Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineering Directorate”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

GPIM AF-M315E Propulsion System

The NASA Space Technology mission Directorate's (STMD) Green Propellant Infusion Mission (GPIM) Technology Demonstration Mission (TDM) will demonstrate an operational AF-M315E green propellant propulsion system. Aerojet-Rocketdyne is responsible for the development of the propulsion system payload. This paper statuses the propulsion system module development, including thruster design and system design; Initial test results for the 1N engineering model thruster are presented. The culmination of this program will be high-performance, green AF-M315E propulsion system technology at TRL 7+, with components demonstrated to TRL 9, ready for direct infusion to a wide range of applications for the space user community.

Spores, Ronald A.↗

Fundamental Research to Enable In-Situ Resource Utilization for NASA’s Artemis Program and Beyond Taking Place at The Glenn Research Center

In Situ Resource Utilization (ISRU) is regarded by many to be the key to future sustainability in space. The National Aeronautics & Space Administration’s (NASA) Space Technology Mission Directorate (STMD) recently published a list of ranked technology shortfalls. ISRU specific capabilities of ‘Extraction and separation of water from extraterrestrial surface material’, ‘Extraction and separation of oxygen from extraterrestrial surface material’, and ‘Produce propellants and mission consumables from extracted in-situ resources’ are within the top 80 shortfalls identified. A team of researchers and engineers at NASA’s Glenn Research Center (GRC) in Cleveland, Ohio, are performing fundamental research and technology maturation to ensure concepts and technologies are ready to support when the mission architecture is primed for ISRU to activate. Through analytical modeling and initial lab-scale testing, researchers are establishing concepts that mature to more sophisticated tests in relevant environments. Numerous studies are underway assessing fundamental behaviors of regolith during various steps of a conceptual ISRU production plant. This paper shares some of GRC’s recent advancements in ISRU research and technology development, in the hopes of providing valuable information to the ISRU community at large, spark ideas for future collaborative endeavors, as well as spur interest in utilizing some of the world-class expertise and facilities GRC has to offer.

ISRU↗

TU-AB-BRD-00: Task Group 100

Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.

60 APPLIED LIFE SCIENCES↗

NICS (NASA Instrument Capabilities Study) Instrument Schedule and Cost Study

This paper summarizes work performed on the Flight Projects Directorate Planetary Science Projects Division (PSPD, Code 430) NICS (NASA Instrument Capabilities study) instrument schedule and cost study. Included are a short summary of the original NICS (NASA, 2008), and the design and approach, data collection, analysis, preliminary findings and recommendations from select areas of the current study. The NICS (2008) was chartered by then NASA Chief Engineer Michael Ryschkewitsch and chaired by Goddard Space Flight Center (GSFC) engineer, John Leon. The focus was to identify problem areas in instrument development and, if possible, to offer solutions. In the area of instrument developments, the NICS (2008) identified a lack of resources and authority to successfully manage to instrument cost and schedule requirements; and a lack of critical skills, expertise, and leadership to successfully implement unique (one-of-a-kind) high technology developments (NASA, 2008, pp. 51, 52). Additionally, the NICS (2008) found problems in requirements formulation, reviews and management; unrealistic caps and overly optimistic estimates; and externally directed changes which increased the likelihood of overrunning cost and schedule (NASA, 2008, pp.53, 54). It is noteworthy that NICS findings are consistent with previous studies at the mission level (Robbins, Schmidt & White, 2020). Five years later in 2013, the Instrument Projects Division (IPD) was established to implement and manage instrument projects greater than $20M. The IPD was known as Code 490. Its structure incorporated several of the NICS (2008) recommendations. To see if these incorporated recommendations made a difference, and to identify other potential challenges in instrument developments, two parallel studies were initiated. Originally led by the IPD, now led by the PSPD, and the Instrument and Payload Systems Engineering Branch (IPSE, Code 592), respectively, the instrument schedule and cost study and the instrument technical complexity study began in 2017. Data collection was initiated in 2020 and is on-going. This paper is limited to the IPD/PSPD study. Among other findings, preliminary data indicate IPD/PSPD project management support positively influenced instrument development as related to providing a dedicated level of support staff, including a deputy Instrument Project Manager (dIPM), reducing IPM leadership changes, and providing other project support. Next steps include continued data collection and analysis, and mapping to technical complexity data.

