Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Data Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Data Compilation for AGR-2 Baseline Coated Particle Batch G73J-14-93072A

Coated particle fuel batch G73J-14-93072A was produced by the Babcock and Wilcox Company (B&W) for possible selection as UCO baseline fuel for the Advanced Gas Reactor Fuel Development and Qualification Program’s AGR-2 irradiation test. Batch G73J-14-93072A is a single batch of TRISO-coated 425 μm nominal diameter 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The TRISO-coatings consist of a ~50% dense carbon buffer layer (100 μm nominal thickness) followed by a dense inner pyrocarbon layer (40 μm nominal thickness) followed by a SiC layer (35 μm nominal thickness) followed by another dense outer pryocarbon layer (40 μm nominal thickness). The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. The bulk of the kernels and coated particle acceptance testing was performed at B&W and is not contained in this report. Sample NP-B7940 was sent to ORNL for supplemental characterization. The procedures for the limited characterization and qualification of the particles performed at ORNL are outlined in ORNL product inspection plan AGR-CHAR-PIP-09. The BAFo equivalent optical anisotropies of the inner and outer pyrocarbon layers are reported on Inspection Report Form IRF-09, with a determination as to whether the particle batch satisfied the specified parameters for this property. The batch was found to satisfy the AGR-2 Fuel Specification SPC-923, Rev. 1 for IPyC and OPyC anisotropy. Also provided in this data package are data on the true BAFo, average particle weight, OPyC open porosity, and SiC soot inclusion defect fraction. True BAFo is calculated as (1+N)/(1-N), where N is the diattenuation. This differs from equivalent BAFo = 1+3N, which is the calculation used by the fuel specification to allow comparison to historical measurements. Average OPyC open porosity was determined using a single sample to be 0.62 ml/m 2 . An unusually high SiC soot defect fraction was observed in this sample, mostly due to bands of porosity apparently resulting from a fabrication anomaly in the coating gas delivery system. This is discussed further in the pages following Data Report Form DRF-32.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 Baseline Coated Particle Batch G73J-14-93071A

Coated particle fuel batch G73J-14-93071A was produced by the Babcock and Wilcox Company (B&W) for possible selection as UCO baseline fuel for the Advanced Gas Reactor Fuel Development and Qualification Program’s AGR-2 irradiation test. Batch G73J-14-93071A is a single batch of TRISO-coated 425 µm nominal diameter 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The TRISO-coatings consist of a ~50% dense carbon buffer layer (100 µm nominal thickness) followed by a dense inner pyrocarbon layer (40 µm nominal thickness) followed by a SiC layer (35 µm nominal thickness) followed by another dense outer pyrocarbon layer (40 µm nominal thickness). The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. The bulk of the kernels and coated particle acceptance testing was performed at B&W and is not contained in this report. Sample NP-B7927 was sent to ORNL for supplemental characterization. The procedures for the limited characterization and qualification of the particles performed at ORNL are outlined in ORNL product inspection plan AGR-CHAR-PIP-09. The BAFo equivalent optical anisotropies of the inner and outer pyrocarbon layers are reported on Inspection Report Form IRF-09, with a determination as to whether the particle batch satisfied the specified parameters for this property. The batch was found to satisfy the AGR-2 Fuel Specification SPC-923, Rev. 1 for IPyC and OPyC anisotropy. Also provided in this data package are data on the true BAFo, average particle weight, OPyC open porosity, and SiC soot inclusion defect fraction. True BAFo is calculated as (1+N)/(1-N), where N is the diattenuation. This differs from equivalent BAFo = 1+3N, which is the calculation used by the fuel specification to allow comparison to historical measurements. Average OPyC open porosity was determined using a single sample to be 0.65 ml/m². An unusually high SiC soot defect fraction was observed in this sample, apparently due to a fabrication anomaly which resulted in one of the hot sampling cups disturbing the bed fluidization during SiC deposition. This is discussed further in the pages following Data Report Form DRF-32.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 Variant Coated Particle Batch G73J-14-93074A

