Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “validation method”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Consensus-Based Approach for Active Power Control and Reserve Estimation in Distributed PV Systems

With the increased adoption of distributed energy resources (DER), they are expected to contribute to power system reliability services and enhance power system stability. This paper presents a distributed consensus control approach for the real-time active power reserve estimation and power management in distributed PV (photovoltaic) systems. The proposed method estimates the cumulative active power reserve from numerous PV generators using only the sparse communication network for a DER aggregator to provide active power regulation services. The real-time active power reserve estimation using the proposed approach can be used by DER aggregators to manage curtailment in distributed PV systems to maintain stipulated reserves and further to provide power system frequency regulation. Using the proposed approach, the DER aggregator only requires measurements at the feeder substation and it does not require information from individual DER units, thereby improving system resiliency. The proposed distributed consensus control method is validated on IEEE 123 testbed using PSCAD simulations.

active power reserve↗

Probing-Based Inertia Estimation Method Using Hybrid Power Plants

With the displacement of synchronous generation by inverter-based resources (IBRs), power systems could face the challenge of reduced inertia since IBRs do not inherently contribute to system inertia. Therefore, there is rising interest in monitoring system inertia in real-time applications for situational awareness. In addition, there is a growing number of IBRs that provide fast frequency responses (FFR) in the form of synthetic inertia and P-f droop. It is desirable to quantify the contribution of these FFR controls as equivalent inertia. This paper proposes a probing-based inertia estimation method using a PV-battery hybrid power plant in the Kauai island power system. The method is validated under different operating conditions.

hybrid power plant↗

A Detailed Model of Rear-Side Irradiance for Bifacial PV Modules

We describe and validate a method for modeling irradiance on the back surface of bifacial PV modules at the scale of individual cells using view factors. We compare model results with irradiance measurements on the back of PV modules in various configurations. Our analysis illustrates the relative accuracy of the model as well as the potential variation in back surface irradiance among the cells.

14 SOLAR ENERGY↗

A Game-Theoretic Quantum Algorithm for Solving Magic Squares

Variational quantum algorithms (VQAs) offer a promising near-term approach to finding optimal quantum strategies for playing non-local games. These games test quantum correlations beyond classical limits and enable entanglement verification. In this work, we present a variational framework for the Magic Square Game (MSG), a two-player non-local game with perfect quantum advantage. We construct a value Hamiltonian that encodes the game’s parity and consistency constraints, then optimize parameterize quantum circuits to minimize this cost. Our approach build on the stabilizer formalism, leverages commutation structure for circuit design, and is hardware-efficient. Compared to existing work, our contribution emphasizes algebraic structure an interpretability. We validate our method through numerical experiments and outline generalizations to larger games.

Chehade, Sarah [ORNL]↗

Representative Period Selection for Robust Capacity Expansion Planning in Low-carbon Grids

With the increasing urgency to decarbonize power systems, while mitigating extreme events, capacity expansion models can play a vital role in reliably planning the expansion of power systems and facilitating the integration of renewable energy sources. Optimizing capacity expansion generally involves selecting surrogate representative days from forecasts of load and the generation profiles of variable renewable energy resources. To properly select those representative days, we propose a novel input-based approach in combination with the k-means clustering algorithm that utilize three unique operational inputs: load shedding, renewable curtailment, and transmission congestion. The proposed method allows for more robust and cost-effective capacity planning. The method is validated using a capacity expansion model and a production cost model based on California Independent System Operator (CAISO)'s decarbonization goals, and results in reduced costs and drastically lower load shedding.

Anderson, Osten P.↗

Finite-Difference Simulation of Eddy Currents in Nonmagnetic Sheets via Electric Vector Potential

The magnetic excitation of eddy currents in thin metal sheets is a mathematically challenging problem with many practical applications. Since the eddy current density is a solenoidal field on a 2-D plane, we may express it as the curl of a separate vector field with only one scalar component. This new field is governed by a unique form of the vector-Poisson equation that is readily solved numerically through standard finite-difference techniques. For the special case of a weakly induced eddy current, the self-inductance terms can be neglected to produce a sparse system matrix that is easily inverted. For a strongly induced eddy current, self-inductance must be included at the cost of a more complex and dense system matrix. The method is validated against the CST EM Studio software suite by producing nearly identical results in only a tiny fraction of the computational time.

42 ENGINEERING↗

Timestamp Shift Detection for Synchrophasor Data Based on Similarity Analysis between Relative Phase Angle and Frequency

Timestamp Shift (TS) in synchrophasor data can lead to false operation of synchrophasor-based wide-area monitoring, protection and control applications. The letter presents a method to detect TS of synchrophasor data based on similarity analysis between its own relative phase angle and frequency. Here, a linear correlation component, caused by TS, between relative phase angle and measured frequency is discovered via theoretical derivation. Then a detection method is developed utilizing this linear component for TS diagnosis. Firstly, system phase angle is leveraged as angle reference and then relative phase angle is calculated. Secondly, the correlation coefficient between relative phase angle and frequency is calculated for similarity analysis. Thirdly, the TS is detected via threshold criterion and corresponding time error is estimated. The effectiveness of this method is validated via experiments with actual synchrophasor data in FNET/Grideye.