NICS implementation↗

NFPA Distributed Energy Resources Safety Training (DERST) For Emergency Responders

The National Fire Protection Association, with support from the Department of Energy, executed a multi-year initiative to develop, enhance, and disseminate Distributed Energy Resources Safety Training (DERST) tools for U.S. emergency responders. As Distributed Energy Resources (DER)—such as solar photovoltaics, battery energy storage systems (ESS), electric vehicles (EVs), and associated infrastructure—become increasingly prevalent, the NFPA identified a critical need for up-to-date standardized, accessible, and effective safety training tailored for the fire service and related public safety professionals. The project delivered a comprehensive suite of educational resources to improve responders’ abilities to safely manage DER-related incidents. This included: • Revised Modular Training Courses: Updated classroom-based DER safety courses, now modular and accessible nationwide through fire academies and the North American Fire Training Directors (NAFTD) network. • Live Burn Testing & Research: A full-scale controlled burn of a DER-equipped residential structure provided real-world data and insights, forming the basis for updated best practices. • A Gamified Simulation Tool – Firefighters Incident Response Simulation Tool (FIRST): A first-of-its-kind, multiplayer, scenario-based simulation using the Unreal Engine 5.0 to train responders in a realistic virtual, multi-DER incident environment. • Field Familiarization Software Tools & Prop Guide: Digital DER field familiarization evolutions software guide and a prop development manual to support field-based DER training exercises, enhancing responders' hands-on familiarity with DER infrastructure and collaboration on virtual incident responses. • National Dissemination Strategy: Strategic partnerships with NAFTD, Vector Solutions, and others enabled wide-scale distribution, with over 5,000 departments accessing resources and 1,100+ departments adopting the simulator in the first seven months. Also provided a web portal for easy access to all training and simulation programs developed under this grant for the U.S. responder community. Key findings from the project—particularly from the burn test—led to paradigm shifts in fire response tactics. For example, traditional approaches to garage fires may be hazardous if DERs are present, due to explosive off gassing and thermal runaway risks. The new training emphasizes scene assessment, stand-off approaches, thermal imaging verification, and careful post-incident cooling of DER components to prevent reignition. This initiative has had a significant national impact, raising awareness, enhancing preparedness, and supporting safer DER incident response practices. Significant engagement from the media, public safety organizations, and PBS coverage has further amplified the reach and adoption of NFPA’s DER safety training, tools, and simulations.

14 SOLAR ENERGY↗

Space Technology Mission Directorate: Game Changing Development Program: Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) can help enable detailed exploration of the solar system, extensive development and utilization of cis-lunar space, and robust human Mars architectures. To improve affordability and viability, NTP systems that utilize low-enriched uranium (LEU) instead of highly enriched uranium (HEU) are being devised. Advanced fuel manufacturing techniques will help enable the use of LEU in certain fission systems previously thought to require HEU. The current LEU NTP baseline engine relies on a fission reactor containing fuel elements made of uranium nitride and refractory metals.

testing and performance↗

System Engineering & Integration (SE&I) In-Situ Resource Utilization (ISRU) Modeling and Analysis (SIMA) Tool for Subsystem Integration into Full-Scale Architectures

In situ resource utilization (ISRU) is the practice of producing mission consumables from local lunar/planetary resources, thereby minimizing system launch mass requirements, mainly through the production of propellant fuel components and life support resources. Modeling full ISRU technology architectures significantly impacts the design and optimization of individual unit processes and facilitates their introduction into service with the Science Technology Mission Directorate (STMD) logistical planning and operation space. The Mission Analysis and Integration Tool (MAIT) is a modeling framework that connects individual ISRU subsystem models for the purposes of technology down select, scaling & optimization, and end-to-end process planning. The development project team seeks to address specific STMD capability gaps by simulating ISRU systems in MAIT. The goal is to produce system architectures for the Moon and Mars that are linked to Key Performance Parameters (KPP) and environmental requirements. To that end, the framework is adaptive, flexible, and suitable for collaboration among government, private sector, and international entities. Our approach currently provides conventional outputs, such as mass, power, and volume, to analyze whole system trade spaces. However, the framework was designed to validate current breadboard subsystems, simulate future process design capacity, and allow flexibility to any external developer-driven subsystem model that is in a state of evolution.

SE&I↗

TU-AB-BRD-04: Development of Quality Management Program

Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.

60 APPLIED LIFE SCIENCES↗

Enabling a new generation of outer solar system missions: engineering design studies for nuclear electric propulsion

We discuss a nuclear electric propulsion (NEP) capability that would (1) enable a class of outer solar system missions that cannot be done with radioisotope power systems and (2) significantly enhance a range of other deep-space mission concepts. NASA plans to develop Kilopower technology for lunar surface power. Kilopower can also serve as a power source for a 10-kWe NEP system; therefore, we highlight 10-kWe NEP benefits to encourage the NASA Science Mission Directorate (SMD) to advocate (as a potential beneficiary) for NASA’s plan to develop Kilopower and to motivate further 10-kWe NEP–related concept studies.

