Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Asset Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 613 records · Page 34

A Cybersecurity Threat Profile for a Connected Lighting System

In anticipation of improved energy performance and cost savings, cities and building owners are increasingly considering “smart lighting initiatives” that aim to convert their collection of simple luminaires (i.e., lighting fixtures) into an intelligent connected lighting system (CLS) capable of remotely monitoring energy consumption and fault conditions, and possibly implementing adaptive lighting schemes. The U.S. Department of Energy (DOE) has set an national goal of tripling the energy efficiency and demand flexibility of the buildings sector by 2030, relative to 2020 levels 1. It is forecast that connected lighting systems can contribute to that goal by delivering 125 TWh of annual energy savings by 2035 2, equivalent to the annual output of 50 typical (500 MW) power plants. However, these energy savings and the DOE goal are put at significant risk if connected technologies are not adopted due to real or perceived cybersecurity concerns. Connected IoT devices such as these have historically been rife with vulnerabilities which sometimes put security considerations secondary to functionality and operability. What are the cybersecurity threats that will impact these systems, as formerly banal luminaires transition into intelligent connected devices that collect information about themselves, their surrounding environment, and possibly us? In this paper we analyze a threat profile performed on a fault-detection use case for streetlights. A threat profile establishes security requirements, justifies security measures, yields actionable controls, and effectively communicates risk to stakeholders. This effort provides critical information for making threat-based decisions to increase security at a reasonable cost, and can effectively be used by development teams, software architects, and managers to make cybersecurity a part of their ongoing culture of awareness, training, and prevention. This leads to more secure systems and better-understood security. On-premise, cloud, and hybrid architectures with different authentication mechanisms were modeled and later categorized using the Microsoft STRIDE framework. An analysis of the recommended controls for each threat was performed to determine which controls could and should be put in place by manufacturers or third-party suppliers, and which controls need to be left up the end-user to implement. Fifty-seven threats were identified. Among our key findings: (1) 65% (37/57) of the threats did not involve the luminaires, but rather the other components needed to communicate with and manage them; (2) 63% (36/57) of the threats could have been mitigated through manufacturer-implemented defensive techniques or “controls”; and (3) 23% (13/57) of the threats were dependent on the network configuration. Recommendations based on the results of this work are made to key stakeholder groups. Notably, lighting technology developers are advised to address all threats that can be reasonably controlled with baked-in technology solutions (e.g., encryption or authentication controls), and employ some form of secure supply chain management and tracking where other parts (e.g., sensors, microprocessors) of a luminaire must also be built and manufactured with the proper security controls in place. Developers should also review threats involving assets not developed in-house to understand how connectivity with other devices will affect their product during system operation and determine if a compensating control for a defense-in-depth strategy will be needed. Finally, those interested in deploying CLS should compare the differences between cloud and on-premise models to determine which is more suitable for their needs and the abilities of their security team.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2009 Space Shuttle Probabilistic Risk Assessment Overview

Loss of a Space Shuttle during flight has severe consequences, including loss of a significant national asset; loss of national confidence and pride; and, most importantly, loss of human life. The Shuttle Probabilistic Risk Assessment (SPRA) is used to identify risk contributors and their significance; thus, assisting management in determining how to reduce risk. In 2006, an overview of the SPRA Iteration 2.1 was presented at PSAM 8 [1]. Like all successful PRAs, the SPRA is a living PRA and has undergone revisions since PSAM 8. The latest revision to the SPRA is Iteration 3. 1, and it will not be the last as the Shuttle program progresses and more is learned. This paper discusses the SPRA scope, overall methodology, and results, as well as provides risk insights. The scope, assumptions, uncertainties, and limitations of this assessment provide risk-informed perspective to aid management s decision-making process. In addition, this paper compares the Iteration 3.1 analysis and results to the Iteration 2.1 analysis and results presented at PSAM 8.