Coated particle fuel batch G73J-14-93074A was produced by the Babcock and Wilcox Company (B&W) for possible selection as UCO variant fuel for the Advanced Gas Reactor Furl Development and Qualification Program's AGR-2 irradiation test. Batch G73J-14-93074A is a single batch of TRISO-coated 425 μm nominal diameter 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The TRISO-coatings consist of a ~50% dense carbon buffer layer (100 μm nominal thickness) followed by a dense inner pyrocarbon layer (40 μm nominal thickness) followed by a SiC layer (35 μm nominal thickness) followed by another dense outer pyrocarbon layer (40 μm nominal thickness). For this variant, argon was added to the hydrogen fluidization gas during SiC deposition. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. The bulk of the kernels and coated particle acceptance testing was performed at B&W and is not contained in this report. Sample NP-B7979 was sent to ORNL for supplemental characterization. The procedures for the limited characterization and qualification of the particles performed at ORNL are outlined in ORNL product inspection plan AGR-CHAR-PIP-09. The BAFo equivalent optical anisotropies of the inner and outer pyrocarbon layers are reported on Inspection Report Form IRF-09, with a determination as to whether the particle batch satisfied the specified parameters for this property. The batch was found to satisfy the AGR-2 Fuel Specification SPC-923, Rev. 1 for IPyC and OPyC anisotropy. Also provided in this data package are data on the true BAFo, average particle weight, OPyC open porosity, and SiC soot inclusion defect fraction. True BAFo is calculated as (1+N)/(1-N), where N is the diattenuation. This differs from equivalent BAFo = 1+3N, which is the calculation used by the fuel specification to allow comparison to historical measurements. Average OPyC open porosity was determined using a single sample to be 0.27 ml/m². One SiC soot inclusion was found in a sample of 4746 particles. This corresponds to <1E-3 defect fraction at 95% confidence.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 Variant Coated Particle Batch G73J-14-93073A

Coated particle fuel batch G73J-14-93073A was produced by the Babcock and Wilcox Company (B&W) for possible selection as UCO variant fuel for the Advanced Gas Reactor Fuel Development and Qualification Program's AGR-2 irradiation test. Batch G73J-14-93073A is a single batch of TRISO-coated 425 μm nominal diameter 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The TRISO-coatings consist of a ~50% dense carbon buffer layer (100 μm nominal thickness) followed by a dense inner pyrocarbon layer (40 μm nominal thickness) followed by a SiC layer (35 μm nominal thickness) followed by another dense outer pyrocarbon layer (40 μm nominal thickness). For this variant, argon was added to the hydrogen fluidization gas during SiC deposition. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. The bulk of the kernels and coated particle acceptance testing was performed at B&W and is not contained in this report. Sample NP-B7958 was sent to ORNL for supplemental characterization. The procedures for the limited characterization and qualification of the particles performed at ORNL are outlined in ORNL product inspection plan AGR-CHAR-PIP-09. The BAFo equivalent optical anisotropies of the inner and outer pyrocarbon layers are reported on Inspection Report Form IRF-09, with a determination as to whether the particle batch satisfied the specified parameters for this property. The batch was found to satisfy the AGR-2 Fuel Specification SPC-923, Rev. 1 for IPyC and OPyC anisotropy. Also provided in this data package are data on the true BAFo, average particle weight, OPyC open porosity, and SiC soot inclusion defect fraction. True BAFo is calculated as (1+N)/(1-N), where N is the diattenuation. This differs from equivalent BAFo = 1+3N, which is the calculation used by fuel specification to allow comparison to historical measurements. Average OPyC open porosity was determined using a single sample to be 0.41 ml/m². One possible SiC soot inclusion was found in a sample of 4729 particles. This corresponds to <1E-3 defect fraction at 95% confidence.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 B&W UO2 Coated Particle Batch G73H-10-93085B

