files (.ccfdl) for requesting image downlink from the instrument and on-board memory management. The Moon - Kommand outputs are command and file-load (.scmf) files that will be uplinked by the Deep Space Network (DSN). Without MoonKommand software, uplink product generation for the MoonKAM instrument would be a manual process. The software is specific to the Moon - KAM instrument on the GRAIL mission. At the time of this writing, the GRAIL mission was making final preparations to begin the science phase, which was scheduled to continue until June 2012.

Kwok, John H.↗

Swirl Coaxial Injector Testing with LOX/RP-J

Testing was conducted at NASA fs Marshall Space Flight Center (MSFC) in the fall of 2012 to evaluate the operation and performance of liquid oxygen (LOX) and kerosene (RP ]1) in an existing swirl coaxial injector. While selected Russian engines use variations of swirl coaxial injectors, component level performance data has not been readily available, and all previously documented component testing at MSFC with LOX/RP ]1 had been performed using a variety of impinging injector designs. Impinging injectors have been adequate for specific LOX/RP ]1 engine applications, yet swirl coaxial injectors offer easier fabrication efforts, providing cost and schedule savings for hardware development. Swirl coaxial elements also offer more flexibility for design changes. Furthermore, testing with LOX and liquid methane propellants at MSFC showed that a swirl coaxial injector offered improved performance compared to an impinging injector. So, technical interest was generated to see if similar performance gains could be achieved with LOX/RP ]1 using a swirl coaxial injector. Results would allow such injectors to be considered for future engine concepts that require LOX/RP ]1 propellants. Existing injector and chamber hardware was used in the test assemblies. The injector had been tested in previous programs at MSFC using LOX/methane and LOX/hydrogen propellants. Minor modifications were made to the injector to accommodate the required LOX/RP ]1 flows. Mainstage tests were performed over a range of chamber pressures and mixture ratios. Additional testing included detonated gbombs h for stability data. Test results suggested characteristic velocity, C*, efficiencies for the injector were 95 ]97%. The injector also appeared dynamically stable with quick recovery from the pressure perturbations generated in the bomb tests.

Greene, Sandra Elam↗