97 MATHEMATICS AND COMPUTING↗

Wideband Impedance Passivation of MMCs for Suppressing Harmonic Oscillations

Harmonic instability and associated oscillation events have become one of the main concerns in MMC-based HVdc systems. These oscillations can appear in the range from a few hundred hertz to several kilohertz, and the root cause is identified as delay-induced negative damping of MMC impedance appearing at the system resonance frequency. Here, this paper introduces a wideband impedance reshaping method through MMC control to eliminate such negative damping for both grid-following (GFL) and grid-forming (GFM) MMCs, which makes the MMC impedance completely passive from the second harmonic frequency upward, thus preventing all harmonic oscillations. First, simplified impedance models of MMCs are derived for the harmonic stability analysis and the impedance reshaping control design. Next, a passivity-based impedance reshaping method is presented, as well as practical considerations for its implementation. In addition, to maintain the MMC's disturbance ride-through capability, an adaptive activation scheme is developed, which enables the wideband impedance reshaping control only in the presence of harmonic oscillation events. The effectiveness of the proposed method is validated by frequency domain analysis and by electromagnetic transient (EMT) simulations of two typical MMC-based power systems.

17 WIND ENERGY↗

Simultaneous Estimation of Electromechanical Modes and Forced Oscillations

Over the past several years, great strides have been made in the effort to monitor the small-signal stability of power systems. These efforts focus on estimating electromechanical modes, which are a property of the system that dictate how generators in different parts of the system exchange energy. Though the algorithms designed for this task are powerful and important for reliable operation of the power system, they are susceptible to severe bias when forced oscillations are present in the system. Forced oscillations are fundamentally different from electromechanical oscillations in that they are the result of a rogue input to the system, rather than a property of the system itself. To address the presence of forced oscillations, the frequently used AutoRegressive Moving Average (ARMA) model is adapted to include sinusoidal inputs, resulting in the AutoRegressive Moving Average plus Sinusoid (ARMA+S) model. From this model, a new Two-Stage Least Squares algorithm is derived to incorporate the forced oscillations, thereby enabling the simultaneous estimation of the electromechanical modes and the amplitude and phase of the forced oscillations. The method is validated using simulated power system data as well as data obtained from the western North American power system (wNAPS) and Eastern Interconnection (EI).

Electromechanical modes↗

Optimizing Service Restoration in Distribution Systems With Uncertain Repair Time and Demand

This paper proposes a novel method to co-optimize the distribution system operation and repair crew routing for outage restoration after extreme weather events. A two-stage stochastic mixed integer linear program is developed. The first stage is to dispatch the repair crews to the damaged components. The second stage is distribution system restoration using distributed generators, and reconfiguration. We consider demand uncertainty in terms of a truncated normal forecast error distribution, and model the uncertainty of the repair time using a lognormal distribution. A new decomposition approach, combined with the progressive hedging algorithm, is developed for solving large-scale outage management problems in an effective and timely manner. Furthermore, the proposed method is validated on modified IEEE 34- and 8500-bus distribution test systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fast and Accurate Frequency Response Estimation for Large Power System Disturbances Using Second Derivative of Frequency Data

Accurate Frequency Response Estimation (FRE) is critical to reliability risk management of large power system disturbances. This letter proposes a measurement-driven approach for FRE by calculating the second derivative of frequency from synchrophasor data. Compared with conventional methods, the proposed method has major advantages of low computational burden and high accuracy, which makes it appropriate for real-time FRE in bulk power systems. The effectiveness of this method is validated with actual synchrophasor data on 96 confirmed historical power system disturbances in the U.S. eastern interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Approximating Trajectory Constraints With Machine Learning – Microgrid Islanding With Frequency Constraints

Here, we introduce deep earning aided constraint encoding to tackle the frequency-constraint microgrid scheduling problem. The nonlinear function between system operating condition and frequency nadir is approximated by using a neural network, which admits an exact mixed-integer formulation (MIP). This formulation is then integrated with the scheduling problem to encode the frequency constraint. With the stronger representation power of the neural network, the resulting commands can ensure adequate frequency response in a realistic setting in addition to islanding success. The proposed method is validated on a modified 33-node system. Successful islanding with a secure response is simulated under the scheduled commands using a detailed three-phase model in Simulink. The advantages of our model are particularly remarkable when the inertia emulation functions from wind turbine generators are considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Switching Device-Cognizant Sequential Distribution System Restoration

This paper presents an optimization framework for sequential reconfiguration using an assortment of switching devices and repair process in distribution system restoration. Compared to existing studies, this paper considers types, capabilities and operational limits of different switching devices, making it applicable in practice. We develop a novel multi-phase method to find the optimal sequential operation of various switching devices and repair faulted areas. We consider circuit breakers, reclosers, sectionalizers, load breaker switches, and fuses. The switching operation problem is decomposed into two mixed-integer linear programming (MILP) subproblems. The first subproblem determines the optimal network topology and estimates the number of steps to reach that topology, while the second subproblem generates a sequence of switching operations to coordinate the switches. For repairing the faults, we design an MILP model that dispatches repair crews to clear faults and replace melted fuses. After clearing a fault, we update the topology of the network by generating a new sequence of switching operations, and the process continues until all faults are cleared. To improve the computational efficiency, a network reduction algorithm is developed to group line sections, such that only switchable sections are present in the reduced network. The proposed method is validated on the IEEE 123-bus and 8500-bus systems.

