Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control Centers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

Wide-Area Energy Storage and Management System to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

The project described in the paper addresses the issue of mitigating additional intermittency and fast ramps that will occur at higher penetration levels of intermittent resources, including wind generation resources, in the Bonneville Power Administration (BPA) and the California Independent System Operator (CAISO) areas. The proposed Wide Area Energy Management System (WAEMS) addresses these additional balancing requirements through energy exchange between the participating control areas and through the use of energy stor-age and other generation resources. For the BPA and CAISO control centers, the new regulation service will look no different comparing with the traditional balancing services. The work conducted developed principles, algorithms, mar-ket integration rules, functional de-sign and technical specifica-tions for the WAEMS system. Main results obtained in the project are as follow: •Most suitable energy storage technologies for the pro-posed application include flywheel energy storage devices (ESD), pumped or conventional hydro power plants, and so-dium sulfur or nickel cadmium batteries. •A preferred WAEMS architecture was selected as an ag-gregate of a flywheel ESD and a pumped storage (or a con-ventional hydro plant). The aggregate to be integrated with BPA/CAISO automatic generation control systems. •An optimization control algorithm has been developed. It provides an excellent regulation signal following capability, helps to maintain a desired state of charge on the ESD, pre-vent violations, and keep the hydro (pumped storage) power output close to the most efficient operating point. •It has been shown that the WAEMS service could help to reduce the regulation requirement in BPA and CAISO con-trol areas by about 30% compared to a traditional regulation service with the same total regulation capacity.

Energy Management System↗

Lessons learned from the introduction of autonomous monitoring to the EUVE science operations center

The University of California at Berkeley's (UCB) Center for Extreme Ultraviolet Astrophysics (CEA), in conjunction with NASA's Ames Research Center (ARC), has implemented an autonomous monitoring system in the Extreme Ultraviolet Explorer (EUVE) science operations center (ESOC). The implementation was driven by a need to reduce operations costs and has allowed the ESOC to move from continuous, three-shift, human-tended monitoring of the science payload to a one-shift operation in which the off shifts are monitored by an autonomous anomaly detection system. This system includes Eworks, an artificial intelligence (AI) payload telemetry monitoring package based on RTworks, and Epage, an automatic paging system to notify ESOC personnel of detected anomalies. In this age of shrinking NASA budgets, the lessons learned on the EUVE project are useful to other NASA missions looking for ways to reduce their operations budgets. The process of knowledge capture, from the payload controllers for implementation in an expert system, is directly applicable to any mission considering a transition to autonomous monitoring in their control center. The collaboration with ARC demonstrates how a project with limited programming resources can expand the breadth of its goals without incurring the high cost of hiring additional, dedicated programmers. This dispersal of expertise across NASA centers allows future missions to easily access experts for collaborative efforts of their own. Even the criterion used to choose an expert system has widespread impacts on the implementation, including the completion time and the final cost. In this paper we discuss, from inception to completion, the areas where our experiences in moving from three shifts to one shift may offer insights for other NASA missions.

Lewis, M.↗

Eye Movement Latencies to Direction Change for Different Classes of Motion

In the analysis of visual motion, local features such as orientation are analyzed early in the cortical processing stream (V1), while integration across orientation and space is thought to occur in higher cortical areas such as MT, MST, etc. If all areas provide inputs to eye movement control centers, we would expect that local properties would drive eye movements with relatively short latencies, while global properties would require longer latencies. When such latencies are observed, they can provide information about when (and where?) various stimulus properties are analyzed. To this end, a stimulus was employed in which local and global properties determining perceived direction-of-motion could be manipulated independently: an elliptical Gabor patch with a drifting carrier, with variable orientation of the carrier grating and the contrast window. We have previously demonstrated that the directional percepts evoked by this stimulus vary between the "grating direction" (the normal to the grating's orientation) and the "window direction" (ARVO 91, 94), and that similar effects can be observed in reflexive eye movements (ARVO 95). Subjects viewed such a stimulus while attempting to maintain steady fixation on the center of the pattern, and the small reflexive eye movements ("stare OKN") were recorded. In the middle of the trial, the orientation of either the grating or the window was rotated smoothly by 30 degrees. Responses to the shift of both grating orientation and window orientation are seen in the average OKN slow phase velocity. Grating rotations produce a rapid OKN rotation to the grating direction (100 ms latency, 300 ms time constant), followed by a slower rebound to the steady state perceived direction midway between the grating and window directions. Window rotations, on the other hand, evoke a slower response (200 ms latency, 500 ms time constant). The results demonstrate multiple cortical inputs to eye movement control: a taste early input driven by orientation, and a slower input from higher areas sensitive to global stimulus properties.