Hamlin, Teri L.↗

Operational Aspects of Space Radiation Analysis

Minimizing astronaut's short and long-term medical risks arising from exposure to ionizing radiation during space missions is a major concern for NASA's manned spaceflight program, particularly exploration missions. For ethical and legal reasons, NASA follows the "as low as reasonably achievable" (ALARA) principal in managing astronaut's radiation exposures. One implementation of ALARA is the response to space weather events. Of particular concern are energetic solar particle events, and in low Earth orbit (LEO), electron belt enhancements. To properly respond to these events, NASA's Space Radiation Analysis Group (SRAG), in partnership with the NOAA Space Environment Center (SEC), provides continuous flight support during U.S. manned missions. In this partnership, SEC compiles space weather data from numerous ground and space based assets and makes it available in near real-time to SRAG (along with alerts and forecasts), who in turn uses these data as input to models to calculate estimates of the resulting exposure to astronauts. These calculations and vehicle instrument data form the basis for real-time recommendations to flight management. It is also important to implement ALARA during the design phase. In order to appropriately weigh the risks associated with various shielding and vehicle configuration concepts, the expected environment must be adequately characterized for nominal and worst case scenarios for that portion of the solar cycle and point in space. Even with the best shielding concepts and materials in place (unlikely), there will be numerous occasions where the crew is at greater risk due to being in a lower shielded environment (short term transit or lower shielded vehicles, EVAs), so that accurate space weather forecasts and nowcasts, of particles at the relevant energies, will be crucial to protecting crew health and safety.

Weyland, M. D.↗

Biocuration: Distilling data into knowledge

Data, including information generated from them by processing and analysis, are an asset with measurable value. The assets that biological research funding produces are the data generated, the information derived from these data, and, ultimately, the discoveries and knowledge these lead to. From the time when Henry Oldenburg published the first scientific journal in 1665 (Proceedings of the Royal Society) to the founding of the United States National Library of Medicine in 1879 to the present, there has been a sustained drive to improve how researchers can record and discover what is known. Researchers' experimental work builds upon years and (collectively) billions of dollars' worth of earlier work. Today, researchers are generating data at ever-faster rates because of advances in instrumentation and technology, coupled with decreases in production costs. Unfortunately, the ability of researchers to manage and disseminate their results has not kept pace, so their work cannot achieve its maximal impact. Strides have recently been made, but more awareness is needed of the essential role that biological data resources, including biocuration, play in maintaining and linking this ever-growing flood of data and information. The aim of this paper is to describe the nature of data as an asset, the role biocurators play in increasing its value, and consistent, practical means to measure effectiveness that can guide planning and justify costs in biological research information resources' development and management.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Spacecraft Data and Relay Management using Delay Tolerant Networking

NASA's demonstration of the successful transmission of relay data through the orbiting Mars Odyssey, Mars Global Surveyor, and Mars Express by the Mars Exploration Rovers has shown not only the benefit of using a relay satellite for multiple landed assets in a deep space environment but also the benefit of international standards for such architecture. As NASA begins the quest defined in the Vision for Exploration with robotic and manned missions to the Moon, continues its study of Mars, and is joined in these endeavors by countries world-wide, landed assets transmitting data through relay satellites will be crucial for completing mission objectives. However, this method of delivery of data will result in increased complexity in routing and prioritization of data transmission as the number of missions increases. Also, there is currently no standard method among organizations conducting such missions to return these data sets to Earth given a complex environment. One possibility for establishing such a standard is for mission designers to deploy protocols which fall under the umbrella of Delay Tolerant Networking (DTN). These developing standards include the Bundle Protocol (BP) which provides a standard, secure, store and forward mechanism designed for high latency and asymmetric communication links and the Licklider Transmission Protocol (LTP) which is used to provide a reliable deep space link transmission service.

network congestion control algorithm↗

Spacecraft data and relay management using delay tolerant networking

NASA’s demonstration of the successful transmission of relay data through the orbiting Mars Odyssey, Mars Global Surveyor, and Mars Express by the Mars Exploration Rovers has shown not only the benefit of using a relay satellite for multiple landed assets in a deep space environment but also the benefit of international standards for such an architecture. As NASA begins the quest defined in the Vision for Exploration with robotic and manned missions to the Moon, continues its study of Mars, and is joined in these endeavors by countries world-wide, landed assets transmitting data through relay satellites will be crucial for completing mission objectives. However, this method of data delivery will result in increased complexity in routing and prioritization of data transmission as the number of missions increases. Also, there is currently no standard method among organizations conducting such missions to return these data sets to Earth given a complex environment. One possibility for establishing such a standard is for mission designers to deploy protocols which fall under the umbrella of Delay Tolerant Networking (DTN). These developing standards include the Bundle Protocol (BP) which provides a standard, secure, store and forward mechanism designed for high latency and asymmetric communication links and the Licklider Transmission Protocol (LTP) which is used to provide a reliable deep space link transmission service.