Coated particle fuel batch G73H-10-93085B was produced by the Babcock and Wilcox Company (B&W) for use as UO₂ fuel for the Advanced Gas Reactor Fuel Development and Qualification Program’s AGR-2 irradiation test. Batch G73H-10-93085B is a single batch of TRISO-coated 500 μm nominal diameter 10% low enrichment uranium oxide kernels (LEU). The TRISO-coatings consist of a ~50% dense carbon buffer layer (100 μm nominal thickness) followed by a dense inner pyrocarbon layer (40 μm nominal thickness) followed by a SiC layer (35 μm nominal thickness) followed by another dense outer pyrocarbon layer (40 μm nominal thickness). Argon was added to the hydrogen fluidization gas during SiC deposition. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. The bulk of the kernels and coated particle acceptance testing was performed at B&W and is not contained in this report. B&W samples NP-B8488, NP-B8489, and NP-B8490 (all from batch G73H-10-93085B) were sent to ORNL for characterization and compacting. These samples were composited and renamed LEU10. Samples were then riffled for supplemental characterization. The procedures for the limited characterization and qualification of the particles performed at ORNL are outlined in ORNL product inspection plan AGR-CHAR-PIP-09. The BAFo equivalent optical anisotropies of the inner and outer pyrocarbon layers are reported on Inspection Report Form IRF-09, with a determination as to whether the particle batch satisfied the specified parameters for this property. The batch was found to satisfy the AGR-2 Fuel Specification SPC-923, Rev. 1 for IPyC and OPyC anisotropy. Also provided in this data package are data on the true BAFo, average particle weight, and SiC soot inclusion defect fraction. True BAFo is calculated as (1+N)/(1-N), where N is the diattenuation. This differs from equivalent BAFo = 1+3N, which is the calculation used by the fuel specification to allow comparison to historical measurements. Three SiC inclusions were found in a sample of 3510 particles. This corresponds to a defect fraction of <2.3E-3 at 95% confidence. One of these inclusions was of unusual appearance and was determined to contain molybdenum using energy dispersive x-ray analysis.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Additive Manufacturing of Nickel Superalloys: Opportunities for Innovation and Challenges Related to Qualification

Innovative designs for turbines can be achieved by advances in nickel-based superalloys and manufacturing methods, including the adoption of additive manufacturing. In this regard, selective electron beam melting (SEBM) and selective laser melting (SLM) of nickel-based superalloys do provide distinct advantages. Furthermore, the direct energy deposition (DED) processes can be used for repair and reclamation of nickel alloy components. The current paper explores opportunities for innovation and qualification challenges with respect to deployment of AM as a disruptive manufacturing technology. Here in the first part of the paper, fundamental correlations of processing parameters to defect tendency and microstructure evolution will be explored using DED process. In the second part of the paper, opportunities for innovation in terms of site-specific control of microstructure during processing will be discussed. In the third part of the paper, challenges in qualification of AM parts for service will be discussed and potential methods to alleviate these issues through in situ process monitoring, and big data analytics are proposed.

36 MATERIALS SCIENCE↗

AGR 3/4 Irradiation Test Final As Run Report

Several fuel and material irradiation experiments have been planned for the Idaho National Laboratory Advanced Reactor Technologies Technology Development Office Advanced Gas Reactor Fuel Development and Qualification Program (referred to as the INL ART TDO/AGR fuel program hereafter), which supports the development and qualification of tristructural-isotropic (TRISO) coated particle fuel for use in HTGRs. The goals of these experiments are to provide irradiation performance data to support fuel process development, qualify fuel for normal operating conditions, support development and validation of fuel performance and fission product transport models and codes, and provide irradiated fuel and materials for post irradiation examination and safety testing (INL 05/2015). AGR-3/4 combined the third and fourth in this series of planned experiments to test TRISO coated low enriched uranium (LEU) oxycarbide fuel. This combined experiment was intended to support the refinement of fission product transport models and to assess the effects of sweep gas impurities on fuel performance and fission product transport by irradiating designed-to-fail fuel particles and by measuring subsequent fission metal transport in fuel-compact matrix material and fuel-element graphite. The AGR 3/4 fuel test was successful in irradiating the fuel compacts to the burnup and fast fluence target ranges, considering the experiment was terminated short of its initial 400 EFPD target (Collin 2015). Out of the 48 AGR-3/4 compacts, 42 achieved the specified burnup of at least 6% fissions per initial heavy-metal atom (FIMA). Three capsules had a maximum fuel compact average burnup < 10% FIMA, one more than originally specified, and the maximum fuel compact average burnup was <19% FIMA for the remaining capsules, as specified. Fast neutron fluence fell in the expected range of 1.0 to 5.5×1025 n/m2 (E >0.18 MeV) for all compacts. In addition, the AGR-3/4 experiment was globally successful in keeping the temperature in the twelve capsules relatively flat in a range of temperatures suitable for the measurement of fission product diffusion in compact matrix and structural graphite materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-3/4 Irradiation Test Predictions using PARFUME