Mulligan, Jeffrey B.↗

Eye Movements Reveal Hierarchical Motion Processing

Purpose: In the analysis of visual motion, local features such as orientation are analyzed early in the cortical processing stream (V1), while integration across orientation and space is thought to occur in higher cortical areas such as MT, MST, etc. If all areas provide inputs to eye movement control centers, we would expect that local properties would drive eye movements with relatively short latencies, while global properties would require longer latencies. When such latencies are observed, they can provide information about when (and where?) various stimulus properties are analyzed. Methods: The stimulus employed was an elliptical Gabor patch with a drifting carrier, in which the orientations of the carrier grating and the contrast window were varied independently. We have previously demonstrated that the directional percepts evoked by this stimulus vary between the "grating direction" (the normal to the grating's orientation) and the "window direction", and that similar effects can be observed in reflexive eye movements. Subjects viewed such a stimulus while attempting to maintain steady fixation on the center of the pattern, and the small reflexive eye movements ("stare OKN") were recorded. In the middle of the trial, the orientation of either the grating or the window was rotated smoothly by 30 degrees. Results: Responses to the shift of both grating orientation and window orientation are seen in the average OKN slow phase velocity. Grating rotations produce a rapid OKN rotation to the grating direction (100 ms latency, 300 ms time constant), followed by a slower rebound to the steady state perceived direction midway between the grating and window directions. Window rotations, on the other hand, evoke a slower response (200 ms latency, 500 ms time constant). Conclusions: The results demonstrate multiple cortical inputs to eye movement control: a fast, early input driven by orientation, and a slower input from higher areas sensitive to global stimulus properties.

Mulligan, Jeffrey B.↗

STS-111/Endeavour/ISS UF2 Pre-Launch Activities: Launch with Playbacks

This video of the preflight preparations for and launch of Space Shuttle Endeavour on STS-111 begins with a view of Endeavour on the launch pad. Additional launch pad views leading up to liftoff are interspersed with footage from the Firing Room at Kennedy Space Center, the crew's prelaunch activities, and inspection of the crew members in the White Room before boarding Endeavour. The crew is introduced by a narrator during the preflight banquet and suiting up, and a later clip shows them departing to the launch site. The crew consists of Commander Kenneth Cockrell, Pilot Paul Lockhart, Mission Specialists Philippe Perrin and Franklin Chang-Diaz, and the Expedition 5 crew of the International Space Station (ISS) (Commander Valery Korzun and Flight Engineers Peggy Whitsun and Sergei Treschev). The nozzles on Endeavour's Space Shuttle Main Engine (SSME) are swiveled before liftoff, and the launch is shown past the separation of the solid rocket boosters. After a brief clip from the Mission Control Center at Johnson Space Center, the following launch replays are shown: Beach Tracker, VAB, Pad A, Tower 1, UCS-15, Grandstand, Cocoa Beach DOAMS, Playalinda DOAMS, UCS-23, and OTV-070.

Source record↗

Writing a New Automated Testing Method for Custom Display Components

During the launch process of the Space Launch System (SLS), engineers in the Firing Room of the Launch Control Center (LCC) will be analyzing displays that show data and statistics about the vehicle and launch. These displays are subject to a battery of tests, but the custom components they use are not currently supported by any testing framework. My project is to modify a testing framework so that the custom components on these displays can be tested similarly to how a user would interact with them.