Torgerson, J. Leigh↗

AMS History from 1950 to 2020

Presentation illustrates over 60 years of aerial measurements and establishment of Aerial Measuring System asset by the DOE. The presentation will be used as part of the training new AMS personnel. Presentation illustrates over 60 years of aerial measurements and establishment of Aerial Measuring System asset by the DOE. The presentation will be used as part of the training new AMS personnel.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Remote-Handled Low-Level Waste Disposal Facility (RDF) Constructability Report

This report has been prepared to document the Constructability Review (CR) process that was implemented to insure that an effective CR was performed and all requirements of DOE Order 413.3 9, “U.S. Department of Energy Project Review Guide for Capital Asset Projects,” in regards to this process have been addressed for the Remote Handled Low Level Waste Disposal Facility (RDF). Independent Constructability Reviews were performed by Battelle Energy Alliance, LLC, (BEA) Construction Management (CM) and Areva Federal Services (AFS) personnel. In addition, BEA CM was also requested to provide an assessment of the adequacy of AFS Constructability Review.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Ushering in the New Age of Laboratories: Smart Labs in Practice; Preprint

Ventilation is the first line of defense against airborne hazards produced during research activities in laboratories. A vital component to maintaining healthy, safe, indoor air quality, laboratory ventilation systems are often victim to ineffective operation, posing a risk to an organization's most important asset - the researchers. Furthermore, system inefficiencies can lead to up to 50% wasted energy. By providing a framework to improve the safety and energy efficiency through optimized ventilation and operations, the Smart Labs Toolkit guides laboratory stakeholders through a straight-forward, holistic approach to achieving a dynamic Smart Labs program. A Smart Labs program employs a combination of physical, administrative, and management techniques to plan, assess, optimize, and manage high-performance laboratories. Grounded in the Smart Labs methodology, the National Renewable Energy Laboratory (NREL) implemented a successful Smart Labs program to oversee the design, construction, maintenance, and operations of its laboratories. To accomplish this effort, NREL's key stakeholders created an internal partnership to align NREL's existing laboratories with Smart Labs principles and solidify organizational roles for the safe and efficient operation of laboratory assets. The program provides the groundwork for decarbonization strategies centered around building operation. This paper outlines best practices employed by NREL to develop a cross-cutting Smart Labs team, garner managerial support, and effectively communicate of goals around safety and energy. Strategies include specific Smart Labs best practices, such as implementing a Laboratory Ventilation Risk Assessment - a systematic process for identifying risk due to airborne hazards and informing dynamic, demand-based ventilation to optimize safety and efficiency.

decarbonization↗

Applying the FAIR Principles to computational workflows

Recent trends within computational and data sciences show an increasing recognition and adoption of computational workflows as tools for productivity and reproducibility that also democratize access to platforms and processing know-how. As digital objects to be shared, discovered, and reused, computational workflows benefit from the FAIR principles, which stand for Findable, Accessible, Interoperable, and Reusable. The Workflows Community Initiative’s FAIR Workflows Working Group (WCI-FW), a global and open community of researchers and developers working with computational workflows across disciplines and domains, has systematically addressed the application of both FAIR data and software principles to computational workflows. We present recommendations with commentary that reflects our discussions and justifies our choices and adaptations. These are offered to workflow users and authors, workflow management system developers, and providers of workflow services as guidelines for adoption and fodder for discussion. The FAIR recommendations for workflows that we propose in this paper will maximize their value as research assets and facilitate their adoption by the wider community.

97 MATHEMATICS AND COMPUTING↗

SMARTER Rules-Based Distributed Deconfliction of ADMS Applications

A conceptual numerical methodology derived from Grid Architecture principles is introduced for deconflicting setpoints issued by multiple advanced distribution management system applications. The methodology applies technical, economic, environmental, and social rules to eliminate non-viable combinations. The concept of temporal equipment controls budgets is introduced to preserve the health of physical assets and avoid equipment damage through repeated controls cycling. The rules are combined with a multi-criteria decision-making framework to select a near-optimal set of deconflicted setpoints using a set of qualitative and quantitative decision criteria selected by the distribution system operator. Numerical results are demonstrated on the IEEE 123-bus test feeder for three competing applications. Three alternative distributed schemes are used to decompose the problem: by topological area, by phase, and fully decentralized. The fully decentralized implementation is shown to yield near-optimal deconfliction results with significantly reduced computational time.