Sotin, Christophe J.↗

JSC Director's Discretionary Fund Program

The JSC Center Director's Discretionary Fund Program 1991 Annual Report provides a brief status of the projects undertaken during the 1991 fiscal year. For this year, four space exploration initiative related issues were focused on: regenerative life support, human spacecraft design, lunar surface habitat, and in situ resource utilization. In this way, a viable program of life sciences, space sciences, and engineering research has been maintained. For additional information on any single project, the individual investigator should be contacted.

Jenkins, Lyle M.↗

NASA Swamp Works at Kennedy Space Center: Advanced Technology Development

The American Concrete Institution (ACI) Universidad de Cuenca Chapter, from Ecuador, is pleased to inform you that Mr. Rob Mueller, Director of Swamp Works, is invited to our academic event named II International Symposium of Cement and Concrete Technology. The dates of the event are from the 8th to 9th of October 2019 in the Carlos Cueva Tamariz Theater, Cuenca - Ecuador. This event is part of the commencement of the 80 years of institutional life of the Faculty of Engineering and is ideal opportunity to establish connections with the industry and academia.During this experience Senior Technologist Rob Mueller will have the opportunity to speak in two 45 min sessions about The Swamp Works. Topic: The rapid, innovative, and cost-effective exploration mission solutions of NASA.

Mueller, Robert P.↗

TU-AB-BRD-02: Failure Modes and Effects Analysis

Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.

60 APPLIED LIFE SCIENCES↗

Understanding Technical and Psychosocial Barriers to Realizing FAIR Data Process

The present study investigates barriers and facilitators to the implementation of Findable, Accessible, Interoperable, and Reusable (FAIR) data processes within the Physical Sciences Division of the Computational Sciences Directorate (PCSD). Employing a dual-method approach consisting of surveys and focus group discussions, the study aims to illuminate the complex interplay between technical and psychosocial factors that influence FAIR data adoption.

42 ENGINEERING↗

Implementing the President's Vision: JPL and NASA's Exploration Systems Mission Directorate

As part of the NASA team the Jet Propulsion Laboratory is involved in the Exploration Systems Mission Directorate (ESMD) work to implement the President's Vision for Space exploration. In this slide presentation the roles that are assigned to the various NASA centers to implement the vision are reviewed. The plan for JPL is to use the Constellation program to advance the combination of science an Constellation program objectives. JPL's current participation is to contribute systems engineering support, Command, Control, Computing and Information (C3I) architecture, Crew Exploration Vehicle, (CEV) Thermal Protection System (TPS) project support/CEV landing assist support, Ground support systems support at JSC and KSC, Exploration Communication and Navigation System (ECANS), Flight prototypes for cabin atmosphere instruments

Industry Day↗

The Advancing State of AF-M315E Technology

The culmination of twenty years of applied research in hydroxyl ammonium nitrate (HAN)-based monopropellants, the NASA Space Technology mission Directorate's (STMD) Green Propellant Infusion Mission (GPIM) will achieve the first on-orbit demonstration of an operational AF-M315E green propellant propulsion system by the end of 2015. Following an contextual overview of the completed flight design of the GPIM propellant storage and feed system, results of first operation of a flight-representative heavyweight 20-N engineering model thruster (to be conducted in mid-2014) are presented with performance comparisons to prior lab model (heavyweight) test articles.

Masse, Robert↗

Measurement Sets and Sites Commonly Used for High Spatial Resolution Image Product Characterization

Scientists within NASA's Applied Sciences Directorate have developed a well-characterized remote sensing Verification & Validation (V&V) site at the John C. Stennis Space Center (SSC). This site has enabled the in-flight characterization of satellite high spatial resolution remote sensing system products form Space Imaging IKONOS, Digital Globe QuickBird, and ORBIMAGE OrbView, as well as advanced multispectral airborne digital camera products. SSC utilizes engineered geodetic targets, edge targets, radiometric tarps, atmospheric monitoring equipment and their Instrument Validation Laboratory to characterize high spatial resolution remote sensing data products. This presentation describes the SSC characterization capabilities and techniques in the visible through near infrared spectrum and examples of calibration results.

Pagnutti, Mary↗

STS-102 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Pete Nickolenko, NASA Test Director, Glenn Chin, Leonardo Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Nickolenko gives an overview of the countdown and built-in hold times, the launch window, and prelaunch activities (such as activation and checkout of the onboard computer systems, closing the payload bay doors, servicing of the onboard cryogenic cell tanks, main engine tests, and power-up of the ground communications systems). Mr. Chin confirms that the payload is in the final flight configuration and is ready for launch. Mr. Priselac gives the weather forecast for the launch date. The men then answer questions from the press.

Source record↗