Automated Testing↗

Crew Field Notes: A New Tool for Planetary Surface Exploration

The Desert Research and Technology Studies (DRATS) field tests of 2010 focused on the simultaneous operation of two rovers, a historical first. The complexity and data volume of two rovers operating simultaneously presented significant operational challenges for the on-site Mission Control Center, including the real time science support function. The latter was split into two "tactical" back rooms, one for each rover, that supported the real time traverse activities; in addition, a "strategic" science team convened overnight to synthesize the day's findings, and to conduct the strategic forward planning of the next day or days as detailed in [1, 2]. Current DRATS simulations and operations differ dramatically from those of Apollo, including the most evolved Apollo 15-17 missions, due to the advent of digital technologies. Modern digital still and video cameras, combined with the capability for real time transmission of large volumes of data, including multiple video streams, offer the prospect for the ground based science support room(s) in Mission Control to witness all crew activities in unprecedented detail and in real time. It was not uncommon during DRATS 2010 that each tactical science back room simultaneously received some 4-6 video streams from cameras mounted on the rover or the crews' backpacks. Some of the rover cameras are controllable PZT (pan, zoom, tilt) devices that can be operated by the crews (during extensive drives) or remotely by the back room (during EVAs). Typically, a dedicated "expert" and professional geologist in the tactical back room(s) controls, monitors and analyses a single video stream and provides the findings to the team, commonly supported by screen-saved images. It seems obvious, that the real time comprehension and synthesis of the verbal descriptions, extensive imagery, and other information (e.g. navigation data; time lines etc) flowing into the science support room(s) constitute a fundamental challenge to future mission operations: how can one analyze, comprehend and synthesize -in real time- the enormous data volume coming to the ground? Real time understanding of all data is needed for constructive interaction with the surface crews, and it becomes critical for the strategic forward planning process.

Horz, Friedrich↗

Results from the centers for disease control and prevention’s predict the 2013–2014 Influenza Season Challenge

Background: Early insights into the timing of the start, peak, and intensity of the influenza season could be useful in planning influenza prevention and control activities. To encourage development and innovation in influenza forecasting, the Centers for Disease Control and Prevention (CDC) organized a challenge to predict the 2013–14 Unites States influenza season. Methods: Challenge contestants were asked to forecast the start, peak, and intensity of the 2013–2014 influenza season at the national level and at any or all Health and Human Services (HHS) region level(s). The challenge ran from December 1, 2013–March 27, 2014; contestants were required to submit 9 biweekly forecasts at the national level to be eligible. The selection of the winner was based on expert evaluation of the methodology used to make the prediction and the accuracy of the prediction as judged against the U.S. Outpatient Influenza-like Illness Surveillance Network (ILINet). Results: Nine teams submitted 13 forecasts for all required milestones. The first forecast was due on December 2, 2013; 3/13 forecasts received correctly predicted the start of the influenza season within one week, 1/13 predicted the peak within 1 week, 3/13 predicted the peak ILINet percentage within 1 %, and 4/13 predicted the season duration within 1 week. For the prediction due on December 19, 2013, the number of forecasts that correctly forecasted the peak week increased to 2/13, the peak percentage to 6/13, and the duration of the season to 6/13. As the season progressed, the forecasts became more stable and were closer to the season milestones. Conclusion: Forecasting has become technically feasible, but further efforts are needed to improve forecast accuracy so that policy makers can reliably use these predictions. CDC and challenge contestants plan to build upon the methods developed during this contest to improve the accuracy of influenza forecasts.

Infectious Diseases↗

Real-time Simulation of Coordinated Sub-Transmission Volt-Var Control Tool under High Distributed PV Penetration

With the rapid penetration of intermittent solar photovoltaic (PV) and other distributed energy resources (DER) into the grid, and subsequent changes in power flow patterns in both distribution and sub-transmission, voltage regulation is becoming a major challenge. It is prudent to leverage PV and DER to provide ancillary services to the grid, such as voltage regulation. Recently, a quasi-static, coordinated real-time sub transmission volt-var control algorithm (CReST-VCT) was developed for voltage regulation under high PV penetration by dispatching the reactive power settings of the shunt devices and PV inverters. The algorithm was validated offline, on a quasistatic study. Such quasi-static dispatching algorithms cannot guarantee its performance for highly nonlinear dynamical power systems. In this paper the performance of the algorithm is validated with a real time nonlinear dynamic simulation of a modified IEEE 118 bus system in Opal-RT. The real time simulation is used to emulate the actual system operation, providing a more realistic testing environment for CReST-VCT. The dispatch and control signals are communicated between the power system (Opal solver) and the control center (GAMS solver) in real-time with a MODBUS bridge. The results demonstrate i) system is stable with the new dispatch points ii) significant improvement in system-wide voltage profiles compared to an uncontrolled scenario. Another significant contribution of the work is developing a framework for dispatchable, long duration dynamic simulations that can be leveraged for market/dispatch studies.