PARFUME, a fuel performance modeling code used for high temperature gas reactors, was used to model the AGR-3/4 irradiation test using as-run physics and thermal hydraulics data. The AGR-3/4 test is the combined third and fourth planned irradiations of the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. The AGR-3/4 test train consists of twelve separate and independently controlled and monitored capsules. Each capsule contains four compacts filled with both uranium oxycarbide (UCO) unaltered “driver” fuel particles and UCO designed-to-fail (DTF) fuel particles. The DTF fraction was specified to be 1×10-2. This report documents the calculations performed to predict failure probability of TRISO-coated fuel particles during the AGR-3/4 experiment. In addition, this report documents the calculated source term from both the driver fuel and DTF particles. The calculations include the modeling of the AGR-3/4 irradiation that occurred from December 2011 to April 2014 in the Advanced Test Reactor (ATR) over a total of ten ATR cycles including seven normal cycles, one low power cycle, one unplanned outage cycle, and one Power Axial Locator Mechanism cycle. Results show that failure probabilities are predicted to be low, resulting in zero fuel particle failures per capsule. The primary fuel particle failure mechanism occurred as a result of localized stresses induced by the calculated IPyC cracking. Assuming 1,872 driver fuel particles per compact, failure probability calculated by PARFUME leads to no predicted particle failure in the AGR-3/4 driver fuel. In addition, the release fraction of fission products Ag, Cs, and Sr were calculated to vary depending on capsule location and irradiation temperature. The maximum release fraction of Ag occurs in Capsule 7 reaching up to 56% for the driver fuel and 100% for the DTF fuel. The release fraction of the other two fission products, Cs and Sr, are much smaller and in most cases less than 1% for the driver fuel. The notable exception occurs in Capsule 7 where the release fraction for Cs and Sr reach up to 0.73% and 2.4%, respectively, for the driver fuel. For the DTF fuel in Capsule 7, the release fraction for Cs and Sr are estimated to be 100% and 5%, respectively.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Establish Fuel Qualification Expectations

The objective of this white paper is to provide an overview of the state of knowledge regarding issues associated with fuel qualification for a liquid-fueled molten salt reactor. The overview consists of fuel qualification expectations for heterogeneous reactors—conventional light water reactors, plus advanced reactors such as sodium fast reactors and modular high-temperature gas-cooled reactors—which consider the mechanical behavior of the fuel itself, interaction between fuel and its cladding, behavior of the cladding, and structural behavior of fuel assemblies. Fuel qualification expectations for molten salt reactors are viewed in contrast to the fuel qualification for heterogeneous reactors in that the fuel is liquid (molten) and there is no accumulation of mechanical effects such as stress, creep, or swelling. However, the liquid fuel salts do accumulate fission products, corrosion byproducts, and buildup of actinides which impact the chemistry of the fuel salt and thermal-physical properties that may impact the ability to remove heat from the core and retain radioactive materials in the fuel salt. Finally, the role of the US Department of Energy in research on tri-structural-isotropic and metal fuel for advanced reactors for fuel qualification purposes is briefly discussed as a potential model for the Department’s research to gather quality chemical and thermal-physical property data necessary to qualify MSR fuel performance under normal and accident conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR 3/4 Irradiation Test Final As Run Report, Revision 1