Anderson, Alexander A.↗

TA55-PMDS Programmatic Maintenance [Slides]

DOE Order 433.1B states: “The contractor must maintain real property assets in a manner that promotes operational safety, worker health, environmental compliance, property preservation and cost-effectiveness while meeting the program mission”. P950 Conduct of Maintenance serves as LANL’s Nuclear Maintenance Management Program specific to M/L 1 and M/L 2 SSC. PA-AP-01108 Maintenance Requirements for Programmatic Equipment defines the process for determining maintenance requirements, as defined in a maintenance plan, for all programmatic equipment owned by the Associate Directorate for Plutonium Science and Manufacturing (ADPSM) utilizing a formal, graded approach to maximize the reliability of permanently-installed programmatic equipment that does not perform a safety function. It bridges the gap between P950 and program equipment.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Transforming Our SMEX Organization by Way of Innovation, Standardization, and Automation

NASA's Small Explorer (SMEX) Flight Operations Team (FOT) is currently tackling the challenge of supporting ground operations for several satellites that have surpassed their designed lifetime and have a dwindling budget. At Goddard Space Flight Center (GSFC), these missions are presently being reengineered into a fleet-oriented ground system. When complete, this ground system will provide command and control of four SMEX missions, and will demonstrate fleet automation and control concepts as a pathfinder for additional mission integrations. A goal of this reengineering effort is to demonstrate new ground-system technologies that show promise of supporting longer mission lifecycles and simplifying component integration. In pursuit of this goal, the SMEX organization has had to examine standardization, innovation, and automation. A core technology being demonstrated in this effort is the GSFC Mission Services Evolution Center (GMSEC) architecture. The GMSEC architecture focuses on providing standard interfaces for ground system applications to promote application interoperability. Building around commercial Message Oriented Middleware and providing a common messaging standard allows GMSEC to provide the capabilities necessary to support integration of new software components into existing missions and increase the level of interaction within the system. For SMS, GMSEC has become the technology platform to transform flight operations with the innovation and automation necessary to reduce operational costs. The automation technologies supported in SMEX are built upon capabilities provided by the GMSEC architecture that allows the FOT to further reduce the involvement of the console, operator. Initially, SMEX is automating only routine operations, such as safety and health monitoring, basic commanding, and system recovery. The operational concepts being developed here will reduce the need for staffed passes and are a necessity for future fleet management. As this project continues to evolve, additional innovations beyond GMSEC and automation have, and will continue to be developed. The team developed techniques for migrating ground systems of existing on-orbit assets. The tools necessary to monitor and control software failures were integrated and tailored for operational environments. All this was done with a focus of extending fleet operations to mission beyond SMU. The result of this work is the foundation for a broader fleet-capable ground system that will include several missions supported by the Space Science Mission Operations Project.

Madden, Maureen↗

Operations Concept for a Solar System Internetwork

Space communications to date has been largely managed at the link layer, with simple point-to-point links between a spacecraft at Earth. However, future space exploration scenarios involve much richer communications scenarios, with complex network scenarios involving space assets communicating back to Earth via multiple intermediate relay service providers. To support these more complex network scenarios, the Space Internetworking Strategy Group has developed an operations concept for a Solar System Internetwork (SSI). The operations concept draws on the successes of the terrestrial Internet while addressing unique aspects of space communications. Key elements of the operations concept include a standardized network layer across the end-to-end SSI and the underlying processes for development of a contact plan that captures the link layer connectivity among SSI network nodes.

Edwards, Charles D., Jr.↗

Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming – 16614

By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM’s primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE “full administrative jurisdiction” and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites’ radiological safety and long-term public and environmental protection. This “shared-jurisdiction approach” will meet LM’s strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to “manage and conserve the lands under the mandate of multiple-use and sustained yield.” In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets.

54 ENVIRONMENTAL SCIENCES↗