CReST-VCT, Opal-RT, Volt/Var Control, renewable in↗

Wallops Ship Surveillance System

Approved as a Wallops control center backup system, the Wallops Ship Surveillance Software is a day-of-launch risk analysis tool for spaceport activities. The system calculates impact probabilities and displays ship locations relative to boundary lines. It enables rapid analysis of possible flight paths to preclude the need to cancel launches and allow execution of launches in a timely manner. Its design is based on low-cost, large-customer- base elements including personal computers, the Windows operating system, C/C++ object-oriented software, and network interfaces. In conformance with the NASA software safety standard, the system is designed to ensure that it does not falsely report a safe-for-launch condition. To improve the current ship surveillance method, the system is designed to prevent delay of launch under a safe-for-launch condition. A single workstation is designated the controller of the official ship information and the official risk analysis. Copies of this information are shared with other networked workstations. The program design is divided into five subsystems areas: 1. Communication Link -- threads that control the networking of workstations; 2. Contact List -- a thread that controls a list of protected item (ocean vessel) information; 3. Hazard List -- threads that control a list of hazardous item (debris) information and associated risk calculation information; 4. Display -- threads that control operator inputs and screen display outputs; and 5. Archive -- a thread that controls archive file read and write access. Currently, most of the hazard list thread and parts of other threads are being reused as part of a new ship surveillance system, under the SureTrak project.

Smith, Donna C.↗

Nasa's Launch Communications Ground Segment for the 21st Century Florida Spaceport

The National Aeronautics and Space Administration (NASA) Near Earth Network (NEN) Project is implementing a new launch communications ground segment to provide services for the next generation of human and robotic space exploration systems. It will deliver unique and advanced capabilities to accelerate the transformation of Kennedy Space Center into a multi-user spaceport in cooperation with the United States Air Force (USAF). The project has leveraged commercial technologies and remote operations concepts matured in NASAs orbiting satellite ground systems to achieve dramatic lifecycle cost efficiencies as compared to the space shuttle-era ground segment. The purpose of this paper is to discuss the development history, capabilities and anticipated use cases of the NEN Launch Communications Segment (NEN LCS).The NASA Kennedy Space Center is co-located with the USAF Eastern Launch Range at Cape Canaveral, Florida. The USAF operates two launch communications ground stations, but they are not designed to transmit voice, commands or other data to the launch vehicle or astronauts. The bi-directional uplink-downlink communications responsibility for human missions has historically resided with the Goddard Space Flight Center in Greenbelt, Maryland. Several market analyses and feasibility studies investigating concepts to provide NASAs next generation launch communications services were performed during the Constellation Program prior to its cancellation in 2009, and as part of the Kennedy Space Centers follow-on efforts to transform itself into a 21st century multi-user spaceport. In 2012, the Kennedy Space Center and the USAF 45th Space Wing jointly led a study to analyze the market needs of current and future launch systems and assess the operational deficiencies of the Eastern Range infrastructure. The study team issued several recommendations, two of which ultimately became driving operational capability requirements for the NEN LCS: increased telemetry data rates of at least 20 Mbps, and S-band uplink capability. Additional capabilities identified in the requirements development process include spread spectrum modulation support, LDPC 12 and 78 error correction codes, support for IRIG-106 and CCSDS data formats, automated best source selection, and Space Link Extension (SLE) services for data distribution. The NEN LCS is comprised of two permanent ground stations, the new Kennedy Uplink Station (KUS) and refurbished Ponce de Leon (PDL) station. Both stations are remotely operated from the Global Monitor and Control Center at Wallops Flight Facility. This core architecture is extensible through host-tenant arrangements with the U.S. Air Force and deployable assets, enabling agile, tailored and robust solutions to meet the needs of civil, commercial or military customers. The NEN LCS has three use cases:1.To provide agile, tailored and robust launch communications solutions to Florida spaceport customers2.To provide orbital communications services to near-earth customers 3.To provide an experimental proving ground for Space Mobile Network concepts and technologies The NEN LCS driving mission is to support the bi-directional link with the Orion crew capsule and two 20 Mbps telemetry links from the Space Launch System core stage on Exploration Mission-1, the first integrated flight of NASAs flagship human exploration systems.