Several fuel and material irradiation experiments have been planned for the Idaho National Laboratory Advanced Reactor Technologies Technology Development Office Advanced Gas Reactor Fuel Development and Qualification Program (referred to as the INL ART TDO/AGR fuel program hereafter), which supports the development and qualification of tristructural-isotropic (TRISO) coated particle fuel for use in HTGRs. The goals of these experiments are to provide irradiation performance data to support fuel process development, qualify fuel for normal operating conditions, support development and validation of fuel performance and fission product transport models and codes, and provide irradiated fuel and materials for post irradiation examination and safety testing (INL 05/2015). AGR-3/4 combined the third and fourth in this series of planned experiments to test TRISO coated low enriched uranium (LEU) oxycarbide fuel. This combined experiment was intended to support the refinement of fission product transport models and to assess the effects of sweep gas impurities on fuel performance and fission product transport by irradiating designed-to-fail fuel particles and by measuring subsequent fission metal transport in fuel-compact matrix material and fuel-element graphite. The AGR 3/4 fuel test was successful in irradiating the fuel compacts to the burnup and fast fluence target ranges, considering the experiment was terminated short of its initial 400 EFPD target (Collin 2015). Out of the 48 AGR-3/4 compacts, 42 achieved the specified burnup of at least 6% fissions per initial heavy-metal atom (FIMA). Three capsules had a maximum fuel compact average burnup < 10% FIMA, one more than originally specified, and the maximum fuel compact average burnup was <19% FIMA for the remaining capsules, as specified. Fast neutron fluence fell in the expected range of 1.0 to 5.5 × 10 25 n/m 2 (E >0.18 MeV) for all compacts. In addition, the AGR-3/4 experiment was globally successful in keeping the temperature in the twelve capsules relatively flat in a range of temperatures suitable for the measurement of fission product diffusion in compact matrix and structural graphite materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Report on FY 2020 creep, fatigue and creep fatigue testing of Alloy 709 base metal at ORNL

The testing activities and research in support of ASME Code qualification of Alloy 709, an advanced austenitic steel, are being carried out at Oak Ridge National Laboratory (ORNL), Argonne National Laboratory, and Idaho National Laboratory. This report summarizes the status and results of FY 2020 planned testing at ORNL. Uniaxial tensile tests on the electroslag remelt (ESR) solution-annealed plate (heat number 58776-3RBC) with additional heat treatment were performed for the baseline mechanical properties evaluation for ASME code qualification of Alloy 709. The tensile properties were found to meet ASME SA-213 specifications and were comparable to the Nippon Steel NF709 data generated for an ASME Section I Code Case for seamless tubing. ORNL was tasked to carry out a subset of the Code Case testing for creep rupture. Creep rupture data from 18 tests were generated on a solution-annealed ESR plate with a solution annealing temperature of 1100°C. There are total of 19 intermediate and long-term creep rupture tests of Alloy 709 ongoing at ORNL. A preliminary fatigue design curve at 760°C was developed for Alloy 709, and the results show that the fatigue design curve of Alloy 709 is comparable to that of Alloy 800H at 760°C.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

In-Situ Measurements of Low Enrichment Uranium Holdup Process Gas Piping at K-25 - Paper for Waste Management Symposia 2010 East Tennessee Technology Park Oak Ridge, Tennessee

This document is the final version of a paper submitted to the Waste Management Symposia, Phoenix, 2010, abstract BJC/OR-3280. The primary document from which this paper was condensed is In-Situ Measurement of Low Enrichment Uranium Holdup in Process Gas Piping at K-25 Using NaI/HMS4 Gamma Detection Systems, BJC/OR-3355. This work explores the sufficiency and limitations of the Holdup Measurement System 4 (HJVIS4) software algorithms applied to measurements of low enriched uranium holdup in gaseous diffusion process gas piping. HMS4 has been used extensively during the decommissioning and demolition project of the K-25 building for U-235 holdup quantification. The HMS4 software is an integral part of one of the primary nondestructive assay (NDA) systems which was successfully tested and qualified for holdup deposit quantification in the process gas piping of the K-25 building. The initial qualification focused on the measurement of highly enriched UO{sub 2}F{sub 2} deposits. The purpose of this work was to determine if that qualification could be extended to include the quantification of holdup in UO{sub 2}F{sub 2} deposits of lower enrichment. Sample field data are presented to provide evidence in support of the theoretical foundation. The HMS4 algorithms were investigated in detail and found to sufficiently compensate for UO{sub 2}F{sub 2} source self-attenuation effects, over the range of expected enrichment (4-40%), in the North and East Wings of the K-25 building. The limitations of the HMS4 algorithms were explored for a described set of conditions with respect to area source measurements of low enriched UO{sub 2}F{sub 2} deposits when used in conjunction with a 1 inch by 1/2 inch sodium iodide (NaI) scintillation detector. The theoretical limitations of HMS4, based on the expected conditions in the process gas system of the K-25 building, are related back to the required data quality objectives (DQO) for the NBA measurement system established for the K-25 demolition project. The combined review of the HMS software algorithms and supporting field measurements lead to the conclusion that the majority of process gas pipe measurements are adequately corrected for source self-attenuation using HMS4. While there will be instances where the UO{sub 2}F{sub 2} holdup mass presents an infinitely thick deposit to the NaI-HMS4 system these situations are expected to be infrequent. This work confirms that the HMS4 system can quantify UO{sub 2}F{sub 2} holdup, in its current configuration (deposition, enrichment, and geometry), below the DQO levels for the K-25 building decommissioning and demolition project. For an area measurement of process gas pipe in the K-25 building, if an infinitely thick UO{sub 2}F{sub 2} deposit is identified in the range of enrichment of {approx}4-40%, the holdup quantity exceeds the corresponding DQO established for the K-25 building demolition project.