distribution system↗

Multi-Time Step Service Restoration for Advanced Distribution Systems and Microgrids

Modern power systems are facing increased risk of disasters that can cause extended outages. The presence of remote control switches (RCSs), distributed generators (DGs), and energy storage systems (ESS) provides both challenges and opportunities for developing post-fault service restoration methodologies. Inter-temporal constraints of DGs, ESS, and loads under cold load pickup (CLPU) conditions impose extra complexity on problem formulation and solution. In this paper, a multi-time step service restoration methodology is proposed to optimally generate a sequence of control actions for controllable switches, ESSs, and dispatchable DGs to assist the system operator with decision making. The restoration sequence is determined to minimize the unserved customers by energizing the system step by step without violating operational constraints at each time step. The proposed methodology is formulated as a mixed-integer linear programming (MILP) model and can adapt to various operation conditions. Furthermore, the proposed method is validated through several case studies that are performed on modified IEEE 13-node and IEEE 123-node test feeders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Repair and Resource Scheduling in Unbalanced Distribution Systems Using Neighborhood Search

—This paper proposes an optimization strategy to assist utility operators to recover power distribution systems after large outages. Specifically, a mixed-integer linear programming (MILP) model is developed for co-optimizing crews, resources, and network operations. The MILP model coordinates damage isolation, network reconfiguration, distributed generator re-dispatch, and crew/resource logistics. In addition, a framework for integrating different types of photovoltaic (PV) systems in the restoration process is developed. We consider two different types of crews, namely, line crews for damage repair and tree crews for obstacle removal. We also model the repair resource logistic constraints. Furthermore, a new algorithm is developed for solving the distribution system repair and restoration problem (DSRRP). The algorithm starts by solving DSRRP using an assignmentbased method, then a neighborhood search method is designed to iteratively improve the solution. The proposed method is validated on modified IEEE 123- and 8500-bus distribution test systems.

Outage management↗

Diesel Generator Model Parameterization for Microgrid Simulation Using Hybrid Box-Constrained Levenberg-Marquardt Algorithm

Existing generator parameterization methods, typically developed for large turbine generator units, are difficult to apply to small kW-level diesel generators in microgrid applications. Here, this article presents a model parameterization method that estimates a complete set of kW-level diesel generator parameters simultaneously using only load-step-change tests with limited measurement points. This method provides a more cost-efficient and robust approach to achieve high-fidelity modeling of diesel generators for microgrid dynamic simulation. A two-stage hybrid box-constrained Levenberg-Marquardt (H-BCLM) algorithm is developed to search the optimal parameter set given the parameter bounds. A heuristic algorithm, namely Generalized Opposition-based Learning Genetic Algorithm (GOL-GA), is applied to identify proper initial estimates at the first stage, followed by a modified Levenberg-Marquardt algorithm designed to fine tune the solution based on the first-stage result. The proposed method is validated against dynamic simulation of a diesel generator model and field measurements from a 16kW diesel generator unit.

42 ENGINEERING↗

Practical Challenges in Real-Time Demand Response

We report on a real-time demand response experiment with 100 controllable devices. The experiment reveals several key challenges in the deployment of a real-time demand response program, including time delays, uncertainties, characterization errors, multiple timescales, and nonlinearity, which have been largely ignored in previous studies. To resolve these practical issues, we develop and implement a two-level multi-loop control structure integrating feed-forward proportional-integral controllers and optimization solvers in closed loops, which eliminates steady-state errors and improves the dynamical performance of the overall building response. Furthermore, the proposed methods are validated by Hardware-in-the-Loop (HiL) tests.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilience-Motivated Distribution System Restoration Considering Electricity-Water-Gas Interdependency

A major outage in the electricity distribution system may affect the operation of water and natural gas supply systems, leading to an interruption of multiple services to critical customers. Therefore, enhancing resilience of critical infrastructures requires joint efforts of multiple sectors. In this paper, a distribution system service restoration method considering the electricity-water-gas interdependency is proposed. The objective is maximizing the supply of electricity, water, and gas to critical customers after an extreme event. The operational constraints of electricity, water, and natural gas networks are considered. Additionally, the characteristics of electricity-driven coupling components, including water pumps and gas compressors, are also modeled. Relaxation techniques are applied to non convex constraints posed by physical laws of those networks. Consequently, the restoration problem is formulated as a mixed-integer second-order cone program, which can readily be solved by the off-the-shelf solvers. The proposed method is validated by numerical simulations on an electricity-water-gas integrated system, developed based on benchmark models of the subsystems. The results indicate that considering the interdependency refines the allocation of limited generation resources and demonstrate the exactness of the proposed convex relaxation

24 POWER TRANSMISSION AND DISTRIBUTION↗