Roberts, Christopher J.↗

Ammonia Vent of the External Active Thermal Control System (EATCS) Radiator #3 Flow Path #2 on the International Space Station (ISS)

The External Active Thermal Control System (EATCS) provides cooling for all pressurized modules and the main Power Distribution Electronics (PDE) on the International Space Station (ISS). There are 2 EATCS loops (Loop A and Loop B) which includes 3 deployable radiators. Each deployable radiator contains 2 flow paths to provide heat rejection.Telemetry monitoring identified a coolant (liquid ammonia) leak in EATCS Loop B. Robotic External Leak Locator (RELL) scans found higher concentrations of vaporous ammonia near the EATCS Loop B Radiator #3 Flow Path #2. On May 3, 2017, the EATCS Loop B Radiator #3 Flow Path #2 was isolated and vented. As of the data to date, the ammonia leak has ceased. The purpose of this presentation is to discuss the analysis for venting the EATCS Loop B Radiator #3 Flow Path #2. Venting analysis is performed to determine the worst case time to empty the flow path and maximum thrusts imposed on the ISS. Flight controllers and engineers in the Mission Control Center (MCC) uses this data to develop operational procedures and perform the vent safely. It was predicted that the worst case time to empty the EATCS Loop B Radiator #3 Flow Path #2 was ~ 60 minutes. The predicted maximum thrusts were ~ 11 lbf (49 N) at the start of the vent and ~10 lbf (45 N) after the system reaches saturation.The vent was successfully performed and took ~ 20 minutes to empty the EATCS Loop B Radiator #3 Flow Path #2. Using telemetry from the day of the vent, analysis determined the time to empty the EATCS Loop B Radiator #3 Flow Path #2 would be ~13 minutes. The predictive analysis used worst case inputs and assumptions which bounded the actual results. Telemetry is not available to correlate actual thrust with the predicted maximum thrusts. However, by using Russian Thrusters for ISS attitude control, attitude control telemetry indicated the flight attitude was maintained.

Cowan, Darnell T.↗

Transitioning to Intel-based Linux Servers in the Payload Operations Integration Center

The MSFC Payload Operations Integration Center (POIC) is the focal point for International Space Station (ISS) payload operations. The POIC contains the facilities, hardware, software and communication interface necessary to support payload operations. ISS ground system support for processing and display of real-time spacecraft and telemetry and command data has been operational for several years. The hardware components were reaching end of life and vendor costs were increasing while ISS budgets were becoming severely constrained. Therefore it has been necessary to migrate the Unix portions of our ground systems to commodity priced Intel-based Linux servers. hardware architecture including networks, data storage, and highly available resources. This paper will concentrate on the Linux migration implementation for the software portion of our ground system. The migration began with 3.5 million lines of code running on Unix platforms with separate servers for telemetry, command, Payload information management systems, web, system control, remote server interface and databases. The Intel-based system is scheduled to be available for initial operational use by August 2004 The overall migration to Intel-based Linux servers in the control center involves changes to the This paper will address the Linux migration study approach including the proof of concept, criticality of customer buy-in and importance of beginning with POSlX compliant code. It will focus on the development approach explaining the software lifecycle. Other aspects of development will be covered including phased implementation, interim milestones and metrics measurements and reporting mechanisms. This paper will also address the testing approach covering all levels of testing including development, development integration, IV&V, user beta testing and acceptance testing. Test results including performance numbers compared with Unix servers will be included. need for a smooth transition while maintaining real-time support. An important aspect of the paper will involve challenges and lessons learned. product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support. This paper will also address the deployment approach including user involvement in testing and the , This includes COTS product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support.