54 ENVIRONMENTAL SCIENCES↗

Generic system components of the Thiokol ultrasonic RSRM case-to-insulation bondline inspection system

Qualification testing of the Ultrasonic Redesigned Solid Rocket Motor Bondline Inspection Systems (URBIS) was conducted at the Thiokol Nondestructive Evaluation Test Facility M337A and at the Rotation Process Storage Facility at Kennedy Space Center. The test was performed on portions of the URBIS that are generic to redesigned solid rocket motor case-to-insulation bondline inspections. Testing began on Feb. 13, 1989 and was completed on May 26, 1989. The main purpose of the test was to verify that each URBIS performed to the manufacturer's specifications in the same manner and to make any procedural changes necessary for specific redesigned solid rocket motor inspections. All five URBISs passed every stage of the qualification test. Each URBIS is now qualified for use on redesigned solid rocket motors. Verifying the fact that each URBIS obtains and analyzes data in a similar fashion has eliminated concerns about variations in data between the five systems. The following recommendations were made as a result of this test: (1) each URBIS should be located within a stable environment; (2) an electronic preventative maintenance program should be established for each URBIS; (3) when the URBIS is being utilized to perform transducer analysis, the URBIS equipment setting should match the equipment setting noted on the manufacturer-supplied transducer certification sheet; and (4) optimum scan velocities for each inspection technique (clevis, capture feature, pinhole and membrane) should be determined through further testing.

Cook, M.↗

End-of-fabrication CMOS process monitor

A set of test 'modules' for verifying the quality of a complementary metal oxide semiconductor (CMOS) process at the end of the wafer fabrication is documented. By electrical testing of specific structures, over thirty parameters are collected characterizing interconnects, dielectrics, contacts, transistors, and inverters. Each test module contains a specification of its purpose, the layout of the test structure, the test procedures, the data reduction algorithms, and exemplary results obtained from 3-, 2-, or 1.6-micrometer CMOS/bulk processes. The document is intended to establish standard process qualification procedures for Application Specific Integrated Circuits (ASIC's).

Buehler, M. G.↗

AGR-5/6/7 Irradiation As Run Predictions Using PARFUME

The PARticle FUel ModEl (PARFUME), a fuel performance modeling code used for high-temperature gas-cooled reactors, was used to model the Advanced Gas Reactor (AGR)-5/6/7 irradiation test using as-run physics and thermal data. The AGR-5/6/7 irradiation test consists of the combined fifth, sixth, and seventh planned irradiations of the AGR Fuel Development and Qualification Program. The AGR-5/6/7 test train is a multi-capsule, instrumented experiment that is designed for irradiation in the 133.4-mm diameter northeast flux trap position of the Advanced Test Reactor (ATR) at Idaho National Laboratory. Each capsule contains compacts filled with uranium oxycarbide unaltered fuel particles. This report documents the calculations performed to predict the failure probability of tristructural isotropic (TRISO)-coated fuel particles during the AGR-5/6/7 experiment. In addition, this report documents the calculated fission product release fraction from the fuel. The calculations include modeling of the AGR 5/6/7 irradiation that occurred from February 2018 to July 2020 over nine ATR cycles, including six normal cycles and three power axial locator mechanism cycles, for a total of approximately 376 effective full power days (EFPD). The irradiation conditions and material properties of the AGR-5/6/7 test predicted zero fuel particle failures in Capsules 1, 3, and 4. Fuel particle failures were predicted in two of the compacts in Capsule 2 and one particle failure is predicted in each one of the compacts in Capsule 5. All compacts that exhibited fuel particle failures predicted by PARFUME were caused by localized stress concentrations in the silicon carbide (SiC) layer caused by cracking in the inner pyrolytic (IPyC) layer. In addition, shrinkage of the buffer and IPyC layer during irradiation resulted in formation of a buffer-IPyC gap. Compacts with a lower irradiation temperature and fluence experienced the smallest buffer-IPyC gap formation. Conversely, higher irradiated temperature compacts with a high fluence experienced the largest buffer-IPyC gap formation. Compact 3-6-3 experienced the largest buffer IPyC gap formation of just under 21.7 µm. The release fraction of fission products silver (Ag), cesium (Cs), and strontium (Sr) vary depending on capsule location and irradiation temperature. The maximum release fraction of Ag occurs in Capsule 3, reaching up to 59.5% for the TRISO fuel particles (compact 3-6-3). The release fraction of the other two fission products, Cs and Sr, are much smaller. A maximum Cs release fraction of 1.1% occurred in compact 3-4-3 and 4.4% for Sr in compact 3-6-3.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ECAR-5633 AGR-5/6/7 Daily As-Run Thermal Analyses