Guillebeau, P. L.↗

Addressing embedded digital devices in safety-related systems of nuclear power plants - 307

The purpose of this paper is to provide an overview of the development of the approach to addressing embedded digital devices (EDD) in safety-related systems of nuclear power plants in the U.S. and around the world. In April, 2016, the U.S. Nuclear Regulatory Commission (US NRC) issued RIS 2016-05 to heighten awareness that EDDs might exist in procured equipment used in safety-related systems without the devices having been explicitly identified in procurement documentation. Inadequate consideration of these devices in digital technology system upgrades, component replacements, and new equipment applications could lead to an adverse safety consequence. The US NRC request was for addressees to implement early efforts to identify these devices. An area where this is being addressed is in regard to the performance of Diversity and Defense-In-Depth (D3) analyses, as addressed in US NRC Branch Technical Position 7-19. Nuclear facilities have increased their use and reliance on digital technology in systems and equipment (e.g., I and C, electrical systems, and fluid systems). In addition to digital instrumentation and control (I and C) systems, examples of safety-related equipment that may use digital technology include emergency diesel generators, pumps, valve actuators, motor control centers, breakers, priority logic modules, time-delay relays, and uninterruptible power sources. In the U.S. and around the world, engineering and licensing activities in standards and guidance have been, and are being developed to address this important consideration in protecting safety-related systems. This paper addresses development of an extended approach to evaluating common-cause failure vulnerability and mitigation in regard to equipment with an EDD. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modeling and Evaluation of Miles-in-Trail Restrictions in the National Air Space

Miles-in-trail restrictions impact flights in the national air space on a daily basis and these restrictions routinely propagate between adjacent Air Route Traffic Control Centers. Since overly restrictive or ineffective miles-in-trail restrictions can reduce the overall efficiency of the national air space, decision support capabilities that model miles-in-trail restrictions should prove to be very beneficial. This paper presents both an analytical formulation and a linear programming approach for modeling the effects of miles-in-trail restrictions. A methodology for monitoring the conformance of an existing miles-in-trail restriction is also presented. These capabilities have been implemented in the Future ATM Concepts Evaluation Tool for testing purposes. To allow alternative restrictions to be evaluated in post-operations, a new mode of operation, which is referred to as the hybrid-playback mode, has been implemented in the simulation environment. To demonstrate the capabilities of these new algorithms, the miles-in-trail restrictions, which were in effect on June 27, 2002 in the New York Terminal Radar Approach Control, are examined. Results from the miles-in-trail conformance monitoring functionality are presented for the ELIOT, PARKE and WHITE departure fixes. In addition, the miles-in-trail algorithms are used to assess the impact of alternative restrictions at the PARKE departure fix.

Grabbe, Shon↗

Internet Data Delivery for Future Space Missions

This paper presents work being done at NASA/GSFC (Goddard Space Flight Center) on applying standard Internet applications and protocols to meet the technology challenge of future satellite missions. Internet protocols (IP) can provide seamless dynamic communication among heterogeneous instruments, spacecraft, ground stations, and constellations of spacecraft. A primary component of this work is to design and demonstrate automated end-to-end transport of files in a dynamic space environment using off-the-shelf, low-cost, commodity-level standard applications and protocols. These functions and capabilities will become increasingly significant in the years to come as both Earth and space science missions fly more sensors and the present labor-intensive, mission-specific techniques for processing and routing data become prohibitively expensive. This paper describes how an IP-based communication architecture can support existing operations concepts and how it will enable some new and complex communication and science concepts. The authors identify specific end-to-end file transfers all the way from instruments to control centers and scientists, and then describe how each data flow can be supported using standard Internet protocols and applications. The scenarios include normal data downlink and command uplink as well as recovery scenarios for both onboard and ground failures. The scenarios are based on an Earth orbiting spacecraft with data rates and downlink capabilities from 300 Kbps to 4 Mbps. Many examples are based on designs currently being investigated for the Global Precipitation Measurement (GPM) mission.

Rash, James↗

Proven and Robust Ground Support Systems - GSFC Success and Lessons Learned

Over the past fifteen years, Goddard Space Flight Center has developed several successful science missions in-house: the Wilkinson Microwave Anisotropy Probe (WMAP), the Imager for Magnetopause-to-Aurora Global Exploration (IMAGE), the Earth Observing 1 (EO-1) [1], and the Space Technology 5 (ST-5)[2] missions, several Small Explorers, and several balloon missions. Currently in development are the Solar Dynamics Observatory (SDO) [3] and the Lunar Reconnaissance Orbiter (LRO)[4]. What is not well known is that these missions have been supported during spacecraft and/or instrument integration and test, flight software development, and mission operations by two in house satellite Telemetry and Command (T & C) Systems, the Integrated Test and Operations System (ITOS) and the Advanced Spacecraft Integration and System Test (ASIST). The advantages of an in-house satellite Telemetry and Command system are primarily in the flexibility of management and maintenance - the developers are considered a part of the mission team, get involved early in the development process of the spacecraft and mission operations-control center, and provide on-site, on-call support that goes beyond Help Desk and simple software fixes. On the other hand, care must be taken to ensure that the system remains generic enough for cost effective re-use from one mission to the next. The software is designed such that many features are user-configurable. Where user-configurable options were impractical, features were designed so as to be easy for the development team to modify. Adding support for a new ground message header, for example, is a one-day effort because of the software framework on which that code rests. This paper will discuss the many features of the Goddard satellite Telemetry and Command systems that have contributed to the success of the missions listed above. These features include flexible user interfaces, distributed parallel commanding and telemetry decommutation, a procedure language, the interfaces and tools needed for a high degree of automation, and instantly accessible archives of spacecraft telemetry. It will discuss some of the problems overcome during development, including secure commanding over networks or the Internet, constellation support for the three satellites that comprise the ST-5 mission, and geographically distributed telemetry end users.

Pfarr, Barbara↗

Blockchain for Fault-Tolerant Grid Operations Version 2.0

This report explores the potential of distributed ledger technology (DLT) as a transformative tool to enhance fault-tolerant operations in electrical distribution systems. Leveraging DLT's core attributes, including an immutable decentralized ledger, distributed consensus mechanisms, and state replication capabilities, this study focuses on three critical use cases. A central aspect of this research centers on the utilization of a consensus-driven ledger, providing actors within the system, such as distributed resources, with access to a reliable data repository. This empowers these actors to collaborate effectively and make informed decisions, all securely recorded on the blockchain. The first use case concentrates on data configuration, utilizing mathematical criteria---particularly, the chi-squared test for gross error detection---to identify trustworthy sensors for advanced decision-making. Building upon this foundation of trust, the second use case, topology identification, accurately determines circuit breaker states, unveiling the distribution network's topology. Ultimately, the third use case leverages this trust to execute switching actions, reconfiguring feeders and restoring power to disconnected customers after fault events. The concept of trust serves as a cornerstone in this approach, marking a departure from traditional fault location, isolation, and service restoration (FLISR) methods. Additionally, the blockchain-based architecture introduces decentralization, empowering disconnected areas to make autonomous decisions, even when communication with a central control center is disrupted. The primary contributions of this report are twofold: (1) a novel approach for evaluating distribution system voltage areas while preserving data ownership and (2) the implementation of interactions between distribution network areas using the actor model. Unlike the previous sequential approach for evaluating the area connection voltages, which required a radial network topology, this study's area model reduction enables a more versatile approach. The area model reduction addresses issues of prolonged data waiting times and multiple points of failure within the previous approach. Notably, the presented evaluation for the reduced network model area connection reveals a significant increase in the differences in voltage magnitudes. Simulation and evaluation of area agents across four distinct cases elucidate the area-level interaction behavior during a fault event. Simulations demonstrate that the proposed distributed FLISR (DFLISR) approach can successfully restore service to an affected area. Varying message delays and message loss probabilities in each simulation case underscore their impacts on restoration times, ranging from 3 min and 32 s to 6 min and 19 s. In contrast, power is not restored in an area in one of our simulation cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