The purpose of this engineering and calculations report is to document the results of the thermal analyses performed to calculate the Advanced Gas-Cooled Reactor (AGR)-5/6/7 as-run daily temperatures of the fuel compacts. Temperature data provided by this report will be used to evaluate fuel performance. The AGR-5/6 portion of the experiment was for fuel qualification at prototypic temperatures, while the AGR-7 portion of the experiment was a margin test at very high temperatures.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of Thin Plastic Scintillation Detectors for Beta-Particle Measurements at the Advanced Test Reactor Critical Facility

The Fission Wire Measurement System is a custom measurement system designed in the 1960s to measure the beta-particle activity of irradiated uranium-aluminum fission wires. This measurement is conducted to determine the fission rate profile of the Advanced Reactor Test Critical facility. The Advanced Test Reactor Critical facility is an open-pool, low-power test reactor used to qualify experiment configurations and verify core models prior to full-power experiment irradiations in the Advanced Test Reactor. Power distribution measurements in ATR-C use uranium-aluminum wires that are distributed throughout the core to validate simulation and modeling results. These measurements require from 340 to 1500 wires to be irradiated and measured within a 12-hour window. The system consists of 4 measurement channels and one reference channel, each with a 2-pi proportional gas flow detector and the measurement channels each have an automated sample changer. The gas flow detectors are of a custom design for this detector system that use methane gas with a large anode wire compared to modern proportional counters. These detectors, which are nearly 60 years old are irreplaceable. The measurements from these gas detectors are affected by the gas flow rate, atmospheric and line pressure, and are very sensitive to the applied high voltage. Recent improvements have been made to the control and data acquisition system, but the detectors have remained the same. The nature of the measurement of the fission product decay activity is such that the energy spectrum of the signal is changing with time. Thin, 250-um thick, plastic scintillators were commercially obtained as a potential replacement for the gas flow detectors. The original calibration of the uranium-aluminum fission wires was conducted in 1965 using a series of irradiations of gold foils and the wires in a well-characterized thermal neutron field. These measurements provided a time-dependent fission rate conversion factor from the gold foil data to calibrate the fission wires based on the response from the 2-pi proportional gas detectors. Transitioning to the new detectors requires qualification and testing. The sensitivity of the scintillators to changes in the energy spectrum of the fission wires and translation of the calibration factor have been completed. These measurements indicated that the sensitivity of the scintillators over time changes at a different rate than the sensitivity of the gas flow detectors. However, the inverse activity of measurements of both detector types is linear with time. Initial results indicate that the scintillator detectors will be a sufficient replacement for the gas detectors with minor adjustments to the fission rate conversion factor. Replacement of the detectors will improve the fission wire measurements and provide a more stable and reliable measurement system.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Data Compilation for AGR-2 UCO Baseline Compact Lot LEU07-OP1-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Baseline fuel compact lot LEU07-OPI-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU07. LEU07 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-92072A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93072A can be found in ORNL/TM-2008/133. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGR-CHAR-PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data need for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized. A record of the materials use to make the matrix is also included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